LAW Nº14/2016 OF 02/05/2016 GOVERNING PUBLIC PRIVATE PARTNERSHIPS
This provision says the law governs public-private partnerships (PPP).
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Rwanda
- Instrument
- Act or statute
- Citation
- 14/2016 OF 02/05/2016
- Status
- In force
- Version
- Undated source snapshot
- Language
- mul
- Updated
- Official source
- View official record ↗
Statute overview
About this statute
This provision says the law governs public-private partnerships (PPP). This article defines key terms used in the PPP law. This article says which PPP arrangements this law covers and allows the Prime Minister to prescribe other PPP arrangements. This Law does not apply to public procurement contracts or to privatization/divestiture of government-owned enterprises, assets, or infrastructure facilities. This article lists the sectors where PPPs may be carried out.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of LAW Nº14/2016 OF 02/05/2016 GOVERNING PUBLIC PRIVATE PARTNERSHIPS
Showing 36 of 36
- 1 Verify source ↗
Icyo iri tegeko rigamije
AI-assisted research summary: This provision says the law governs public-private partnerships (PPP).
Ingingo ya mbere: Icyo iri tegeko rigamije Article One: Purpose of this Law Article premier: Objet de la présente loi Ingingo ya mbere: Icyo iri tegeko rigamije Article One: Purpose of this Law Article premier: Objet de la présente loi Iri tegeko rigenga ubufatanye bw’inzego za Leta n’abikorera bwitwa “PPP” mu magambo ahinnye y’Icyongereza mu ngingo zikurikira. This Law governs public private partnerships hereinafter abbreviated as “PPP”. La présente loi régit les partenariats public-privé ci- dessous dénommés « PPP » en sigle Anglais. - 2 Verify source ↗
Ibisobanuro by’amagambo
AI-assisted research summary: This article defines key terms used in the PPP law.
Ingingo ya 2: Ibisobanuro by’amagambo Article 2: Definitions of terms Article 2: Définitions des termes Ingingo ya 2: Ibisobanuro by’amagambo Article 2: Definitions of terms Article 2: Définitions des termes iri Muri ibisobanuro bikurikira: tegeko, amagambo akurikira afite For the purpose of this Law, the following terms are defined as follows: Aux fins de la présente loi, les termes suivants ont des significations suivantes: 1º amasezerano ya PPP: amasezerano yanditse akozwe hagati y’urwego rukora n’umufatanyabikorwa amasezerano agaragaza ibigize umushinga wa PPP; 1° PPP agreement: a written contract concluded a Contracting between Authority and a partner recording the terms of a PPP project; 1° accord de PPP: contrat écrit conclu entre l’autorité contractante et un partenaire contenant des clauses du projet de PPP; 2º inyandiko yatanzwe nta butumire ku ipiganwa: inyandiko igamije gutangira PPP nta tangazo ryatanzwe rihamagarira ipiganwa; 2° unsolicited proposal: a proposal to undertake a PPP project that is not in response to an expressed request for proposals; 2° offre non sollicitée: offre d’initiation d’un projet de PPP, soumise sans qu’il y ait d’appel d’offres; 3º Komite Nyobozi: urwego rushinzwe kwemeza no gukurikirana umushinga wa PPP; 3° Steering Committee: in charge of approval and oversight of a PPP project; the body 3° Comité Directeur: chargé d’approuver et de superviser un projet de PPP; organe 4º umufatanyabikorwa: uwikorera ufite ubushobozi bwo kugirana amasezerano ya PPP n’urwego rukora amasezerano; 4° partner: a private party who is competent to contract a PPP agreement with the Contracting Authority; 4° partenaire: un privé compétent pour conclure un accord de PPP avec l’autorité contractante; 5º Urwego rukora amasezerano: urwego rwa Leta rurebwa n’amasezerano ya PPP mu bikorwa rufite mu nshingano zarwo; 5° Contracting Authority: a public institution in charge of PPP agreement; 5° Autorité contractante: une institution publique ayant l’accord de PPP dans ses attributions ; 7 Official Gazette nᵒ 22 of 30/05/2016 6º urwego hagamijwe rukoreshwa ku mpamvu zihariye: ikigo gishyirwaho n’uruhande rwikorera cyane umushinga gushyira mu w’ubufatanye hagati y’inzego za Leta n’abikorera kandi kikagirana amasezerano y’ubufatanye hagati y’izo nzego zombi. bikorwa cyane 6° special purpose vehicle: a corporate entity incorporated by a private party specifically of private implementing partnership project and entering into a partnership agreement with both sectors. purpose public the for a 6° organe à objectif spécial: entité établie par une partie privée à des fins spéciales de mettre en œuvre un projet de partenariat public-privé et de conclure un accord de partenariat entre les deux secteurs. - 3 Verify source ↗
Ibirebwa n’iri tegeko
AI-assisted research summary: This article says which PPP arrangements this law covers and allows the Prime Minister to prescribe other PPP arrangements.
Ingingo ya 3: Ibirebwa n’iri tegeko Article 3: Scope of this Law Article 3: Champ d’application de la présente loi Ingingo ya 3: Ibirebwa n’iri tegeko Article 3: Scope of this Law Article 3: Champ d’application de la présente loi Iri tegeko rireba uburyo bwa PPP bukurikira: This Law applies arrangements: to the following PPP La présente loi s’applique aux ententes suivantes de PPP: rukora amasezerano 1º amasezerano yo gucunga umutungo, aho urwego ruha umufatanyabikorwa uburenganzira bwo gucunga igikorwa remezo cyangwa undi mutungo no gutanga serivisi zijyanye nabyo, mu gihe cyumvikanyweho; 1º management contract, whereby a Contracting Authority awards a partner the right to manage and perform a specific service with respect to an infrastructure facility or other asset for an agreed time period; 1º contrat de gestion par lequel l’Autorité contractante attribue à un partenaire le droit de gérer et donner certains services en rapport en infrastructure ou un autre patrimoine pour un temps convenu; équipements avec les 2º “Build-Operate-Own” “BOO” aho uwikorera ashora imari ahanga, yubaka, akegukana kandi agakoresha igikorwa remezo cyangwa ibindi bikorwa bigamije gutanga serivisi; 2º “Build-Operate-Own” “BOO”, whereby a private partner finances, designs, constructs, owns and operates an infrastructure facility or other asset to provide services; 2º “Build-Operate-Own” “BOO”, par lequel le partenaire privé finance, conçoit, construit, s’approprie et gère un équipement en infrastructure ou un autre bien pour donner des services; 3º “Build-Operate-Transfer” “BOT”, aho umufatanyabikorwa ashora imari ahanga, yubaka igikorwa remezo cyangwa ibindi bikorwa bigamije gutanga serivisi kandi akabibungabunga kugeza abishyikirije Leta mu gihe bumvikanyeho; 3º “Build-Operate-Transfer” or “BOT”, whereby a partner finances, designs, constructs an infrastructure facility or other asset to provide services and maintains it for an agreed time period after which a transfer of the infrastructure facility or other asset is made to the Government; 8 3º “Build-Operate-Transfer” “BOT”, par le partenaire finance, conçoit, lequel construit un équipement en infrastructure ou un autre bien pour donner des services et le maintient jusqu’au moment convenu du transfert de cet équipement ou bien à l’Etat; rukora amasezerano 4º “Lease-Operate-Develop” “LOD”, aho Urwego ruha umufatanyabikorwa uburenganzira bwo gukoresha igikorwa remezo cyangwa undi mutungo ku buryo bw’ubukode mu gihe cyumvikanyweho akanacyongerera agaciro. Official Gazette nᵒ 22 of 30/05/2016 4º “Lease-Operate-Develop” “LOD”, whereby the Contracting Authority grants a Partner a lease to operate and develop an existing infrastructure facility or other asset for an agreed time. 4º “Lease-Operate-Develop” “LOD”, par lequel l’Autorité contractante accorde à un partenaire le droit de gérer et d’améliorer un équipement en infrastructure ou un autre bien sous forme de bail pour un temps convenu. Iteka rya Minisitiri w’Intebe rishobora kugena ubundi buryo bwa PPP. An Order of the Prime Minister may prescribe any other PPP arrangement. Un arrêté du Premier Ministre peut prévoir toute autre entente de PPP. - 4 Verify source ↗
Ibitarebwa n’iri tegeko
AI-assisted research summary: This Law does not apply to public procurement contracts or to privatization/divestiture of government-owned enterprises, assets, or infrastructure facilities.
Ingingo ya 4: Ibitarebwa n’iri tegeko Article 4: Scope of non-application of this Law Article 4: Champ de non-application de la présente loi Ingingo ya 4: Ibitarebwa n’iri tegeko Article 4: Scope of non-application of this Law Article 4: Champ de non-application de la présente loi Iri tegeko ntirireba: This Law does not apply to: La présente loi ne s’applique pas : 1° amasezerano akorwa hakurikijwe itegeko 1° contracts subject to the law governing 1° aux contrats conclus conformément à la loi ry’amasoko ya Leta; public procurement; sur les marchés publics ; 2° ibyerekeranye n’uburyo Leta yegurira byayo ibigo, umutungo n’ibikorwa abikorera. 2° the privatization or divestiture of enterprises, assets and any infrastructure facility owned by the Government. 2° à la privatisation ou à la cession des entreprises, biens et équipements en infrastructure de l’Etat. - 5 Verify source ↗
Ibyiciro PPP ishobora gukorwamo
AI-assisted research summary: This article lists the sectors where PPPs may be carried out.
Ingingo ya 5: Ibyiciro PPP ishobora gukorwamo Article 5: Potential sectors for PPPs Article 5: Secteurs potentiels pour les PPP UMUTWE WA II: INZEGO ZA LETA ZIGIRA URUHARE MURI PPP N’INSHINGANO ZAZO CHAPTER II: PUBLIC INSTITUTIONS PLAYING A ROLE IN PPP AND THEIR RESPONSIBILITIES CHAPITRE II: INSTITUTIONS PUBLIQUES JOUANT UN ROLE DANS LE PPP ET LEURS ATTRIBUTIONS Ingingo ya 5: gukorwamo Ibyiciro PPP ishobora Article 5: Potential sectors for PPPs Article 5: Secteurs potentiels pour les PPP PPP ishobora gukorwa mu bikorwa remezo na serivisi mu byiciro bikurikira: Potential sectors for PPPs in infrastructure and services are the following: Les secteurs potentiels pour infrastructures et services sont les suivants: les PPP en 1° ubwikorezi harimo nk’imihanda, inzira ya gari ya moshi, ibibuga by’indege, ibiraro, inzira zica mu butaka, ibyambu by’amato n’ibyambu byo ku butaka; 2° ingufu harimo nk’izikomoka ku mazi, kuri gazi, ku mirasire y’izuba, ku muyaga, ku 1° transportation, including roads, railways, airports, bridges, tunnels, waterways and inland ports; 2° energy including water energy, gas energy, solar energy, wind energy, 1° 2° 9 le transport notamment les routes, chemins de fer, aéroports, ponts, tunnels, ports sur mer et ports sur terre; l’énergie, notamment l’énergie hydraulique, l’énergie éolienne, l’énergie thermique, le biogaz et la tourbe; l’énergie solaire, Official Gazette nᵒ 22 of 30/05/2016 mashyuza, nyiramugengeri; kuri biyogazi no kuri geothermal energy, biogas energy and peat; 3° imibereho myiza harimo nk’ibijyanye imikino n’uburezi, umuco, ubuzima, n’imyidagaduro; 3° social affairs, including those related to education, culture, health, sports and leisure; 4° ubukerarugendo harimo nk’ ubushingiye ku mateka, amahoteli, pariki n’ahantu nyaburanga; 4° tourism, including tourism related to tourism history, hotels, parks and attractions; 5° umutungo kamere n’ibidukikije, harimo peteroli nk’amashyamba, n’ibiyikomokaho, amabuye y’agaciro, amazi no gutunganya imyanda; 5° natural resources and environment, including those related to forestry, oil and oil products, minerals, water sanitation and waste disposal; 6° itumanaho n’ikoranabuhanga; 6° telecommunication and information technology; 7° ibindi byiciro byagenwa n’Iteka rya Minisitiri w’Intebe. 7° any other sectors as may be determined by an Order of Prime Minister. 3° 4° 5° 6° 7° les affaires sociales notamment en rapport avec l’éducation, la culture, la santé, les sports et loisirs; le tourisme, notamment le tourisme en rapport avec l’histoire, les hôtels, les parcs et lieux touristiques; les ressources naturelles et environnement, notamment les forêts, le pétrole et les produits les minéraux, l’assainissement de l’eau et le traitement des déchets; pétroliers, télécommunication d’information; et technologie d’autres secteurs qui peuvent être déterminés par un arrêté du Premier Ministre. UMUTWE WA II: INZEGO ZA LETA PPP URUHARE ZIGIRA N’INSHINGANO ZAZO MURI CHAPTER II: PUBLIC INSTITUTIONS PLAYING A ROLE IN PPP AND THEIR RESPONSIBILITIES CHAPITRE II: INSTITUTIONS PUBLIQUES JOUANT UN ROLE DANS LE PPP ET LEURS ATTRIBUTIONS - 6 Verify source ↗
Inzego za Leta zigira uruhare
AI-assisted research summary: This article lists the public institutions that play a role in PPP.
Ingingo ya 6: Inzego za Leta zigira uruhare muri PPP Article 6: Public institutions playing a role in PPP Article 6: Institutions publiques jouant un rôle dans le PPP Ingingo ya 6: Inzego za Leta zigira uruhare muri PPP Article 6: Public institutions playing a role in PPP Article 6: Institutions publiques jouant un rôle dans le PPP Inzego za Leta zigira uruhare muri PPP ni izi zikurikira: Public institutions playing role in PPP are the following: Les institutions publiques jouant un rôle dans le PPP sont les suivantes: 1° Komite Nyobozi ; 2° Urwego rukora amasezerano ; 1° Steering Committee; 2° Contracting Authority; 1° le Comité Directeur ; 2° l’Autorité contractante ; 10 3° Urwego rushinzwe Iterambere mu 3° Rwanda Development Board. Rwanda. Official Gazette nᵒ 22 of 30/05/2016 3° l’Office pour Développement au Rwanda. la Promotion du - 7 Verify source ↗
Abagize Komite Nyobozi
AI-assisted research summary: The Steering Committee is made up of specified officials, and the Prime Minister’s Order sets how it works.
Ingingo ya 7: Abagize Komite Nyobozi n’imikorere yayo Article 7: Composition and functioning of the Steering Committee Article 7: Composition et fonctionnement du Comité Directeur 2 Official Gazette nᵒ 22 of 30/05/2016 Ingingo ya 7: Abagize Komite Nyobozi n’imikorere yayo Article 7: Composition and functioning of the Steering Committee Article 7: Composition et fonctionnement du Comité Directeur Komite Nyobozi igizwe n’aba bakurikira: The Steering Committee is composed of the following persons: Le Comité Directeur est composé des personnes suivantes : 1° Minisitiri ufite imari n’igenamigambi mu 1º the Minister in charge of finance and 1º le Ministre ayant les finances et nshingano ze; 2° Minisitiri ufite nshingano ze; ibikorwa remezo mu 2º the Minister in charge of infrastructure; 2º le Ministre ayant les infrastructures dans ses attributions ; economic planning; planification attributions ; économique dans la ses 3° Umuyobozi Mukuru w’Urwego rushinzwe 3º the Chief Executive Officer of Rwanda Iterambere mu Rwanda ; Development Board; 3º le Directeur Général de l’Office pour la Promotion du Développement au Rwanda ; 4° Umuyobozi amasezerano n’umushinga wa PPP wigwaho. w’Urwego uhinduka rukora bitewe 4º the Head of the Contracting Authority depending on the PPP project under study. 4º le Responsable de l’Autorité contractante qui change suivant le projet de PPP sous étude. Iteka rya Minisitiri w’Intebe rigena imikorere ya Komite Nyobozi. An Order of Prime Minister determines the functioning of the Steering Committee. Un arrêté du Premier Ministre détermine fonctionnement du Comité Directeur. le - 8 Verify source ↗
Inshingano za Komite Nyobozi
AI-assisted research summary: The Steering Committee must approve and oversee PPP projects, including shortlisted bidders and the preferred bidder. It may also seek help from technicians and experts if needed.
Ingingo ya 8: Inshingano za Komite Nyobozi Article 8: Responsibilities of the Steering Committee Article 8: Attributions du Comité Directeur Ingingo ya 8: Inshingano za Komite Nyobozi Article 8: Responsibilities of the Steering Committee Article 8: Attributions du Comité Directeur Komite Nyobozi ifite inshingano zo kwemeza no gukurikirana imishinga ya PPP. The Steering Committee has the responsibility to approve and oversee PPP projects. Le Comité Directeur est chargé d’approuver et de superviser les projets de PPP. By’umwihariko Komite Nyobozi kwemeza ibi bikurikira: ishinzwe The Steering Committee responsible for approving the following: is specifically Le Comité Directeur est plus particulièrement chargé d’approuver ce qui suit : 11 Official Gazette nᵒ 22 of 30/05/2016 1° urutonde rw’abatoranyijwe bemerewe 1º the shortlisted bidders for a PPP project; 1° la liste des soumissionnaires présélectionnés gupiganwa mu mushinga wa PPP; pour un projet de PPP ; 2° uwemerewe gukora umushinga wa PPP. 2º the preferred bidder for a PPP project. 2° le soumissionnaire préférentiel pour un projet de PPP. Nyobozi Komite kwifashisha abatekinisiye n’abahanga igihe bibaye ngombwa kugira ngo igere ku nshingano zayo. ishobora The Steering Committee may, if necessary, seek the assistance of technicians and experts in order to fulfil its responsibilities. Le Comité Directeur peut, en cas de nécessité, demander l'assistance des techniciens et des experts pour remplir ses attributions. - 9 Verify source ↗
Inshingano z’Urwego rukora
AI-assisted research summary: The Contracting Authority must carry out several PPP-related tasks, including identifying and submitting projects, preparing studies and reports, and managing PPP procurement and agreements.
Ingingo ya 9: Inshingano z’Urwego rukora amasezerano Article 9: Responsibilities of the Contracting Authority Article contractante 9: Attributions de l’Autorité Ingingo ya 9: Inshingano z’Urwego rukora amasezerano Article 9: Responsibilities of the Contracting Authority Article 9: Attributions de l’Autorité contractante Inshingano z’Urwego rukora amasezerano ni izi zikurikira: The responsibilities of Contracting Authority are the following: Les attributions de l’Autorité contractante sont les suivantes: 1° kugaragaza umushinga wa PPP no 1º identify a PPP project and submit it to the 1º identifier un projet de PPP et le soumettre au kuwushyikiriza Komite Nyobozi; Steering Committee; Comité Directeur; 2° gukora inyigo y’ikoreka ry’umushinga wa PPP no kuyishyikiriza Komite Nyobozi; 2º undertake a PPP project feasibility study and submit it to the Steering Committee; 2º entreprendre une étude de faisabilité d’un projet de PPP et le soumettre au Comité Directeur; 3° gusesengura inyigo y’ikoreka igihe 3º analyse a feasibility study where it was 3º analyser une étude de faisabilité au cas où yakozwe n’umufatanyabikorwa; developed by a partner; elle a été élaborée par un partenaire; 4° gukora imirimo yose ijyanye n’ipiganwa mu mushinga wa PPP hakurikijwe ibiteganywa n’iri tegeko no gutanga raporo kuri Komite Nyobozi ku ntera zimaze kugerwaho; 4º perform all activities related to the procurement procedure for PPP projects in accordance with the provisions of this Law and deliver reports to the Steering Committee regarding steps taken during the procurement procedure; 4º effectuer toutes les activités relatives à la procédure de compétition pour la passation des marchés de PPP conformément aux dispositions de la présente loi et donner des rapports au Comité Directeur sur les étapes réalisées ; 5° gushyira umukono ku masezerano ya PPP hamwe n’umufatanyabikorwa cyangwa urwego rukoreshwa ku mpamvu zihariye; 5º enter into a PPP agreement with a partner or a special purpose vehicle; 5º conclure un accord de PPP avec un partenaire ou un organe à objectif spécial; 12 Official Gazette nᵒ 22 of 30/05/2016 6° gutegura gahunda y’amasezerano ya PPP ; y’imicungire 6º prepare a plan for PPP agreement 6º préparer un plan de gestion de l’accord de management; PPP ; 7° gushyiraho amabwiriza yihariye y’ipiganwa ajyanye n’imishinga ya PPP iri mu nshingano zarwo; 8° gutanga raporo ya buri kwezi n’iya buri mwaka kuri Komite Nyobozi igaragaza aho ishyirwa mu bikorwa ry’amasezerano ya PPP rigeze. 7º issue sector-specific competition rules relating to PPP projects within its remit; 8º provide to the Steering Committee monthly and annual progress reports on the implementation of PPP agreement. 7º édicter les règles de concurrence spécifiques relatives aux projets de PPP rentrant dans ses attributions ; 8º donner au Comité Directeur des rapports mensuels et annuels sur l’état d’avancement de l’exécution de l’accord de PPP. - 10 Verify source ↗
Uruhare rw’Urwego rushinzwe
AI-assisted research summary: The Rwanda Development Board may issue PPP procurement guidelines, lead negotiations for PPP agreements, and advise the Government on PPP matters.
Ingingo ya 10: Uruhare rw’Urwego rushinzwe Iterambere mu Rwanda Article 10: Role of Rwanda Development Board Article 10: Rôle de l’Office pour la Promotion du Développement au Rwanda UMUTWE WA III: AMASEZERANO YA PPP CHAPTER III: PPP AGREEMENT CHAPITRE III: ACCORD DE PPP Ingingo ya 10: Uruhare rw’Urwego rushinzwe Iterambere mu Rwanda Article 10: Role of Rwanda Development Board Article 10: Rôle de l’Office pour la Promotion du Développement au Rwanda Mu bijyanye n’iri tegeko, Urwego rushinzwe Iterambere mu Rwanda rufite uruhare rukurikira: Pursuant to this Law, Rwanda Development Board plays the following role: Selon la présente loi, l’Office pour la Promotion du Développement au Rwanda joue le rôle suivant: 1° gutanga umurongo rusange ngenderwaho mu ipiganwa ry’imishinga ya PPP; 1º to issue general guidelines applicable to the competitive procurement procedures for PPP Projects; 1º édicter les directives générales applicables à la procédure de compétition dans les projets de PPP; 2° kuyobora imishyikirano ijyanye n’amasezerano ya PPP; 2º to be lead negotiator during negotiations relating to a PPP agreement; the 2º présider les négociations relatives à l’accord de PPP; 3° kugira inama Guverinoma ku birebana na 3º to advise Government on matters relating 3º conseiller l’Etat sur les questions relatives au PPP. to PPP. PPP. UMUTWE WA III: AMASEZERANO YA PPP CHAPTER III: PPP AGREEMENT CHAPITRE III: ACCORD DE PPP - 11 Verify source ↗
Uburenganzira bwo gukora
AI-assisted research summary: The Contracting Authority may enter into a PPP agreement with a preferred bidder, a selected partner for an unsolicited proposal, or a special purpose vehicle designated by such partner.
Ingingo ya 11: Uburenganzira bwo gukora amasezerano ya PPP Article 11: Authorization to enter into PPP Agreements Article 11: Autorisation de conclure des accords de PPP Ingingo ya 11: Uburenganzira bwo gukora amasezerano ya PPP Article 11: Authorization to enter into PPP Agreements Article 11: Autorisation de conclure des accords de PPP Urwego rugirana amasezerano ya PPP n’umwe muri aba bakurikira: amasezerano rukora The Contracting Authority enters into a PPP agreement with one of the following: L’Autorité contractante conclut un accord de PPP avec l’un des partenaires suivants: 13 Official Gazette nᵒ 22 of 30/05/2016 1° umufatanyabikorwa watsindiye gukora umushinga wa PPP cyangwa wawuhawe bitanyuze mu ipiganwa; 1° a preferred bidder for a PPP project or a selected partner in a case of unsolicited proposal; 1° l’attributaire du marché d’un projet de PPP ou un partenaire retenu dans le cas d’une offre non sollicitée ; 2° urwego rukoreshwa ku mpamvu zihariye n’umufatanyabikorwa rwashyizweho uvugwa mu gace ka mbere k’iyi ngingo. 2° special purpose vehicle incorporated by such partner referred to in item 1o of this Article. 2° organe à objectif spécial désigné par le partenaire visé au point 1o du présent article. - 12 Verify source ↗
Ibikubiye mu masezerano ya PPP
AI-assisted research summary: A PPP agreement must include specific details about the parties, project, rights and obligations, duration, dispute resolution, termination, and any other lawful arrangements.
Ingingo ya 12: Ibikubiye mu masezerano ya PPP Article 12: Provisions of a PPP agreement Article 12: Dispositions d’un accord de PPP UMUTWE WA IV: UBURYO BWO GUKORESHA IPIGANWA MU MUSHINGA WA PPP CHAPTER COMPETITIVE PROCUREMENT PROCEDURE FOR A PPP PROJECT IV: CHAPITRE DE COMPETITION POUR LA PASSATION DE MARCHE POUR UN PROJET DE PPP PROCEDURE IV: Ingingo ya 12: Ibikubiye mu masezerano ya PPP Amasezerano ya PPP agomba kugaragaza ibi ibikurikira: Article 12: Provisions of a PPP agreement Article 12: Dispositions d’un accord de PPP The PPP agreement must comprise the following: Un accord de PPP doit comprendre ce qui suit: 1° izina ry’Urwego n’aho rubarizwa ; rukora amasezerano 1º name and address of the Contracting 1° nom et adresse de l’Autorité contractante; Authority; 2° izina ry’umufatanyabikorwa n’aho abarizwa ry’urwego rukoreshwa ku mpamvu zihariye n’aho rubarizwa ; cyangwa izina 2º name and address of the partner or name and address of the special purpose vehicle; 2° nom et adresse du partenaire ou nom et adresse de l’organe à objectif spécial; 3° inyito y’umushinga wa PPP; 3º title of PPP project; 3° titre du projet de PPP ; 4° impamvu y’amasezerano ya PPP; 4º purpose of PPP agreement; 4° objet de l’accord de PPP; 5° itariki amasezerano ya PPP atangira 5º effective date of PPP agreement; 5° date d’entrée en vigueur de l’accord de PPP; gukurikizwa ; 6° uburenganzira n’inshingano by’Urwego 6º rights and obligations of the Contracting 6° droits et obligations de l’Autorité rukora amasezerano; Authority; contractante; 7° uburenganzira n’inshingano by’umufatanyabikorwa cyangwa urwego rukoreshwa ku mpamvu zihariye; 7º rights and obligations of the Partner or 7° droits et obligations du partenaire ou de special purpose vehicle; l’organe à objectif spécial ; 14 Official Gazette nᵒ 22 of 30/05/2016 8° igihe amasezerano ya PPP azamara; 8º duration of the PPP Agreement; 8° durée de l’Accord de PPP ; 9° uburyo bwo gukemura impaka; 9º dispute resolution mechanisms; 9° mécanismes de résolution de conflit; 10° uburyo bwo gusesa amasezerano ya PPP; 10º modalities agreement; for termination of PPP 10° modalités de résiliation de l’accord de PPP; 11° ibindi impande zombi zakumvikanaho bitanyuranyije n’amategeko. 11º any other arrangements between both parties agreed upon without contrary to the law. 11° d’autres ententes convenues entre les deux parties qui ne sont pas contraires à la loi. UMUTWE WA IV: UBURYO BWO GUKORESHA IPIGANWA MU MUSHINGA WA PPP CHAPTER COMPETITIVE PROCUREMENT PROCEDURE FOR A PPP PROJECT IV: CHAPITRE DE COMPETITION POUR LA PASSATION DE MARCHE POUR UN PROJET DE PPP PROCEDURE IV: - 13 Verify source ↗
Inyigo y’ikoreka ry’umushinga
AI-assisted research summary: Before issuing a tender notice, the Contracting Authority must carry out a feasibility study for the PPP project.
Ingingo ya 13: Inyigo y’ikoreka ry’umushinga wa PPP Article 13: Feasibility study for a PPP project Article 13: Etude de faisabilité d’un projet de PPP Ingingo ya 13: Inyigo y’ikoreka ry’umushinga wa PPP Article 13: Feasibility study for a PPP project Article 13: Etude de faisabilité d’un projet de PPP rihamagarira Mbere yo gutanga gupiganwa, Urwego rukora amasezerano rugomba gukora inyigo y’ikoreka ry’umushinga wa PPP. itangazo Prior to a tender notice, the Contracting Authority must conduct a feasibility study in connection with the PPP project. Avant le lancement de l’avis d’appel d’offres, l’Autorité contractante doit mener une étude de faisabilité du projet de PPP. y’ikoreka Inyingo kugaragaza nibura ibi bikurikira: ry’umushinga igomba The feasibility study of the project must comprise at least the following: L’étude de faisabilité du projet comprend au moins ce qui suit: 1° inyigo yerekeranye n’isoko; 1º a market study; 1º une étude de marché; 2° isesengura ngenagaciro ry’umushinga; 2º a value for money analysis; 2º une analyse de rentabilité; 3° isesengura ry’umushinga mu 3º a technical and legal analysis in 3º une analyse technique et juridique en rapport byerekeranye na tekiniki n’amategeko; connection with the project; avec le projet; 15 Official Gazette nᵒ 22 of 30/05/2016 4° ingaruka ku bidukikije hashingiwe ku nyigo y’isuzuma ngaruka ku bidukikije yakozwe amategeko hakurikijwe abigenga; 4º environmental impact based on an environmental impact assessment made according to relevant laws; 4º un impact environnemental basé sur une évaluation de l’impact environnemental effectuée conformément à la loi en la matière; 5° ingaruka ku bukungu no ku mibereho 5º economic and social impact; 5º un impact économique et social; y’abaturage; 6° uburyo bwa PPP bwakoreshwa; 6º the PPP arrangement options; 6º les options de l’entente de PPP; 7° ingano y’imari y’umushinga n’isesengura mu byerekeye amafaranga ateganywa n’ateganywa ndetse kwinjizwa gukoreshwa mu ishyirwa mu bikorwa ry’umushinga wa PPP. 7º the budget of the project and a financial analysis of projected revenues and costs in the implementation of the PPP project. 7º le budget du projet et une analyse financière des recettes escomptées et des coûts prévus dans l’exécution du projet de PPP. - 14 Verify source ↗
Kwemeza
AI-assisted research summary: The Contracting Authority must submit the PPP project feasibility study to the Steering Committee for approval, and if approved it must prepare the bidding documents.
Ingingo ya 14: Kwemeza ry’umushinga wa PPP inyigo y’ikoreka Article 14: Approval of a PPP project feasibility study Article 14: Approbation de l’étude de faisabilité d’un projet de PPP Ingingo ya 14: Kwemeza inyigo y’ikoreka ry’umushinga wa PPP Article 14: Approval of a PPP project feasibility study Article 14: Approbation de l’étude de faisabilité d’un projet de PPP iyo Inyigo y’ikoreka ry’umushinga wa PPP amasezerano irangiye, ruyishyikiriza Komite Nyobozi kugira ngo iyemeze. Urwego rukora After the feasibility study of the PPP project, the Contracting Authority submits it to the Steering Committee for approval. Après l’étude de faisabilité du projet de PPP, la soumet au Comité l’Autorité contractante Directeur pour approbation. Iyo Komite Nyobozi imaze kwemeza inyigo y’ikoreka, ikanemeza ko hatangira uburyo bwo gupiganira umushinga wa PPP, Urwego rukora amasezerano rutegura inyandiko yo kugaragaza ubushake bwo gupiganwa n’izindi nyandiko z’ipiganwa. Where the Steering Committee provides its approval of the feasibility study and authorizes commencement of a competitive procurement procedure for a PPP project, the Contracting Authority drafts the request for expressions of interest and other bidding documents. Lorsque le Comité Directeur approuve l’étude de faisabilité et l’exécution du projet sous forme de PPP, et autorise le début de la procédure de passation de marché du projet de PPP, l’Autorité contractante prépare les documents de manifestation d’intérêt et autres documents d’appel d’offres. 16 Official Gazette nᵒ 22 of 30/05/2016 - 15 Verify source ↗
Amahame agenga ipiganwa mu
AI-assisted research summary: A PPP project’s competitive procurement must follow the listed principles: competition, transparency, fairness and non-discrimination, efficiency and effectiveness, protection of public property and public interest, and accountability.
Ingingo ya 15: Amahame agenga ipiganwa mu mushinga wa PPP Article 15: Principles regulating competitive procurement in a PPP project Article 15: Principes régissant la compétition pour la passation de marché dans un projet de PPP Ingingo ya 15: Amahame agenga ipiganwa mu mushinga wa PPP Article 15: Principles regulating competitive procurement in a PPP project Mu ipiganwa risesuye ry’umushinga wa PPP hagenderwa ku mahame akurikira: A competitive procurement procedure for PPP project is governed by the following principles: Article 15: Principes régissant la compétition pour la passation de marché dans un projet de PPP La procédure de compétition pour la passation de marché dans le cadre d’un projet de PPP est régie par les principes suivants: 1º gupiganisha; 2º gukorera mu mucyo; 1° competition; 2° transparency; 1° compétition; 2° transparence; 3º gutanga amahirwe angana; 3° fairness and non-discrimination; 3° équité et non-discrimination; 4º gukora neza no kwihutisha akazi; 4° efficiency and effectiveness; 4° efficacité et efficience; 5º kurengera umutungo n’inyungu rusange; 5° protection of public property and public 5° protection du patrimoine public et de interest; l’intérêt général; 6º kwirengera ibyemezo byafashwe. 6° accountability. 6° assumer sa responsabilité. - 16 Verify source ↗
Gusaba kugaragaza ubushake
AI-assisted research summary: The contracting authority must ask for expressions of interest for a PPP project by advertisement.
Ingingo ya 16: Gusaba kugaragaza ubushake bwo gupiganwa Article 16: Request for expressions of interest Article 16: Demande de manifestations d’intérêt 3 Official Gazette nᵒ 22 of 30/05/2016 Ingingo ya 16: Gusaba kugaragaza ubushake bwo gupiganwa Article 16: Request for expressions of interest Article 16: Demande de manifestations d’intérêt rukora amasezerano ruhamagarira Urwego abapiganwa kugaragaza ubushake bwo gupiganira umushinga wa PPP itangazo mu binyamakuru nibura bibiri bisomwa cyane mu gihugu no mu kinyamakuru nibura kimwe cyo ku rwego mpuzamahanga cyangwa hakoreshejwe uburyo bw’ikoranabuhanga. rushyira requests for The Contracting Authority expressions of interest in connection with a PPP project through an advertisement published at least in two widely read national newspapers and through one information technology. international newspaper or L’Autorité contractante demande les manifestations d'intérêt dans le cadre d'un projet de PPP à travers un appel publié au moins dans deux journaux nationaux les plus lus et un journal international ou en utilisant la technologie de l'information. risaba kugaragaza ubushake bwo Itangazo gupiganira umushinga wa PPP rigomba nibura kugaragaza ibi bikurikira: The advertisement requesting for expressions of interest in connection with a PPP project must indicate at least the following: L’appel de demande de manifestations d’intérêt dans le cadre d’un projet de PPP doit au moins comprendre ce qui suit: 17 Official Gazette nᵒ 22 of 30/05/2016 1° Urwego rukora amasezerano n’aho 1º the Contracting Authority and its 1º l’Autorité Contractante et son adresse; rubarizwa; address; 2° incamake y’imiterere y’umushinga wa 2º the PPP project summary; 2º le résumé du projet de PPP; PPP; 3° ibyo ugaragaza ubushake bwo gupiganwa rwo kugaragaza rwego bwashingirwaho afite rw’abemerewe rutonde asabwa mu ubushobozi ashyirwa ku gupiganwa; 4° ahantu n’igihe ntarengwa inyandiko zigaragaza ubushake bwo gupiganwa zigomba gutangwa; 3º the requirements for the bidder proving his/her ability to be considered for shortlisting him/her on the list of bidders; 3º les conditions requises à un soumissionnaire prouvant sa capacité à être prise en considération pour le présélectionner sur la liste des soumissionnaires; 4º the place and deadline for submitting 4º le lieu et la date limite de soumission des bids; offres; 5° ahantu n’igihe inyandiko zigaragaza 5º the place and date for opening bids. 5º le lieu et la date d’ouverture des offres. ubushake bwo gupiganwa zifungurirwa. - 17 Verify source ↗
Gupiganira umushinga wa PPP
AI-assisted research summary: Companies may form a consortium to bid for a PPP project.
Ingingo ya 17: Gupiganira umushinga wa PPP bikorewe mu itsinda Article 17: Participation of a bidding consortium for a PPP project Article 17: Soumission en consortium à un projet de PPP Ingingo ya 17: Gupiganira umushinga wa PPP bikorewe mu itsinda Article 17: Participation of a bidding consortium for a PPP project Article 17: Soumission en consortium à un projet de PPP Sosiyete zishobora kwishyira hamwe kugira ngo zipiganire umushinga wa PPP. Amasezerano yo kwishyira hamwe asobanura uruhare rwa buri sosiyete. Companies may form a consortium to participate in a competitive procurement procedure for a PPP project. The consortium agreement specifies the role of each company. Les sociétés peuvent former un consortium pour participer dans une procédure de passation de marché en compétition pour un projet de PPP. L’accord du consortium définit le rôle de chaque société. Amakuru akenewe kuri sosiyete zigize itsinda ripiganira umushinga wa PPP kugira ngo hagaragazwe ubushobozi bwaryo agomba kuba yerekeranye n’itsinda muri rusange na buri sosiyete by’umwihariko. The information required from a consortium bidding for a PPP project to demonstrate its qualifications must the bidding consortium as a whole as well as to each individual participant in particular. relate to Les informations requises sur le consortium de sociétés soumissionnaires à un projet de PPP pour attester sa compétence doivent porter sur le consortium dans son entièreté ainsi que sur chaque société en particulier. 18 - 18 Verify source ↗
Gukora no kwemeza urutonde
AI-assisted research summary: The Contracting Authority must review bidder responses, make a shortlist of bidders that meet the stated criteria, and send a summary report to the Steering Committee. The Steering Committee approves the final shortlist.
Ingingo ya 18: Gukora no kwemeza urutonde rw’abapiganwa Article 18: Shortlist and approval of bidders Article 18: Présélection et approbation des soumissionnaires Ingingo ya 18: Gukora no kwemeza urutonde rw’abapiganwa Article 18: Shortlist and approval of bidders Article 18: Présélection et approbation des soumissionnaires Official Gazette nᵒ 22 of 30/05/2016 ubushake, rukora amasezerano, Urwego rushingiye ku byasabwe mu nyandiko ihamagarira abapiganwa kugaragaza isuzuma n’isesengura ry’inyandiko zatanzwe n’abagaragaje ubushake bwo gupiganwa, raporo igaragaza urutonde rw’abemerewe gupiganwa bujuje ibisabwa igashyikirizwa Komite Nyobozi. rugakora rukora The Contracting Authority, after conducting a review and evaluation of the responses submitted by bidders to the request for expressions of interest based on the criteria specified in the request creates a shortlist of bidders who fulfil the criteria and submits a summary report to the Steering Committee. L’Autorité contractante, à l’appui des critères fixés dans la demande de manifestation d’intérêt établit une liste de soumissionnaires présélectionnés qui remplissent ces critères, et soumet un rapport résumé au Comité Directeur. Komite Nyobozi yemeza urutonde rwa nyuma rw’abasabwa gutanga inyandiko z’ipiganwa. The Steering Committee approves the final shortlist of bidders that will be invited to submit bids. Le Comité Directeur approuve la liste finale des soumissionnaires qui seront invités à présenter les offres. - 19 Verify source ↗
Ibitabo by’amabwiriza agenga
AI-assisted research summary: The Contracting Authority must give the bidding documents to shortlisted bidders, and the documents must contain the listed bid and evaluation details.
Ingingo ya 19: Ibitabo by’amabwiriza agenga ipiganwa Article 19: Bidding documents Article 19: Dossiers d’appel d’offres Ingingo ya 19: Ibitabo by’amabwiriza agenga ipiganwa Article 19: Bidding documents Article 19: Dossiers d’appel d’offres rukora Urwego abemerewe gupiganwa agenga ipiganwa. amasezerano rushyikiriza ibitabo by’amabwiriza The Contracting Authority releases the bidding documents to the shortlisted bidders. L’Autorité Contractante met à la disposition des soumissionnaires présélectionnés les dossiers d’appel d’offres. Ibitabo by’amabwiriza agenga ipiganwa bigomba kuba bikubiyemo nibura ibi bikurikira: The bidding documents shall include at least the following: Les dossiers d’appel d’offres comprennent au moins ce qui suit: 1º amakuru y’ingenzi y’umushinga wa PPP itegura akenewe n’itangwa ry’inyandiko z’ipiganwa; n’abapiganwa mu 1º all key information on the PPP project the necessary for preparation and submission of bids; the bidders to 1º les informations clés du projet de PPP nécessaires aux soumissionnaires pour la préparation et la soumission des offres ; 2º umushinga w’ amasezerano ya PPP; 2º the draft PPP agreement; 2º le projet d’accord de PPP; 3º igihe ntarengwa n’ahantu z’ipiganwa zigomba kugezwa; inyandiko 3º the deadline and venue for submission of 3º la date limite et le lieu de soumission des bids; offres; 19 Official Gazette nᵒ 22 of 30/05/2016 4º igihe n’ahantu inyandiko z’ipiganwa 4º the date and venue for bids opening; 4º la date et le lieu d’ouverture des offres ; zigomba gufungurirwa; 5º ibisabwa nk’ingwate y’ipiganwa n’ingano 5º required bid security and its maximum 5º la garantie de soumission requise et sa yayo; quantity; quantité maximale; 6º ibigenderwaho mu ry’inyandiko z’ipiganwa; isesengura 6º criteria while analysing the bidding 6º les critères d’analyse des offres; documents; 7º ibigenderwaho harebwa ko umushinga wa PPP washyizwe mu bikorwa. 7º criteria the evaluation of implementation of the PPP project. for the 7º les critères d’évaluation de l’exécution d’un projet de PPP. - 20 Verify source ↗
Uburyo bw’ibyiciro bibiri mu
AI-assisted research summary: If the contracting authority chooses a two-stage competitive procurement procedure, it must send the bidding documents to shortlisted bidders, hold consultation meetings, and share the meeting minutes. It may also revise the documents and resend them.
Ingingo ya 20: Uburyo bw’ibyiciro bibiri mu gusaba gutanga inyandiko z’ipiganwa Article 20: procurement procedure Two-stage competitive Article 20: Procédure de sollicitation des propositions à deux étapes Ingingo z’ipiganwa no kwemeza raporo 21: Gusesengura ya inyandiko Ingingo ya 20: Uburyo bw’ibyiciro bibiri mu gusaba gutanga inyandiko z’ipiganwa 20: Article procurement procedure Two-stage competitive Article 20: Procédure de sollicitation des propositions à deux étapes Iyo Urwego rukora amasezerano ruhisemo uburyo bw’ibyiciro bibiri mu gusaba gutanga inyandiko z’ipiganwa, rukurikiza ibi bikurikira: Where the Contracting Authority elects to use a two-stage competitive procurement procedure, the Authority conducts it as follows: l’Autorité contractante opte pour Lorsque la procédure à deux étapes de passation de marché, l’Autorité le fait comme suit: 1° guha ibitabo by’amabwiriza agenga ipiganwa abari ku rutonde rw’abemerewe gupiganwa kugira ngo babisuzume; 2° gutumira abari ku rutonde rw’abemerewe nama gupiganwa nyunguranabitekerezo ku bikubiye mu bitabo by’amabwiriza agenga ipiganwa bahawe; mu 1º submit bidding documents to shortlisted bidders for their review; the 1º soumettre les dossiers d’appel d’offres aux pour présélectionnés soumissionnaires examen; 2º convene meetings with the shortlisted bidders for the purpose of consultation on the content of the bidding documents; 2º inviter les soumissionnaires présélectionnés à une réunion de consultation en rapport avec les dossiers d’appel d’offres; 3° gukora inyandikomvugo abari igashyikirizwa rw’abemerewe gupiganwa bose. ku y’inama rutonde 3º prepare minutes of the meeting and submit it to all shortlisted bidders. 3º dresser un procès-verbal de réunion et le les soumissionnaires tous soumettre à présélectionnés. Urwego gusubiramo rukora amasezerano ibitabo by’amabwiriza rushobora agenga The Contracting Authority may revise the bidding documents and re-submit them to the shortlisted bidders. L’Autorité contractante peut revoir les dossiers d’appels d’offres et les soumettre de nouveau aux soumissionnaires présélectionnés. 20 ipiganwa rutonde rw’abemerewe gupiganwa rukongera kubishyikiriza abari ku Official Gazette nᵒ 22 of 30/05/2016 - 21 Verify source ↗
Evaluation of bids documents and
AI-assisted research summary: The Contracting Authority must review and score bids, prepare an evaluation report, and submit it to the Steering Committee for approval.
Article 21: Evaluation of bids documents and approval of the report Article 21: Evaluation des dossiers d’offres et approbation du rapport Ingingo ya 21: Gusesengura z’ipiganwa no kwemeza raporo inyandiko Article 21: Evaluation of bids documents and approval of the report Article 21: Evaluation des dossiers d’offres et approbation du rapport Urwego rukora amasezerano rusuzuma niba inyandiko y’ipiganwa yujuje ibisabwa. The Contracting Authority makes an assessment to find out if the bids documents fulfil the requirements. L’Autorité Contractante examine si les dossiers d’offres remplissent les conditions requises. Urwego rukora amasezerano rusesengura buri nyandiko y’ipiganwa yatanzwe rukayiha amanota isesengura ibigenderwaho mu hakurikijwe ry’inyandiko z’ipiganwa biteganywa n’ibitabo by’amabwiriza agenga ipiganwa. Urwego rukora amasezerano rutegura raporo rugaragaza upiganwa warushije abandi igashyikirizwa Komite Nyobozi kugira ngo iyemeze. isesengura Iyo ipiganwa ryitabiriwe n’umuntu umwe, Urwego rukora amasezerano rusesenguye rugasanga yujuje ibigenderwaho mu ry’inyandiko z’ipiganwa biteganywa mu bitabo by’amabwiriza agenga ipiganwa rukora raporo igaragaza ko yakwemererwa gukora umushinga wa PPP rukayishyikiriza Komite Nyobozi kugira ngo iyemeze. The Contracting Authority reviews and evaluates each of the bids submitted by the bidders and ranks it on the basis of the evaluation criteria set forth in the bidding documents. The Contracting Authority then prepares an evaluation report in which it identifies the preferred bidder and submits it to the Steering Committee for approval. L’Autorité contractante revoit chacune des offres lui soumises et lui donne une note sur base des critères préétablis dans le cahier d’appel d’offres. L’Autorité contractante prépare un rapport sur l’évaluation dans lequel le soumissionnaire préféré est mentionné et le soumet au Comité Directeur pour approbation. Where a competitive procurement procedure results in the submission of only one bid, the Contracting Authority may, in case the bidder fulfils the evaluation criteria set forth in the bidding documents, make a report recommending the bidder to execute the PPP project and submit it to the Steering Committee for approval. le d’un l’offre aboutit Lorsque la procédure de passation de marché en seul à compétition soumissionnaire, l’Autorité contractante peut, au cas où critères d’évaluation énoncés dans le dossier d’appel d’offres, faire un rapport recommandant que le soumissionnaire exécute le projet de PPP et le soumet au Comité Directeur pour approbation. soumissionnaire remplit les Iyo Komite Nyobozi umurongo w’igikwiye gukorwa. itemeje raporo, itanga Where the Steering Committee does not approve the report, it provides a guideline on what should be done. Lorsque le Comité Directeur n’approuve pas le rapport, le Comité donne un avis sur ce qui doit être fait. 21 Official Gazette nᵒ 22 of 30/05/2016 - 22 Verify source ↗
Gusaba kurenganurwa ku
AI-assisted research summary: A dissatisfied PPP partner may file a written complaint to the Steering Committee, and the procurement process is suspended while the complaint is decided.
Ingingo ya 22: Gusaba kurenganurwa ku birebana n’ipiganwa mu mushinga wa PPP Article 22: Filing a complaint regarding competitive procurement procedures for a PPP project Article 22: Plainte en rapport avec la procédure de passation de marché en compétition pour un projet de PPP Ingingo ya 22: Gusaba kurenganurwa ku birebana n’ipiganwa mu mushinga wa PPP Article 22: Filing a complaint regarding competitive procurement procedures for a PPP project Article 22: Plainte en rapport avec la procédure de passation de marché en compétition pour un projet de PPP imigendekere Umufatanyabikorwa utishimiye y’ipiganwa mu mushinga wa PPP ashobora gusaba mu nyandiko Komite Nyobozi kumurenganura. is not satisfied with the A partner who competitive procurement procedures for a PPP project may lodge a written complaint to the Steering Committee. Un partenaire qui n’est pas satisfait par la procédure de passation de marché en compétition pour un projet PPP peut adresser une plainte écrite au Comité Directeur. Inyandiko ishyikirizwa isaba kurenganurwa Komite Nyobozi mu gihe kitarenze iminsi irindwi (7) uhereye ku munsi yamenyesherejwe icyemezo cya Komite Nyobozi. A written complaint is sent to the Steering Committee within seven (7) days after such bidder was informed about the decision by the Steering Committee. La plainte écrite est déposée auprès du Comité Directeur dans un délai de sept (7) jours à partir de la date où il a été informé de la décision par le Comité Directeur. Komite Nyobozi imenyesha umufatanyabikorwa wasabye kurenganurwa umwanzuro ku busabe bwe mu gihe kitarenze iminsi cumi n’itanu (15) uhereye ku munsi yabwakiriyeho. The Steering Committee informs the partner who lodged a complaint the decision regarding his/her request not later than fifteen (15) days from the receipt of the complaint. Le Comité Directeur informe le partenaire de la décision prise en rapport avec son recours dans un délai de quinze (15) jours à compter de la réception de la plainte. hari umufatanyabikorwa wasabye Iyo imigendekere y’ipiganwa mu kurenganurwa, mushinga wa PPP iba isubitswe kugeza igihe Komite Nyobozi itangiye umwanzuro. lodges a complaint, Where a partner the competitive procurement procedure of the PPP project is suspended until the Steering Committee issues a decision. Lorsqu’un partenaire dépose une plainte, la procédure de passation de marché en compétition pour un projet de PPP est suspendue jusqu’ à ce que le Comité Directeur donne sa décision. - 23 Verify source ↗
Imishyikirano ku masezerano ya
AI-assisted research summary: If the Steering Committee approves the preferred bidder, the Contracting Authority invites that bidder to negotiate the PPP agreement with relevant institutions.
Ingingo ya 23: Imishyikirano ku masezerano ya PPP Article 23: Negotiation of a PPP agreement Article 23: Négociation d’un contrat de PPP Ingingo ya 23: Imishyikirano ku masezerano ya PPP Komite Nyobozi imaze kwemeza uwemerewe gukora umushinga wa PPP, Urwego rukora kugirana amasezerano imishyikirano n’inzego bireba ku masezerano ya PPP. rumuhamagarira Article 23: Negotiation of a PPP agreement Article 23: Négociation d’un contrat de PPP le Comité Directeur Lorsque le soumissionnaire pour un projet de PPP, l’Autorité contractante invite le soumissionnaire à mener les négociations de l’accord de PPP avec les institutions concernées. approuve Where the Steering Committee approves the preferred bidder the Contracting Authority invites the bidder to enter into negotiations with relevant institutions on the PPP agreement. for a PPP project, 22 Official Gazette nᵒ 22 of 30/05/2016 - 24 Verify source ↗
Gushyira umukono ku
AI-assisted research summary: After the PPP agreement is approved by the concerned parties, the Contracting Authority and the partner must sign it.
Ingingo ya 24: Gushyira umukono ku masezerano ya PPP Article 24: Signing of a PPP agreement Article 24: Signature d’un accord de PPP UMUTWE WA V: AMASEZERANO YA PPP AKORWA BITANYUZE MU IPIGANWA CHAPTER V: PPP PROCUREMENT PROCEDURE UNSOLICITED FOR PROPOSAL CHAPITRE DE PASSATION DE MARCHES EN CAS D’UNE OFFRE NON SOLLICITEE PROCEDURE V: Ingingo ya 24: Gushyira umukono ku masezerano ya PPP Iyo inzego zose bireba zemeranyijwe ku bikubiye rukora mu masezerano ya PPP, Urwego amasezerano n’umufatanyabikorwa bayashyiraho umukono. Article 24: Signing of a PPP agreement Article 24: Signature d’un accord de PPP Upon approval of the PPP agreement by the concerned parties, the Contracting Authority and the partner sign the PPP agreement. Après approbation de l’accord de PPP par les parties concernées, l’Autorité contractante et le partenaire signent l’accord. UMUTWE WA V: AMASEZERANO YA PPP AKORWA BITANYUZE MU IPIGANWA CHAPTER V: PPP PROCUREMENT PROCEDURE UNSOLICITED FOR PROPOSAL CHAPITRE V: PROCEDURE DE PASSATION DE MARCHES EN CAS D’UNE OFFRE NON SOLLICITEE - 25 Verify source ↗
Igihe amasezerano ya PPP akorwa
AI-assisted research summary: The Contracting Authority may use an unsolicited-proposal procurement procedure only in the listed situations.
Ingingo ya 25: Igihe amasezerano ya PPP akorwa bitanyuze mu ipiganwa Article 25: Circumstances under which procurement procedure for unsolicited proposal is required Article 25: Circonstances la procédure de passation de marché d’une offre non sollicitée requérant Ingingo ya 25: Igihe amasezerano ya PPP akorwa bitanyuze mu ipiganwa Article 25: Circumstances under which procurement procedure for unsolicited proposal is required Article 25: Circonstances requérant la procédure de passation de marché d’une offre non sollicitée Urwego rukora amasezerano rushobora kugirana amasezerano n’umufatanyabikorwa bitanyuze mu ipiganwa mu gihe: in The Contracting Authority may engage procurement procedure with a partner through an unsolicited proposal where: L’Autorité contractante peut engager une procédure de passation de marché d’une offre non sollicitée lorsque: 1° bikenewe cyane ko imirimo y’igikorwa remezo cyangwa serivisi ikomeza kandi bigaragara ipiganwa byayidindiza cyangwa nta nyungu bifitiye Igihugu; gukoresha ko in 1º there is an urgent need to ensure continuity the provision of an infrastructure facility or service and it is clear that engaging in a competitive procurement procedure may cause delay or is not in national’s best interest; dans 1º il y a un besoin urgent pour assurer la continuité d’une les infrastructure ou d’un service et qu’il est évident que la procédure de marché en compétition peut les retarder ou n’est pas dans l’intérêt national; travaux 2° ishyirwa mu bikorwa ry’umushinga wa PPP rirebana n’umutekano w’Igihugu ; 2º the implementation of a PPP project involves matters pertaining to national security; 2º la mise en exécution du projet de PPP sécurité implique des problèmes de nationale; 3° serivisi umwe; ikenewe yihariwe n’umuntu 3º the required service is a monopoly; 3º le service requis est un monopole ; 4° bigaragara ko abikorera bataritabira gushora imari yabo mu gikorwa remezo 4º it is clear that there is little interest of the private in in infrastructure sector or services that the investing sector 4º il est évident que le secteur privé a peu d’intérêt dans le secteur d’infrastructure ou 23 Official Gazette nᵒ 22 of 30/05/2016 cyangwa serivisi Guverinoma ibona ko bifitiye Igihugu akamaro. Government considers to be of national interest. dans le service que l’Etat considère qu’il est dans l’intérêt national. - 26 Verify source ↗
Isuzuma ry’ibanze ry’inyandiko
AI-assisted research summary: The partner prepares a PPP project and sends it to the Contracting Authority; after review, the Contracting Authority sends the report to the Steering Committee for approval and informs the partner of the decision.
Ingingo ya 26: Isuzuma ry’ibanze ry’inyandiko y’umushinga wa PPP Article 26: Preliminary processing of a PPP project Article 26: Analyse préliminaire d’un projet de PPP 4 Official Gazette nᵒ 22 of 30/05/2016 Ingingo ya 26: Isuzuma ry’ibanze ry’inyandiko y’umushinga wa PPP Article 26: Preliminary processing of a PPP project Article 26: Analyse préliminaire d’un projet de PPP abyibwirije Umufatanyabikorwa cyangwa abishishikarijwe n’Urwego rukora amasezerano, ategura umushinga wa PPP akawushyikiriza Urwego ngo ruwusuzume. amasezerano rukora kugira rukora Iyo Urwego kuwusuzuma, rukora Komite Nyobozi kugira ngo iyemeze. raporo amasezerano rumaze rukayishyikiriza On its own initiative or upon proposal by the Contracting Authority, the partner prepares a PPP the Contracting it project and submits Authority for consideration. to De sa propre initiative ou sur proposition de l'Autorité Contractante, le partenaire prépare un projet de PPP et le soumet à l'Autorité Contractante pour examen. After consideration, the Contracting Authority submits the report to Steering Committee for approval. Après examen, l’Autorité contractante soumet le rapport au Comité Directeur pour approbation. rukora Urwego umufatanyabikorwa Nyobozi. amasezerano icyemezo rumenyesha cya Komite The Contracting Authority informs the partner of the decision of the Steering Committee. L'Autorité contractante informe le partenaire de la décision du Comité Directeur. - 27 Verify source ↗
Gukora no kwemeza inyigo
AI-assisted research summary: For an unsolicited PPP proposal, the partner must conduct a feasibility study, and the contracting authority and partner decide who will do it.
Ingingo ya 27: Gukora no kwemeza inyigo y’ikoreka ry’umushinga wa PPP ukozwe bitanyuze mu ipiganwa Article 27: Development and approval of a feasibility study of a PPP project in case of an unsolicited proposal Article 27: Elaboration et approbation d’une étude de faisabilité d’un projet de PPP dans le cas d’une offre non sollicitée Ingingo ya 27: Gukora no kwemeza inyigo y’ikoreka ry’umushinga wa PPP ukozwe bitanyuze mu ipiganwa Article 27: Development and approval of a feasibility study of a PPP project in case of an unsolicited proposal Article 27: Elaboration et approbation d’une étude de faisabilité d’un projet de PPP dans le cas d’une offre non sollicitée Umushinga wa PPP ukozwe bitanyuze mu abyibwirije ipiganwa, umufatanyabikorwa cyangwa rukora abishishikarijwe n’Urwego amasezerano, hakorwa inyigo y’ikoreka. In case of an unsolicited proposal for a PPP project, the partner, on its own initiative or upon proposal by the contracting Authority, conducts a feasibility study. Lors de la passation de marché dans le cas d’une offre non sollicitée d’un projet de PPP, le partenaire, de sa propre initiative ou sur proposition de l'Autorité contractante, mène une étude de faisabilité. Ibiyikubiyemo byubahiriza ngingo ya 13 y’iri tegeko. ibiteganywa mu The content of the feasibility study complies with the provisions of Article 13 of this Law. Le contenu de l'étude de faisabilité se conforme aux dispositions de l'article 13 de la présente loi. amasezerano Urwego n’umufatanyabikorwa bumvikana ukora iyo nyigo. rukora The Contracting Authority and the partner decide who conducts the study. L’Autorité Contractante et le partenaire se mettent d’accord sur celui qui mène l’étude. 24 Official Gazette nᵒ 22 of 30/05/2016 Iyo inyigo y’ikoreka yakozwe n’Urwego rukora amasezerano ruyishyikiriza Komite Nyobozi kugira ngo iyemeze. Where the Contracting Authority conducts the feasibility study, it submits the study to the Steering Committee for approval. l'étude de faisabilité est menée par Lorsque l’Autorité Contractante, cette dernière la remet au Comité Directeur pour approbation. Iyo inyigo y’ikoreka ikozwe n’umufatanyabikorwa ishyikirizwa Urwego amasezerano rukayisesengura mbere y’uko ishyikirizwa Komite Nyobozi kugira ngo iyifateho icyemezo. rukora Where the feasibility study is conducted by the partner, it is submitted to the Contracting Authority prior to submission to the Steering Committee for a decision thereon. Lorsque l’étude de faisabilité est menée par le partenaire, elle est remise à l’Autorité contractante avant d’être soumise au Comité Directeur pour la prise de décision y relative. Iyo Komite Nyobozi itemeje inyigo y’ikoreka, itanga umurongo w’igikwiye gukorwa. Where the Steering Committee does not approve the feasibility study, it provides a guideline on what should be done. Lorsque le Comité Directeur n’approuve pas l'étude de faisabilité, il donne la ligne à suivre. - 28 Verify source ↗
Kugira
AI-assisted research summary: After approval of the feasibility study, the contracting authority asks the partner to negotiate with the relevant institutions, and they sign the PPP agreement only if all concerned institutions agree.
Ingingo ya 28: Kugira masezerano ya PPP no kuyashyiraho umukono imishyikirano ku Article 28: Negotiations and signing of a PPP agreement Article 28: Négociations et signature d’un accord de PPP UMUTWE WA VI: INGINGO ZINYURANYE N’IZISOZA CHAPTER VI: MISCELLANEOUS AND FINAL PROVISIONS CHAPITRE VI: DISPOSITIONS DIVERSES ET FINALES Ingingo ya 28: Kugira imishyikirano ku masezerano ya PPP no kuyashyiraho umukono Article 28: Negotiations and signing of a PPP agreement Article 28: Négociations et signature d’un accord de PPP Komite Nyobozi imaze kwemeza inyigo y’ikoreka ku mushinga wa PPP ukozwe bitanyuze mu amasezerano ipiganwa, ruhamagarira kugirana n’inzego bireba imishyikirano ku masezerano ya PPP. umufatanyabikorwa Urwego rukora Upon the approval by the Steering Committee of the feasibility study of a PPP project submitted following the unsolicited Contracting Authority calls upon the partner to negotiate with the institutions concerned with a PPP agreement. proposal, an Après l’approbation par le Comité Directeur de l'étude de faisabilité du projet de PPP soumis selon l’offre non sollicitée, l'Autorité contractante appelle le partenaire à faire les négociations avec les institutions concernées sur l’accord de PPP. Iyo inzego zose bireba zemeranyijwe ku bikubiye rukora mu masezerano ya PPP, Urwego amasezerano n’umufatanyabikorwa bayashyiraho umukono. Where all concerned institutions agree on the provisions of the PPP agreement, the Contracting Authority and the partner sign the PPP agreement. Lorsque toutes les institutions concernées sont d’accord sur les clauses de l’accord de PPP, l'Autorité contractante et le partenaire signent l’accord de PPP. UMUTWE WA VI: INGINGO ZINYURANYE N’IZISOZA CHAPTER VI: MISCELLANEOUS AND FINAL PROVISIONS CHAPITRE VI: DISPOSITIONS DIVERSES ET FINALES - 29 Verify source ↗
Ibanga mu mushinga wa PPP
AI-assisted research summary: Information, communications, and negotiations shared between the Government institutions involved in a PPP project and the partner are confidential.
Ingingo ya 29: Ibanga mu mushinga wa PPP Article 29: Confidentiality in a PPP project Article 29: Confidentialité dans un projet de PPP Ingingo ya 29: Ibanga mu mushinga wa PPP Article 29: Confidentiality in a PPP project Article 29: Confidentialité dans un projet de PPP Itumanaho hamwe n’amakuru asangiwe hagati y’inzego za Leta zigira imishyikirano ryose, Any information communications, shared negotiations and between Government Toutes les communications, les négociations et les informations entre les institutions de l’Etat jouant un 25 uruhare n’umufatanyabikorwa bifatwa nk’ibanga. mushinga mu wa Official Gazette nᵒ 22 of 30/05/2016 PPP institutions playing a role in the PPP project and the partner are confidential. rôle dans le projet de PPP et le partenaire sont confidentielles. Icyakora, ibivugwa mu gika cya mbere cy’iyi ngingo bitangajwe mu rwego rwo kubahiriza amategeko ntibifatwa nko kumena ibanga. However, provisions of Paragraph One of this - 30 Verify source ↗
Ihezwa mu mushinga wa PPP
AI-assisted research summary: A PPP partner is disqualified for five years for listed misconduct, and permanent disqualification can follow repeat offending or being on the public procurement disqualification list.
Ingingo ya 30: Ihezwa mu mushinga wa PPP Article 30: Disqualification from PPP project Article 30: Disqualification du projet de PPP Ingingo ya 30: Ihezwa mu mushinga wa PPP Article 30: Disqualification from PPP project Article 30: Disqualification du projet de PPP Umufatanyabikorwa ahezwa mu mushinga wa PPP mu gihe cy’imyaka itanu (5) kubera imwe mu mpamvu zikurikira: A partner is disqualified from a PPP project for a period of five (5) years for one of the following reasons: Un partenaire est disqualifié du projet de PPP pour une période de cinq (5) ans pour l’une des raisons suivantes : 1º yatanze amakuru atari yo arebana 1º having provided false information 1º avoir donné de fausses informations n’isosiyete; regarding the company; concernant la société; 2º ahamwe n’icyaha cyo guhimba cyangwa 2º having been convicted of forgery; 2º avoir été reconnu coupable de faux et usage gukoresha inyandiko mpimbano; de faux; 3º atubahirije amategeko kugira ngo ahabwe 3º having violated applicable laws to obtain 3º avoir violé les lois en vigueur pour être amasezerano ya PPP; a PPP Project; attribuer un projet de PPP ; 4º ahamwe n’igikorwa cy’uburiganya mu 4º having been convicted of fraud in 4º avoir commis la fraude en rapport avec un mushinga wa PPP; connection with PPP project; projet PPP ; 5º yahamwe n’icyaha cya ruswa n’ibyaha 5º having been convicted of the crime of 5º avoir été reconnu coupable de crime de bifitanye isano na yo. corruption and related offenses; corruption et infractions connexes; Umufatanyabikowa wahejwe mu mishinga ya PPP akongera kugaragarwaho na kimwe mu bivugwa mu gika cya mbere cy’iyi ngingo ahezwa burundu. A partner disqualified from PPP projects for committing any of the offenses set out in Paragraph One of this Article, shall in case of recidivism be permanently disqualified. Un partenaire disqualifié des projets de PPP pour avoir commis l’une des infractions énumérées à l’alinéa premier du présent article est disqualifié définitivement en cas de récidive. 26 Official Gazette nᵒ 22 of 30/05/2016 Umufatanyabikorwa ahezwa kandi mu mushinga wa PPP igihe ari ku rutonde rw’abahejwe mu masoko ya Leta. A partner is also disqualified from PPP projects in case he/she is found on the list of persons disqualified from public procurement procedures. Un partenaire est également disqualifié des projets de PPP au cas où il se trouve sur la liste des personnes disqualifiées de la procédure de passation des marchés publics. - 31 Verify source ↗
Ububasha bwo guheza
AI-assisted research summary: The Rwanda Development Board may disqualify a partner from a PPP project, after giving written notice and hearing the partner.
Ingingo ya 31: Ububasha bwo guheza umufatanyabikorwa mu mushinga wa PPP Article 31: Power to disqualify a partner from a PPP project Article 31: Pouvoir de disqualifier un partenaire d’un projet de PPP Ingingo ya 31: Ububasha bwo guheza umufatanyabikorwa mu mushinga wa PPP Article 31: Power to disqualify a partner from a PPP project Article 31: Pouvoir de disqualifier un partenaire d’un projet de PPP Urwego rushinzwe iterambere mu Rwanda ni rwo rufite ububasha bwo guheza umufatanyabikorwa mu mushinga wa PPP. The Rwanda Development Board is competent to disqualify a partner from a PPP project. L’Office pour la Promotion du Développement au Rwanda est compétent de disqualifier un partenaire d’un projet de PPP. Iyo Urwego rushinzwe iterambere mu Rwanda rumenye ko umufatanyabikorwa agaragayeho imwe mu mpamvu zivugwa mu ngingo ya 30 y’iri tegeko, rumutumiza mu nyandiko kuza gutanga ibisobanuro mu gihe kitarenze iminsi cumi n’itanu (15). Where Rwanda Development Board discovers that a partner is linked to one of the reasons referred to under Article 30 of this Law, it summons that partner in writing to provide explanations within a period not exceeding fifteen (15) days. pour l’Office la Promotion du Lorsque Développement au Rwanda remarque qu’un partenaire a fait montre l’une des raisons visées à l’article 30 de la présente loi, il le convoque par écrit pour donner des explications dans un délai ne dépassant pas quinze (15) jours. rushinzwe Urwego iterambere mu Rwanda rumenyesha mu nyandiko umufatanyabikorwa icyemezo rwafashe mu gihe kitarenze iminsi cumi n’itanu (15) uhereye ku munsi rumaze kumwumva. The Rwanda Development Board notifies in writing the partner of the decision taken within fifteen (15) days from the date of his/her hearing. L’Office pour la Promotion du Développement au Rwanda notifie le partenaire de la décision dans un délai ne dépassant pas quinze (15) jours après l’audition. ari Urwego icyemezo cyafashwe uguheza Iyo umufatanyabikorwa, rushinzwe iterambere mu Rwanda rumushyira ku rutonde rw’abahezwa mu mishinga ya PPP rugatangazwa mu binyamakuru nibura bibiri bisomwa cyane mu gihugu no mu kinyamakuru nibura kimwe cyo ku rwego mpuzamahanga, ku rubuga rwa interineti y’Urwego rushinzwe iterambere mu Rwanda n’iy’Urwego rushinzwe amasoko ya Leta. Where the decision taken is disqualification, the Rwanda Development Board puts the partner on the list of persons disqualified from PPP projects. The list is published at least in two widely read international national newspapers and one newspaper, on the websites of Rwanda Development Board and of Rwanda Public Procurement Authority. Si la décision prise est de disqualifier un partenaire, l’Office pour la Promotion du Développement au Rwanda le met sur la liste de personnes disqualifiées pour les projets de PPP et publie cette liste au moins dans deux journaux nationaux les plus lus et un journal international, sur le site-web de l’Office pour la Promotion du Développement au Rwanda et celui de l’Office National des Marchés Publics. 27 Official Gazette nᵒ 22 of 30/05/2016 Icyemezo cyo guheza umufatanyabikorwa mu mishinga ya PPP ntigikuraho kuba yakurikiranwa mu butabera. The decision to disqualify a partner from PPP projects does not exclude the partner’s prosecution. La décision de disqualifier un partenaire des projets PPP n’exclue pas qu’un partenaire soit poursuivi en justice. - 32 Verify source ↗
Agaciro k’ibyakozwe mbere y’iri
AI-assisted research summary: Prior acts and contracts for certain PPP procurement matters made before publication of the Law remain valid.
Ingingo ya 32: Agaciro k’ibyakozwe mbere y’iri tegeko Article 32: Validity of acts performed prior to this Law Article 32: Validité des actes posés avant la présente loi Ingingo ya 32: Agaciro k’ibyakozwe mbere y’iri tegeko Article 32 Validity of acts performed prior to this Law Article 32: Validité des actes posés avant la présente loi Ibikorwa byarangiye birebana n’ipiganwa ku mishinga ya PPP cyangwa mu mishinga ya PPP ikorwa bitanyuze mu ipiganwa n’amasezerano yashyizweho umukono mbere y’uko iri tegeko ritangazwa mu Igazeti ya Leta ya Repubulika y’u Rwanda bigumana agaciro kabyo. All prior acts the procurement regarding procedure in PPP projects or PPP projects for unsolicited proposal and any contract signed prior to the date of publication of this Law in the Official Gazette of the Republic of Rwanda remain into force. Tous les actes antérieurs relatifs aux procédures de passation de marché de projets de PPP ou les projets de PPP en offre non sollicitée et tous contrats signés avant la publication de la présente loi au Journal Officiel de la République du Rwanda restent valides. - 33 Verify source ↗
Itegurwa, isuzumwa n’itorwa
AI-assisted research summary: This article says the law was drafted in English and considered and adopted in Kinyarwanda.
Ingingo ya 33: Itegurwa, isuzumwa n’itorwa by’iri tegeko Article 33: Drafting, consideration and adoption of this Law Article 33: Initiation, examen et adoption de la présente loi Ingingo ya 33: Itegurwa, isuzumwa n’itorwa by’iri tegeko Article 33: Drafting, consideration and adoption of this Law Article 33: Initiation, examen et adoption de la présente loi Iri tegeko ryateguwe mu rurimi rw’Icyongereza, risuzumwa rurimi rw’Ikinyarwanda. ritorwa mu kandi Ingingo 34: z’amategeko zinyuranyije n’iri tegeko Ivanwaho ya ry’ingingo This Law was drafted in English, considered and adopted in Kinyarwanda. La présente loi a été initiée en anglais, examinée et adoptée en kinyarwanda. - 34 Verify source ↗
Ivanwaho ry’ingingo z’amategeko
AI-assisted research summary: Any earlier legal provisions that conflict with this Law are repealed.
Ingingo ya 34: Ivanwaho ry’ingingo z’amategeko zinyuranyije n’iri tegeko Article 34: Repealing provision Article 34: Disposition abrogatoire Article 34: Repealing provision Article 34: Disposition abrogatoire Ingingo zose z’amategeko abanziriza iri kandi zinyuranyije naryo zivanyweho. All prior legal provisions contrary to this Law are hereby repealed. Toutes les dispositions légales antérieures contraires à la présente loi sont abrogées. - 35 Verify source ↗
Igihe
AI-assisted research summary: This article says the law starts to apply on the date it is published in the Official Gazette of the Republic of Rwanda.
Ingingo ya 35: Igihe gukurikizwa iri tegeko ritangira Article 35: Commencement Article 35: Entrée en vigueur 5 Official Gazette nᵒ 22 of 30/05/2016 ITEGEKO Nº 14/2016 RYO KU WA 02/05/2016 RIGENGA UBUFATANYE BW’INZEGO ZA LETA N’ABIKORERA Nº LAW GOVERNING PARTNERSHIPS 14/2016 OF PUBLIC 02/05/2016 PRIVATE LOI Nº 14/2016 DU 02/05/2016 REGISSANT LES PARTENARIATS PUBLIC-PRIVE Twebwe, KAGAME Paul, Perezida wa Repubulika; We, KAGAME Paul, President of the Republic; Nous, KAGAME Paul, Président de la République ; INTEKO ISHINGA AMATEGEKO YEMEJE, NONE NATWE DUHAMIJE, DUTANGAJE RITYA KANDI ITEGEKO DUTEGETSE KO RYANDIKWA MU IGAZETI YA LETA YA REPUBULIKA Y’U RWANDA RITEYE THE PARLIAMENT HAS ADOPTED AND WE SANCTION, PROMULGATE THE FOLLOWING LAW AND ORDER IT BE PUBLISHED IN THE OFFICIAL GAZETTE OF THE REPUBLIC OF RWANDA LE PARLEMENT A ADOPTE ET NOUS SANCTIONNONS, PROMULGUONS LA LOI DONT LA TENEUR SUIT ET ORDONNONS QU’ELLE SOIT PUBLIEE AU JOURNAL OFFICIEL DE LA REPUBLIQUE DU RWANDA INTEKO ISHINGA AMATEGEKO: THE PARLIAMENT: LE PARLEMENT: Umutwe w’Abadepite, mu nama yawo yo ku wa 2 Werurwe 2016; The Chamber of Deputies, in its session of 2 March 2016; La Chambre des Députés, en sa séance du 2 mars 2016; Ishingiye ku Itegeko Nshinga rya Repubulika y’u Rwanda ryo mu 2003 ryavuguruwe mu 2015, cyane cyane mu ngingo zaryo, iya 64, iya 69, iya 70, iya 88, iya 90, iya 91, iya 106, iya 120 n’iya 176; Pursuant to the Constitution of the Republic of Rwanda of 2003 revised in 2015, especially in Articles 64, 69, 70, 88, 90, 91, 106, 120 and 176; Vu la Constitution de la République du Rwanda de 2003 révisée en 2015, spécialement en ses articles 64, 69, 70, 88, 90, 91, 106, 120 et 176; YEMEJE: ADOPTS: ADOPTE: 6 Official Gazette nᵒ 22 of 30/05/2016 UMUTWE WA MBERE: RUSANGE INGINGO CHAPTER ONE: GENERAL PROVISIONS CHAPITRE GENERALES PREMIER: DISPOSITIONS Ingingo ya 35: Igihe iri tegeko ritangira gukurikizwa Iri ritangira gukurikizwa ku munsi tegeko ritangarijweho mu Igazeti ya Leta ya Repubulika y’u Rwanda. Article 35: Commencement Article 35: Entrée en vigueur This Law comes into force on the date of its publication in the Official Gazette of the Republic of Rwanda. La présente loi entre en vigueur le jour de sa publication au Journal Officiel de la République du Rwanda. Kigali, ku wa 02/05/2016 Kigali, on 02/05/2016 Kigali, le 02/05/2016 28 Official Gazette nᵒ 22 of 30/05/2016 (sé) KAGAME Paul Perezida wa Repubulika (sé) KAGAME Paul President of the Republic (sé) KAGAME Paul Président de la République (sé) MUREKEZI Anastase Minisitiri w’Intebe (sé) MUREKEZI Anastase Prime Minister (sé) MUREKEZI Anastase Premier Ministre Bibonywe kandi bishyizweho ikirango cya Repubulika: (sé) BUSINGYE Johnston Minisitiri w’Ubutabera/Intumwa Nkuru ya Leta Seen and sealed with the Seal of the Republic: (sé) BUSINGYE Johnston Minister of Justice/Attorney General Vu et scellé du Sceau de la République: (sé) BUSINGYE Johnston Ministre de la Justice/Garde des Sceaux 29 - 1000 Verify source ↗
ade public so as to comply with laws are
AI-assisted research summary: Information made public in compliance with the law is not treated as a breach of confidentiality.
Article made public so as to comply with laws are not considered as breach of confidentiality. Cependant, les cas mentionnés à l'alinéa premier du présent article rendus publiques dans le respect des lois ne sont pas considérées comme une violation de la confidentialité.
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
LAW Nº14/2016 OF 02/05/2016 GOVERNING PUBLIC PRIVATE PARTNERSHIPS
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in