О внесении изменений в постановление Правительства Российской Федерации от 27 декабря 2004 г. № 861 | 588 — Russia law | Esheria

О внесении изменений в постановление Правительства Российской Федерации от 27 декабря 2004 г. № 861

The Russian Government approves attached amendments to an earlier electricity network connection regulation.

Jurisdiction
Russia
Instrument
Regulation
Citation
588
Version
Undated source snapshot
Language
ru
Official source
View official record ↗
application forms electricity connection electricity connection fees electricity network connection grid connection network connection procedures power capacity redistribution technical conditions technological connection

Statute overview

About this statute

The Russian Government approves attached amendments to an earlier electricity network connection regulation. This provision sets the terms for grid connection: the network organization must connect the applicant’s equipment, and the applicant must pay and complete required technical conditions. The technical conditions are valid for at least 2 and at most 5 years, and the network organization and applicant each must carry out their assigned connection measures. The parties sign a capacity-redistribution agreement: Side 1 agrees to reduce its maximum capacity and help notify the network organization, while Side 2 accepts the redistributed capacity and completes the connection steps.

LexChat organizes source-backed legal information for research. Verify amendments, commencement, and current legal force with the official publisher before relying on it.