Об утверждении Правил подготовки технических проектов разработки месторождений твердых полезных ископаемых | 449/08 — Russia law | Esheria

Об утверждении Правил подготовки технических проектов разработки месторождений твердых полезных ископаемых

The order approves rules for preparing technical projects for solid mineral deposits and sets how project documentation is prepared, approved, changed, and when older approved projects do not need to be updated.

Jurisdiction
Russia
Instrument
Act or statute
Citation
449/08
Version
Undated source snapshot
Language
ru
Official source
View official record ↗
mine planning mineral extraction mineral processing mining process control project documentation subsoil use tailings storage technical project preparation water circulation

Statute overview

About this statute

The order approves rules for preparing technical projects for solid mineral deposits and sets how project documentation is prepared, approved, changed, and when older approved projects do not need to be updated. A unified technical mining project must be prepared and coordinated when several deposits are developed together, and the project must include the listed technical, geological, environmental, safety, and organizational details. ТСПП must include process controls and technical measures for tailings handling, closed-loop leaching, and loss accounting, and it must not allow losses above the minimum industrial content threshold.

LexChat organizes source-backed legal information for research. Verify amendments, commencement, and current legal force with the official publisher before relying on it.