Règlement ministériel du 5 octobre 2012 concernant la réglementation temporaire de la circulation sur la N15 entre Heiderscheidergrund et Heiderscheid à l'occasion de travaux de construction.
This ministerial order says traffic on the N15 between Heiderscheidergrund and Heiderscheid is to be temporarily regulated because of construction work.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Luxembourg
- Instrument
- Regulation
- Citation
- http://data.legilux.public.lu/eli/etat/leg/rmin/2012/10/05/n7/jo
- Status
- Repealed
- Version
- Undated source snapshot
- Language
- fr
- Updated
- Official source
- View official record ↗
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This ministerial order says traffic on the N15 between Heiderscheidergrund and Heiderscheid is to be temporarily regulated because of construction work. During the works phase on the specified stretch of N15, the speed limit is 70 km/h and drivers of motor vehicles may not overtake except as allowed for the listed two-wheel vehicles. Les infractions au présent règlement sont punies selon l’article 7 de la loi modifiée du 14 février 1955 sur la circulation routière. This regulation takes effect on 15 October 2012 and lasts until the works are completed.
Ask AI about this statute
Règlement ministériel du 5 octobre 2012 concernant la réglementation temporaire de la circulation sur la N15 entre Heiderscheidergrund et Heiderscheid à l'occasion de travaux de construction.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in