LAW N° 32/2015 OF 11/06/2015 RELATING TO EXPROPRIATION IN THE PUBLIC INTEREST
This law sets out the procedures for expropriation in the public interest.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Rwanda
- Instrument
- Act or statute
- Citation
- 32/2015 OF 11/06/2015
- Status
- In force
- Version
- Undated source snapshot
- Language
- mul
- Updated
- Official source
- View official record ↗
Statute overview
About this statute
This law sets out the procedures for expropriation in the public interest. This article defines key terms used in the law, including public interest acts, long-term acts, fair compensation, expropriation in the public interest, person, applicant for expropriation, expropriator, and person to be expropriated. Only the Government may order expropriation in the public interest, and people may not obstruct expropriation-related work or public-interest underground/surface activity on their land. Projects that plan expropriation for public interest must budget for property valuation and fair compensation. This article lists activities treated as public-interest works and says the Minister in charge of lands may determine additional ones.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of LAW N° 32/2015 OF 11/06/2015 RELATING TO EXPROPRIATION IN THE PUBLIC INTEREST
Showing 43 of 43
- 1 Verify source ↗
Icyo iri tegeko rigamije
AI-assisted research summary: This law sets out the procedures for expropriation in the public interest.
Ingingo ya mbere: Icyo iri tegeko rigamije Article One: Purpose of this Law Article premier: Objet de la présente loi article premier; to Pursuant the International Covenant on Economic, Social and Cultural Rights signed in New York, United States of America on 19 December 1966 as ratified by Decree-Law n° 8/75 of 12 February 1975, especially in Article One; Vu le Pacte relatif aux droits économiques, sociaux et culturels signé à New York, aux Etats Unis d’Amérique le 19 décembre 1966 tel que ratifié par le Décret-Loi n° 8/75 du 12 février 1975, spécialement en son article premier; Pursuant to the African Charter on Human and Peoples’ Rights signed in Nairobi on 27 June 1981 as ratified by Law n° 10/1983 of 1stJuly 1983, especially in Article 14; Vu la Charte africaine des droits de l’homme et des peuples signé à Nairobi le 27 juin 1981 telle que ratifiée par la Loi n° 10/1983 du 1er juillet 1983, spécialement en son article 14; Ishingiye ku Itegeko Ngenga no 04/2005 ryo ku wa 08 Mata 2005 rigena uburyo bwo kurengera, kubungabunga no guteza imbere ibidukikije mu Rwanda; Pursuant to Organic Law no 04/2005 of 08 April 2005 determining the modalities of protection, conservation and promotion of environment in Rwanda; Vu la Loi organique n° 04/2005 du 08 avril 2005 portant modalités de protéger, sauvegarder et promouvoir l’environnement au Rwanda; Ishingiye ku Itegeko no 43/2013 ryo ku wa 16/06/2013 rigenga ubutaka mu Rwanda; Pursuant to Law no 43/2013 of 16/06/2013 governing land in Rwanda; Vu la Loi no 43/2013 du 16/06/2013 portant régime foncier au Rwanda; 22 Official Gazette nᵒ 35 of 31/08/2015 Isubiye ku Itegeko n° 18/2007 ro ku wa 19 Mata 2007 ryerekeye kwimura abantu ku mpamvu z’inyungu rusange; Having reviewed Law no 18/2007 of 19 April 2007 relating to expropriation in the public interest; Revu la Loi n° 18/2007 du 19 avril 2007 portant expropriation pour cause d’utilité publique; YEMEJE: ADOPTS: ADOPTE: UMUTWE WA MBERE: RUSANGE INGINGO CHAPTER ONE: GENERAL PROVISIONS CHAPITRE PREMIER: DISPOSITIONS GENERALES Ingingo ya mbere: Icyo iri tegeko rigamije Article One: Purpose of this Law Article premier: Objet de la présente loi Iri tegeko rigena uburyo kwimura abantu ku mpamvu z’inyungu rusange bikorwa. This Law determines procedures relating to expropriation in the public interest. La présente loi détermine d’expropriation pour cause d’utilité publique. les procédures - 2 Verify source ↗
Ibisobanuro by’amagambo
AI-assisted research summary: This article defines key terms used in the law, including public interest acts, long-term acts, fair compensation, expropriation in the public interest, person, applicant for expropriation, expropriator, and person to be expropriated.
Ingingo ya 2: Ibisobanuro by’amagambo Article 2: Definitions of terms Article 2:Définitions des termes Ingingo ya 2: Ibisobanuro by’amagambo Article 2: Definitions of terms Article 2: Définitions des termes iri Muri tegeko, asobanurwa ku buryo bukurikira: amagambo akurikira For the purposes of this Law, the following terms shall have the following meanings: Aux fins de la présente loi, les termes repris ci- après ont les significations suivantes: 1° igikorwa cy’inyungu rusange: igikorwa cya Leta, icy’inzego z’ibanze zifite ubuzimagatozi cyangwa icy’ibigo bya Leta kigamije imibereho inyungu cyangwa myiza by’abaturage muri rusange; 1° act of public interest: an act of Government, local entities with legal personality or public institutions, aiming at the interest or well- being of the general public; 1° opération d’utilité publique: travaux de l’Etat, des entités la personnalité juridique ou des établissements publics, visant l’intérêt ou le bien-être de la population en général; locales dotées de 2° igikorwa kirambye: igikorwa cyose gikorerwa ku butaka kikaba cyarenza iminsi (120) ijana na makumyabiri kikiburiho; 3° indishyi ikwiye: indishyi k’ubutaka n’ibyabukoreweho y’agaciro ihabwa 2° long term act: any activity performed on land and likely to remain there for more than one hundred and twenty (120) days; 2° opérationà long terme: toute activité réalisée sur un terrain et susceptible d’y rester pour une durée de plus de cent vingt (120) jours; 3° fair compensation: an indemnity equivalent the activities the value of land and to 23 3° juste compensation équivalente à la valeur d’un terrain, à des indemnisation: uwimurwa kandi ibarwa hashingiwe ku biciro n’indishyi ku y’ihungabana ritewe no kwimurwa; isoko biri Official Gazette nᵒ 35 of 31/08/2015 performed thereon given to the person to be expropriated and calculated in consideration of market prices as well as compensation for disturbance due to expropriation; opérations qui y sont réalisées versée à l’exproprié et calculée en application du tarif du marché ainsi que l’indemnisation de perturbation suite à l’expropriation; 4° kwimura abantu ku mpamvu z'inyungu rusange: igikorwa gishingiye ku bubasha bufitwe na Leta, ibigo bya Leta n’inzego z’ibanze zifite ubuzima gatozi bwo gukura umuntu mu mutungo we ku mpamvu z’inyungu rusange habanje gutangwa indishyi ikwiye; 4° expropriation in the public interest: an act based on power of Government, public institutions and local administrative entities with legal personality to remove a person from his/her property in the public interest after fair compensation; 5° umuntu: umuntu ku giti cye, abantu bafatanyije umutungo w’ubutaka, isosiyete cyangwa y’ubucuruzi, ishyirahamwe bifite ubuzima gatozi; umuryango 5° person: a natural person, a group of persons sharing land property, a business company, an organisation or association with legal personality; 4° expropriation pour cause d'utilité publique: acte basé sur le pouvoir réservé à l'Etat, aux entités établissements la administratives personnalité de déplacer une personne de sa propriété pour cause d’utilité publique, après lui avoir donné une juste indemnisation; publics locales et dotées juridique aux de 5° personne: personne physique, groupe de personnes partageant la propriété foncière, ou société association dotée de la personnalité juridique; commerciale, organisation 6° usaba kwimura: Urwego rwa Leta, rwifuza kwimura abantu ku mpamvu z’inyungu rubanje kubisaba uwimura; rusange, 6° applicant for expropriation: a Government organ that intends to carry out the act of expropriation in the public interest after submitting an application to the expropriator; 6° demandeur d’expropriation: organe de l’Etat désirant procéder à l’expropriation pour cause d’utilité publique après avoir adressé sa demande à l’expropriant ; 7° uwimura: Urwego rwa Leta rufite inshingano n’ububasha ruhabwa n’itegeko byo ku mpamvu abantu z’inyungu rusange; kwimura 7° expropriator: a Government organ with responsibilities and powers conferred by the law to carry out expropriation in the public interest; 7° expropriant: organe de l’Etat ayant, en vertu de la loi, les attributions et les pouvoirs d’expropriation pour cause d’utilité publique; 8° uwimurwa: umuntu wese ugiye gukurwa mu bye ku mpamvu z’inyungu rusange. 8° person to be expropriated: any person who is to be removed from his or her private property due to public interest. 8° exproprié: toute personne devant être déplacée de sa propriété privée pour cause d’utilité publique. 24 Official Gazette nᵒ 35 of 31/08/2015 - 3 Verify source ↗
Ububasha bwo gutegeka ko
AI-assisted research summary: Only the Government may order expropriation in the public interest, and people may not obstruct expropriation-related work or public-interest underground/surface activity on their land.
Ingingo ya 3: Ububasha bwo gutegeka ko abantu bimurwa ku mpamvu z’inyungu rusange Article 3: Powers to order expropriation in the public interest Article 3: Pouvoirs d’ordonner l’expropriation pour cause d’utilité publique Ingingo ya 3: Ububasha bwo gutegeka ko abantu bimurwa ku mpamvu z’inyungu rusange Article 3: Powers to order expropriation in the public interest Article 3: Pouvoirs d’ordonner l’expropriation pour cause d’utilité publique Leta ni yo yonyine ishobora gutegeka kwimura abantu ku mpamvu z’inyungu rusange. Only the Government shall order expropriation in the public interest. Seul l'Etat est habilité à ordonner l’expropriation pour cause d’utilité publique. Kwimura abantu nk’uko biteganywa muri iri tegeko, bikorwa gusa ku mpamvu z’inyungu rusange kandi habanje gutangwa indishyi ikwiye. Ntawe ugomba kwitwaza inyungu ze bwite ngo abangamire ishyirwa mu bikorwa rya gahunda yo kwimura abantu ku mpamvu z’inyungu rusange. Ntawe ushobora kubuza ibikorerwa mu kuzimu cyangwa hejuru y’ubutaka bwe bigamije inyungu rusange. Iyo ibyo bikorwa bimuteye igihombo abibonera indishyi ikwiye. Expropriation as provided for under this Law shall be carried out only in the public interest and with prior and fair compensation. L’expropriation prévue par la présente loi n’a lieu qu’aux seules fins d’utilité publique et moyennant une juste et préalable indemnisation. No person shall hinder the implementation of the program of expropriation in the public interest on pretext of self-centred interests. Nul ne peut se prévaloir de ses propres intérêts pour compromettre la mise en œuvre du programme d’expropriation pour cause d’utilité publique. No person shall oppose any underground or surface activity carried out on his/her land with an aim of public interest. In case it causes any loss to him/her, he/she shall receive fair compensation for it. Nul ne peut s’opposer à l’exploitation du sous-sol ou de la partie superficielle de son terrain pour cause d’utilité publique. Lorsque l’exploitation lui est préjudiciable, juste il en indemnisation. reçoit une - 4 Verify source ↗
Amafaranga y’igikorwa
AI-assisted research summary: Projects that plan expropriation for public interest must budget for property valuation and fair compensation.
Ingingo ya 4: Amafaranga y’igikorwa cy’ibarura ry’umutungo n’ay’indishyi ikwiye Article 4: Funds for property valuation and fair compensation Article 4: Fonds pour l’évaluation des biens et le paiement d’une juste indemnisation II: UMUTWE WA BY’INYUNGU RUSANGE IBIKORWA CHAPTER II:ACTIVITIES OF PUBLIC INTEREST CHAPITRE PUBLIQUE II: TRAVAUX D’UTILITE Ingingo ya 4: Amafaranga y’igikorwa cy’ibarura ry’umutungo n’ay’indishyi ikwiye Article 4: Funds for property valuation and fair compensation Article 4: Fonds pour l’évaluation des biens et le paiement d’une juste indemnisation Buri mushinga, ku rwego urwo ari rwo rwose, uteganya ibikorwa byo kwimura abantu ku mpamvu z’inyungu rusange ugomba guteganya amafaranga y’igikorwa cy’ibarura ry’umutungo w’uwimurwa n’ay’indishyi ikwiye. Every project, at any level, which intends to carry out acts of expropriation in the public interest, shall budget for valuation of the property of the person to be expropriated and for fair compensation. Tout projet qui, à n’importe quel niveau, envisage l’expropriation pour cause d’utilité publique doit prévoir sur son budget les fonds permettant l’évaluation des biens de le paiement d’une juste indemnisation. l’exproprié et 25 Official Gazette nᵒ 35 of 31/08/2015 UMUTWE WA II: BY’INYUNGU RUSANGE IBIKORWA CHAPTER II: ACTIVITIES OF PUBLIC INTEREST CHAPITRE PUBLIQUE II: TRAVAUX D’UTILITE - 5 Verify source ↗
Urutonde
AI-assisted research summary: This article lists activities treated as public-interest works and says the Minister in charge of lands may determine additional ones.
Ingingo ya 5: Urutonde by’inyungu rusange rw’ibikorwa Article 5: List of activities of public interest Article 5:Liste des travaux d’utilité publique Ingingo ya 5: Urutonde by’inyungu rusange rw’ibikorwa Article 5: List of activities of public interest Article 5: Liste des travaux d’utilité publique Ibikorwa by’inyungu rusange ni ibi bikurikira: Activities of public followings: interest shall be the Les travaux d’utilité publique sont les suivants: 1° imihanda n’inzira ya gari ya moshi; 1° roads and railway lines; 1° les routes et les chemins de fer; 2° imiyoboro y’amazi n’ibigega by’amazi; rusange 2° water pipes and public reservoirs; 2° les canalisations d’eau et d’eaux publics; les réservoirs 3° imiyoboro itwara amazi yanduye n’aho atunganyirizwa; 3° water sewage and treatment plants ; 3° les égouts et les stations de traitement des eaux usées; 4° ingomero z’amazi; 4° water dams; 4° les barrages hydrauliques; 5° imiyoboro y’amazi y’imvura ikorwa ku mihanda; 5° rainwater pipes built alongside the roads; 5° les canalisations d’eaux pluviales sur les bordures des routes; 6° ahatunganyirizwa imyanda; 6° waste treatment sites; 6° les lieux de traitement des déchets; 7° imiyoboro y’amashanyarazi; 7° electric lines; 7° les passages des câbles électriques; 8° imiyoboro ya gazi, peterori n’ibigega byabyo; 8° gas and oil pipelines and tanks; 8° les gazoducs et les oléoducs ainsi que les réservoirs de gaz et de pétrole; 9° imiyoboro y’itumanaho; 9° communication lines; 9° passages les télécommunication; des câbles de 10° ibibuga by’indege; 10° airports and airfields; 10° les aéroports; 26 Official Gazette nᵒ 35 of 31/08/2015 11° aho bategera ibinyabiziga, gari ya moshi 11° motor car parks, train stations and ports ; 11° les gares routières, les gares ferroviaires et les n’amato n’aho babyururukira; ports; 12° ahantu hakomye hagamije kurengera urusobe rw’ibinyabuzima, umuco gakondo n’amateka y’Igihugu; 12° biodiversity, cultural and historical reserved areas; 12° les domaines réservés à la préservation de la biodiversité, de la culture traditionnelle et de l’histoire du pays; 13° ibikorwa bigamije umutekano n’ubusugire 13° facilities meant for security and national 13° les installations relatives à la sécurité et à bw’Igihugu; sovereignty; l’intégrité nationale; 14° ibitaro, ibigo nderabuzima, amavuriro n’izindi nyubako zifitanye isano n’ubuvuzi rusange; 14° hospitals, health centres, dispensaries and other public health related buildings ; 14° les hôpitaux, les centres de santé, les dispensaires et d’autres établissements de santé publique; 15° amashuri n’izindi nyubako zifitanye isano 15° schools and other related buildings; 15° les écoles et autres bâtiments y afférents; na yo; 16° inyubako z’inzego z’ubuyobozi bwa Leta 16° Government administrative buildings and 16° les bâtiments administratifs publics et ceux n’ibigo byayo; those of public institutions; des établissements publics; 17° ibibuga, ubusitani rusange n’inyubako 17° public entertainment playgrounds, gardens bigenewe imikino n’imyidagaduro; and buildings; 17° les les terrains, les bâtiments publics destinés aux sports et aux loisirs; jardins publics et 18° amasoko; 19° amarimbi; 18° markets; 19° cemeteries; 18° les marchés; 19° les cimetières; 20° inzibutso za jenoside; 20° genocide memorial sites; 20° les mémoriaux du génocide; 21° imirimo yo bikorwa ibishushanyo mbonera by’imitunganyirize y’imikoreshereze y’ubutaka; gushyira mu 21° activities implement to development master plans; land use and 21° les activités relatives à l’exécution des et d’utilisation schémas-directeurs d’aménagement des terres; 22° amabuye y’agaciro n’undi mutungo kamere 22° minerals and other natural resources in the 22° les minerais et autres ressources naturelles 27 Official Gazette nᵒ 35 of 31/08/2015 biri mu bikorwa by’inyungu rusange. Iteka rya Minisitiri ufite ubutaka mu nshingano ze, abyibwirije cyangwa abisabwe n’urwego rwa Leta bireba, ibindi bikorwa by’inyungu rusange. rigena public domain. d’intérêt général. An Order of the Minister in charge of lands, on the Minister’s own initiative or upon request by relevant public institution, determines any other activity of public interest. Un arrêté du Ministre ayant la terre dans ses attributions, sur l’initiative du Ministre ou à la demande de l’institution publique concernée, détermine toute autre activité d’utilité publique. - 6 Verify source ↗
Imirimo igamije gushyira mu
AI-assisted research summary: The project initiator must first negotiate with affected owners, and must pay for affected assets before starting work.
Ingingo ya 6: Imirimo igamije gushyira mu ibishushanyombonera bikorwa y’imikoreshereze by’imitunganyirize y’ubutaka Article 6: Activities to implement land use and development master plans 15 Article 6: Activités visant schémas-directeurs d’aménagement des terres l’exécution des et d’utilisation Official Gazette nᵒ 35 of 31/08/2015 UMUTWE WA III: INZEGO ZIFITE URUHARE RWO KWIMURA ABANTU, IKURIKIZWA, IMIHANGO BW’ABIMURWA UBURENGANZIRA N’UBW’ABIMURA MPAMVU Z’INYUNGU RUSANGE KU Icyiciro cya mbere: Inzego zifite uruhare mu kwimura abantu ku mpamvu z’inyungu rusange Ingingo ya 6: Imirimo igamije gushyira mu ibishushanyombonera bikorwa y’imikoreshereze by’imitunganyirize y’ubutaka Article 6: Activities to implement land use and development master plans Article 6: Travaux visant schémas-directeurs d’aménagement des terres l’exécution des et d’utilisation bikorwa Umuntu utangije igikorwa kigamije gushyira ibishushanyombonera mu by’imitunganyirize y’imikoreshereze y’ubutaka agomba ba nyir’imitungo y’aho umushinga uzakorerwa. kumvikana kubanza na Iyo ubwo bwumvikane butabaye, imihango ijyanye no kwimura abantu ku mpamvu z’inyungu bisabwe n’urwego rwimura n’uwatangije umushinga kandi hitabwa ku nyungu z’uwimurwa. irakurikizwa rusange Ikiguzi cyangwa agaciro k’imitungo y’aho cyishyurwa uzakorerwa umushinga n’uwatangije umushinga mbere y’uko atangira kuwushyira mu bikorwa UMUTWE WA III: INZEGO ZIFITE URUHARE RWO KWIMURA ABANTU, IKURIKIZWA, IMIHANGO BW’ABIMURWA UBURENGANZIRA KU MPAMVU N’UBW’ABIMURA Z’INYUNGU RUSANGE The the initiator of an act aimed at implementation of land use and development master plans shall first negotiate with owners of assets that are affected by the project. L’initiateur d’une opération visant la mise en œuvre des schémas-directeurs d’utilisation et d’aménagement des terres doit négocier au préalable avec les propriétaires des biens qui seront affectés par son projet. In case negotiations fail, formalities related to expropriation in the public interest shall be followed upon request of the expropriator and the initiator of the project, taking into account the interests of the person to be expropriated. En cas d’échec de la procédure, les formalités relatives à l’expropriation pour cause d’utilité publique sont déclenchées à la demande de l’expropriant et de l’initiateur du projet en tenant en compte les intérêts de l’exproprié. The price or value of assets affected by the project shall be paid by the initiator of the project before any commencement of activities. Le prix ou la valeur des biens affectés par le projet est payé par l’initiateur du projet avant le commencement des travaux. III: COMPETENT CHAPTER AND AUTHORITIES, RIGHTS OF BE EXPROPRIATED AND EXPROPRIATORS IN THE CONTEXT OF EXPROPRIATION IN THE PUBLIC INTEREST PROCEDURES PERSONS TO III: PROCEDURES AUTORITES CHAPITRE COMPETENTES, ET DROITS DES EXPROPRIES ET DES EXPROPRIANTS DANS LE CADRE DE CAUSE L’EXPRORIATION D’UTILITE PUBLIQUE POUR 28 Icyiciro cya mbere: Inzego zifite uruhare mu kwimura abantu ku mpamvu z’inyungu rusange - 7 Verify source ↗
Inzego zigaragaza imishinga yo
AI-assisted research summary: This article names which public authorities decide expropriation projects in the public interest.
Ingingo ya 7: Inzego zigaragaza imishinga yo kwimura abantu ku mpamvu z’inyungu rusange III: COMPETENT CHAPTER AND AUTHORITIES, RIGHTS OF BE EXPROPRIATED AND EXPROPRIATORS IN THE CONTEXT OF EXPROPRIATION IN THE PUBLIC INTEREST PROCEDURES PERSONS TO III: PROCEDURES AUTORITES CHAPITRE COMPETENTES, ET DROITS DES EXPROPRIES ET DES EXPROPRIANTS DANS LE CADRE DE L’EXPRORIATION CAUSE D’UTILITE PUBLIQUE POUR Section One: Competent authorities to carry out expropriation in the public interest Section première: Autorités compétentes en expropriation pour cause d’utilité publique Article 7: Organs expropriation in the public interest initiating projects of Article 7: Organes qui déterminent les projets d’expropriation pour cause d’utilité publique Ingingo ya 7: Inzego zigaragaza imishinga yo kwimura abantu ku mpamvu z’inyungu rusange Inzego zigaragaza imishinga yo kwimura abantu ku mpamvu z’inyungu rusange ni izi zikurikira: Official Gazette nᵒ 35 of 31/08/2015 Section One: Competent authorities to carry out expropriation in the public interest Section première: Autorités compétentes en expropriation pour cause d’utilité publique Article 7: Organs determining projects of expropriation in the public interest Article 7: Organes chargés de déterminer les projets d’expropriation pour cause d’utilité publique Organs which of expropriation in the public interest are the following: determine projects Les organes chargés de déterminer les projets d’expropriation pour cause d’utilité publique sont les suivants: 1° Komite Nyobozi ku rwego rw’Akarere, iyo imirimo ireba Akarere kamwe; 1° the Executive Committee at the District level, in case such activities concern one district; 1° le Comité Exécutif au niveau du District lorsque district; les travaux concernent un seul 2° Komite Nyobozi ku rwego rw’Umujyi wa Kigali, iyo imirimo ireba Akarere karenze kamwe mu mbago z’Umujyi wa Kigali; 3° Minisiteri bireba, iyo imirimo iteganyijwe ireba Uturere turenze kamwe cyangwa ari igikorwa cyo ku rw’Igihugu, haseguriwe ibivugwa mu gace ka 2° k’iyi ngingo. rwego 2° the Executive Committee at the level of the City of Kigali, in case such activities concern more than one district in the boundaries of the City of Kigali ; 2° le Comité Exécutif au niveau de la Ville de Kigali lorsque les travaux concernent plus d’un district dans les limites de la Ville de Kigali; 3° the relevant Ministry, in case planned activities concern more than one District or if it is an activity at the national level, subject to provisions of item 2° of this Article. 3° le Ministère concerné lorsque les travaux envisagés concernent plus d’un District ou lorsqu’il s’agit d’une opération au niveau national, sous réserve des dispositions du point 2° du présent article. - 8 Verify source ↗
Inzego zigenzura imishinga yo
AI-assisted research summary: The article establishes committees that supervise expropriation projects in the public interest at district, City of Kigali, and national levels, and says the Prime Minister’s Order determines their organization and duties.
Ingingo ya 8: Inzego zigenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rusange Article 8: Organs supervising projects of expropriation in the public interest Article 8:Organes chargés de contrôler les projets d’expropriation pour cause d’utilité publique Ingingo ya 8: Inzego zigenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rusange Article 8: Organs supervising projects of expropriation in the public interest Article 8:Organes chargés de contrôler les projets d’expropriation pour cause d’utilité publique Hashyizweho Komite zishinzwe kugenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rusange zikurikira: Organs in charge of supervising projects of expropriation in the public interest are hereby established as follows: Il est créé les organes chargés de contrôler les projets d’expropriation pour cause d’utilité publique qui sont les suivants: 29 Official Gazette nᵒ 35 of 31/08/2015 1° Komite ishinzwe kugenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rusange ku rwego rw’Akarere, iyo ari umushinga ureba Akarere kamwe; 1° the committee in charge of supervision of projects of expropriation the public interest at the District level where the project concerns one district; in 1° le comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique au niveau du District lorsqu’il s’agit d’un projet qui concerne un district; 2° Komite ishinzwe kugenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rusange ku rwego rw’Umujyi wa Kigali, iyo ari umushinga ureba Uturere turenze kamwe mu mbago z’Umujyi wa Kigali; 2° the committee in charge of supervision of projects of expropriation the public interest at the City of Kigali level where the project concerns more than one District within the boundaries of the City of Kigali ; in 2° le comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique au niveau de la Ville de Kigali lorsqu’il s’agit d’un projet qui concerne plus d’un District dans les limites de la Ville de Kigali ; 3° Komite ishinzwe kugenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rusange ku rwego rw’Igihugu, iyo ari umushinga ureba Uturere turenze kamwe cyangwa umushinga wo ku rwego rw’Igihugu, haseguriwe ibivugwa mu gace ka 2° k’iyi ngingo. 3° the committee in charge of supervision of to public projects of expropriation due interest at the national level where the project concerns more than one District or it is a project at the national level, subject to the provisions of item 2° of this Article. 3° le comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique au niveau national lorsqu’il s’agit d’un projet qui concerne plus d’un District ou d’un projet au niveau national, réserve des dispositions du point 2°du présent article. sous rya Minisitiri w’Intebe rishyiraho Iteka inshingano n’abagize imiterere, Komite zishinzwe kugenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rusange. imikorere, An Order of the Prime Minister shall determine the organization, functioning, responsibilities and composition of the committees in charge of supervision of projects of expropriation in the public interest. Un arrêté du Premier Ministre détermine l’organisation, le fonctionnement, les attributions et la composition des comités chargés du contrôle des projets d’expropriation pour cause d’utilité publique. - 9 Verify source ↗
Inzego zemeza ko abantu
AI-assisted research summary: This article lists which bodies approve expropriation in the public interest, depending on the level and type of project.
Ingingo ya 9: Inzego zemeza ko abantu bimurwa ku mpamvu z’inyungu rusange Article 9: Organs approving expropriation in the public interest Article 9: Organes chargés d’approuver l’expropriation pour cause d’utilité publique Icyiciro cya 2: Imihango ikurikizwa mu kwimura abantu ku mpamvu z’inyungu rusange Section 2: Procedure for expropriation in the public interest Section 2: Procédure d’expropriation pour cause d’utilité publique Ingingo ya 9: Inzego zemeza ko abantu bimurwa ku mpamvu z’inyungu rusange Article 9: Organs approving expropriation in the public interest Article 9: Organes chargés d’approuver l’expropriation pour cause d’utilité publique Inzego zemeza ko abantu bimurwa ku mpamvu z’inyungu rusange ni izi zikurikira: The organs approving expropriation in the public interest are the following: Les organes chargés d’approuver l’expropriation pour cause d’utilité publique sont les suivants: 1° ku rwego rw’ Akarere, ni Inama Njyanama y’Akarere ishingiye ku nama ya Komite kugenzura imishinga yo kwimura abantu ku ishinzwe 1° at the District level, it is the District Council after considering the recommendation of the in charge of supervision of committee the public projects of expropriation in 1° le Conseil de District au niveau du District sur proposition du comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique au niveau du District; 30 Official Gazette nᵒ 35 of 31/08/2015 mpamvu z’inyungu rusange ku rwego rw’Akarere; interest at the District level ; 2° ku rwego rw’ Umujyi wa Kigali, iyo ari turenze umushinga ureba Uturere kamwe mu mbago z’Umujyi wa Kigali, ni Inama Njyanama y’Umujyi wa Kigali ishingiye ku nama ya Komite ishinzwe imishinga yo kwimura kugenzura abantu ku mpamvu z’inyungu rusange ku rwego rw’Umujyi wa Kigali; 3° ku rwego rw’Uturere turenze kamwe, ni Minisiteri ifite ubutaka mu nshingano zayo, ishingiye ku nama ya Komite imishinga yo ishinzwe kugenzura kwimura abantu ku mpamvu z’inyungu rusange rw’Igihugu, rwego haseguriwe ibivugwa mu gace ka 2 k’iyi ngingo. Hakoreshwa Iteka rya Minisitiri; ku 4° ku rwego rw’Igihugu, ku bikorwa n’ubusugire bigamije umutekano bw’Igihugu, ni Serivise za Minisitiri w’Intebe hashingiwe ku nama ya Komite ishinzwe kugenzura imishinga kwimura abantu ku mpamvu yo z’inyungu rusange ku rwego rw’Igihugu hakoreshejwe rya Minisitiri Iteka w’Intebe. 2° at the level of the City of Kigali, where the project concerns more than one district within the boundaries of the City of Kigali, it is the Council of the City of Kigali after the recommendation of considering the in charge of supervision of committee projects of expropriation the public interest at the level of the City of Kigali; in 2° le Conseil de la Ville de Kigali lorsqu’il s’agit d’un projet qui concerne plus d’un district dans les limites de la Ville de Kigali sur proposition du comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique au niveau de la Ville de Kigali; 3° at the level of more than one District, the Ministry in charge of land, upon proposal by the Committee in charge of supervision of the public projects of expropriation interest at national to provisions of item 2 of this Article. A Ministerial Order shall be used; subject level in 3° au niveau de plus d’un District, le Ministère ayant la terre dans ses attributions, sur proposition du Comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique au niveau national, sous réserve des dispositions du point 2 du présent article. Il est procédé par voie d’arrêté ministériel; 4° at the national level and in case of activities related to security and national sovereignty, the Prime Minister’s Office upon proposal by the Committee in charge of supervision of projects of expropriation the public interest at the national level by way of a Prime Minister’s Order. in 4° au niveau national, les services du Premier Ministre sur proposition du comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique au niveau national par voie d’arrêté du Premier Ministre lorsqu’il s’agit des opérations relatives à la sécurité et à l’intégrité nationale. 31 Official Gazette nᵒ 35 of 31/08/2015 Icyiciro cya 2: Imihango ikurikizwa mu kwimura abantu ku mpamvu z’inyungu rusange Section 2: Procedure for expropriation in the public interest Section 2: Procédure d’expropriation pour cause d’utilité publique - 10 Verify source ↗
Ubusabe bwo kwimura
AI-assisted research summary: An expropriation request in the public interest must include specified project, land, compensation, environmental, consultation, and impact information.
Ingingo ya 10: Ubusabe bwo kwimura abantu ku mpamvu z’inyungu rusange Article10: Request for expropriation in the public interest Article 10: Demande d’expropriation pour cause d’utilité publique ya Ingingo ishingiro ry’umushinga wo kwimura abantu ku mpamvu z’inyungu rusange 11: Gusuzuma Ingingo ya 10: Ubusabe bwo kwimura abantu ku mpamvu z’inyungu rusange Article 10: Request for expropriation in the public interest Article 10: Demande d’expropriation pour cause d’utilité publique Inyandiko isaba kwimura abantu ku mpamvu z’inyungu rusange igomba kugaragaramo ibi bikurikira: The application for expropriation in the public interest shall contain the following information: Le dossier de requête en expropriation pour cause d’utilité publique doit comprendre les éléments suivants: 1° imiterere y’umushinga; 1° the nature of the project; 1° la nature du projet; 2° ikigaragaza ko umushinga ugamije inyungu rusange; 2° the indication that the project aims at the 2° la justification du caractère d’intérêt général public interest; du projet; 3° igishushanyo mbonera umushinga uzakorerwaho; cy’ubutaka 3° the master plan of land where the project will 3° le schéma directeur du terrain sur lequel le be carried out; projet sera réalisé; 4° inyandiko igaragaza ko umushinga utabangamiye ibidukikije; 4° the document indicating that the project has no detrimental effect on the environment; 4° le document indiquant que le projet n’a pas d’effets préjudiciables à l’environnement; 5° inyandiko ihamya ko amafaranga y’indishyi ikwiye ahari; 6° isobanurampamvu rigaragaza ko ubwo butaka cyangwa aho hantu ari ho habereye uwo mushinga; 5° the document confirming the availability of funds for fair compensation; 5° le document prouvant l’existence des fonds pour une juste indemnisation; 6° the explanatory note detailing that such land or place suits the project; 6° l’exposé des motifs relatif à l’adéquation entre le projet et le terrain; 7° inyandikomvugo igaragaza ko abaturage iby’uwo mushinga bireba basobanuriwe n’akamaro kawo; 7° the minutes indicating that the concerned population was sensitized about the project and its importance; 7° le procès-verbal de la réunion consultative indiquant que la population a été sensibilisée sur le projet et son intérêt; 32 Official Gazette nᵒ 35 of 31/08/2015 8° inyigo igaragaza ingaruka ku mibereho y’abimurwa. 8° a study indicating consequences on living conditions of persons to be expropriated. 8° une étude indiquant les conséquences sur les conditions de vie des expropriés. Icyakora, igishushanyombonera kivugwa mu gace ka 3° k’igika cya mbere cy'iyi ngingo kigomba kugaragaramo by’umwihariko ibi bikurikira: However, the master plan referred to in item 3° of Paragraph One of this Article shall particularly indicate the following: Toutefois, le schéma directeur prévu au point 3° l’alinéa premier du présent article doit de particulièrement éléments suivants: comprendre les 1° igishushanyo cyangwa amakarita yerekana imbago z’ubutaka iyo mirimo izakorerwaho; 1° the plan or maps indicating the demarcations of the land where activities shall be carried out; le schéma ou les cartes faisant état des 1° limites du terrain sur lequel ces travaux seront réalisés; 2° imiterere y’ibintu biri kuri ubwo butaka; 2° the nature of assets on that land; 2° la nature des biens situés dans le périmètre du terrain; 3° urutonde rw’abafite uburenganzira bwanditse ku mpapurompamo z’ubwo butaka; 3° the list indicating holders of rights registered 3° on the land titles; la liste des détenteurs de droits enregistrés sur les titres fonciers de ce terrain; 4° urutonde rw’abafite uburenganzira ku 4° the list of authorized beneficiaries of bikorwa biri kuri ubwo butaka. property incorporated on that land. la liste des ayant droits aux biens 4° incorporés sur le terrain. ya Ingingo ishingiro ry’umushinga wo kwimura abantu ku mpamvu z’inyungu rusange 11: Gusuzuma - 11 Verify source ↗
Consideration of the relevance of
AI-assisted research summary: The relevant committee must review the project’s relevance within 30 days of receiving the expropriation request, hold a consultative meeting with local residents, notify them of the meeting details, and have the minutes signed by the members who attend.
Article 11: Consideration of the relevance of the project proposal for expropriation in the public interest Article 11: Examen de la pertinence du projet d’expropriation pour cause d’utilité publique 16 Official Gazette nᵒ 35 of 31/08/2015 Article 11: Consideration of the relevance of the project proposal for expropriation in the public interest Article 11: Examen de la pertinence du projet d’expropriation pour cause d’utilité publique ishinzwe kugenzura Komite imishinga yo kwimura abantu ku mpamvu z’inyungu rusange bireba, bitarenze iminsi mirongo itatu (30) nyuma yo kugezwaho ubusabe, isuzuma ishingiro ry’uwo mushinga kandi igakorana inama nyunguranabitekerezo n’abaturage b’aho ubutaka buherereye ku bijyanye n’ishingiro ry’umushinga wo kwimura abantu ku mpamvu z’inyungu rusange. Komite ibamenyesha itariki, The relevant committee in charge of monitoring projects of expropriation in the public interest shall consider the relevance of the project within a period not exceeding thirty (30) days after receiving the request for expropriation and shall conduct a consultative meeting with the population living where the land is located concerning the relevance of the project of interest. The expropriation the public in 33 Le comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique compétent procède à l’examen de la pertinence du projet dans un délai ne dépassant pas trente (30) jours en expropriation pour cause d’utilité publique et tient une réunion consultative avec la population du lieu de situation du terrain à propos de la pertinence du projet d’expropriation pour cause réception de requête après la Official Gazette nᵒ 35 of 31/08/2015 isaha n’aho inama izabera. committee shall inform them about the date, time and venue of that meeting. d’utilité publique. Le comité les informe de la date, de l’heure et du lieu de la réunion. Inyandikomvugo y’inama ishyirwaho umukono n’abagize Komite bayitabiriye. The minutes of the meeting shall be signed by present members of the Committee. Le procès-verbal de la réunion est signé par les membres du Comité présents. - 12 Verify source ↗
Ihezwa mu nama rya bamwe
AI-assisted research summary: Committee members must not decide on matters that directly concern them or certain close relatives; affected persons must notify the committee in writing and step out of the meeting while the project is being examined.
Ingingo ya 12: Ihezwa mu nama rya bamwe mu bagize Komite ishinzwe kugenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rusange Article 12: Exclusion of some members of the committee in charge of supervision of projects of expropriation in the public interest Article 12: Exclusion de certains membres du Comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique Ingingo ya 12: Ihezwa mu nama rya bamwe mu bagize Komite ishinzwe kugenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rusange Article 12: Exclusion of some members of the committee in charge of monitoring projects of expropriation in the public interest from a meeting Article 12: Exclusion de certains membres du Comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique à la réunion Umuntu wese uri muri Komite ishinzwe kugenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rusange abujijwe kuba mu bafata ibyemezo iyo inama isuzuma ibibazo bimureba, cyangwa iyo isuzuma ibibazo afitemo inyungu, iyo bireba ababyeyi be, abo bafitanye isano kugeza ku rwego rwa kabiri cyangwa iyo bireba abo bafitanye rishingiye ku bushyingirane kugeza ku rwego rwa kabiri. Uwo bireba cyangwa undi wese ubifiteho amakuru abimenyesha mbere Komite mu nyandiko bityo akiheza cyangwa agahezwa mu nama zayo igihe cyose hasuzumwa uwo mushinga w’iyimura. isano Any member of the committee in charge of monitoring projects of expropriation in the public interest shall be prohibited to be among members who take decisions when the committee is assessing issues that have direct link to him/her, or issues that affect his/her personal interests, his/her parents, relatives up to the second degree, or in-laws up to the second degree. Any concerned person or any person who has information on the subject shall inform in writing the committee prior to its meeting and shall be excused or excluded from the meeting as long as the committee is assessing such project of expropriation. Il est interdit à un membre du Comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique de prendre part à la prise de décision lorsque la réunion traite des affaires qui le concernent personnellement, ou des affaires touchant à ses intérêts ou qui concernent ses parents, les membres de sa famille jusqu’au second degré ou les parents collatéraux jusqu’au second degré. Toute personne concernée ou qui détient une information en la matière le notifie au préalable par écrit au Comité et se retire ou est récusée de la réunion du Comité aussi longtemps que ce projet d’expropriation est en cours d’examen. Icyakora, afite uburenganzira bwo kwitabira inama nk’abandi baturage bireba. nyunguranabitekerezo - 13 Verify source ↗
Isimburwa rya Komite
AI-assisted research summary: If committee quorum cannot be reached because many members have an interest in the land, the project is reviewed by a higher-level committee; for national-level cases, the Ministry in charge of land reviews it.
Ingingo ya 13: Isimburwa rya Komite ishinzwe kugenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rusange Article 13: Replacement of the committee in charge of supervision of projects of expropriation in the public interest Article 13: Remplacement du Comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique Ingingo ya 13: Isimburwa rya Komite ishinzwe kugenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rusange However, he/she shall have to participate in consultative meetings as any other person concerned. right the Toutefois, il a le droit de participer à la réunion consultative autre personne concernée. comme toute Article 13: Replacement of the committee in charge of expropriation in the public interest of monitoring projects Article 13: Remplacement du Comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique Mu gihe bigaragaye ko benshi mu bagize Where it happens that several members of the Lorsqu’il s’avère que les membres du Comité qui 34 Official Gazette nᵒ 35 of 31/08/2015 inyungu kuri ubwo butaka Komite bafite busabwa gukorerwaho imirimo y’inyungu rusange ku buryo Komite idashobora kugira umubare wa ngombwa ngo iterane, umushinga wigwa na Komite yo ku rwego rwisumbuye. committee have interest in the land concerned by the request for expropriation to the extent that the quorum for the committee meeting my not be reached, the project shall be examined by the committee at the upper level. ont un intérêt sur le terrain faisant l’objet de requête en expropriation sont tellement nombreux que le quorum requis pour la réunion du Comité ne peut pas être atteint, le projet est examiné par le Comité au niveau directement supérieur. Iyo bireba abagize Komite ishinzwe kugenzura imishinga yo kwimura abantu ku mpamvu rw’igihugu, z’inyungu umushinga usuzumwa na Minisiteri ifite ubutaka mu nshingano zayo rusange ku rwego Where the project concerns members of the committee in charge of monitoring projects of expropriation in the public interest at national level, the project shall be examined by the Ministry in charge of land. Lorsque le terrain présente un intérêt pour les membres du Comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique au niveau national, l’examen du projet est assuré par le Ministère ayant les terres dans ses attributions. - 14 Verify source ↗
Umwanzuro ku ishingiro
AI-assisted research summary: If the committee finds an expropriation project is relevant, it must send its written decision to the District Council, Kigali City Council, or the Ministry in charge of land within at least 15 days after the consultative meeting. If it finds the project is not relevant, it must inform the requester and the persons to be expropriated within the period and manner set in paragraph one.
Ingingo ya 14: Umwanzuro ku ishingiro ry’umushinga wo kwimura abantu ku mpamvu z’inyungu rusange Article 14: Decision on the relevance of a project of expropriation in the public interest Article 14: Décision sur la pertinence d’un projet d’expropriation pour cause d’utilité publique Ingingo ya 14: Umwanzuro ku ishingiro ry’umushinga wo kwimura abantu ku mpamvu z’inyungu rusange Article 14: Decision on the relevance of a project of expropriation in the public interest Article 14: Décision sur la pertinence d’un projet d’expropriation pour cause d’utilité publique Inama Njyanama ishinzwe kugenzura Mu gihe isanze umushinga ufite ishingiro, Komite imishinga yo kwimura abantu ku mpamvu z’inyungu rusange ku rwego rubifitiye ububasha, ishyikiriza mu nyandiko rwego rw’Akarere cyangwa ku rwego rw’Umujyi wa Kigali cyangwa Minisiteri ifite ubutaka mu nshingano zayo, umwanzuro yafashe nibura mu gihe cy’iminsi cumi n’itanu (15) nyuma y’ikiganiro nyunguranabitekerezo n’abaturage bireba. ku Where the committee in charge of monitoring of projects of expropriation in the public interest at the level of competent authority finds that the project is relevant, it shall submit in writing its decision to the District Council or Kigali City Council or the Ministry in charge of land within at least fifteen (15) days after the consultative meeting with the concerned population. Iyo Komite isanze umushinga udafite ishingiro ibimenyesha uwasabye kwimura n’abagombaga kwimurwa mu buryo no mu gihe giteganyijwe mu gika cya mbere cy’iyi ngingo. Where the committee finds that the project is not relevant, it shall inform the person that requested for expropriation and the persons that had to be expropriated in the way and within the period provided for in Paragraph One of this Article. 35 l’autorité compétente constate Lorsque le Comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique au niveau de la pertinence du projet, il communique par écrit sa décision au Conseil de District ou au Conseil de la Ville de Kigali ou au Ministère ayant la terre dans ses attributions au moins dans les quinze (15) réunion jours qui suivent consultative avec la population concernée. tenue de la la il communique Lorsque le Comité constate que le projet n’est pas pertinent, au demandeur d’expropriation et aux expropriés selon la voie et dans les délais prescrits à l’alinéa premier du présent article. la décision Official Gazette nᵒ 35 of 31/08/2015 - 15 Verify source ↗
Kwemeza ko abantu bimurwa
AI-assisted research summary: The relevant organ must approve expropriation in the public interest within 15 days after receiving the committee’s decision.
Ingingo ya 15: Kwemeza ko abantu bimurwa ku mpamvu z’inyungu rusange Article 15: Approval of expropriation in the public interest Article 15: Approbation de l’expropriation pour cause d’utilité publique Itangazwa ry’icyemezo Ingingo ya 15: Kwemeza ko abantu bimurwa ku mpamvu z’inyungu rusange Article 15: Approval of expropriation in the public interest Article 15: Approbation de l’expropriation pour cause d’utilité publique Mu gihe kitarenze iminsi cumi n’itanu (15) uhereye igihe rwagerejweho umwanzuro na Komite ibishinzwe urwego bireba ruteganyijwe mu ngingo ya 9 y’iri tegeko, rushingiye ku mwanzuro wa Komite ishinzwe kugenzura imishinga yo kwimura abantu ku mpamvu z’inyungu rubifitiye ku ububasha, rwemeza ko abantu bimurwa ku mpamvu z’inyungu rusange. rusange rwego On the basis of the decision of the Committee in charge of monitoring projects for expropriation in the public interest at the competent authority level, the relevant organ provided under Article 9 of this Law shall within fifteen (15) days of receiving the decision of the relevant Committee approve expropriation in the public interest. Sur base de la décision du Comité chargé de contrôler les projets d’expropriation pour cause d’utilité publique au niveau de l’autorité compétente, l’organe concerné visé à l’article 9 de la présente loi approuve le projet d’expropriation pour cause d’utilité publique dans un délai ne dépassant pas quinze (15) jours à compter de la date de réception de la décision du Comité compétent. - 16 Verify source ↗
Publication of the decision on a
AI-assisted research summary: The decision on the expropriation project must be announced in widely read media, and the rights-holder list must be posted publicly within 15 days after displacement is confirmed.
Ingingo ya 16: cyafashwe ku mushinga wo kwimura abantu ku mpamvu z’inyungu rusange Article 16: Publication of the decision on a project for expropriation in the public interest Article 16: Publication de la décision sur un projet d’expropriation pour cause d’utilité publique Ingingo ya 16: Itangazwa ry’icyemezo cyafashwe ku mushinga wo kwimura abantu ku mpamvu z’inyungu rusange Article 16: Publication of the decision on a project for expropriation in the public interest Article 16: Publication de la décision sur un projet d’expropriation pour cause d’utilité publique Icyemezo kivugwa mu ngingo ya 15 y’iri tegeko, gitangazwa nibura kuri imwe mu maradiyo yumvwa na benshi mu Rwanda na nibura muri kimwe mu binyamakuru bikorera mu Rwanda kandi gisomwa n’abantu benshi, kugira ngo abo bireba babimenye. Mu gihe bibaye ngombwa hakoreshwa n’ubundi buryo bw’itumanaho. The decision provided for under Article 15 of this Law shall be announced on at least one of the radio stations with a wide audience in Rwanda and in at least one of Rwanda-based newspapers with a wide readership in order for the relevant parties to be informed thereof. If necessary, any other means of communication shall be used. La décision visée à l’article 15 de la présente loi est annoncée à au moins l’une des stations de radio ayant un vaste auditoire au Rwanda et dans au moins l’un des journaux basés au Rwanda ayant un vaste lectorat pour que les parties concernés en prennent connaissance. En cas de besoin, il est fait recours à tout autre moyen de communication. Urutonde rw’abafite uburenganzira bwanditse z’ubutaka n’ibikorwa ku mpapurompamo byabukoreweho bimanikwa ahagaragara ku biro by’Umujyi iby’Akarere, iby’Umurenge n’iby’Akagari aho ubwo butaka buherereye. Kigali, wa The list of holders of rights registered on land titles and property incorporated on land shall be posted in a publicly accessible place at the office of the City of Kigali, the District, the Sector and the Cell of the place in which the land is located. La liste des détenteurs des droits enregistrés sur les titres fonciers et des biens incorporés sur le terrain est affichée dans un lieu accessible au public au Bureau de la Ville de Kigali, du District, du Secteur et de la Cellule du lieu de situation du terrain. 36 Gutangaza icyemezo cyafashwe ku mushinga wo kwimura abantu ku mpamvu z’inyungu rusange no kumanika urutonde rw’abafite uburenganzira bwanditse ku mpapurompamo z’ubutaka n’ibikorwa byabukoreweho bikorwa mu gihe kitarengeje iminsi cumi n’itanu (15) ibarwa nyuma yo kwemeza ko abantu bimurwa ku mpamvu z’inyungu rusange. - 17 Verify source ↗
Agaciro k’ibikorwa bikozwe
AI-assisted research summary: After publication of the expropriation decision and the list of rights holders, the land owner may not start other long-term activities on the land.
Ingingo ya 17: Agaciro k’ibikorwa bikozwe nyuma yo gutangaza icyemezo cyo kwimura abantu ku mpamvu z’inyungu rusange Article 17: Value of activities developed after the of of expropriation in the public interest publication decision the Article 17: Valeur des activités réalisées après la publication de la décision d’expropriation pour cause d’utilité publique Icyiciro cya 3: Uburenganzira bw’abimurwa n’ubw’abimura ku mpamvu z’inyungu rusange Section 3: Rights of the persons to be expropriated and those of expropriators in the public interest Section 3: Droits des expropriés et des expropriants pour cause d’utilité publique Ingingo ya 17: Agaciro k’ibikorwa bikozwe nyuma yo gutangaza icyemezo cyo kwimura abantu ku mpamvu z’inyungu rusange rusange z’inyungu uburenganzira Nyuma y’uko icyemezo cyo kwimura abantu ku n’urutonde mpamvu ku rw’abafite n’ibikorwa mpapurompamo byabukoreweho bitangajwe, nta bindi bikorwa birambye nyir’ubutaka yemerewe kuhakorera. Iyo abikoze, nta gaciro bihabwa mu gihe cy’iyimurwa. bwanditse z’ubutaka Official Gazette nᵒ 35 of 31/08/2015 The publication of the decision on a project for expropriation in the public interest and the list of holders of rights registered on land titles and property incorporated on land shall be done approving of within expropriation in the public interest. fifteen days (15) Article 17: Value of activities developed after the of of expropriation in the public interest publication decision the the publication of After the decision on expropriation in the public interest and the list of holders of rights registered on land titles and property incorporated on land, the land owner shall not develop any other long-term activities on the land. Otherwise, such activities shall not be compensable during expropriation. La publication de la décision sur un projet d’expropriation pour cause d’utilité publique et l’affichage de la liste des détenteurs des droits enregistrés sur les titres fonciers et des biens incorporés sur le terrain se fait dans un délai ne dépassant pas quinze (15) jours à compter de la date de l’approbation de l’expropriation pour cause d’utilité publique. Article 17: Valeur des activités réalisées après la publication de la décision d’expropriation pour cause d’utilité publique Après la publication de la décision d’expropriation pour cause d’utilité publique et l’affichage de la liste des détenteurs des droits enregistrés sur les titres fonciers et des biens incorporés sur le terrain, le propriétaire du terrain n’a pas droit d’y réaliser d’autres opérations à long terme. Dans le cas contraire, ces opérations ne sont pas indemnisables lors de l’expropriation. Icyiciro cya 3: Uburenganzira bw’abimurwa n’ubw’abimura ku mpamvu z’inyungu rusange Section 3: Rights of the persons to be expropriated and those of expropriators in the public interest Section 3: Droits des expropriés et des expropriants pour cause d’utilité publique - 18 Verify source ↗
Gusaba ko icyemezo cyo
AI-assisted research summary: A person affected by an expropriation decision may ask the higher organ to review it within 30 days of publication.
Ingingo ya 18: Gusaba ko icyemezo cyo kwimura abantu ku mpamvu z’inyungu rusange gisubirwamo Article 18: Application for review of the decision on expropriation the public interest in Article 18: Recours hiérarchique contre la décision d’expropriation pour cause d’utilité publique Ingingo ya 18: Gusaba ko icyemezo cyo kwimura abantu ku mpamvu z’inyungu rusange gisubirwamo Article 18: Application for review of the decision on expropriation the public interest in Article 18: Recours hiérarchique contre la décision d’expropriation pour cause d’utilité publique Umuntu urebwa n’icyemezo cyo kwimura abantu ku mpamvu z’inyungu rusange afite uburenganzira bwo gusaba ko icyo cyemezo cyafashwe gisubirwamo atakambira Urwego icyemezo. Gutakamba rukuriye urwafashe Any person affected by the decision on expropriation in the public interest shall have the right to request for review of the decision before the organ directly higher than the one having taken the decision. The appeal shall be made Toute personne concernée par la décision d’expropriation pour cause d’utilité publique a le recours hiérarchique devant droit de l’organe du niveau directement supérieur à celui qui a pris la décision en vue de réviser cette faire 37 Official Gazette nᵒ 35 of 31/08/2015 bikorwa mu gihe kitarenze iminsi mirongo itatu (30) nyuma y’itangazwa ryacyo. within thirty (30) days from the day of the publication of the decision. décision. Le recours est formé dans un délai ne dépassant pas trente (30) jours à compter de la date de la publication de la décision. Utakamba agaragaza mu nyandiko impamvu ashingiraho. The appellant shall indicate in writing the grounds for his/her appeal. Le requérant doit indiquer par écrit les motifs de son recours. Urwego rwatakambiwe rugomba kuba rwafashe icyemezo kandi rwamenyesheje mu nyandiko uwatakambye mu gihe kitarenze iminsi mirongo itatu (30) nyuma yo kwakira ugutakamba k’usaba ko icyemezo cyo kwimura abantu ku mpamvu z’inyungu rusange gisubirwamo. Icyemezo kigomba kuba cyanditse kandi kigaragaza impamvu zashingiweho mu ifatwa ryacyo. The authority before which the appeal is made must decide on the appeal and inform the appellant in writing within thirty (30) days of receiving the request for review of the decision on expropriation in the public interest. L’autorité saisie du recours doit y donner suite et informer le requérant par écrit dans un délai ne dépassant pas trente (30) jours à compter de la réception de la demande de réviser la décision d’expropriation pour cause d’utilité publique. The decision must be in writing and indicate the grounds there for. La décision doit être écrite et indiquer les motifs qui la justifient. - 19 Verify source ↗
Gusaba ko icyemezo cyo
AI-assisted research summary: A person seeking expropriation in the public interest may ask the next higher organ to review a decision revoking expropriation, within 15 days of publication.
Ingingo ya 19: Gusaba ko icyemezo cyo kutimura abantu ku mpamvu z’inyungu rusange gisubirwamo Article 19: Application for review of the decision revoking expropriation in the public interest la décision Article 19: Recours contre révoquant l’expropriation pour cause d’utilité publique 17 Official Gazette nᵒ 35 of 31/08/2015 Ingingo ya 19: Gusaba ko icyemezo cyo kutimura abantu ku mpamvu z’inyungu rusange gisubirwamo Article 19: Application for review of the decision revoking expropriation in the public interest Article 19: Recours contre la décision révoquant l’expropriation pour cause d’utilité publique Usaba kwimura abantu ku mpamvu z’inyungu rusange afite uburenganzira bwo gusaba ko icyemezo cyafashwe cyasubirwamo atakambira urwego rwisumbuye ku rwafashe icyo cyemezo. Gutakamba bikorwa mu minsi cumi n’itanu (15) nyuma y’itangazwa ryacyo. The applicant for expropriation in the public interest shall have the right to apply for review of the decision before the organ directly higher than the one having taken the decision. The appeal shall be made within fifteen (15) days after the publication of the decision. Le demandeur d’expropriation pour cause d’utilité publique a le droit de faire recours en vue de réviser la décision prise devant l’organe supérieur à celui qui a pris la décision. Le recours est formé dans les quinze (15) jours suivant la publication de la décision. Utakamba agaragaza mu nyandiko impamvu ashingiraho. The appellant shall indicate in writing the grounds for his/her appeal. Le requérant indique par écrit les motifs de son recours. Urwego rwatakambiwe rugomba kuba rwafashe icyemezo mu gihe kitarenze iminsi mirongo itatu (30) nyuma yo gusabwa ko icyemezo cyo The organ before which the application is made must decide on the application within thirty (30) days of receiving the application for review of L’organe saisi du recours doit y donner suite dans un délai ne dépassant pas trente (30) jours à compter de la réception du recours en vue de 38 Official Gazette nᵒ 35 of 31/08/2015 kutimura abantu ku mpamvu z’inyungu rusange gisubirwamo. the decision revoking expropriation in the public interest. réviser la décision révoquant l’expropriation pour cause d’utilité publique. Icyemezo kigomba kuba cyanditse kandi kigaragaza impamvu zashingiweho mu ifatwa ryacyo. The decision shall be in writing and indicate the grounds there for. La décision doit être écrite et indiquer les motifs qui la justifient. - 20 Verify source ↗
Gusaba ko urutonde
AI-assisted research summary: People affected by expropriation in the public interest may ask for review of the initial list within 15 days, and the listed organ must decide within 7 working days.
Ingingo ya 20: Gusaba ko urutonde rw’abimurwa rusubirwamo Article 20: Application for review of the list of persons to be expropriated Article 20: Recours en vue de réviser la liste des expropriés Ingingo ya rw’abimurwa 21: Kwemeza urutonde Ingingo ya 20: Gusaba ko urutonde rw’abimurwa rusubirwamo Article 20: Application for review of the list of persons to be expropriated Article 20: Recours en vue de réviser la liste des expropriés igihe urutonde Mu gihe kitarenze iminsi cumi n’itanu (15) rw’ibanze ibarwa uhereye rwatangarijwe, umuntu urebwa n’igikorwa cyo kwimura abantu ku mpamvu z’inyungu rusange afite uburenganzira bwo gusaba urwego kandi rwakoze akagaragaza impamvu. kurusubiramo, urutonde Within fifteen (15) days from the publication of the initial list of persons to be expropriated, any person affected by expropriation in the public interest shall have the right to apply to the organ having made the list for its review and indicate the grounds for his/her application. Dans un délai ne dépassant pas quinze (15) jours à compter de la date de publication de la liste initiale, par personne l’expropriation pour cause d’utilité publique a le droit de demander à l’organe qui a dressé la liste de la réviser et en indiquer le motif. concernée toute rwakoze urutonde ku rugomba kuba Urwego bwo rwafashe gusubiramo urutonde mu gihe kitarenze iminsi irindwi (7) y’akazi nyuma yo kwakira ubusabe. umwanzuro busabe The organ having made the list must decide on the application for review of the list within seven (7) working days of receiving the application. L’organe ayant dressé la liste doit donner suite au recours pour réviser la liste dans un délai ne dépassant pas sept (7) jours ouvrables à compter de la réception de la demande. ya Ingingo rw’abimurwa 21: Kwemeza urutonde Article 20 of this Law, the District or City of Kigali Mayor or the relevant Minister shall approve the list of the persons to be expropriated which serves as a basis for drawing up an inventory of the property to be expropriated. Dans un délai de sept (7) jours ouvrables à compter de la date de prise de la décision prévue à l’alinéa deux (2) de l’article 20 de la présente loi, le Maire de District, le Maire de la Ville de Kigali ou l’expropriation approuve la liste des expropriés qui sert de base pour inventorier leurs propriétés. le Ministre concerné par 39 Official Gazette nᵒ 35 of 31/08/2015 IGENAGACIRO IV: UMUTWE WA RY’UBUTAKA N’IBYABUKOREWEHO N'ITANGWA RY'INDISHYI IKWIYE CHAPTER IV: VALUATION OF LAND AND INCORPORATED THEREON AND PAYMENT OF FAIR COMPENSATION PROPERTY IV: DU CHAPITRE TERRAIN ET DES BIENS QUI Y SONT INCORPORES ET PAIEMENT D’UNE JUSTE INDEMNISATION EVALUATION Icyiciro cya mbere: Igenagaciro ry’ubutaka n’ibyabukoreweho Section One: Valuation of land and property incorporated thereon Section première: Evaluation du terrain et des travaux qui y sont réalisés Ingingo by'ubutaka n’ibyabukoreweho 22: Urutonde ya rw'ibiciro - 21 Verify source ↗
Approval of the list of those to be
AI-assisted research summary: The relevant district or Kigali City mayor must approve the relocation list within 7 working days after the decision under Article 20(2).
Article 21: Approval of the list of those to be expropriated Article 21: Approbation de expropriés la liste des UMUTWE WA IGENAGACIRO IV: RY’UBUTAKA N’IBYABUKOREWEHO N'ITANGWA RY'INDISHYI IKWIYE CHAPTER IV: VALUATION OF LAND AND INCORPORATED THEREON AND PAYMENT OF FAIR COMPENSATION PROPERTY IV: EVALUATION CHAPITRE DU TERRAIN ET DES BIENS QUI Y SONT INCORPORES ET PAIEMENT D’UNE JUSTE INDEMNISATION Icyiciro cya mbere: Igenagaciro ry’ubutaka n’ibyabukoreweho Section One: Valuation of land and property incorporated thereon Section première: Evaluation du terrain et des travaux qui y sont réalisés Ingingo by'ubutaka n’ibyabukoreweho 22: Urutonde ya rw'ibiciro Article 21: Approval of the list of those to be expropriated Article 21: Approbation de expropriés la liste des Mu gihe kitarenze iminsi irindwi (7) y’akazi ibarwa uhereye igihe umwanzuro uvugwa mu gika cya kabiri (2) cy’ingingo ya 20 y’iri tegeko wafatiwe, Umuyobozi w’Akarere, uw’Umujyi wa Kigali urebwa n’igikorwa, yemeza urutonde rw’abimurwa ruzashingirwaho mu imitungo y’abimurwa. cyangwa Minisitiri kubara Within seven (7) working days of taking the decision provided under Paragraph two of - 22 Verify source ↗
List of land values and prices for
AI-assisted research summary: The article requires annual land-value lists and unit prices to be established, reviewed, approved, and published.
Article 22: List of land values and prices for property incorporated on land Article 22: Liste des valeurs foncières et des prix des biens qui sont incorporés sur le terrain Article 22: List of land values and prices for property incorporated on land Article 22: Liste des valeurs foncières et des prix des biens qui sont incorporés sur le terrain Ibiciro by'ubutaka n’ibyabukoreweho biri ku isoko bivugwa muri iri tegeko, bikusanywa n'Urugaga rw’Abakora umwuga wo kugena agaciro k’umutungo utimukanwa. Land values and prices for property incorporated on land consistent with the prevailing market rates provided under this Law shall be established by the Institute of Real Property Valuers in Rwanda. Les valeurs foncières et les prix des biens qui sont incorporés sur le terrain conformes aux tarifs actuels du marché prévus par la présente loi sont établis par l'Ordre des Evaluateurs des Biens Immobiliers au Rwanda. Urutonde by'ubutaka rw'ibiciro n’ibyabukoreweho rusubirwamo buri mwaka kandi rutunganya ku mutungo imikorere utimukanwa mu Rwanda mbere y'uko bikurikizwa. y'abagenagaciro rukemezwa n'urwego The list of land values and prices for property incorporated on land shall be reviewed every year and approved by the regulatory Council for the real property valuation in Rwanda before it becomes effective. La liste des valeurs foncières et des prix des biens incorporés sur le terrain est révisable chaque année et approuvée par le Conseil de régulation de la profession d'évaluateurs immobiliers au Rwanda avant qu’elle ne prenne effet. Ibiciro fatizo by’ubutaka n’ibyabukoreweho bitangazwa buri mwaka mu Igazeti ya Leta ya Repubulika y’u Rwanda. for land and property The unit prices incorporated thereon shall be published every year in the Official Gazette of the Republic of Rwanda. Les prix unitaires des terrains et des biens qui y sont incorporés sont publiés chaque année au Journal Officiel de la République du Rwanda. - 23 Verify source ↗
Ishyirwaho ry’abagenagaciro
AI-assisted research summary: After a final decision to expropriate in the public interest, the expropriating organ must immediately look for valuers to value the land and any property on it.
Ingingo ya 23: Ishyirwaho ry’abagenagaciro bashinzwe k’ubutaka n’ibyabukoreweho agaciro kugena Article 23: Appointment of valuers for land and property incorporated thereon Article 23: Désignation des évaluateurs du terrain et des biens qui y sont incorporés Ingingo ya 23: Ishyirwaho ry’abagenagaciro bashinzwe k’ubutaka n’ibyabukoreweho agaciro kugena Article 23: Appointment of valuers for land and property incorporated thereon Article 23:Désignation des évaluateurs du terrain et des biens qui y sont incorporés Nyuma yo gufata icyemezo ntakuka cyo kwimura abantu ku mpamvu z’inyungu rusange, After the final decision to expropriate in the public interest is taken, the organ wishing to 40 Après définitive la d’expropriation pour cause d’utilité publique, décision avoir pris Official Gazette nᵒ 35 of 31/08/2015 Urwego rwifuza kwimura abantu ku mpamvu z’inyungu rusange ruhita rushaka abagenagaciro bakora imirimo yo kugena agaciro k’ubutaka n’ibyabukoreweho. carry out expropriation in the public interest shall immediately to conduct valuation of land and property incorporated thereon. for valuers look l’organe qui désire réaliser l’expropriation pour cause d’utilité publique cherche immédiatement les évaluateurs immobiliers pour exécuter les travaux d’évaluation du terrain et des biens qui y sont incorporés. yo kugena Imirimo n’ibyabukoreweho bemewe w’Igenagaciro ku mitungo Rwanda. n’urugaga ikorwa agaciro k’ubutaka n’abagenagaciro umwuga itimukanwa mu rw’abakora - 24 Verify source ↗
Kumenyesha abimurwa
AI-assisted research summary: Authorities must notify affected persons of the expected start date for land measurement and inventory, and the notice must be posted and broadcast through specified local media channels.
Ingingo ya 24: Kumenyesha abimurwa itariki k’ubutaka n’ibyabukoreweho bizatangirira agaciro kugena Article 24: Communication to the persons to be expropriated of the start date of valuation of land and property incorporated thereon Article 24: Communication aux expropriés de la date de commencement des travaux d’évaluation du terrain et des biens qui y sont incorporés Ingingo ya 24: Kumenyesha abimurwa itariki k’ubutaka n’ibyabukoreweho bizatangirira agaciro kugena Ubuyobozi bw’Akarere, ubw’Umujyi wa Kigali cyangwa Minisiteri bugomba kumenyesha abimurwa ku mpamvu z’inyungu ry’ubutaka n’ibarura rusange ry’ibyabukoreweho bizatangirira. bireba itariki ipima Imenyesha itangazo rikorwa binyuze mu rimanikwa ku biro by’Akagari uwo mushinga uzakoreramo. Binyuzwa kandi nibura kuri imwe mu maradiyo yumvwa na benshi mu Rwanda no muri nibura kimwe mu binyamakuru bikorera mu Rwanda kandi gisomwa n’abantu benshi, kugira ngo abo bireba babimenye. Mu gihe bibaye ngombwa hakoreshwa n’ubundi buryo bw’itumanaho. The valuation of land and property incorporated thereon shall be conducted by valuers certified by the Institute of Real Property Valuers in Rwanda. L’évaluation du terrain et des biens qui y sont incorporés est faite par les évaluateurs agréés par l’Ordre des Evaluateurs Immobiliers au Rwanda. Article 24: Communication to the persons to be expropriated of the start date of valuation of land and property incorporated thereon Article 24: Communication aux expropriés de la date de commencement des travaux d’évaluation du terrain et des biens qui y sont incorporés The District or City of Kigali administration or the relevant Ministry must inform the persons to be expropriated in the public interest of the expected start date of measurement of land and inventory of property incorporated thereon. Such a communication shall be made through an announcement posted on the office of the Cell of the place designated for the implementation of the project. The communication shall also be made through at least one radio station with a wide audience in Rwanda and at least one of Rwanda-based newspapers with a wide readership for the relevant parties to be informed thereof. If necessary, use shall be made of any other means of communication. 41 le Ministère concerné doit L’administration de District, de la Ville de Kigali ou les expropriés pour cause d’utilité publique de la date prévue pour commencer la mesure du terrain et l’inventaire des biens qui y sont incorporés. informer La communication se fait au moyen d’un communiqué affiché au bureau de la Cellule du lieu prévu pour l’exécution de ce projet. La communication se fait également par au moins une radio avec un vaste auditoire au Rwanda et par au moins un des journaux avec un vaste lectorat édités au Rwanda pour que les concernés en prennent connaissance. En cas de besoin, il est fait de tout communication. autre moyen recours de - 25 Verify source ↗
Abagomba kuba baharí mu
AI-assisted research summary: Land valuation must be done with the land owner, the property owner or their lawful representatives, and local administrative representatives present.
Ingingo ya 25: Abagomba kuba baharí mu ubutaka gihe n’ibyabukoreweho kubarura cyo Article 25: Persons whose presence is required during the valuation of land and property incorporated thereon Article 25: Personnes dont la présence est requise lors de l’évaluation du terrain et des biens qui y sont incorporés Ingingo ya 25: Abagomba kuba baharí mu gihe ubutaka n’ibyabukoreweho kubarura cyo Official Gazette nᵒ 35 of 31/08/2015 Article 25: Persons whose presence is required during the valuation of land and property incorporated thereon Article 25: Personnes dont la présence est requise lors de l’évaluation du terrain et des biens qui y sont incorporés kubarura ubutaka yo Imirimo n’ibyabukoreweho ikorwa nyir’ubutaka na nyir’ibikorwa byabukoreweho bahari cyangwa bahagarariwe mu buryo bwemewe n’amategeko ubuyobozi hari bw’inzego z'imitegekere y'igihugu zegerejwe abaturage. n’abahagarariye kandi The valuation of land and property incorporated thereon shall be conducted in the presence of land owner and that of the owner of property or land incorporated lawful the presence of in representatives representatives of local administrative entities. their and on Nyuma y’imirimo yo kubarura ubutaka n’ibyabukoreweho, ubuyobozi bw’Umudugudu igaragaza abari inyandikomvugo butegura baharí ikemezwa n’abatari Nshingwabikorwa n’Umunyamabanga w’Akagari k’aho icyo gikorwa giherereye. bahari, incorporated After the valuation of land and that of the property the Village administration shall write the minutes indicating persons present and absent for approval by the Executive Secretary of the Cell of the place where the valuation is conducted. thereon, Les activités d’évaluation du terrain et des biens qui y sont incorporés se déroulent en présence du propriétaire foncier et du propriétaire des biens qui sont incorporés sur le terrain ou de leurs représentants légitimes et des représentants des entités administratives locales. Après les activités d’évaluation du terrain et des biens qui y sont incorporés, l’administration du Village dresse un procès-verbal indiquant les personnes présentes et absentes pour approbation par le Secrétaire Exécutif de la Cellule du lieu de réalisation de cette évaluation. Ingingo 26: Kugaragaza uburenganzira butaka abimurwa n’ibyabukoreweho bafite ku - 26 Verify source ↗
Kugaragaza uburenganzira
AI-assisted research summary: Owners of land taken for expropriation in the public interest must provide land titles and proof of ownership of any property on the land.
Ingingo ya 26: Kugaragaza uburenganzira butaka abimurwa n’ibyabukoreweho bafite ku Article 26: Proof of rights to land and the property persons to be expropriated incorporated thereon for Article 26: Preuve de droits des expropriés sur le terrain et les biens qui y sont incorporés 18 Official Gazette nᵒ 35 of 31/08/2015 Ibihabwa agaciro mu Article 26: Proof of rights to land and property incorporated thereon for persons to be expropriated Article 26: Preuve de droits des expropriés sur le terrain et les biens qui y sont incorporés Nyir’ubutaka bwagenewe ibikorwa by’inyungu ibyangombwa rusange agomba kugaragaza by’ubutaka ko bihamya ibyabukoreweho ari ibye. n’ibimenyetso The owner of land designated for expropriation in the public interest shall provide land titles and documentary evidence that he/she is the owner of property incorporated on land. Le propriétaire du terrain destiné aux travaux d’utilité publique doit présenter les titres fonciers ainsi que les pièces attestant qu’il est propriétaire des biens qui sont incorporés sur le terrain. Agaragaza kandi icyemezo cy’irangamimerere n’icyemezo bahisemo kigaragaza bw’icungamutungo iyo bashyingiranywe. uburyo He/she shall also provide a civil status certificate and a document evidencing his/her chosen matrimonial regime in case of a married person. Il doit également présenter une attestation de son état civil et, s’il est marié, le document attestant le régime matrimonial choisi. Icyakora uwambuwe ubutaka, uwituje cyangwa ibikorwa ku butaka bubujijwe uwakoreye ibyo bikorwa nyuma y’uko gukorerwaho However, a person dispossessed of land or unlawfully occupying land or having developed activities on land on which such activities are Toutefois, la personne dépossédée de son terrain, la personne qui s’est installée sans autorisation ou qui a réalisé les travaux sur un terrain sur lequel 42 Official Gazette nᵒ 35 of 31/08/2015 amategeko abigenga ajyaho, nta ndishyi ahabwa. prohibited after the enactment of relevant laws shall receive no compensation. ces travaux sont interdits après l’adoption des lois en la matière n’a pas droit à l’indemnisation. - 27 Verify source ↗
Biens évalués lors de l’expropriation
AI-assisted research summary: For expropriation in the public interest, the provision lists the items that must be valued for compensation.
Ingingo ya 27: kwimura abantu ku mpamvu z’inyungu rusange 27: Properties Article expropriation in the public interest valued during Article 27: Biens évalués lors de l’expropriation pour cause d’utilité publique Ingingo ya 27: Ibihabwa agaciro mu kwimura abantu ku mpamvu z’inyungu rusange Ibintu bihabwa agaciro kugira ngo harihwe z’abimuwe ku mpamvu indishyi z’inyungu rusange ni ibi bikurikira: ikwiye 1° ubutaka; 1° land; Article 27: Properties expropriation in the public interest valued during Article 27: Biens évalués lors de l’expropriation pour cause d’utilité publique The properties subject to valuation for the to compensation fair payment expropriation in the public interest are: due of faisant l’objet d’évaluation pour Les biens d’une juste indemnisation en cas paiement d’expropriation pour cause d’utilité publique sont les suivants: 1° le terrain; 2° ibikorwa umuntu yakoze ku butaka bigamije kubukoresha neza cyangwa kububyaza umusaruro; 2° activities carried out on land for its 2° efficient management or rational use; les activités réalisées sur le terrain visant sa meilleure gestion ou son exploitation rationnelle; 3° indishyi y’ihungabana ritewe no kwimurwa. 3° compensation for disruption caused by expropriation. 3° l’indemnisation de perturbation subie suite à l’expropriation. - 28 Verify source ↗
Ibigenderwaho mu kugena
AI-assisted research summary: This article says fair compensation is calculated using the land or property’s size, nature, location, and prevailing market rates, and it sets disruption compensation at 5% of the total value of the expropriated property.
Ingingo ya 28: Ibigenderwaho mu kugena indishyi ikwiye Article 28: Criteria for determining fair compensation Article 28:Critères de détermination de la juste indemnisation Ingingo ya 28: Ibigenderwaho mu kugena indishyi ikwiye Article 28: Criteria for determining fair compensation Article 28:Critères de détermination de la juste indemnisation andi mategeko, Bitabangamiye agaciro k’ubutaka n’agaciro k’ibikorwa byakorewe ku butaka bwimurwaho abantu ku mpamvu z’inyungu rusange, bibarwa hitawe ku ngano, ku bwoko bwabyo n’imiterere yabyo, n’aho biherereye kandi hashingiwe ku biciro biri ku isoko. Indishyi y’ihungabana ritewe no kwimurwa yishyurwa uwimuwe ingana na 5% by’agaciro k’umutungo wose yimuweho. Without prejudice to other laws, the value of land and property incorporated thereon to be expropriated in the public interest shall be calculated on the basis of their size, nature and location and the prevailing market rates. Sans préjudice d’autres lois, la valeur du terrain et celle des biens qui y sont incorporés soumis à l’expropriation pour cause d’utilité publique sont calculées sur base de leur importance, leur nature et leur situation ainsi que sur base des tarifs actuels du marché. The compensation for disruption caused by expropriation to be paid to the expropriated person shall be equivalent to five percent (5%) of the total value of his/her property expropriated. L’indemnisation de perturbation subie suite à l’expropriation à payer à l’exproprié est égale à cinq pourcent (5%) de la valeur de toute sa propriété faisant l’objet d’expropriation. 43 Official Gazette nᵒ 35 of 31/08/2015 - 29 Verify source ↗
Igihe imirimo yo kugena
AI-assisted research summary: Land and property valuation must be completed within 30 days, with a possible extension of up to 15 more days if requested by the expropriation applicant and approved by the competent approving organ.
Ingingo ya 29: Igihe imirimo yo kugena agaciro k’ubutaka n’ibyabukoreweho imara Article 29: Deadline for valuation of land and property incorporated thereon Article 29: Délai d’évaluation du terrain et des biens qui y sont incorporés Ingingo ya 29: Igihe imirimo yo kugena agaciro k’ubutaka n’ibyabukoreweho imara Article 29: Deadline for valuation of land and property incorporated thereon Article 29: Délai d’évaluation du terrain et des biens qui y sont incorporés yo k’ubutaka Imirimo n’ibyabukoreweho ikorwa mu gihe kitarenze iminsi mirongo itatu (30). agaciro kugena The valuation of land and property incorporated thereon shall be carried out within thirty (30) days. L’évaluation du terrain et des biens qui y sont incorporés se fait dans un délai ne dépassant pas trente (30) jours. Icyo gihe gishobora kongerwaho iminsi itarenze cumi n’itanu (15), bisabwe n’usaba kwimura abantu ku mpamvu rusange, bikemezwa n’urwego rwemeza ko abantu bimurwa ku mpamvu z’inyungu rusange. z’inyungu Such a period can be extended to a maximum of fifteen (15) days upon request by the applicant for expropriation in the public interest and after approval approves that expropriation in the public interest. organ the by sur proposition Ce délai peut être prorogé de quinze (15) jours au maximum du demandeur d’expropriation pour cause d’utilité publique et après approbation de l’organe chargé d’approuver les projets d’expropriation pour cause d’utilité publique. - 30 Verify source ↗
Gutanga raporo y’igenagaciro
AI-assisted research summary: After valuing the land and property, valuers must submit a report to the District or City of Kigali Mayor or the relevant Minister.
Ingingo ya 30: Gutanga raporo y’igenagaciro Article 30: Submission of the valuation report Article 30: Soumission du rapport d’évaluation Ingingo ya 30: Gutanga raporo y’igenagaciro Article 30: Submission of the valuation report Article 30: Soumission du rapport d’évaluation Abagenagaciro bakoze igenagaciro ry’ubutaka n’ibarura ry’ibyabukoreweho bamaze kurangiza igikorwa bashyikiriza Umuyobozi w’Akarere, uw’Umujyi wa Kigali cyangwa Minisitiri bireba raporo rw’abimurwa, ingano y’ubutaka n’agaciro k’ibikorwa bya buri muntu wimurwa n’indishyi igomba guhabwa buri muntu wese urebwa n’igikorwa cyo kwimura ku mpamvu z’inyungu rusange. ikubiyemo urutonde ikwiye After completion of the valuation of land and property incorporated thereon, valuers shall submit to the District or City of Kigali Mayor or the relevant Minister, a report containing the list of persons to be expropriated, the size of land and the value of property incorporated thereon belonging to each person to be expropriated, and the fair compensation to be paid to any person whose property is expropriated in the public interest. Après avoir terminé l’évaluation du terrain et des biens qui y sont incorporés, les évaluateurs soumettent au Maire de District, au Maire de la Ville de Kigali ou au Ministre concerné un rapport incluant la liste des expropriés, la superficie du terrain et la valeur des travaux qui y sont réalisés pour chaque exproprié et la juste indemnisation à payer à chaque personne dont la propriété est affectée par l’expropriation pour cause d’utilité publique. - 31 Verify source ↗
Kwemeza no gutangaza
AI-assisted research summary: The expropriator must decide on a valuation report and publish it within 15 days after the report is submitted.
Ingingo ya 31: Kwemeza no gutangaza raporo y’igenagaciro Article 31: Approval and publication of the valuation report Article 31: Approbation et publication du rapport d’évaluation Ingingo ya 31: Kwemeza no gutangaza raporo y’igenagaciro Article 31: Approval and publication of the valuation report Article 31: Approbation et publication du rapport d’évaluation Mu gihe kitarenze iminsi cumi n’itanu (15) nyuma yo kugezwaho raporo y’igenagaciro, urwego rwimura rugomba gufata umwanzuro n’abagenagaciro yakozwe kuri raporo Within fifteen (15) days after the submission of the valuation report, the expropriator shall decide on the report prepared by valuers and publish it for the information of relevant parties in Dans un délai ne dépassant pas quinze (15) jours à compter de la réception du rapport d’évaluation, l’expropriant doit prendre une décision sur le rapport dressé par les évaluateurs et le publier à 44 Official Gazette nᵒ 35 of 31/08/2015 rukayitangariza abo bireba mu nyandiko kandi kopi yayo ikamanikwa ku biro by’Akagari ubutaka buherereyemo. writing and a copy thereof shall be posted on the office of the Cell of the place in which the land is located. l’intention des parties concernées par écrit et une copie de celui-ci est affiché au bureau de la Cellule du lieu de situation du terrain. Hakorwa kandi itangazo rimenyesha abo bireba ko raporo yasohotse. Iryo tangazo rinyura nibura kuri imwe mu maradiyo yumvwa na benshi mu Rwanda na nibura muri kimwe mu binyamakuru bikorera mu Rwanda kandi gisomwa n’abantu benshi, kugira ngo abo bireba babimenye. Mu ngombwa gihe hakoreshwa n’ubundi buryo bw’itumanaho. bibaye A communication that the report is published shall also be made to the relevant parties. Such a communication shall also be made through at least one of radio stations with a wide audience in Rwanda and one of Rwanda-based newspapers with a wide readership for the relevant parties to be informed thereof. If necessary, any other means of communication shall be used. Il est fait également un communiqué annonçant aux parties concernées que le rapport est publié. Ce communiqué est diffusé sur au moins l’une des stations de radio avec un vaste auditoire au Rwanda et dans au moins l’un des journaux basés au Rwanda avec un vaste lectorat pour que les personnes concernées en prennent connaissance. En cas de besoin, il est fait recours à tout autre moyen de communication. - 32 Verify source ↗
Gushyira umukono cyangwa
AI-assisted research summary: If the land owner or owner of property agrees with the valuers’ assessed value, they must sign or fingerprint the approved fair compensation report.
Ingingo ya 32: Gushyira umukono cyangwa igikumwe ku nyandiko y’indishyi ikwiye yemejwe Article 32: Signing approved fair compensation report or fingerprinting 32: Apposer Article ou l’empreinte digitale sur le rapport de la juste indemnisation approuvée signature la Ingingo ya 32: Gushyira umukono cyangwa igikumwe ku nyandiko y’indishyi ikwiye yemejwe Mu gihe nyir’ubutaka cyangwa nyir’ibikorwa byabukoreweho yemeye agaciro kagenwe n’abagenagaciro ashyira umukono cyangwa igikumwe ku nyandiko zabugenewe z’indishyi ikwiye yemejwe. cyo gushyira umukono Igihe cyangwa igikumwe ku nyandiko zabugenewe z’indishyi ikwiye yemejwe ntikigomba kujya munsi y’iminsi irindwi (7) cyangwa ngo kirenze iminsi makumyabiri n’umwe (21) uhereye igihe raporo y’igenagaciro yatangarijwe. Article 32: Signing approved fair compensation report or fingerprinting 32: Apposer Article ou l’empreinte digitale sur le rapport de la juste indemnisation approuvée signature la When the land owner or the owner of property incorporated on the valuation, he/she shall sign or fingerprint the approved fair compensation reports. is satisfied with land Lorsque le propriétaire foncier ou le propriétaire des biens qui sont incorporés sur le terrain est satisfait de la valeur calculée par les évaluateurs, il appose sa signature ou son empreinte digitale sur les rapports de la juste indemnisation approuvée. The deadline for signing or fingerprinting approved fair compensation reports may not be less than seven (7) days or more than twenty- one (21) days from the publication of the valuation report. La période pour signer ou apposer l’empreinte digitale sur les rapports de la juste indemnisation approuvée ne doit être ni inférieure à sept (7) jours ni supérieure à vingt-et-un (21) jours à compter de la publication du rapport d’évaluation. 45 Official Gazette nᵒ 35 of 31/08/2015 - 33 Verify source ↗
Kuvuguruza agaciro kahawe
AI-assisted research summary: A person who disagrees with the assessed value of expropriated land must state the reasons in writing within 7 days, and must pay for a recognized valuer or valuation firm to do a counter-assessment.
Ingingo ya 33: Kuvuguruza agaciro kahawe ubutaka n’ibyabukoreweho Article 33: Contesting the assessed value of land and property incorporated thereon Article 33: Contestation de la valeur attribuée au terrain et aux biens qui y sont incorporés Ingingo ya 33: Kuvuguruza agaciro kahawe ubutaka n’ibyabukoreweho Article 33: Contesting the assessed value of land and property incorporated thereon Article 33: Contestation de la valeur attribuée au terrain et aux biens qui y sont incorporés rwemeje Mu gihe kitarenze iminsi irindwi (7) nyuma raporo rwimura y’uko urwego yakozwe uwimurwa n’abagenagaciro, utanyuzwe n’agaciro kahawe ubutaka bwe n’ak’ibikorwa byabukoreweho agaragaza mu nyandiko ibyo anenga muri raporo yakozwe n’abagenagaciro. Within seven (7) days after the approval of the valuation report by the expropriator, any person to be expropriated who is not satisfied with the assessed value of his/her land and property incorporated thereon shall indicate in writing grounds for his/her dissatisfaction with the valuation report. Dans un délai ne dépassant pas sept (7) jours après l’approbation du rapport des évaluateurs par l’expropriant, l’exproprié qui n’est pas satisfait de la valeur attribuée à son terrain et aux biens qui y sont incorporés doit indiquer par écrit les raisons de son désaccord avec le rapport dressé par les évaluateurs. Uvuguruza agaciro yishyiriraho umugenagaciro cyangwa ibiro byazobereye mu igenagaciro kandi byemewe n’urugaga rw’abakora umwuga itimukanwa mu w’igenagaciro ku mitungo agaciro Rwanda kugira ngo bagaragaze mvuguruza. Raporo y’agaciro mvuguruza igomba kuba yabonetse mu gihe kitarenze iminsi igihe uwimurwa yasabiye gusubirishamo igenagaciro. ibarwa uhereye icumi (10) Any person contesting the assessed value shall, at his/her own expense, engage the services of a valuer or a valuation firm recognized by the Institute of Real Property Valuers in Rwanda to carry out a counter-assessment of the value. The counter-assessment report must be available within ten (10) days from the application for counter valuation by to be expropriated. the person Quiconque conteste la valeur attribuée, loue, à ses frais, les services d’un évaluateur ou d’un bureau des évaluateurs agréés par l’Ordre des Evaluateurs des Biens Immobiliers au Rwanda, en vue de calculer la valeur de la contre-expertise. Le rapport de la contre-expertise doit être disponible dans un délai ne dépassant pas dix (10) jours à compter de la date de demande de contre- expertise. - 34 Verify source ↗
Isesengurwa rya raporo
AI-assisted research summary: The expropriator must decide on a counter-assessment report within 5 working days. If accepted, it replaces the initial valuation report. If not accepted, disagreement minutes are signed, and the expropriated person may go to court within 15 days. The determined value is paid to avoid suspending expropriation pending court decision.
Ingingo ya 34: Isesengurwa rya raporo y’agaciro mvuguruza Article 34: Analysis of the counter-assessment report Article 34: Analyse du rapport de la contre- expertise Icyiciro cya 2: Indishyi ikwiye Section 2: Fair compensation Section 2: Juste indemnisation Ingingo ya 34: Isesengurwa rya raporo y’agaciro mvuguruza Article 34: Analysis of counter-assessment report Article 34: Examen du rapport de la contre- expertise y’agaciro mvuguruza yakozwe Raporo ibiro by’inyigo n’umugenagaciro cyangwa ishyikirizwa byazobereye mu ruyifateho rwimura kugira ngo Urwego umwanzuro mu gihe kitarengeje iminsi itanu (5) y’akazi nyuma yo gushyikirizwa raporo y’igenagaciro mvuguruza. igenagaciro The counter-assessment report by a valuer or a valuation the firm shall be submitted expropriator who shall take a decision thereon within five (5) working days after its reception. to Le rapport de la contre-expertise dressé par l’évaluateur ou un bureau d’étude agréé est soumis à l’expropriant pour y prendre une décision dans un délai ne dépassant pas cinq (5) jours ouvrables à compter de la date de réception du rapport de contre-expertise. Iyo raporo y’agaciro mvuguruza yemewe n’urwego rwimura, isimbura iy’igenagaciro rya When the counter-assessment report is accepted by the expropriator, such a report shall replace Lorsque le rapport de contre-expertise est accepté par l’expropriant, ce rapport remplace le rapport 46 inyandiko mvugo mbere. Hakorwa kandi ishyirwaho umukono n’uhagarariye urwego rwimura, uwimurwa n’abagenagaciro bo ku mpande zombi. raporo y’agaciro mvuguruza Iyo itemewe n’urwego rwimura, hakorwa inyandikomvugo Iyo igaragaza umukono nyandikomvugo n’uhagarariye urwego rwimura, uwimurwa n’abagenagaciro bo ku mpande zombi. ibitemeranyijweho. ishyirwaho atanyuzwe uwimurwa Iyo n’umwanzuro wafashwe, atanga ikirego mu rukiko rubifitiye ububasha mu gihe kitarenze iminsi cumi n’itanu ashyiriyeho (15) umukono igaragaza ibitemeranyijweho. ibarwa guhera umunsi nyandikomvugo ku Agaciro kemejwe n’urwego rwimura gahabwa uwimurwa kugira ngo igikorwa cyo kwimura abantu rusange kidahagarara mu gihe hagitegerejwe icyemezo cy’urukiko. ku mpamvu z’inyungu Official Gazette nᵒ 35 of 31/08/2015 thereof and the initial valuation report. Minutes shall also be taken the representative of the expropriator, the person to be expropriated and valuers of both parties. jointly signed by initial. Il est également dressé un procès-verbal signé par l’expropriant, représentant de l’exproprié et les évaluateurs des deux côtés. le When is not the counter-assessment report accepted by the expropriator, minutes shall also be taken thereof and indicate the points of disagreement. Such minutes shall be jointly signed by the representative of the expropriator, the person to be expropriated and valuers of both parties. When the person to be expropriated is not satisfied with that decision, he/she can refer the matter to the competent court within fifteen (15) the day he/she appends his/her days from signature to the minutes indicating points of disagreement. Lorsque le rapport de la contre-expertise n’est pas accepté par l’expropriant, il est dressé un procès- verbal indiquant les points faisant objet de désaccord. Ce procès-verbal est cosigné par le représentant de l’expropriant, l’exproprié et les évaluateurs des deux côtés. Lorsque l’exproprié n’est pas satisfait de la décision qui a été prise, il introduit l’affaire devant la juridiction compétente endéans quinze (15) jours à compter de la date de signature du procès-verbal indiquant les points de désaccord. The value determined by the expropriator shall be paid to the expropriated person in order to avoid suspension of expropriation in public interest pending the court’s decision. l’expropriation est versée à La valeur de l’exproprié pour éviter suspension de l’expropriation pour cause d’utilité publique en attendant la décision de la juridiction. la Icyiciro cya 2: Indishyi ikwiye Section 2: Payment of fair compensation Section 2: Paiement d’une juste indemnisation - 35 Verify source ↗
Kwishyura indishyi ikwiye
AI-assisted research summary: Fair compensation for expropriation must be paid to the expropriated person before relocation.
Ingingo ya 35: Kwishyura indishyi ikwiye Article 35: Payment of fair compensation Article 35: Paiement d’une juste indemnisation Ingingo ya 35: Kwishyura indishyi ikwiye Article 35: Payment of fair compensation Article 35: Paiement d’une juste indemnisation Indishyi ikwiye ishobora kuba amafaranga y’u buryo Rwanda, y’uwimura bwumvikanyweho n’uwimurwa. cyangwa ubundi hagati Fair compensation can be paid in monetary form in the Rwandan currency or in any other form mutually agreed upon by the expropriator and the person to be expropriated. 47 La juste indemnisation peut se faire en espèces en monnaie rwandaise, ou par tout autre moyen sur et base d’un l’exproprié. l’expropriant accord entre iyimurwa Kugira ngo ikwiye mbere y’uko yimuka. ihabwa uwimurwa ryemerwe, indishyi igomba kurihwa Official Gazette nᵒ 35 of 31/08/2015 In order for the expropriation to be authorized, the fair compensation must be paid to the expropriated person before he/she relocates. Pour que l’expropriation soit autorisée, la juste indemnisation destinée à l’exproprié doit être payée avant le déménagement. - 36 Verify source ↗
Igihe uwimura agomba kuba
AI-assisted research summary: Approved fair compensation must be paid within 120 days; if not, the expropriation becomes void unless the parties agree otherwise.
Ingingo ya 36: Igihe uwimura agomba kuba yamaze kwishyura indishyi ikwiye Article 36: Time frame for payment of fair compensation Article 36: Délai du paiement de la juste indemnisation Ingingo ya 36: Igihe uwimura agomba kuba yamaze kwishyura indishyi ikwiye Article 36: Time frame for payment of fair compensation Article 36: Délai du paiement de la juste indemnisation Indishyi ikwiye yemejwe yishyurwa mu gihe kitarenze iminsi ijana na makumyabiri (120) uhereye igihe iyo ndishyi ikwiyeyemerejwe n’Inama Njyanama ku rwego rw’Akarere, ku rwego rw’Umujyi wa Kigali cyangwa Minisiteri bireba. Iyo igihe kivugwa mu gika cya mbere cy'iyi ngingo kirenze, iyimurwa riba ritaye agaciro n’uwimura keretse babyumvikanyeho. uwimurwa Nyuma yo kwakira indishyi ikwiye, uwimurwa afite na makumyabiri (120) ngo abe yimutse. kitarenze iminsi igihe ijana The approved fair compensation shall be paid within a period not exceeding one hundred and twenty (120) days from the day of its approval by the District or City of Kigali Council or the relevant Ministry. La juste indemnisation approuvée est payée dans un délai ne dépassant pas cent- vingt (120) jours à compter du jour de son approbation par le Conseil de District, le Conseil de la Ville de Kigali ou le Ministère concerné. If fair compensation is not paid within the period provided under Paragraph One of this Article, expropriation shall become null and void unless otherwise agreed upon between the expropriator and the person to be expropriated. Subsequent to receiving fair compensation, the expropriated person shall have a period not exceeding one hundred and twenty (120) days to relocate. Si la juste indemnisation n’est pas payée dans les délais visés à l’alinéa premier du présent article, l’expropriation devient nulle et non avenue sauf par et l’expropriant. l’exproprié amiable accord entre indemnisation, Après la réceptionde la juste l’exproprié déménage dans un délai ne dépassant pas cent -vingt (120) jours. Icyakora, ku mirimo y’ubuhinzi ntiyemerewe guhinga ibihingwa birenza iminsi ijana na makumyabiri (120) mu murima we. However, the person to be expropriated shall not be allowed to plant crops that require more than one hundred and twenty (120) days of growth before they can be harvested. Toutefois, l’exproprié n’a pas le droit de cultiver sur son terrain les cultures qui exigent d’attendre plus de cent- vingt (120) jours avant de pouvoir faire la récolte. 48 Official Gazette nᵒ 35 of 31/08/2015 Article 36 of this Law and shall not exceed one year. When the expropriator retracts his/her project despite having mutually agreed with the person to be expropriated, the expropriator shall pay the person to be expropriated an additional compensation of five per cent (5%). 49 qui son projet rétracte L'expropriant d’expropriation pour cause d’utilité publique après l'évaluation des biens des expropriés ou ne s’acquitte pas de ses obligations de payer la juste indemnisation dans les délais visés à l’article 36 de tenu de payer un dédommagement équivalent à cinq pour cent (5%) de la juste indemnisation qui devait être payée à l'exproprié. la présente loi est Lorsque l’expropriant et l'exproprié conviennent de poursuivre l'expropriation, l'expropriant est tenu de payer un dédommagement prévu à l’alinéa premier que l’expropriation ne continue. Le délai additionnel commence à courir le jour qui suit la date d’expiration de la période visée à l’article 36 de la présente loi et ne peut dépasser une année. présent article avant du Lorsque l’expropriant se rétracte après s’être convenu avec l'exproprié, l’expropriant paie à l'exproprié un dédommagement additionnel de cinq pour cent (5%). Official Gazette nᵒ 35 of 31/08/2015 - 37 Verify source ↗
Indishyi ihabwa uwimurwa
AI-assisted research summary: An expropriator who withdraws an expropriation project or pays late must pay an extra 5% of the fair compensation.
Ingingo ya 37: Indishyi ihabwa uwimurwa mu gihe uwimura yaretse umushinga wo kwimura abantu ku mpamvu z’inyungu the in case Article 37: Compensation expropriator retracts his/her project for expropriation in the public interest or in case lorsque 37: Article l'expropriant projet d’expropriation pour cause d’utilité publique Dédommagement son rétracte 19 Official Gazette nᵒ 35 of 31/08/2015 rusange cyangwa yatinze kwishyura indishyi ikwiye of delay in payment of fair compensation ou en cas de retard de paiement de la juste indemnisation Ingingo ya 37: Indishyi ihabwa uwimurwa mu gihe uwimura yaretse umushinga wo kwimura abantu ku mpamvu z’inyungu rusange cyangwa yatinze kwishyura indishyi ikwiye the in case Article 37: Compensation expropriator retracts his/her project for expropriation in the public interest or in case of delay in payment of fair compensation Dédommagement son rétracte lorsque 37: Article l'expropriant projet d’expropriation pour cause d’utilité publique ou en cas de retard de paiement de la juste indemnisation imitungo Uwimura wisubiyeho akareka igikorwa cyo kwimura abantu ku mpamvu z'inyungu rusange yaramaze y'abimurwa kandi kubarurwa cyangwa warengeje igihe cyo kwishyura indishyi ikwiye giteganyijwe mu ngingo ya 36 y'iri tegeko yishyura indishyi y’atanu ku ijana (5%) y'indishyi ikwiye yari kuzahabwa uwimurwa. Any expropriator that retracts his/her project for expropriation in the public interest after the valuation of the property of the persons to be expropriated or fails to pay fair compensation within the period provided under Article 36 of this Law shall be bound to pay compensation of five per cent (5%) of fair compensation that had to be paid to the person to be expropriated. uwimura rikomeza, Iyo uwimura n'uwimurwa bumvikanye ko iyimurwa agomba kwishyura indishyi ivugwa mu gika cya mbere cy'iyi ngingo, mbere y'uko iyimurwa rikomeza. Igihe cy'inyongera kibarwa uhereye ku munsi ukurikira iminsi ivugwa mu gika cya mbere cy’ingingo ya 36 y’iri tegeko, ntigishobora kurenza umwaka umwe. Mu gihe uwimura yisubiyeho nyuma yo kumvikana n’uwimurwa, uwimura atanga indishyi y’inyongera y’atanu ku ijana (5%). When the expropriator and the person to be expropriated agree to pursue expropriation, the expropriator shall be bound to pay compensation provided under paragraph One of this Article prior to pursuing expropriation. The additional time period shall begin to run from the day following the expiry of the period provided under - 38 Verify source ↗
Uburyo bukoreshwa mu
AI-assisted research summary: Fair compensation is paid into the expropriated person’s bank or financial account, with special rules for joint ownership, secured property, missing account details, and abandoned property.
Ingingo ya 38: Uburyo bukoreshwa mu kwishyura indishyi ikwiye y’amafaranga Article 38: Mode of payment of monetary fair compensation Article 38: Mode de paiement de la juste indemnisation en espèces Ingingo ya 38: Uburyo bukoreshwa mu kwishyura indishyi ikwiye y’amafaranga Article 38:Mode of payment of monetary fair compensation Article 38: Mode de paiement de la juste indemnisation en espèces Amafaranga y’indishyi ikwiye ashyirwa kuri konti y’uwimurwa muri banki cyangwa mu kigo cy’imari yihitiyemo byemewe n’amategeko biri mu Gihugu. Monetary fair compensation shall be deposited into the account of the person to be expropriated opened with a recognized locally-based bank or financial institution of his/her choice. La juste indemnisation est versée au compte de l’exproprié ouvert dans une banque locale ou dans une institution financière locale agréée de son choix. kuri Mu gihe indishyi ikwiye igomba guhabwa iyo basangiye abimurwa barenze umwe uburenganzira mutungo nk’umuryango cyangwa se umugore n’umugabo bashingiranywe, amafaranga ashyirwa kuri konti bumvikanyeho ku buryo bisaba ko ugiye kuyabikuza rwanditse rw’abo bayisangiye. uruhushya ahabwa uwo in case of joint ownership, fair When, compensation must be paid to more than one person to be expropriated such as a family or a legally married spouses, compensation shall be deposited into an agreed upon account such that withdrawal of money from that account shall require a written authorization from other co- holders. Iyo abimurwa basangiye umutungo bakaba batumvikana ku burenganzira buri wese awufiteho, amafaranga y’indishyi ashyirwa mu isanduku ya Leta, kugeza igihe hagaragajwe inyandiko yemeza ko amakimbirane yarangiye. Iyo umutungo w’uwimurwa watanzweho ingwate muri banki cyangwa mu kigo cy’imari, amafaranga y’indishyi ikwiye ashyirwa kuri konti yatanzwe n’iyo banki cyangwa n’icyo kigo. In case the persons to be expropriated jointly own the property and do not agree on their respective rights over the property, the amount of fair compensation shall be deposited into public treasury, until a document proving the resolution of the disagreement is produced. In case the property of the person to be expropriated is encumbered by a guarantee provided to a bank or a financial institution, the amount of fair compensation shall be deposited into the account indicated by the bank or financial institution. la juste Lorsque, en cas de copropriété, indemnisation doit être payée à plusieurs expropriés tels que la famille ou les conjoints légalement mariés, l’indemnisation est versée au compte convenu, de sorte que la personne devant retirer cet argent doit se munir d’une autorisation écrite de ses co-titulaires. Lorsque plusieurs expropriés en copropriété sont en désaccord sur le droit qui revient à chaque copropriétaire, l’indemnisation est versée au trésor public, jusqu’à la présentation d’un document prouvant la résolution du désaccord. Lorsque les biens de l’exproprié sont grevés d’une garantie d’une banque ou institution financière, l’indemnisation est versée au compte indiqué par cette banque ou institution financière. Iyo uwimurwa atagaragaje konti yashyirwaho amafaranga y’indishyi ikwiye mu gihe kitarenze igihe iminsi mirongo abimenyesherejweho, ayo mafaranga ashyirwa mu isanduku ya Leta, akaba ari ho azayafatira. (30) uhereye itatu If, within a period not exceeding thirty (30) days from the day he/she is informed thereof, the person to be expropriated fails to furnish the account into which fair compensation shall be deposited, such fair compensation shall be Lorsque l’exproprié ne signale pas le numéro de compte sur lequel la juste indemnisation doit être versée dans un délai de trente (30) jours à compter du jour où il en a été informé, l’indemnisation est versée au trésor public à partir duquel il peut la 50 itagira beneyo, amafaranga Ku mitungo hakurikijwe y’indishyi amategeko abigenga agashyirwa kuri konti ntakorwaho yabigenewe. abikwa ikwiye Official Gazette nᵒ 35 of 31/08/2015 deposited into the public treasury from which he/she can withdraw it. retirer. For abandoned properties, the amount of fair compensation shall be kept in accordance with relevant laws and deposited into a blocked account opened for this purpose. Pour les biens abandonnés, la juste indemnisation est gardée conformément aux lois en la matière et est versée au compte bloqué ouvert à cet effet. - 39 Verify source ↗
Uburyo bwo gutanga indishyi
AI-assisted research summary: If compensation is paid in kind, it must follow the agreed form. Where several expropriated persons share rights in the property, the joint owners must agree on the compensation. Minutes of the agreed compensation must be signed or fingerprinted by both parties.
Ingingo ya 39: Uburyo bwo gutanga indishyi ikwiye itari amafaranga Article 39: Mode of payment of compensation in kind fair Article 39: Mode de paiement de la juste indemnisation en nature UMUTWE Y’INZIBACYUHO N’IZISOZA WA V: INGINGO CHAPTER V: TRANSITIONAL AND FINAL PROVISIONS CHAPITRE TRANSITOIRES ET FINALES V: DISPOSITIONS Ingingo ya 39: Uburyo bwo gutanga indishyi ikwiye itari amafaranga Article 39: Mode of payment of compensation in kind fair Article 39: Mode de paiement de la juste indemnisation en nature Mugihe cy’iyishyurwa ry’indishyi ikwiye itari gitangwa amafaranga, hashingiwe ku ndishyi ikwiye yumvikanyweho. icyumvikanyweho In case of payment of fair compensation in kind, the type of fair compensation agreed upon shall be paid in accordance with the agreed upon fair compensation. En cas de paiement d’une juste indemnisation en nature, cette juste indemnisation convenue est payée conformément à la juste indemnisation convenue. Iyo indishyi ikwiye igomba guhabwa abimurwa barenze umwe basangiye uburenganzira kuri uwo mutungo, icyumvikanyweho kigomba kwemezwa n’ababusangiye bose. If, in case of joint ownership, fair compensation must be paid to more than one person to be expropriated, such fair compensation shall be mutually agreed upon between the joint owners. juste Lorsque, en cas de copropriété, indemnisation doit être octroyée à plusieurs personnes, ces co-titulaires doivent se convenir sur cette juste indemnisation. la Icyumvikanyweho ishyirwaho umukono n’uwimura n’uwimurwa. gikorerwa cyangwa inyandiko igikumwe Minutes shall be taken of mutually agreed form of fair compensation and bear the signature or fingerprint of both the expropriator and the person to be expropriated. Il est juste fait un procès-verbal d’une indemnisation convenue qui porte la signature ou l’empreinte digitale de l’expropriant et de l’exproprié. UMUTWE Y’INZIBACYUHO N’IZISOZA WA V: INGINGO CHAPTER V: TRANSITIONAL AND FINAL PROVISIONS CHAPITRE TRANSITOIRES ET FINALES V: DISPOSITIONS - 40 Verify source ↗
Ibiciro byari bisanzwe
AI-assisted research summary: Until the values under Article 22 are published, the existing land values continue to apply, for no more than six months from publication of this Law.
Ingingo ya 40: Ibiciro byari bisanzwe bikurikizwa Article 40: Existing land values Article 40: Valeurs foncières existantes Ingingo ya 40: Ibiciro byari bisanzwe bikurikizwa Article 40: Existing land values Article 40: Valeurs foncières existantes Mu gihe ibiciro biteganywa mu ngingo ya 22 y’iri tegeko bitaratangazwa, ibyari bisanzwe bikomeza gukurikizwa mu gihe kitarenze amezi Pending the publication of the values provided under Article 22 of this Law, the existing values shall apply for a period not exceeding six (6) Dans l’attente de la publication des valeurs prévues à l’article 22 de la présente loi , les valeurs foncières existantes restent d’application 51 Official Gazette nᵒ 35 of 31/08/2015 atandatu (6), uhereye ku munsi iri tegeko ritangarijweho mu Igazeti ya Leta ya Repubulika y’u Rwanda. months from the date of publication of this Law in the Official Gazette of the Republic of Rwanda. pour un délai ne dépassant pas six (6) mois à compter du jour de la publication de la présente loi au Journal Officiel de la République du Rwanda. - 41 Verify source ↗
Itegurwa, isuzumwa n’itorwa
AI-assisted research summary: This article says the law was drafted, considered, and adopted in Kinyarwanda.
Ingingo ya 41: Itegurwa, isuzumwa n’itorwa ry’iri tegeko Article 41: Drafting, consideration and adoption of this Law Article 41: Initiation, examen et adoption de la présente loi Ingingo ya 41: Itegurwa, isuzumwa n’itorwa by’iri tegeko Article 41: Drafting, consideration and adoption of this Law Article 41: Initiation, examen et adoption de la présente loi Iri tegeko ryateguwe, risuzumwa kandi ritorwa mu rurimi rw’Ikinyarwanda. This Law was drafted, considered and adopted in Kinyarwanda. La présente loi a été initiée, examinée et adoptée en Kinyarwanda. - 42 Verify source ↗
Ivanwaho ry’itegeko n'ingingo
AI-assisted research summary: This article repeals Law No. 18/2007 on expropriation in the public interest and any earlier legal provisions that conflict with this Law.
Ingingo ya 42: Ivanwaho ry’itegeko n'ingingo z'amategeko zinyuranyije n’iri tegeko Article 42: Repealing provision Article 42: Disposition abrogatoire Ingingo ya 42: Ivanwaho ry’itegeko n'ingingo z'amategeko zinyuranyije n’iri tegeko Itegeko n° 18/2007 ryo kuwa 19 Mata 2007 ryerekeye kwimura abantu ku mpamvu z’inyungu rusange n’ingingo zose z’amategeko abanziriza ryo bivanyweho. iri kandi zinyuranyije na Article 42: Repealing provision Article 42: Disposition abrogatoire Law n° 18/2007 of 19 April 2007 relating to expropriation in the public interest and all prior legal provisions contrary to this Law are hereby repealed. La Loi n° 18/2007 du 19 avril 2007 portant expropriation pour cause d’utilité publique ainsi que toutes les dispositions légales antérieures contraires à la présente loi sont abrogées. - 43 Verify source ↗
Igihe iri tegeko ritangira
AI-assisted research summary: This law starts to apply on the day it is published in the Official Gazette of the Republic of Rwanda.
Ingingo ya 43: Igihe iri tegeko ritangira gukurikizwa Article 43: Commencement Article 43: Entrée en vigueur 20 Official Gazette nᵒ 35 of 31/08/2015 ITEGEKO N° 32/2015 RYO KUWA 11/06/2015 RYEREKEYE KWIMURA ABANTU KU MPAMVU Z’INYUNGU RUSANGE LAW N° 32/2015 OF 11/06/2015 RELATING TO EXPROPRIATION IN THE PUBLIC INTEREST LOI N° 32/2015 DU 11/06/2015 PORTANT EXPROPRIATION CAUSE D’UTILITE PUBLIQUE POUR Twebwe, KAGAME Paul, Perezida wa Repubulika; We, KAGAME Paul, President of the Republic; Nous, KAGAME Paul, Président de la République; ISHINGA INTEKO AMATEGEKO YEMEJE, NONE NATWE DUHAMIJE, DUTANGAJE ITEGEKO RITEYE RITYA KANDI DUTEGETSE KO RYANDIKWA MU YA REPUBULIKA Y’U RWANDA IGAZETI LETA YA THE PARLIAMENT HAS ADOPTED AND WE SANCTION, PROMULGATE THE FOLLOWING LAW AND ORDER IT BE PUBLISHED IN THE OFFICIAL GAZETTE OF THE REPUBLIC OF RWANDA LE PARLEMENT A ADOPTE ET NOUS SANCTIONNONS, PROMULGUONS LA LOI DONT LA TENEUR SUIT ET ORDONNONS QU’ELLE SOIT PUBLIEE AU JOURNAL OFFICIEL DE LA REPUBLIQUE DU RWANDA INTEKO ISHINGA AMATEGEKO: THE PARLIAMENT: LE PARLEMENT: Umutwe w’Abadepite mu nama yawo yo ku wa 29 Mata 2015; The Chamber of Deputies, in its session of 29 April 2015; La Chambre des Députés, en sa séance du 19 avril 2015; Umutwe wa Sena mu nama yawo yo kuwa 13 Werurwe 2015; Ishingiye ku Itegeko Nshinga rya Repubulika y’u Rwanda ryo ku wa 04 Kamena 2003 nk’uko ryavuguruwe kugeza ubu, cyane cyane mu ngingo zaryo, iya 11, iya 29, iya 30, iya 31, iya 32, iya 49 , iya 62, iya 66, iya 67, iya 88, iya 89, iya 90, iya 92, iya 93, iya 94, iya 95, iya 108, iya 190 n’iya 201; The Senate, in its session of 13 March 2015; Le Sénat, en sa séance du 13 mars 2015; Pursuant to the Constitution of the Republic of Rwanda of 04 June 2003 as amended to date, especially in Articles 11, 29, 30, 31, 32, 49, 62, 66, 67, 88, 89, 90, 92, 93, 94, 95, 108, 190 and 201; Vu la Constitution de la République du Rwanda du 04 juin 2003 telle que révisée à ce jour, spécialement en ses articles 11, 29, 30, 31, 32, 49, 62, 66, 67, 88, 89, 90, 92, 93, 94, 95, 108, 190 et 201; 21 Uburenganzira Ishingiye ku Masezerano Mpuzamahanga yerekeye mu by’imbonezamubano na politiki yashyiriweho i New York muri Leta Zunze umukono Ubumwe z’Amerika ku wa 19 Ukuboza 1966, nk’uko yemejwe n’Itegeko-teka n° 8/75 ryo kuwa 12 Gashyantare 1975, cyane cyane mu ngingo yayo ya mbere; n’umuco Ishingiye ku Masezerano Mpuzamahanga yerekeye Uburenganzira mu by’ubukungu, yashyiriweho imibereho myiza umukono i New York muri Leta Zunze Ubumwe z’Amerika yo ku wa 19 Ukuboza 1966, nk’uko yemejwe n’Itegeko-teka n° 8/75 ryo kuwa 12 Gashyantare 1975, cyane cyane mu ngingo yayo ya mbere; Ishingiye ku Masezerano Nyafurika yerekeye uburenganzira bwa muntu n’ubw’abaturage yashyiriweho umukono i Nairobi muri Kenya ku wa 27 Kamena 1981 nk’uko yemejwe n’itegeko n° 10/1983 ryo ku wa 01 Nyakanga 1983, cyane cyane mu ngingo yayo ya 14; Official Gazette nᵒ 35 of 31/08/2015 Pursuant to the International Covenant on Civil and Political Rights signed in New York, United States of America on 19 December 1966 as ratified by Decree-Law n° 8/75 of 12 February 1975, especially in Article one; Vu le Pacte relatif aux droits civils et politiques signé à New York, aux Etats Unis d’Amérique le 19 décembre 1966 tel que ratifié par le Décret-Loi n° 8/75 du 12 février 1975, spécialement en son Ingingo ya 43: Igihe iri tegeko ritangira gukurikizwa Iri tegeko ritangira gukurikizwa ku munsi Igazeti ya Leta ya ritangarijweho mu Repubulika y’u Rwanda. Article 43: Commencement Article 43: Entrée en vigueur This Law shall come into force on the day of its the publication Republic of Rwanda. the Official Gazette of in La présente loi entre en vigueur le jour de sa publication au Journal Officiel de la République du Rwanda. Kigali, ku wa 11/06/2015 Kigali, on 11/06/2015 Kigali, le 11/06/2015 52 (sé) KAGAME Paul Perezida wa Repubulika (sé) MUREKEZI Anastase Minisitiri w’Intebe Official Gazette nᵒ 35 of 31/08/2015 (sé) KAGAME Paul President of the Republic (sé) MUREKEZI Anastase Prime Minister (sé) KAGAME Paul Président de la République (sé) MUREKEZI Anastase Premier Ministre Bibonywe kandi bishyizweho Ikirango cya Repubulika: Seen and sealed with the Seal of the Republic: Vu et scellé du Sceau de la République: (sé) BUSINGYEJohnston Minisitiri w’Ubutabera/Intumwa Nkuru ya Leta (sé) BUSINGYE Johnston Minister of Justice/Attorney General (sé) BUSINGYE Johnston Ministre de la Justice/Garde des Sceaux 53
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
LAW N° 32/2015 OF 11/06/2015 RELATING TO EXPROPRIATION IN THE PUBLIC INTEREST
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in