Règlement ministériel du 21 avril 2020 portant réglementation de la circulation sur les voies et places ouvertes à la circulation publique aux abords de la Gare de Luxembourg. | http://data.legilux.public.lu/eli/etat/leg/rmin/2020/04/21/a332/jo — Luxembourg law | Esheria

Règlement ministériel du 21 avril 2020 portant réglementation de la circulation sur les voies et places ouvertes à la circulation publique aux abords de la Gare de Luxembourg.

This ministerial regulation concerns traffic around Luxembourg Railway Station and is adopted because of roadworks linked to the tramway project.

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Luxembourg
Instrument
Regulation
Citation
http://data.legilux.public.lu/eli/etat/leg/rmin/2020/04/21/a332/jo
Status
Repealed
Version
Undated source snapshot
Language
fr
Updated
Official source
View official record ↗
infractions et sanctions parking public roads public squares traffic regulation transport vehicle access restrictions

Publicly available, excluded from search-engine indexing

This page remains available for direct access and API use, but this release emits noindex,follow for the following reason:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)

Statute overview

About this statute

This ministerial regulation concerns traffic around Luxembourg Railway Station and is adopted because of roadworks linked to the tramway project. For the duration of the works, the regulation applies to public roads and squares near Luxembourg Station, except the land forming the site of the AVL bus station. This article sets traffic access rules near Luxembourg Station, including one-way access, vehicle restrictions, a 30 km/h limit, and parking/stopping bans in specified spots. Les infractions aux dispositions de l’article 2 sont sanctionnées selon l’article 7 de la loi du 14 février 1955 sur la circulation routière. This regulation will be published in the Official Journal of Luxembourg and stays in force until the end of the construction site.