LAW N°13/2016 OF 02/05/2016 GOVERNING PETROLEUM EXPLORATION AND PRODUCTION ACTIVITIES
This law governs petroleum exploration and production activities in Rwanda.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Rwanda
- Instrument
- Act or statute
- Citation
- 13/2016 OF 02/05/2016
- Status
- In force
- Version
- Undated source snapshot
- Language
- mul
- Updated
- Official source
- View official record ↗
Statute overview
About this statute
This law governs petroleum exploration and production activities in Rwanda. This article defines key terms used in the petroleum law. Petroleum ownership and control belong only to the State, and no one may explore for or produce petroleum unless authorized by a licence and a petroleum agreement. Petroleum exploration and production must use a reference map, and the Minister establishes that map by order. A person who wants to do exploration must apply to the Minister for a license.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of LAW N°13/2016 OF 02/05/2016 GOVERNING PETROLEUM EXPLORATION AND PRODUCTION ACTIVITIES
Showing 47 of 47
- 1 Verify source ↗
Icyo iri tegeko rigamije
AI-assisted research summary: This law governs petroleum exploration and production activities in Rwanda.
Ingingo ya mbere: Icyo iri tegeko rigamije Article One: Purpose of this Law Article premier: Objet de la présente loi Ingingo ya mbere: Icyo iri tegeko rigamije Article One: Purpose of this Law Article premier: Objet de la présente loi tegeko Iri rigenga n’ubucukuzi bwa peteroli mu Rwanda. ibikorwa by’ubushakashatsi This Law governs petroleum exploration and production activities in Rwanda. La présente loi régit les activités d’exploration et de production pétrolières au Rwanda. - 2 Verify source ↗
Ibisobanuro by’amagambo
AI-assisted research summary: This article defines key terms used in the petroleum law.
Ingingo ya 2: Ibisobanuro by’amagambo Article 2: Definitions of terms Article 2: Définitions des termes Ingingo ya 2: Ibisobanuro by’amagambo Article 2: Definitions of terms Article 2: Définitions des termes Muri iri tegeko amagambo akurikira asobanurwa ku buryo bukurikira: For the purpose of this Law, the following terms have the following meanings: Aux fins de la présente loi, les termes suivants ont les significations suivantes: 1º ahakorerwa ubushakashatsi: ahantu hatangiwe 1° exploration area: an area for which an 1° zone d'exploration: zone par laquelle un permis uruhushya rw’ubushakashatsi; exploration license has been granted; d'exploration a été octroyé; 2º ahantu hacukurwa: ahantu hatangiwe 2° production area: an area for which a production 2° zone de production: zone pour laquelle un uruhushya rw’ubucukuzi bwa peteroli; license has been granted; permis de production a été octroyé; 3º amasezerano ku bijyanye na peteroli: amasezerano cyangwa ay’ubucukuzi bwa peteroli akorwa hagati ya Leta y’u Rwanda n’uwemerewe uruhushya ruteganywa n’iri tegeko; y’ubushakashatsi 3° petroleum agreement: an agreement for petroleum exploration or production entered into between the Government of Rwanda and the eligible holder of the licence provided for by this Law; 84 3° accord pétrolier: accord d’exploitation ou de production le Gouvernement du Rwanda et la personne éligible pour la détention d’un permis prévu par la présente loi; pétrolières conclu entre Official Gazette n°21 of 23/05/2016 4º gahunda y’isubiranya: uburyo uwahawe uruhushya agaragaza uko azavanaho ibikoresho n’uko azasubiranya ahakorewe ubushakashatsi cyangwa ubucukuzi bwa peteroli igihe iyo mirimo ihagaze cyangwa isojwe; 4° decommissioning: measures to be taken by a licensee at the cessation or closure of petroleum exploration or production activities to remove materials from the concerned site or rehabilitate it; 4° déclassement: manière dont un détenteur de permis entend enlever le matériel du site ou assurer sa remise en état lors de la cessation ou de la clôture des activités d’exploration ou de production pétrolière ; 5º gahunda y’isuzuma: icukurwa rikorwa kugira ngo hamenyekane ingano ifatika y’ahacukurwa, uko peteroli ihari ingana n’umusaruro wahava mu gihe runaka; 5° appraisal program: a drilling which is carried out to determine the physical extent, petroleum reserves and likely production rate of a petroleum field for a specific period; 5° programme d'évaluation: forage effectué pour déterminer l’étendue physique, les réserves pétrolières et le taux de production probable d’un champ pétrolier pour une période donnée ; 6º gazi kamere ivanze n’amavuta: gazi iri mu n’amavuta iriba adatunganyije, iri hejuru cyangwa ikaba ikora ku mavuta adatunganyije; peteroli ivanze rya 6° associated natural gas: a natural gas which exists in a reservoir in solution with crude oil or which overlies or is in contact with crude oil; 6° gaz naturel associé: gaz naturel se trouvant dans un réservoir en solution avec du pétrole brut ou qui couvre ou est en contact avec du pétrole brut; 7º ibikorwa biboneye mu by’ubushakashatsi n’ubucukuzi bwa peteroli: imirimo ikorwa hashakishwa cyangwa hacukurwa peteroli ifatwa nk’aho inoze, itekanye kandi itanga umusaruro mu bushakashatsi n’ubucukuzi bwa peteroli; 7° good oil field practices: operations involved in the exploration or production of petroleum as good, safe and efficient in carrying out of petroleum exploration or production; 8º ibikorwa by’ubucukuzi: igamije ubucukuzi bwa peteroli n’ibikorwa byose bifitanye isano nayo; imirimo 8° production activities: operations carried out to produce petroleum and all related activities; 7° bonnes pratiques pétrolières: opérations qui interviennent dans l'exploration ou la production pétrolières reconnues comme convenables, sûres et efficaces dans la réalisation de l'exploration ou de la production pétrolières; 8° activités de production: opérations menées dans la production pétrolière ainsi que toutes les activités y relatives; 9º ibikorwa ibikorwa by’ubushakashatsi: bigamije gushakisha peteroli, bikaba bikubiyemo ubushakashatsi kuri jewoloji, ubugenge bw’isi, ubutabire bw’isi, ubukorerwa mu kirere, rukuruzi y’isi, ireme ry’isi cyangwa ibijyanye n’imitingito hamwe n’isesengurwa ry’ubwo rwa bushakashatsi n’icukurwa mu gahunda y’isuzuma; rwego 9° exploration activities: operations carried out in exploring petroleum and include geological, geophysical, geochemical, aerial, magnetic, gravity or seismic surveys and the appraisal program of those surveys and drilling for appraisal purposes; 9° activités opérations d'exploration: d’exploration pétrolière comprenant des études géochimiques, géophysiques, géologiques, aériennes, magnétiques, gravimétriques ou sismiques et ainsi que le programme d'évaluation de ces études et de forage à des fins d’évaluation; 85 Official Gazette n°21 of 23/05/2016 10º igipande: ahantu hagenwa kugira ngo hakorerwe ubushakashatsi cyangwa ubucukuzi bwa peteroli hashingiwe ku biteganywa n’iri tegeko; 10° block: an area for petroleum exploration or production purposes constituted in accordance with the provisions of this Law; 10° bloc: emplacement d’exploration ou de production pétrolières désigné conformément aux dispositions de la présente loi; 11º ivumbura: itahurwa rya peteroli ishobora gucukurwa ikagezwa ku butaka ikaba yapimwa hakoreshejwe uburyo bwemewe; 11° discovery: a finding of petroleum recoverable at the surface of the earth in a flow measurable by conventional methods; 11° découverte: repérage de pétrole récupérable à la surface de la terre dans un flux mesurable par les méthodes conventionnelles; 12º uruhushya rw’ubushakashatsi: uruhushya rutangwa hashingiwe ku biteganywa n’iri tegeko kugira ngo uruhawe agire uburenganzira bwo gukora ubushakashatsi bwa peteroli; 12° exploration license: a in accordance with the provisions of this Law for the licensee to be allowed to carry out petroleum exploration; license issued 12° permis d'exploration: permis délivré en vertu des dispositions de la présente loi et autorisant son l’exploration pétrolière; d’effectuer détenteur 13º iriba rya peteroli: ahantu kamere hafite 13° petroleum reservoir: a discrete area where 13° réservoir de pétrole: zone d’accumulation imiterere yihariye haboneka peteroli; petroleum naturally accumulates; naturelle et distincte de pétrole; 14º Minisitiri: Minisitiri ibikorwa by’ubushakashatsi n’ubucukuzi bwa peteroli mu nshingano ze; ufite 14° Minister: the Minister in charge of petroleum exploration and production; 14° Ministre: Ministre ayant l’exploration et la production pétrolières dans ses attributions; 15º peteroli: amavuta adatunganyije na gazi kamere 15° petroleum: a crude oil and natural gas recovered 15° pétrole: pétrole brut et gaz naturel récupérés byavanywe mu iriba rya peteroli; from a petroleum reservoir; d’un réservoir de pétrole; 16º uruhushya rw’ubucukuzi: uruhushya rutangwa hashingiwe ku biteganywa n’iri tegeko kugira ngo uruhawe agire uburenganzira bwo gucukura peteroli; 17º umuntu: umuntu ku giti cye, isosiyete y’ubucuruzi, umuryango cyangwa ishyirahamwe bifite ubuzima gatozi; 16° production license: a in accordance with the provisions of this Law for the licensee to be allowed to carry out petroleum production; license issued 16° permis de production: permis délivré en vertu des dispositions de la présente loi autorisant son détenteur d’effectuer la production pétrolière; 17° person: an individual, business company, organisation or association with a legal status; 17° personne: personne société commerciale, organisation ou association dotée de la personnalité juridique ; physique, 18º umwobo: ahacukuwe mu rwego rw’ibikorwa by’ubushakashatsi cyangwa by’ubucukuzi bwa peteroli ariko hatabariwemo imyobo yifashishwa 18° well: a borehole made by drilling for petroleum exploration or production operations purposes but which do not include a seismic shot holes. 18° puits: forage réalisé à des fins des opérations d’exploration ou de production pétrolières, mais sans y inclure les trous de prospection sismique. 86 mu gihe cy’ubushakashatsi mu byerekeranye n’imitingito. Official Gazette n°21 of 23/05/2016 - 3 Verify source ↗
Gutunga no kugenzura peteroli
AI-assisted research summary: Petroleum ownership and control belong only to the State, and no one may explore for or produce petroleum unless authorized by a licence and a petroleum agreement.
Ingingo ya 3: Gutunga no kugenzura peteroli Article 3: Ownership and control of petroleum Article 3: Possession et contrôle du pétrole UMUTWE WA II: IKARITA N’URUHUSHYA RW’UBUSHAKASHATSI N’URW’UBUCUKUZI BWA PETEROLI CHAPTER II: PETROLEUM EXPLORATION AND PRODUCTION MAP AND LICENSE CHAPITRE D’EXPLORATION ET DE PETROLIERES CARTE II: ET PERMIS PRODUCTION Icyiciro cya mbere: Ikarita igaragaza ahakorerwa ubushakashatsi n’ubucukuzi bwa peteroli ku butaka bw’u Rwanda Section One: Reference map exploration and production on Geographical area for petroleum the Rwanda’s Section première: Carte de référence pour l’exploration et la production pétrolière dans la zone géographique du Rwanda Ingingo ya 3: Gutunga no kugenzura peteroli Article 3: Ownership and control of petroleum Article 3: Possession et contrôle du pétrole Uburenganzira bwose bwo gutunga no kugenzura peteroli iri ku butaka, mu butaka, munsi cyangwa hejuru y’ubutaka bw’u Rwanda ni ubwa Leta gusa, bitabangamiye uburenganzira ku butaka bwaba bufitwe n’uwo ari we wese. All rights of ownership and control of petroleum on, in or under any land in Rwanda are vested only in the State without prejudice to any right of ownership that any person may possess to the land. Tous les droits de possession et de contrôle du pétrole se trouvant sur, dans ou sous la terre du Rwanda appartiennent uniquement à l'Etat sans préjudice de tout droit de propriété qu’une personne peut posséder sur le sol. Nta muntu ushakisha cyangwa ngo acukure peteroli tegeko adafite n’amasezerano ku bijyanye na peteroli. ruteganywa uruhushya n’iri No person may explore for or produce petroleum except in accordance with a licence provided under this Law and a petroleum agreement. Personne ne peut explorer ou produire du pétrole, à moins d’en avoir le permis prévu par la présente loi et par un accord pétrolier. UMUTWE WA II: IKARITA N’URUHUSHYA RW’UBUSHAKASHATSI N’URW’ UBUCUKUZI BWA PETEROLI CHAPTER II: PETROLEUM EXPLORATION AND PRODUCTION MAP AND LICENSE CHAPITRE D’EXPLORATION ET DE PETROLIERES CARTE II: ET PERMIS PRODUCTION Icyiciro cya mbere: Ikarita igaragaza ahakorerwa ubushakashatsi n’ubucukuzi bwa peteroli ku butaka bw’u Rwanda Section One: Reference map production and exploration geographical area for petroleum on Rwanda’s Section première: Carte de référence pour l’exploration et la production pétrolière dans la zone géographique du Rwanda - 4 Verify source ↗
Reference map for petroleum exploration
AI-assisted research summary: Petroleum exploration and production must use a reference map, and the Minister establishes that map by order.
Ingingo ya 4: ubushakashatsi n’ubucukuzi bwa peteroli Ikarita igaragaza ahakorerwa Article 4: Reference map for petroleum exploration and production Article 4: Carte de référence pour l’exploration et la production pétrolières Icyiciro cya 2: Uruhushya rw’ubushakashatsi Section 2: Exploration License Section 2: Permis d’exploration Ingingo ya 4: ubushakashatsi n’ubucukuzi bwa peteroli Ikarita igaragaza ahakorerwa Ubushakashatsi n’ubucukuzi bwa peteroli bikorwa hifashishijwe imiterere y’uduce tw’ubutaka bw’u Rwanda n’ibipande bitugize. igaragaza ikarita Article 4: Reference map for petroleum exploration and production Article 4: Carte de référence pour l’exploration et la production pétrolières Petroleum exploration and production are carried out on the basis of a reference map which gives the geological details of the geographical areas of Rwanda and their blocks. L'exploration et la production pétrolières sont effectuées sur base d’une carte de référence indiquant la structure géologique des zones géographiques du Rwanda et de leurs emplacements. Iyo karita ishyirwaho n’Iteka rya Minisitiri. Such map is established by an Order of the Minister. Cette carte est établie par un arrêté du Ministre. 87 Official Gazette n°21 of 23/05/2016 Icyiciro cya 2: Uruhushya rw’ubushakashatsi Section 2: Exploration License Section 2: Permis d’exploration - 5 Verify source ↗
Gusaba uruhushya rw’ubushakashatsi
AI-assisted research summary: A person who wants to do exploration must apply to the Minister for a license.
Ingingo ya 5: Gusaba uruhushya rw’ubushakashatsi Article 5: Application for exploration license Article 5: Demande du permis d’exploration Ingingo ya 5: Gusaba uruhushya rw’ubushakashatsi Article 5: Application for exploration license Article 5: Demande du permis d’exploration Umuntu wifuza gukora ibikorwa by’ubushakashatsi abisabira uruhushya Minisitiri. A person intending to carry out exploration activities requests for a license thereof from the Minister. les activités Une personne désireuse d’effectuer d’exploration introduit une demande de licence auprès du Ministre. Iteka rya Minisitiri rigena uburyo n‘ibishingirwaho mu gihe cyo gusaba uruhushya rw’ubushakashatsi. An Order of the Minister determines modalities and requirements for the application for exploration license. Un arrêté du Ministre détermine les modalités et les conditions de demande du permis d’exploration. - 6 Verify source ↗
Gusubiza ubusabe bw’uruhushya
AI-assisted research summary: The Minister must respond in writing to an exploration license application within 90 days and say whether it is accepted or not.
Ingingo ya 6: Gusubiza ubusabe bw’uruhushya rw’ubushakashatsi Article 6: Response to the application for exploration license Article 6: Réponse à d’exploration la demande de permis 78 Official Gazette n°21 of 23/05/2016 Ingingoya rw’ubushakashatsi ya 7: Itangwa ry’uruhushya Ingingo ya 6: Gusubiza ubusabe bw’uruhushya rw’ubushakashatsi Article 6: Response to the application for exploration license Article 6: Réponse à d’exploration la demande de permis yo ubusabe gusuzuma bw’uruhushya Nyuma rw’ubushakashatsi, Minisitiri uwasabye uruhushya mu nyandiko mu gihe kitarenze iminsi mirongo cyenda (90) amumenyesha ko ubusabe bwe bwemewe cyangwa butemewe. Iyo ubusabe bwemewe, uwasabye ahita atumizwa mu biganiro ku masezerano agaragaza uburyo ubushakashatsi buzakorwa. asubiza After consideration of the application for exploration license, the Minister, within ninety (90) days, responds to the the applicant application is accepted or not. Where the application is accepted, the applicant is invited for negotiation of an agreement for exploration. in writing specifying whether Après examen de la demande de permis d’exploration, le Ministre adresse, endéans quatre-vingt-dix (90) jours, une réponse écrite au requérant lui indiquant si sa demande est acceptée ou non. Lorsque la demande est acceptée, le requérant est invité pour la négociation du contrat d’exploration. Iyo ubusabe butemewe, uwasabye impamvu. amenyeshwa Where the application is not accepted, the applicant shall be notified of the reasons thereof. Lorsque la demande n’est pas acceptée, le requérant est notifié des motifs de ce rejet. Ingingoya rw’ubushakashatsi ya 7: Itangwa ry’uruhushya - 7 Verify source ↗
Granting of exploration license
AI-assisted research summary: The Minister must grant the applicant an exploration license within 7 days after the Government and the applicant sign their agreement.
Article 7: Granting of exploration license Article 7: Octroi du permis d’exploration Article 7: Granting of exploration license Article 7: Octroi du permis d’exploration Mu gihe kitarenze iminsi irindwi (7) amasezerano hagati ya Leta n’uwasabye uruhushya yemeranyijweho akanashyirwaho umukono n’impande zombi, Minisitiri atanga uruhushya rw’ubushakashatsi ku warusabye. Within seven (7) days after the agreement between the Government and the applicant is concluded and signed by both parties, the Minister grants to the applicant the exploration license. Endéans sept (7) jours après que l’accord entre l’Etat et le requérant est conclu et signé par les deux parties, le Ministre octroie au requérant le permis d’exploitation. 88 Official Gazette n°21 of 23/05/2016 - 8 Verify source ↗
Uburenganzira bw’uhawe uruhushya
AI-assisted research summary: An exploration licensee has the exclusive right to explore for petroleum in the permitted exploration area and do only the works needed for that exploration.
Ingingo ya 8: Uburenganzira bw’uhawe uruhushya rw’ubushakashatsi Article 8: Rights of an exploration licensee Article 8: Droits du détenteur de permis d’exploration Ingingo ya 8: Uburenganzira bw’uhawe uruhushya rw’ubushakashatsi Umuntu wese uhawe uruhushya rw’ubushakashatsi afite uburenganzira bwo gushakisha peteroli ahantu yemerewe gukorera ubushakashatsi no kuhakorera indi mirimo ijyanye na bwo gusa. Article 8: Rights of an exploration licensee Article 8: Droits du détenteur de permis d’exploration Any exploration licensee has the exclusive right to explore for petroleum in the exploration area, and to carry out necessary works for that purpose only. Tout détenteur d’un permis d’exploration a droit d'explorer le pétrole dans la zone d'exploration, et d’effectuer uniquement les travaux nécessaires à cette fin. - 9 Verify source ↗
Igihe uruhushya rw’ubushakashatsi
AI-assisted research summary: The exploration license lasts 3 years and can be renewed if a written application is submitted.
Ingingo ya 9: Igihe uruhushya rw’ubushakashatsi rumara Article 9: Validity period for the exploration license Article 9: Période de validité du permis d’exploitation Ingingo ya 9: Igihe uruhushya rw’ubushakashatsi rumara Article 9: Validity period for the exploration license Article 9: Période de validité du permis d’exploitation Uruhushya rw’ubushakashatsi rumara imyaka itatu (3) ishobora kongerwa bisabwe mu nyandiko. The exploration license is valid for three (3) years renewable upon written application. Le permis d’exploration est valable pour une durée de trois (3) ans renouvelable sur demande écrite. - 10 Verify source ↗
Gusaba kongera igihe cy’uruhushya
AI-assisted research summary: An exploration license holder may apply to the Minister to renew the license, but the application must be filed within 90 days before expiry.
Ingingo ya 10: Gusaba kongera igihe cy’uruhushya rw’ubushakashatsi Article 10: Application for renewal of exploration license Article 10: Demande de renouvellement du permis d’exploration Ingingo ya 10: Gusaba kongera igihe cy’uruhushya rw’ubushakashatsi Article 10: Application for renewal of exploration license Article 10: Demande de renouvellement du permis d’exploration Ufite uruhushya rw’ubushakashatsi ashobora gusaba Minisitiri ko rwongererwa igihe. Ubusabe bukorwa mu gihe kitarenze iminsi mirongo icyenda (90) mbere y’uko uruhushya rusanzwe rukoreshwa rurangira. The exploration licensee may apply to the Minister for a renewal of such a license. The application for renewal is made within ninety (90) days before the current license is due to expire. Le détenteur d’un permis d'exploration peut faire une demande au Ministre le renouvellement de ce permis. Cette demande est introduite endéans quatre-vingt-dix (90) jours avant l’expiration du permis en cours. Uruhushya rw’ubushakashatsi rwongerewe igihe rumara igihe kitarenze imyaka itatu (3) gishobora kongerwa inshuro imwe gusa nayo itarengeje imyaka ibiri (2). The renewed exploration license remains valid for a period not exceeding three (3) years renewable only once for not more than two (2) years. Le permis d’exploration renouvelé reste valable pour une période ne dépassant pas trois (3) ans renouvelable une fois et ce, pour une période ne dépassant pas deux (2) ans. Iteka rya Minisitiri rigena ibishingirwaho mu kongera igihe cy’uruhushya rw’ubushakashatsi. An Order of the Minister determines the requirements for renewing the exploration license. Un arrêté du Ministre détermine les conditions de renouvellement du permis d’exploration. - 11 Verify source ↗
Kongera cyangwa kutongera igihe
AI-assisted research summary: The Minister must reply in writing on an exploration license renewal application and do so before the license expires.
Ingingo ya 11: Kongera cyangwa kutongera igihe cy’uruhushya rw’ubushakashatsi Article 11: Grant or refusal of renewal of exploration license Article 11: Renouvellement et non-renouvellement du permis d’exploration Ingingo ya 11: Kongera cyangwa kutongera igihe cy’uruhushya rw’ubushakashatsi Article 11: Grant or refusal of renewal of exploration license Article 11 : Renouvellement et non-renouvellement du permis d’exploration igihe Nyuma y’isuzuma ry’ubusabe bwo kongera cy’uruhushya rw’ubushakashatasi, Minisitiri asubiza uwasabye mu nyandiko amumenyesha ko ubusabe bwe After consideration of the application for exploration license renewal, the Minister responds to the applicant in writing specifying whether or not the renewal was Après examen de la demande de renouvellement du permis, le Ministre répond par écrit au requérant lui indiquant si le renouvellement est accepté ou non. Le 89 Official Gazette n°21 of 23/05/2016 bwemewe cyangwa butemewe. Uwasabye asubizwa mbere y’uko uruhushya rusabirwa iyongerwa rurangira. Iyo ubusabe butemewe, uwasabye impamvu mu nyandiko. amenyeshwa granted. The applicant receives the reaction before the expiry of the license subject to the application for renewal. If the renewal is not granted, the applicant is notified of the reasons thereof in writing. requérant reçoit la réponse avant l’expiration du permis faisant l’objet de la demande de renouvellement. En cas de refus de renouvellement, le requérant en est notifié des raisons par écrit. - 12 Verify source ↗
Gahunda y’ibikorwa na raporo
AI-assisted research summary: The exploration licensee must follow the work plan and spending requirements in the license and petroleum agreement, and must submit a work plan, projected expenditure, and detailed activity report to the Minister on the stated schedule.
Ingingo ya 12: Gahunda y’ibikorwa na raporo by’uwahawe uruhushya rw’ubushakashatsi Article 12: Work plan and report of the exploration licensee Article 12: Programme de travail et rapport du détenteur de permis d’exploration Ingingo ya 12: Gahunda y’ibikorwa na raporo by’uwahawe uruhushya rw’ubushakashatsi Article 12: Work plan and report of the exploration licensee Article 12: Programme de travail et rapport du détenteur de permis d’exploration uruhushya Uwahawe agomba kubahiriza ibisabwa bijyanye na gahunda y’ibikorwa n’amafaranga akoreshwa bigaragara mu ruhushya no mu masezerano ku bijyanye na peteroli. rw’ubushakashatsi Uwahawe uruhushya rw’ubushakashatsi agomba, mbere yo gutangira imirimo n’ukwezi kumwe mbere y’uko umwaka urangira, gushyikiriza Minisitiri gahunda irambuye y’imirimo n’amafaranga agomba gushyirwa mu bikorwa, akanamushyikiriza irambuye y’ibyakozwe. raporo The exploration licensee must meet the requirements of work plan and expenditure stipulated in the license and petroleum agreement. The exploration licensee must, before starting activities and one month before the end of each year, submit to the Minister, an adequate work plan and projected expenditure and a detailed activity report. Le détenteur d’un permis d’exploration doit se conformer aux conditions requises pour le programme de travail et les dépenses tels que prévus par le permis et l’accord pétrolier. Le détenteur d’un permis d'exploration doit, avant de commencer les activités et un mois avant la fin de l’année, soumettre au Ministre le programme de travail convenable et les prévisions de dépenses ainsi qu’un rapport d’activités détaillé. - 13 Verify source ↗
Guhindura gahunda y’ibikorwa
AI-assisted research summary: The exploration licensee may amend the work plan and projected expenditure if necessary and agreed by both parties, but not in a way that reduces the planned activities during the license term.
Ingingo ya 13: Guhindura gahunda y’ibikorwa Article 13: Amendment of work plan Article 13: Modification du programme de travail Ingingo ya 13: Guhindura gahunda y’ibikorwa Article 13: Amendment of work plan Article 13: Modification du programme de travail Mu gihe bibaye ngombwa, uwahawe uruhushya mpamvu ashobora, rw'ubushakashatsi zumvikanyweho n’impande zombi, guhindura gahunda y’ibikorwa n’amafaranga byari biteganyijwe. ku Where considered necessary, the exploration licensee may, for reasons agreed upon between both parties, amend the work plan and projected expenditure. Icyakora, iryo hinduka ntirigomba gutuma habaho igabanuka ry'ibikorwa byari biteganyijwe kuri gahunda rusange y'ibikorwa n'amafaranga biteganyijwe mu gihe uruhushya rw'ubushakashatsi ruzamara. However, such an amendment shall not have effect so as to reduce the activities of the overall work plan and projected expenditure to be carried out during the term of the exploration license. jugé nécessaire, S’il est le détenteur du permis d’exploration peut, pour des raisons convenues entre les deux parties, modifier le programme de travail et les prévisions de dépenses. Toutefois, cette modification ne doit pas réduire les activités du programme de travail et des dépenses à effectuer pendant la durée du permis d'exploration. 90 - 14 Verify source ↗
Ingwate ku iyubahirizwa ry’imirimo
AI-assisted research summary: Before starting exploration operations, the exploration licensee must show the Minister a guarantee that confirms compliance with the work plan.
Ingingo ya 14: Ingwate ku iyubahirizwa ry’imirimo y’ubushakashatsi Article 14: Exploration performance guarantee Article 14: Garantie d’exécution d’exploration Ingingo ya 14: Ingwate ku iyubahirizwa ry’imirimo y’ubushakashatsi Mbere yo gutangira imirimo y’ubushakashatsi, uwahawe uruhushya rw’ubushakashatsi agaragariza Minisitiri ingwate yemeza ko azubahiriza ishyirwa mu bikorwa rya gahunda y’imirimo. Official Gazette n°21 of 23/05/2016 Article 14: Exploration performance guarantee Article 14: Garantie d’exécution d’exploration starting the exploration operations, Before the exploration licensee demonstrates to the Minister that he/she has the guarantee to ensure that he/she shall comply with the implementation of work plan. Avant de commencer les opérations d’exploration, le détenteur du permis d’exploration prouve au Ministre qu’il possède une garantie qui assure qu’il va se conformer au plan de travail. rya Minisitiri Iteka n’imicungire by’iyo ngwate. rigena ubwoko, imiterere An Order of the Minister determines the nature, condition and management of such guarantee. Un arrêté du Ministre détermine la nature, l’état et la gestion de cette garantie. - 15 Verify source ↗
Imenyekanisha ry’ivumburwa rya
AI-assisted research summary: If petroleum is discovered in an exploration area, the exploration licensee must give the Minister a detailed written report within 30 days.
Ingingo ya 15: Imenyekanisha ry’ivumburwa rya peteroli Article 15: Notification of discovery of petroleum Article 15: Notification de découverte de pétrole Ingingo ya 15: Imenyekanisha ry’ivumburwa rya peteroli Igihe ahakorerwa ubushakashatsi havumbuwe peteroli, uwahawe uruhushya rw’ubushakashatsi rw’aho hantu agomba, mu gihe kitarenze iminsi mirongo itatu (30) uhereye igihe peteroli yavumburiwe, kugeza kuri Minisitiri raporo irambuye mu nyandiko ijyanye n’iryo vumbura. Article 15: Notification of discovery of petroleum Article 15: Notification de découverte de pétrole Where petroleum has been discovered in an exploration area, the exploration licensee of that area must provide the Minister with a detailed written report for such a discovery within a period not exceeding thirty (30) days as of the date of the discovery of petroleum. Lorsque le pétrole est découvert dans une zone d'exploration, le détenteur du permis d’exploration de cette zone doit fournir au Ministre un rapport écrit détaillé sur la découverte, dans un délai ne dépassant pas trente (30) jours à compter de la date de découverte du pétrole. - 16 Verify source ↗
Kugaragaza inyungu z’ivumbura mu
AI-assisted research summary: If petroleum is discovered in an exploration area, the exploration licensee must notify the Minister within 90 days whether the discovery has commercial interest.
Ingingo ya 16: Kugaragaza inyungu z’ivumbura mu by’ubucuruzi Article 16: Determination of commercial interest of a discovery Article 16: Détermination de l'intérêt commercial d'une découverte Ingingo ya 16: Kugaragaza inyungu z’ivumbura mu by’ubucuruzi Article 16: Determination of commercial interest of a discovery Article 16: Détermination de l'intérêt commercial d'une découverte Mu gihe ahakorerwa ubushakashatsi havumbuwe peteroli, uwahawe uruhushya rw’ubushakashatsi agomba mu gihe kitarenze iminsi mirongo cyenda (90) uhereye igihe ivumbura ryabereye, kugeza kuri Minisitiri inyandiko igaragaza ko ivumbura rifite cyangwa ridafite inyungu mu bucuruzi. Where petroleum has been discovered in an exploration area, the exploration licensee must, within a period not exceeding ninety (90) days as of the date on which the discovery is made, provide to the Minister a notice stating that the discovery is, or is not of commercial interest. le pétrole est découvert dans une zone Lorsque d'exploration, le détenteur du permis d’exploration doit, dans un délai ne dépassant pas quatre-vingt-dix (90) jours à compter de la date à laquelle la découverte a été faite, fournir au Ministre une notification indiquant que la découverte présente ou non un intérêt commercial. - 17 Verify source ↗
Gahunda y’isuzuma
AI-assisted research summary: An exploration licensee must prepare an appraisal program for Ministerial approval within 2 years after submitting notice that the discovery is commercially interesting.
Ingingo ya 17: Gahunda y’isuzuma Article 17: Appraisal program Article 17: Programme d’évaluation Ingingo 18: Guta rw’ubushakashatsi ku havumbuwe peteroli ya agaciro k’uruhushya Ingingo ya 17: Gahunda y’isuzuma Article 17: Appraisal program Article 17: Programme d’évaluation Mu gihe kitarenze imyaka ibiri (2) hatanzwe inyandiko igaragaraza ko ivumbura rifite inyungu mu bucuruzi, Within a period not exceeding two (2) years as of the submission of the notice that the discovery is of Endéans deux (2) ans de la transmission d’une notification indiquant que la découverte présente un 91 Official Gazette n°21 of 23/05/2016 uwahawe uruhushya rw’ubushakashatsi agomba kuba yakoze raporo irambuye yemezwa na Minisitiri yerekeye cyane cyane ibi bikurikira: commercial interest, the exploration licensee must prepare an appraisal program to be approved by the Minister in order to provide the details particularly of the following: commercial, le détenteur d’un permis intérêt d’exploration doit élaborer un programme d’évaluation devant être approuvé par le Ministre afin de donner particulièrement des précisons suivantes: 1° ibigize ubutabire, imiterere y’ubugenge n’ubwiza 1° the chemical composition, physical properties and 1° la composition chimique, les propriétés bya peteroli yavumbuwe; quality of petroleum discovered; physiques et la qualité du pétrole découvert; 2° ubujyakuzimu, ubunini n’imbibi by’iriba; 2° the depth, thickness and boundaries of the reservoir; 2° la profondeur, l’épaisseur et les limites du réservoir; 3° ibiranga umusaruro wava mu iriba hashingiwe ku 3° the reservoir’s productivity indicators for every well 3° les indices de productivité du réservoir pour bipimo byasuzumwe kuri buri mwobo; tested; chaque puits mesuré ; 4° ikigereranyo cy’umusaruro wava mu iriba; 4° estimate of the production capacity of the reservoir; 4° l’estimation de la capacité de production du réservoir; 5° andi makuru y’ingenzi ajyanye n’ivumbura avugwa rw’ubushakashatsi cyangwa mu mu masezerano ku bijyanye na peteroli. ruhushya Ingingo 18: Guta rw’ubushakashatsi ku havumbuwe peteroli ya agaciro k’uruhushya 5° other relevant information relating to the discovery as may be stipulated in the exploration license or a petroleum agreement. 5° les autres informations importantes relatives à la découverte telles que stipulées dans le permis d’exploration ou l’accord pétrolier. - 18 Verify source ↗
Invalidation of the exploration license
AI-assisted research summary: An exploration license for a petroleum discovery area may stop being valid if the licensee does not apply for a production license in time, or if the discovery is not commercially interesting.
Article 18: Invalidation of the exploration license related to petroleum discovery area Article 18: Invalidation du permis d’exploration de la zone de découverte du pétrole Icyiciro cya 3: Uruhushya rw’ubucukuzi Section 3: Production license Section 3: Permis de production 79 Official Gazette n°21 of 23/05/2016 Article 18: Invalidation of the exploration license related to petroleum discovery area Article 18: Invalidation du permis d’exploration de la zone de découverte du pétrole Uruhushya rw’ubushakashatsi ku havumbuwe peteroli ruta agaciro iyo: An exploration license related to a petroleum discovery area may cease to have effect where: Un permis d’exploration de la zone de découverte du pétrole cesse d’être valide lorsque : 1° uwahawe uruhushya rw’ubushakashatsi atasabye uruhushya rw’ubucukuzi mu gihe cyagenwe; 1° the exploration licensee fails to apply for a production license within the period specified; 1° le détenteur du permis d’exploration n’a pas demandé un permis de production dans le délai prévu ; 2° ivumbura ritagaragaza inyungu mu bucuruzi. 2° the discovery is not of commercial interest. 2° la découverte ne présente pas un intérêt commercial. 92 Official Gazette n°21 of 23/05/2016 Icyiciro cya 3: Uruhushya rw’ubucukuzi Section 3: Production license Section 3: Permis de production - 19 Verify source ↗
Uwemerewe gusaba uruhushya
AI-assisted research summary: If an appraisal shows a discovery area may be productive, the exploration licensee gets first priority to apply for a production license and must apply before the exploration license expires.
Ingingo ya 19: Uwemerewe gusaba uruhushya rw’ubucukuzi Article 19: Eligible applicant for production license Article 19: Demandeur admissible au permis de production Ingingo ya 19: Uwemerewe gusaba uruhushya rw’ubucukuzi Article 19: Eligible applicant for production license Article 19: Demandeur admissible au permis de production Iyo gahunda y’isuzuma yerekanye ko ahavumbuwe iriba cyangwa igice cy’iriba rya peteroli ishobora gucukurwa, ufite uruhushya rw’ubushakashatsi rw’ahavumbuwe peteroli niwe ufite uburenganzira bwa mbere bwo gusaba uruhushya rw’ubucukuzi. Ibyo, abikora mbere y’uko uruhushya rw’ubushakashatsi yari asanganywe ruta agaciro. Where an appraisal program shows that the discovery area contains a petroleum reservoir or part of a petroleum reservoir that may be subject to production, the exploration licensee is given priority in applying for the production license. Such an application must be made before his or her exploration license expires. Lorsque le programme d'évaluation indique que la zone de découverte contient un réservoir de pétrole ou une partie d'un réservoir de pétrole pouvant être produit, la priorité en termes de demande de permis de production est donnée au détenteur d’un permis d'exploration. La demande doit être introduite avant l’expiration du permis d’exploration. Undi muntu ubifitiye ubushobozi, ashobora gusaba uruhushya rw’ubucukuzi ku hantu hari iriba cyangwa igice cy’iriba rya peteroli ishobora gucukurwa. Aho hantu hagomba kuba atari mu gace k’ahatangiwe uruhushya rugifite agaciro ku havumbuwe peteroli. rw’ubushakashatsi Any other capable person may apply for the grant of a production license in respect of an area with a petroleum reservoir or a part of petroleum reservoir that may be subject to production. Such an area shall not be located within the boundaries for which a valid exploration license has already been granted to another person. Toute autre personne qui en a la capacité peut faire une demande de permis de production concernant une zone qui contient un réservoir de pétrole ou une partie du réservoir de pétrole pouvant être produit. Cette zone ne peut pas faire partie de la zone soumise à un permis d'exploration toujours valide déjà octroyé à une autre personne. - 20 Verify source ↗
Gusaba uruhushya rw’ubucukuzi
AI-assisted research summary: Anyone who wants to carry out production activities must apply for a license from the Minister.
Ingingo ya 20: Gusaba uruhushya rw’ubucukuzi Article 20: Application for production license Article 20: Demande de permis de production Ingingo ya 20: Gusaba uruhushya rw’ubucukuzi Article 20: Application for production license Article 20: Demande de permis de production Umuntu wifuza gukora ibikorwa by’ubucukuzi abisabira uruhushya Minisitiri. A person intending to carry out production activities requests a license from the Minister. Une personne désireuse d’effectuer des activités de production en fait une demande de licence au Ministre. Iteka rya Minisitiri rigena uburyo n‘ibishingirwaho mu gihe cyo gusaba uruhushya rw’ubucukuzi. An Order of the Minister determines modalities and the content of an application for production license. Un arrêté du Ministre détermine les modalités et le contenu de la demande de permis de production. - 21 Verify source ↗
Gusubiza ubusabe bw’uruhushya
AI-assisted research summary: The Minister must reply in writing to a production license applicant within 90 days, saying whether the application is accepted or not.
Ingingo ya 21: Gusubiza ubusabe bw’uruhushya rw’ubucukuzi Article 21: Response to the application for production license Article 21: Réponse à la demande de permis de production Ingingoya rw’ubucukuzi ya 22: Itangwa ry’uruhushya Ingingo ya 21: Gusubiza ubusabe bw’uruhushya rw’ubucukuzi Article 21: Response to the application for production license Article 21: Réponse à la demande de permis de production yo gusuzuma bw’uruhushya Nyuma rw’ubucukuzi, Minisitiri asubiza uwasabye uruhushya mu nyandiko mu gihe kitarenze iminsi mirongo cyenda ubusabe After consideration of the application for production license, the Minister, within a period not exceeding Après examen de la demande, le Ministre donne une réponse écrite au requérant lui indiquant si la demande 93 Official Gazette n°21 of 23/05/2016 (90), amumenyesha ko ubusabe bwe bwemewe cyangwa butemewe. ninety (90) days, responds to the applicant in writing specifying whether the application is accepted or not. est acceptée ou non, dans un délai ne dépassant pas quatre-vingt-dix (90) jours. Iyo ubusabe bwemewe, uwasabye ahita atumizwa mu biganiro ku masezerano agaragaza uburyo ubucukuzi buzakorwa. Where the application is accepted, the applicant is convened for negotiation about an agreement for production. Lorsque la demande est acceptée, le requérant est invité pour la négociation des modalités de production. Iyo kandi ubusabe butemewe, uwasabye abimenyeshwa mu nyandiko. Where the application is not accepted, the applicant is notified of the reasons thereof. Lorsque la demande est rejetée, le requérant est notifié des motifs de ce rejet. Ingingoya rw’ubucukuzi ya 22: Itangwa ry’uruhushya - 22 Verify source ↗
Granting of production license
AI-assisted research summary: The Minister must grant the applicant a production license within 7 days after the agreement with the Government is concluded and signed by both parties.
Article 22: Granting of production license Article 22: Octroi du permis de production Article 22: Granting of production license Article 22 : Octroi du permis de production Mu gihe kitarenze iminsi irindwi (7) amasezerano hagati ya Leta n’uwasabye uruhushya yemeranyijweho akanashyirwaho umukono n’impande zombi, Minisitiri atanga uruhushya rw’ubucukuzi ku warusabye. Within a period not exceeding seven (7) days after the conclusion of an agreement between the Government and the applicant and the signing of the agreement by both parties, the Minister grants to the applicant the production license. Dans un délai ne dépassant pas sept (7) jours de la conclusion de l’accord entre l’Etat et le requérant, ainsi que la signature dudit accord par les deux parties, le Ministre octroie au requérant le permis de production. - 23 Verify source ↗
Uburenganzira bw’uhawe uruhushya
AI-assisted research summary: A production licensee may produce petroleum in the production area and do only the necessary works for that purpose.
Ingingo ya 23: Uburenganzira bw’uhawe uruhushya rw’ubucukuzi Article 23: Rights of a production licensee Article 23: Droits du détenteur de permis de production Ingingo ya 23: Uburenganzira bw’uhawe uruhushya rw’ubucukuzi Article 23: Rights of a production licensee Article 23: Droits du détenteur de permis de production Umuntu wese uhawe uruhushya rw’ubucukuzi afite uburenganzira bwo gucukura peteroli ahantu yemerewe gukorera ubucukuzi no kuhakorera indi mirimo ijyanye na bwo gusa. Any production licensee has the right to carry out production of petroleum in the production area, and to carry out necessary works for that purpose only. Un détenteur d’un permis de production jouit du droit de produire le pétrole dans la zone de production et d’effectuer uniquement les travaux nécessaires à cette fin. - 24 Verify source ↗
Igihe uruhushya rw’ubucukuzi
AI-assisted research summary: A production license is valid for 25 years and can be extended if the licensee requests it.
Ingingo ya 24: Igihe uruhushya rw’ubucukuzi rumara Article 24: Validity period for the production license Article 24: Période de validité du permis de production Ingingo ya 24: Igihe uruhushya rw’ubucukuzi rumara Article 24: Validity period for the production license Article 24: Période de validité du permis de production rw’ubucukuzi Uruhushya makumyabiri n’itanu kongererwa igihe bisabwe n’uwari waruhawe. (25). Uruhushya rumara igihe cy’imyaka rushobora A production license is valid for twenty five (25) years. The license may be extended upon request of the licensee. Le permis de production est valable pour une période de vingt-cinq ans (25) ans. Le permis peut être prolongé à la demande de son détenteur. 94 Official Gazette n°21 of 23/05/2016 - 25 Verify source ↗
Gusaba kongera igihe cy’uruhushya
AI-assisted research summary: A production license holder may apply to the Minister to renew the license, and the application must be made at least 12 months before expiry.
Ingingo ya 25: Gusaba kongera igihe cy’uruhushya rw’ubucukuzi Article 25: Application for renewal of production license Article 25: Demande de renouvellement du permis de production Ingingo ya 25: Gusaba kongera igihe cy’uruhushya rw’ubucukuzi Article 25: Application for renewal of production license Article 25: Demande de renouvellement du permis de production Ufite uruhushya ashobora gusaba rw’ubucukuzi Minisitiri ko rwongererwa igihe. Ubusabe bukorwa nibura amezi cumi n’abiri (12) mbere y’uko uruhushya rusanzwe rukoreshwa rurangira. A production licensee may apply to the Minister for a renewal of such a license. The application for renewal is made within twelve (12) months before the current license is due to expire. Le détenteur du permis de production peut faire une demande de renouvellement de ce permis auprès du Ministre. Cette demande est introduite au moins douze (12) mois avant l’expiration du permis en cours. Uruhushya rw’ubucukuzi rwongerewe igihe rumara igihe kitarenze imyaka cumi (10) idashobora kongerwa. The renewed production license is valid for a non- renewable period of ten (10) years. Le permis de production renouvelé reste valable pour une période de dix (10) ans non-renouvelables. Iteka rya Minisitiri rigena ibishingirwaho mu kongera igihe cy’uruhushya rw’ubucukuzi. An Order of the Minister determines the requirements for renewing a production license. Un arrêté du Ministre détermine les conditions de renouvellement du permis de production. - 26 Verify source ↗
Amasezerano y’imikoranire ku
AI-assisted research summary: The Minister may order production licensees with shared blocks to enter into a unit production agreement.
Ingingo ya 26: Amasezerano y’imikoranire ku bipande bihuje imbibi Article 26: Unit production agreement Article 26: Accord d’unité de production Ingingo ya 26: Amasezerano y’imikoranire ku bipande bihuje imbibi Article 26: Unit production agreement Article 26: Accord d’unité de production Minisitiri abyibwirije cyangwa abisabwe n’umwe mu bafite uruhushya rw’ubucukuzi ku bipande bihuje imbibi, ashobora gutegeka abafite uruhushya rw’ubucukuzi gukora amasezerano y’imikoranire kuri ibyo bipande bihuje imbibi. The Minister may, on his own motion or upon request by one of the production licensees whose production area includes shared blocks, order the production licensees to enter into a unit production agreement covering the shared blocks. Le Ministre peut, de sa propre initiative ou à la demande de l’un des détenteurs du permis de production dont les blocs sont contigus, ordonner aux détenteurs de permis de production de conclure un accord de collaboration dans la production couvrant ces blocs. - 27 Verify source ↗
Gutakamba
AI-assisted research summary: A person who is unhappy with a Minister’s decision under this Law may appeal to a competent institution under the relevant laws.
Ingingo ya 27: Gutakamba Article 27: Appeal Article 27: Recours Icyiciro cya 4: Isubiranya Section 4: Decommissioning Section 4: Déclassement Ingingo ya 27: Gutakamba Article 27: Appeal Article 27: Recours Umuntu wese utanyuzwe n’icyemezo cyafashwe na Minisitiri hashingiwe ku biteganywa n’iri tegeko atakambira urwego rubifitiye ububasha hashingiwe ku mategeko abigenga. Any person who is not satisfied with the decision of the Minister on the basis of the provisions of this Law, appeals to the competent institution in accordance with relevant laws. Toute personne qui n’est pas satisfaite de la décision prise par le Ministre conformément aux dispositions de la présente loi, introduit son recours auprès d’une institution compétente conformément aux lois en la matière. 95 Official Gazette n°21 of 23/05/2016 Icyiciro cya 4: Isubiranya Section 4: Decommissioning Section 4: Déclassement - 28 Verify source ↗
Gahunda y’isubiranya
AI-assisted research summary: The production licensee must submit a decommissioning plan to the Minister for approval.
Ingingo ya 28: Gahunda y’isubiranya Article 28: Decommissioning plan Article 28: Plan de déclassement Ingingo ya 28: Gahunda y’isubiranya Article 28: Decommissioning plan Article 28: Plan de déclassement Uwemerewe uruhushya rw’ubucukuzi Minisitiri gahunda y’isubiranya kugira ngo ayemeze. ashyikiriza The production licensee submits a decommissioning plan to the Minister for approval. Le détenteur du permis de production présente au Ministre un plan de déclassement pour approbation. Iteka rya Minisitiri rigena ibikubiye muri gahunda y’isubiranya. An Order of the Minister determines the content of the decommissioning plan. Un arrêté du Ministre détermine le contenu du plan de déclassement. - 29 Verify source ↗
Amafaranga agenewe
AI-assisted research summary: A production licensee must provide decommissioning funds within a period set by the Minister.
Ingingo ya 29: Amafaranga agenewe by’isubiranya ibikorwa Article 29: Decommissioning funds Article 29: Fonds de déclassement UMUTWE WA III: IMIKORERE N’INSHINGANO BY’UWAHAWE URUHUSHYA CHAPTER OBLIGATIONS OF A LICENSEE III: WORK PRACTICES AND CHAPITRE III: PRATIQUES ET OBLIGATIONS DE TRAVAIL POUR UN DETENTEUR DE PERMIS 80 Ingingo by’ubushakashatsi n’ubucukuzi 30: ya Imigendekere Official Gazette n°21 of 23/05/2016 y’ibikorwa Ingingo ya 29: Amafaranga agenewe by’isubiranya ibikorwa Article 29: Decommissioning funds Article 29: Fonds de déclassement Uwahawe uruhushya rw’ubucukuzi ateganya, mu gihe cyemejwe na Minisitiri amafaranga agenewe ibikorwa by’isubiranya. A production licensee avails, within a period specified by the Minister, the decommissioning funds. Le détenteur du permis de production prévoit, dans un délai fixé par le Ministre, des fonds de déclassement. rya Minisitiri Iteka imikoreshereze n’imicungire by’ayo mafaranga. itangwa, rigena ingano, An Order of the Minister determines the disbursement, amount, use and management of such funds. Un arrêté du Ministre détermine le décaissement, le montant, l’utilisation et la gestion de ces fonds. UMUTWE WA III: IMIKORERE N’INSHINGANO BY’UWAHAWE URUHUSHYA CHAPTER OBLIGATIONS OF A LICENSEE III: WORK PRACTICES AND CHAPITRE III: PRATIQUES ET OBLIGATIONS POUR UN DETENTEUR DE PERMIS Ingingo by’ubushakashatsi n’ubucukuzi 30: ya Imigendekere y’ibikorwa - 30 Verify source ↗
Conduct of exploration and production
AI-assisted research summary: A licensee must carry out exploration or production activities safely, properly, and in line with petroleum good practices.
Article 30: Conduct of exploration and production activities Article 30: Déroulement des activités d’exploration et de production Article 30: Conduct of exploration and production activities Article 30: Déroulement des activités d’exploration et de production Uwahawe uruhushya, akora ibikorwa by’ubushakashatsi iby’ubucukuzi mu buryo bukwiye kandi cyangwa biboneye mu ibikorwa butekanye, by’ubushakashatsi n’ubucukuzi bwa peteroli. yubahiriza A licensee carries out all exploration or production activities in a proper and safe manner and in accordance with petroleum exploration and production good practices. Le détenteur d’un permis mène les activités d’exploration ou de production d'une manière appropriée et sécuritaire, et conformément aux bonnes pratiques en termes d’exploration et de production du pétrole. - 31 Verify source ↗
Gutwika gazi kamere
AI-assisted research summary: Natural gas flaring needs prior authorization from the Minister, but it may be approved for safety/health or to prevent property damage in exploration or production areas.
Ingingo ya 31: Gutwika gazi kamere Article 31: Flaring natural gas Article 31: Flamboiement du gaz naturel Ingingo ya 31: Gutwika gazi kamere Article 31: Flaring natural gas Article 31: Flamboiement du gaz naturel Gutwika gazi kamere iyo ari yo yose bibanza gusabirwa uburenganzira butangwa na Minisitiri. Flaring natural gas requires prior authorization of the Minister. Le flamboiement du gaz naturel exige l’accord préalable du Ministre. 96 Official Gazette n°21 of 23/05/2016 ihagarariye Leta Icyakora, byemejwe n’impuguke ahakorerwa cyangwa imirimo ubucukuzi bwa peteroli, gazi kamere ishobora gutwikwa kugira ngo: y’ubushakashatsi However, upon approval by a Government expert in the exploration or production area, flaring natural gas may be carried out for: Toutefois, après approbation d’un expert représentant l’Etat sur les lieux d’exploration ou de production du pétrole le flamboiement du gaz naturel peut se faire pour: 1° habungwabungwe n’umutekano by’abakora ahakorerwa ubushakashatsi cyangwa ubucukuzi bwa peteroli; ubuzima 1° securing the safety and health of persons engaged in petroleum exploration or production activities; 1° assurer la sécurité et la santé des personnes impliquées dans les activités d’exploration ou production pétrolières ; 2° hakumirwe iyangizwa ry’umutungo w’umuntu uwo ari we wese uri ahakorerwa ubushakashatsi cyangwa ubucukuzi bwa peteroli. 2° avoiding damage or destruction over any property belonging to any person in the petroleum exploration or production area. 2° éviter les dégâts matériels sur le patrimoine de toute personne se trouvant dans la zone d'exploration ou de production pétrolières. - 32 Verify source ↗
Iyubakwa n’ikoreshwa ry’umuyoboro
AI-assisted research summary: A petroleum pipeline licensee may not start construction, operation, alteration, or reconstruction without prior written authorization from the Minister.
Ingingo ya 32: Iyubakwa n’ikoreshwa ry’umuyoboro wa peteroli Article 32: Construction and operation of a pipelines Article 32: Construction et opération d’oléoduc Ingingo ya 32: Iyubakwa n’ikoreshwa ry’umuyoboro wa peteroli Article 32: Construction and operation of a pipelines Article 32: Construction et opération d’oléoduc uruhushya ntiyemerewe Uwahawe gutangira kubaka, gukoresha, guhindura cyangwa kubaka bundi bushya umuyoboro wa peteroli atabisabiye uburenganzira Minisitiri mu nyandiko. rw’ubucukuzi licensee shall not commence the A production construction, operation, alteration or reconstruction of a pipeline without a prior written authorization of the Minister. Le détenteur du permis de production ne peut pas commencer la construction, l’opération, l'altération ou la reconstruction d'un oléoduc sans l’autorisation préalable écrite du Ministre. Minisitiri amusubiza mu nyandiko mu gihe kitarenze iminsi mirongo itatu (30) uhereye ku munsi ubusabe bwakiriwe. The Minister provides a written response to the applicant for the authorisation within a period not exceeding thirty (30) as of the receipt. Le Ministre répond par écrit à la demande d’autorisation dans un délai ne dépassant pas trente (30) jours à compter de la date de réception. Usaba ubwo burenganzira, agomba kugaragaza nibura ibi bikurikira: The applicant must provide information at least on the following: Le requérant doit fournir notamment des informations sur ce qui suit: 1° uko umuyoboro wa peteroli uzubakwa n’ibikoresho 1° how the pipeline is to be constructed and the 1° la façon dont l’oléoduc sera construit et les matériaux bizakoreshwa; materials to be used; qui seront utilisés ; 2° uko kubaka no gukoresha umuyoboro wa peteroli byagira ingaruka ku bidukikije n’ingamba ateganya gufata mu rwego rwo kugabanya izo ngaruka; 2° how the construction and use of the pipeline would impact on the environment and any measures the licensee intends to take to reduce that impact; 2° la façon dont la construction et l'utilisation de l'oléoduc auraient un impact sur l'environnement et les mesures que le détenteur de permis vise à prendre pour réduire cet impact; 97 3° uko ateganya gukuraho cyangwa gukoresha umuyoboro wa peteroli igihe icyo wubakiwe kimaze kugerwaho. Official Gazette n°21 of 23/05/2016 3° how the licensee intends to remove or otherwise use 3° la façon dont le détenteur vise à enlever ou à utiliser the pipeline when it has served its purpose. l’oléoduc quand son objectif est atteint. - 33 Verify source ↗
Guhugura abakozi
AI-assisted research summary: A licensee must train staff under the petroleum agreement, and an annual compliance report must be provided to the Minister.
Ingingo ya 33: Guhugura abakozi Article 33: Training of staff Article 33: Formation du personnel Ingingo ya 33: Guhugura abakozi Article 33: Training of staff Article 33: Formation du personnel Uwahawe uruhushya agomba guhugura abakozi hashingiwe ku masezerano ahuza impande zombi ku bijyanye na peteroli. A licensee must train staff in accordance with the petroleum agreement between both parties. Le détenteur du permis doit former le personnel conformément à l’accord pétrolier qui lie les deux parties. Minisitiri ahabwa raporo buri mwaka yerekana uko ibiteganywa n’iyi ngingo byubahirizwa. The Minister is provided each year a report on the compliance with the provisions of this Article. Il est donné chaque année au Ministre le rapport sur le respect des dispositions du présent article. - 34 Verify source ↗
Ipima rya peteroli
AI-assisted research summary: A production licensee must measure or weigh all petroleum produced from the licensed area using methods approved by the Minister, and must not change the measurement method or equipment without the Minister’s prior written authorization.
Ingingo ya 34: Ipima rya peteroli Article 34: Measurement and weighing of petroleum Article 34: Mesure et pesage du pétrole Ingingo ya 34: Ipima rya peteroli Article 34: Measurement and weighing of petroleum Article 34: Mesure et pesage du pétrole Uwahawe uruhushya rw’ubucukuzi apima peteroli yose yacukuwe aho yaherewe uruhushya akoresheje uburyo busanzwe bukoreshwa mu bikorwa biboneye mu by’ubucukuzi bwa peteroli kandi bwemejwe na Minisitiri. A production licensee measures or weighs, by methods customarily used in good oil field practices and approved by the Minister, all petroleum produced from the area subject to the license. Le détenteur du permis de production mesure ou pèse tout le pétrole produit dans la zone couverte par le permis en se servant de bonnes pratiques pétrolières en termes de production du pétrole et approuvées par le Ministre. Uwahawe uruhushya nta kintu agomba guhindura mu buryo bw’ubucukuzi akoresha mu ipima cyangwa ibikoresho bikoreshwa mu ipima atabanje kubyemererwa mu nyandiko na Minisitiri. The production licensee shall not make any alteration in a method of its measurement or weighing used or any appliances used for that purpose without a prior written authorization of the Minister. Le détenteur du permis de production ne fait aucune modification de son procédé de mesure ou de pesage utilisé ou des appareils utilisés à cet effet, sans autorisation préalable écrite du Ministre. - 35 Verify source ↗
Ingaruka z’igikoresho gifite inenge mu
AI-assisted research summary: If a petroleum measuring or weighing appliance is found defective, it is treated as defective from the day after its last test or examination, and the production licensee pays the resulting cost.
Ingingo ya 35: Ingaruka z’igikoresho gifite inenge mu ipima rya peteroli Article 35: Effects of a defective petroleum measuring or weighing appliance Article 35: Effets d’un appareil de mesure ou de pesage défectueux Ingingo ya 35: Ingaruka z’igikoresho gifite inenge mu ipima rya peteroli Article 35: Effects of a defective petroleum measuring or weighing appliance Article 35: Effets d’un appareil de mesure ou de pesage défectueux Igikoresho icyo ari cyo cyose gikoreshwa mu ipima rya peteroli, gisuzumwe hashingiwe ku biteganywa n’iri tegeko cyangwa ku masezerano bikagaragara ko gifite inenge, gifatwa nk’aho ari ko cyahoze kimeze uhereye igihe giheruka gusuzumwa. Any petroleum measuring or weighing appliance tested or examined under the provisions of this Law or petroleum agreement and found to be defective, is considered to have existed in that condition commencing from the date following the date on which it was last tested or examined. Tout appareil de mesure ou de pesage de pétrole vérifié ou examiné conformément aux dispositions de la présente loi ou de l’accord pétrolier qui s’avère défectueux est réputé avoir existé dans cette condition à compter de la date qui suit la date à laquelle il a été dernièrement vérifié ou examiné. 98 Official Gazette n°21 of 23/05/2016 Uwahawe uruhushya rw’ubucukuzi aryozwa ikiguzi kijyanye n’inenge zagaragaye kibarwa uhereye igihe isuzuma riheruka ryakorewe. The production licensee is liable for the cost resulting from defects found, which covers the period starting from the date the appliance was last tested or examined. Le détenteur du permis de production est responsable du coût résultant des défauts constatés et couvrant la période qui court de la date à laquelle l'appareil a été dernièrement vérifié ou examiné. - 36 Verify source ↗
Raporo n’inyandiko bijyanye
AI-assisted research summary: A licensee must submit reports and records about petroleum exploration and production during the license term and when the license expires or is cancelled. The Minister can set what those reports contain and how they are submitted.
Ingingo ya 36: Raporo n’inyandiko bijyanye n’uruhushya Article 36: Reports and records relating to the license Article 36: Rapports et dossiers relatifs au permis UMUTWE WA IV: GUHEREREKANYA, GUKURAHO URUHUSHYA NO KUREKA KU CY’AHATANGIWE BUSHAKE URUHUSHYA IGICE CHAPTER IV: TRANSFER, CANCELLATION OF A LICENCE AND RELINQUISHMENT OF ANY PART OF THE AREA COVERED BY THE LICENSE CHAPITRE IV: CESSION, ANNULATION DU PERMIS ET RENONCIATION A UNE PARTIE D’UNE ZONE COUVERTE PAR LE PERMIS Ingingo ya 36: Raporo n’inyandiko bijyanye n’uruhushya Article 36: Reports and records relating to the license Article 36: Rapports et dossiers relatifs au permis Uwahawe uruhushya agomba, mu gihe cy’uruhushya, rurangiye raporo n’inyandiko n’ibikorwa bifitanye by’ubushakashatsi n’ubucukuzi bwa peteroli. rukuweho cyangwa gutanga isano A licensee must, during the term of the license and on expiry or cancellation of the license, submit reports and records relating to petroleum exploration and production activities. Le détenteur d’un permis soumet, pendant la durée, à l'expiration ou à l’annulation du permis, des rapports et dossiers relatifs aux activités d’exploration et de production pétrolières. Iteka rya Minisitiri rigena ibikubiye muri izo raporo n’inyandiko n’uko bitangwa. An Order of the Minister determines the content of such reports and records as well as the modalities for their submission. Un arrêté du Ministre détermine le contenu de ces rapports et dossiers ainsi que les modalités de leur transmission. UMUTWE WA IV: GUHEREREKANYA, GUKURAHO URUHUSHYA NO KUREKA KU BUSHAKE CY’AHATANGIWE URUHUSHYA IGICE CHAPTER IV: TRANSFER, CANCELLATION OF A LICENCE AND RELINQUISHMENT OF ANY PART OF THE AREA COVERED BY THE LICENSE CHAPITRE IV: CESSION, ANNULATION DU PERMIS ET RENONCIATION A UNE PARTIE D’UNE ZONE COUVERTE PAR LE PERMIS - 37 Verify source ↗
Ihererekanya ry’uruhushya
AI-assisted research summary: A license transfer must be requested in writing from the Minister, and the Minister sets the transfer procedures.
Ingingo ya 37: Ihererekanya ry’uruhushya Article 37: Transfer of a license Article 37: Cession du permis Article 37: Cession du permis Ingingo ya 37: Ihererekanya ry’uruhushya Article 37: Transfer of a license Gusaba guhererekanya uruhushya bisabwa Minisitiri mu nyandiko. The transfer of license is applied for in writing to the Minister. La demande de la cession du permis est faite en écrit et adressée au Ministre. Ibikorwa bikurikira bifatwa nk’ihererekanya: The following acts are considered as transfer: Sont considérés comme cession les actes suivants : 1° itangwa iryo ariryo ryose, igurishwa cyangwa kwikuraho uruhushya ku buryo ubwo ari bwo bwose; 1° any license transfer, sale or assignment in any 1° toute cession, vente du permis ou toute forme form; de renonciation au permis ; 2° kugwatiriza uruhushya cyangwa gufatira ingwate 2° mortgaging a license or seizing a mortgaged 2° hypothéquer le permis ou saisir le permis y’uruhushya; license; hypothéqué; 99 Official Gazette n°21 of 23/05/2016 3° ihererekanya z’ubwiganze ry’inyungu bw’imigabane ya nyir’ uruhushya urwo arirwo rwose; 3° transfer of proceeds from dominant shares 3° cession du produit des parts dominantes belonging to any licensee; appartenant au détenteur du permis ; 4° kwegukana inyungu z’ubwiganze bw’imigabane 4° acquiring proceeds from dominant shares with 4° acquisition du produit des parts dominantes en n’umuntu uwo ariwe wese ku ruhushya. reference to a licensee. rapport avec le détenteur du permis. bwo Uburyo hagati y’uwaruhawe n’undi muntu wese ubifitiye ubushobozi, bigenwa n’Iteka rya Minisitiri. guhererekanya uruhushya The modalities for transferring a license are determined by an Order of the Minister. Les modalités de cession du permis sont définies par arrêté du Ministre. Iyo uruhushya rumaze kwandikwa ku muntu mushya binyuze mu ihererekanya, uwegukanye uruhushya ni we uhabwa uburenganzira, inshingano n’ibindi byasabwa gukorwa n’uwahererekanyije uruhushya. After transfer registration, the transferee exercises rights, obligations and carries out any other activity as may be required of the license transferor. Après enregistrement de la mutation, le cessionnaire exerce les droits et les obligations et mène toute autre activité incombant au cédant du permis. - 38 Verify source ↗
Gukuraho uruhushya
AI-assisted research summary: The Minister may cancel a license if the licensee does not comply with the law, the petroleum agreement, or the license conditions.
Ingingo ya 38: Gukuraho uruhushya Article 38: Cancellation of a licence Article 38 : Annulation du permis Ingingo ya 38: Gukuraho uruhushya Article 38: Cancellation of a licence Article 38 : Annulation du permis Minisitiri ashobora gukuraho uruhushya iyo uwaruhawe atubahirije ibiteganywa n’iri tegeko, amasezerano ku bijyanye na peteroli cyangwa uruhushya yahawe. The Minister may cancel a license where the licensee fails to comply with the provisions of this Law, the petroleum agreement or the conditions of the license. Le Ministre peut annuler le permis lorsque le détenteur ne se conforme pas aux dispositions de la présente loi, à l’accord pétrolier ou aux conditions du permis. Uruhushya rukurwaho kandi iyo urusanganywe yahawe integuza y’iminsi mirongo itatu (30) nibura, amenyeshwa mu nyandiko ko agiye gukurirwaho uruhushya ntagire icyo ahindura ku mikorere ye. The license is also cancelled if the Minister has given the licensee at least thirty (30) days written notice of the intention to do so and the licensee did not take remedial action. Le permis est également annulé lorsque le Ministre a donné au détenteur du permis un préavis écrit de trente (30) jours au moins, de son intention d’annulation du permis et que le détenteur ne prend pas de mesures correctives. - 39 Verify source ↗
Kureka ku bushake
AI-assisted research summary: A licensee may give written notice to the Minister to give up part of a licensed area, if allowed by a petroleum agreement.
Ingingo ya 39: Kureka ku bushake cy’ahatangiwe uruhushya igice Article 39: Relinquishment of any part of the area covered by the license Article 39: Renonciation à une partie d’une zone couverte par le permis Ingingo ya 39: Kureka ku bushake cy’ahatangiwe uruhushya igice Article 39: Relinquishment of any part of the area covered by the license Article 39: Renonciation à une partie d’une zone couverte par le permis Hashingiwe ku biteganywa n’amasezerano ku bijyanye na peteroli, uwahawe uruhushya amenyesha Minisitiri mu nyandiko ireka ku bushake ry'igice cy'aho yaherewe uruhushya. Based on provisions of a petroleum agreement, the licensee may, by written notice to the Minister, relinquish any part of the area covered by the license. Sur base des dispositions d'un accord pétrolier, le détenteur d’un permis peut, par notification écrite au Ministre, renoncer à une partie d’une zone couverte par le permis. 100 Inyandiko yo kureka ku bushake igice cy’ahatangiwe uruhushya igomba kugaragaza ibi bikurikira: The notice for relinquishment of any part of the area covered by the license must state the following: La notification de renonciation à une partie d’une zone couverte par le permis doit indiquer ce qui suit : Official Gazette n°21 of 23/05/2016 1° itariki uwahawe uruhushya yifuza ko ireka ku bushake ritangira kubahirizwa akanagaragaza agace ashaka kureka; 1° the date on which the the relinquishment to have effect and the area to be relinquished; licensee wishes 1° la date à laquelle le détenteur du permis souhaite que la renonciation prend effet et la zone à renoncer; 2° amakuru arambuye ku cyangwa by’ubushakashatsi byakorewe ahantu ashaka kureka. bikorwa ubucukuzi 2° the details of exploration or production operations carried out in respect of the area to be relinquished. 2° les informations détaillées sur les opérations d'exploration ou de production effectuées dans la zone à renoncer. Iyo nyandiko itangwa: Such notice is submitted : Cette notification est donnée : 1° hasigaye nibura amezi atatu (3), uhereye ku gihe yatanze cy’ireka ku bushake iyo ari uruhushya rw’ubushakashatsi; 2° hasigaye nibura amezi cumi n’abiri (12) uhereye ku gihe yatanze cy’ireka ku bushake, iyo ari uruhushya rw’ubucukuzi; 1° at least three (3) months from the proposed date of relinquishment, in the case of an exploration license; 1° au moins trois (3) mois à compter de la date proposée le cas du permis renonciation, pour la de d'exploration ; 2° at least twelve (12) months from the proposed date of relinquishment, in case of a production license; 2° au moins douze (12) mois à compter de la date proposée de la renonciation, pour le cas du permis de production; Ireka ku bushake rivugwa muri iyi ngingo ntiribangamira ishyirwa mu bikorwa ry’ibigomba kubahirizwa biri mu masezerano ku bijyanye na peteroli cyangwa ifatwa ry’ibihano ku kutubahiriza ibiteganywa n’iri tegeko, amasezerano n’uruhushya. A relinquishment provided for by this Article shall not prejudice the enforcement of the terms and conditions of the petroleum agreement or the taking of any action in respect of a breach of the provisions of this Law, of the agreement and of the license. Une renonciation prévue par le présent article ne met pas obstacle à l’application des conditions de l’accord pétrolier ou à la prise de toute mesure à l'égard de la violation des dispositions de la présente loi, de l’accord et du permis. - 40 Verify source ↗
Gukuraho ibikoresho, gusiba imyobo
AI-assisted research summary: When a license is cancelled, expires, or part of the licensed area is given up, the licensee must remove materials, plug or close wells, and decommission the affected area.
Ingingo ya 40: Gukuraho ibikoresho, gusiba imyobo no gusubiranya Article 40: Removal of materials, plugging of wells and decommissioning Article 40: Enlèvement du matériel, bouchage des puits et déclassement UMUTWE WA V: AMASEZERANO KU BIJYANYE NA PETEROLI CHAPTER V: PETROLEUM AGREEMENTS CHAPITRE V: ACCORDS PETROLIERS 81 Official Gazette n°21 of 23/05/2016 Ingingo ya 40: Gukuraho ibikoresho, gusiba imyobo no gusubiranya Article 40: Removal of materials, plugging of wells and decommissioning Article 40: Enlèvement du matériel, bouchage des puits et déclassement Iyo uruhushya rukuweho, rurangije igihe cyangwa iyo igice cy’ahatangiwe uruhushya kiretswe ku bushake, uwahawe uruhushya agomba gukora ibi bikurikira: Where a license has been cancelled, has expired or part of the license area has been relinquished, the licensee must carry out the following: Lorsqu'un permis est annulé, a expiré ou en cas de renonciation à une partie de la zone du permis, le détenteur du permis doit faire ce qui suit : 101 Official Gazette n°21 of 23/05/2016 1° gukuraho ibikoresho byose yari yarashyize aho yari 1° to remove from the former license area all the 1° enlever de l'ancienne zone du permis tout le matériel afitiye uruhushya; materials brought into such area; qu’il y avait déposé; 2° gusiba cyangwa gufunga imyobo yose yacukuwe aho yaherewe uruhushya, cyangwa igice cy’aharetswe mu gihe cy’ibyo bikorwa; 2° to plug or close off all wells made in the former license or in the part of a relinquished area during those operations; 2° boucher ou fermer tous les puits creusés au cours de ses activités dans l'ancienne zone couverte par le permis ou dans une partie de la zone faisant objet de renonciation; 3° gusubiranya ahakorewe ibikorwa bijyanye na 3° decommissioning the area subject to petroleum- 3° déclassement de la zone d’activités liées au pétrole. peteroli. related activities. Gukuraho ibikoresho, gusiba imyobo no gusubiranya ibikorwa bijyanye na peteroli bikorwa ahakorewe bitarenze igihe cyumvikanyweho mu masezerano n’impande zombi. Removal of materials, plugging of wells and decommissioning of the area subject to petroleum related activities are carried out by a deadline specified in the agreement entered into by both parties. L’enlèvement du matériel, le bouchage des puits et le déclassement de la zone d’activités liées au pétrole sont faits dans les délais convenus dans l’accord entre les deux parties. UMUTWE WA V: AMASEZERANO KU BIJYANYE NA PETEROLI CHAPTER V: PETROLEUM AGREEMENTS CHAPITRE V: ACCORDS PETROLIERS - 41 Verify source ↗
Amasezerano ku bijyanye na peteroli
AI-assisted research summary: The Minister may make a petroleum agreement with the person licensed for petroleum activity.
Ingingo ya 41: Amasezerano ku bijyanye na peteroli Article 41: Petroleum agreement Article 41: Accord pétrolier Ingingo ya 41: Amasezerano ku bijyanye na peteroli Article 41: Petroleum agreement Article 41: Accord pétrolier ibiteganywa n’iri Bitabangamiye tegeko, Minisitiri agirana amasezerano n’uwemerewe uruhushya ku bijyanye na peteroli mu rwego rwo kugaragaza ku buryo burambuye uburenganzira n’inshingano ku mpande zombi . - 42 Verify source ↗
Ubwoko bw’amasezerano ku bijyanye
AI-assisted research summary: The Minister enters into a petroleum agreement with the eligible licensee, and the agreement must be one of the listed types.
Ingingo ya 42: Ubwoko bw’amasezerano ku bijyanye na peteroli Article 42: Types of petroleum agreements Article 42: Types d’accords pétroliers Ingingo ya 42: Ubwoko bw’amasezerano ku bijyanye na peteroli Without prejudice to the provisions of this Law, the Minister enters into a petroleum agreement with the eligible licensee, in order to elaborate further on the rights and obligations of both parties. Sans préjudice des dispositions de la présente loi, le Ministre conclut un accord pétrolier avec le détenteur du permis, pour éclaircir davantage les droits et obligations des deux parties. Article 42: Types of petroleum agreements Article 42: Types d’accords pétroliers Amasezerano akorwa hagati ya Minisitiri n’uwemerewe uruhushya ku bijyanye na peteroli atoranywa muri aya akurikira: The petroleum agreement that the Minister enters into with the eligible licensee is chosen among the following: L’accord pétrolier que le Ministre conclut avec la personne admissible en tant que détenteur de permis choisi parmi les suivants: 1° ubukode; 1° concessions; 1° les concessions; 102 Official Gazette n°21 of 23/05/2016 2° ubufatanye mu ishoramari; 3° kugabana umusaruro; 4° isoko rya serivise; 5° kugira uruhare ku mari bwite. 2° joint-ventures; 3° production sharing; 4° service contract; 5° equity participation. 2° les entreprises mixtes; 3° le partage de production; 4° le contrat de service; 5° la participation au capital. - 43 Verify source ↗
Imiterere n’ibikubiye mu masezerano
AI-assisted research summary: The Minister may make an Order setting the format and content of a petroleum agreement.
Ingingo ya 43: Imiterere n’ibikubiye mu masezerano ku bijyanye na peteroli Article 43: Format and content of petroleum agreement Article 43: Modèle et contenu de l’accord pétrolier UMUTWE WA VI: AMAKOSA N’IBIHANO BYO MU RWEGO RW’UBUTEGETSI CHAPTER VI: ADMINISTRATIVE FAULTS AND SANCTIONS CHAPITRE VI: FAUTES ET SANCTIONS ADMINISTRATIVES Ingingo ya 43: Imiterere n’ibikubiye mu masezerano ku bijyanye na peteroli Article 43: Format and content of petroleum agreement Article 43: Modèle et contenu de l’accord pétrolier Iteka rya Minisitiri rigena imiterere n’ibikubiye mu masezerano ku bijyanye na peteroli. An Order of the Minister determines the format and content of a petroleum agreement. Un arrêté du Ministre détermine le modèle et le contenu de l’accord pétrolier. UMUTWE WA VI: AMAKOSA N’IBIHANO BYO MU RWEGO RW’UBUTEGETSI CHAPTER VII: ADMINISTRATIVE FAULTS AND SANCTIONS CHAPITRE VII: FAUTES ET SANCTIONS ADMINISTRATIVES - 44 Verify source ↗
Amakosa n’ibihano byo mu rwego
AI-assisted research summary: The Minister may make an order setting administrative faults and sanctions for petroleum exploration and production activities, subject to the penal code.
Ingingo ya 44: Amakosa n’ibihano byo mu rwego n’ibikorwa rw’ubutegetsi by’ubushakashatsi n’ubucukuzi bwa peteroli bijyanye Article 44: Administrative faults and sanctions related to petroleum exploration and production activities Article 44: Fautes et sanctions administratives liées aux activités d'exploration et de production pétrolières UMUTWE WA VII: INGINGO ZISOZA CHAPTER VII: FINAL PROVISIONS CHAPITRE VII : DISPOSITIONS FINALES Ingingo ya 44: Amakosa n’ibihano byo mu rwego rw’ubutegetsi n’ibikorwa by’ubushakashatsi n’ubucukuzi bwa peteroli bijyanye Article 44: Administrative faults and sanctions related to petroleum exploration and production activities Article 44: Fautes et sanctions administratives liées aux activités d'exploration et de production pétrolières ibiteganywa n’Igitabo Haseguriwe cy’Amategeko Ahana, Iteka rya Minisitiri rigena amakosa n’ibihano byo n’ibikorwa rw’ubutegetsi mu by’ubushakashatsi n’ubucukuzi bwa peteroli. bijyanye rwego Subject to the provisions of the penal code, an Order of the Minister determines administrative faults and sanctions related to petroleum exploration and production activities. Sous réserve des dispositions du code pénal, un arrêté du Ministre détermine sanctions administratives liées à des activités d'exploration et de production pétrolières. fautes et les les UMUTWE WA VII: INGINGO ZISOZA CHAPTER VIII: FINAL PROVISIONS CHAPITRE VIII: DISPOSITIONS FINALES - 45 Verify source ↗
Itegurwa, isuzuma n’itorwa by’iri
AI-assisted research summary: This article says the Law was drafted in English and considered and adopted in Kinyarwanda.
Ingingo ya 45: Itegurwa, isuzuma n’itorwa by’iri tegeko Article 45: Drafting, consideration and adoption of this Law Article 45: Initiation, examen et adoption de la présente loi Ingingo ya 45: Itegurwa, isuzuma n’itorwa by’iri tegeko Article 45: Drafting, consideration and adoption of this Law Article 45: Initiation, examen et adoption de la présente loi tegeko Iri risuzumwa kandi ritorwa mu rurimi rw’Ikinyarwanda. ryateguwe mu rw’Icyongereza, rurimi This Law was drafted in English, considered and adopted in Kinyarwanda. La présente loi a été initiée en Anglais, examinée et adoptée en Kinyarwanda. 103 Official Gazette n°21 of 23/05/2016 - 46 Verify source ↗
Ivanwaho ry’ingingo z’amategeko
AI-assisted research summary: This article repeals any earlier legal provisions that conflict with this Law.
Ingingo ya 46: Ivanwaho ry’ingingo z’amategeko zinyuranyije n’iri tegeko Article 46: Repealing provision Article 46: Disposition abrogatoire Ingingo ya 46: Ivanwaho ry’ingingo z’amategeko zinyuranyije n’iri tegeko Article 46: Repealing provision Article 46: Disposition abrogatoire Ingingo zose z’amategeko abanziriza zinyuranyije na ryo zivanyweho. iri kandi All prior legal provisions contrary to this Law are repealed. Toutes les dispositions légales antérieures contraires à la présente loi sont abrogées. - 47 Verify source ↗
Igihe iri tegeko ritangira gukurikizwa
AI-assisted research summary: This law takes effect on the day it is published in the Official Gazette of the Republic of Rwanda.
Ingingo ya 47: Igihe iri tegeko ritangira gukurikizwa Article 47: Commencement Article 47: Entrée en vigueur 82 Official Gazette n°21 of 23/05/2016 ITEGEKO N°13/2016 RYO KU WA 02/05/2016 RIGENGA IBIKORWA BY’UBUSHAKASHATSI N’UBUCUKUZI BWA PETEROLI LAW N°13/2016. OF 02/05/2016 GOVERNING PETROLEUM AND PRODUCTION ACTIVITIES EXPLORATION LOI N°13/2016 DU 02/05/2016 REGISSANT LES ACTIVITES DE D’EXPLORATION PRODUCTION PETROLIERES ET Twebwe, KAGAME Paul, Perezida wa Repubulika; We, KAGAME Paul, President of the Republic; Nous, KAGAME Paul, Président de la République; ISHINGA AMATEGEKO YEMEJE, INTEKO NONE NATWE DUHAMIJE, DUTANGAJE ITEGEKO RITEYE RITYA KANDI DUTEGETSE KO RYANDIKWA MU IGAZETI YA LETA YA REPUBULIKA Y’U RWANDA THE PARLIAMENT HAS ADOPTED AND WE SANCTION, PROMULGATE THE FOLLOWING LAW AND ORDER IT BE PUBLISHED IN THE OFFICIAL GAZETTE OF THE REPUBLIC OF RWANDA LE PARLEMENT A ADOPTE ET NOUS SANCTIONNONS, PROMULGUONS LA LOI DONT LA TENEUR SUIT ET ORDONNONS QU’ELLE SOIT PUBLIEE AU JOURNAL OFFICIEL DE LA REPUBLIQUE DU RWANDA INTEKO ISHINGA AMATEGEKO: THE PARLIAMENT: LE PARLEMENT: Umutwe w’Abadepite, mu nama yawo yo ku wa 02 Werurwe 2016; The Chamber of Deputies, in its session of 02 March 2016; La Chambre des Députés, en sa séance du 02 mars 2016 ; Ishingiye ku Itegeko Nshinga rya Repubulika y’u Rwanda ryo mu 2003 ryavuguruwe mu 2015, cyane cyane mu ngingo zaryo, iya 35, iya 53, iya 64, iya 69, iya 70, iya 88, iya 90, iya 91, iya 106, iya 120, iya 168 n’iya 176; Ishingiye ku Masezerano Mpuzamahanga yo gufata neza urusobe rw’ibinyabuzima n’aho ruba, yashyiriweho umukono i RIO DE JANEIRO muri BRESIL, ku wa 05 Kamena 1992, nk’uko yemejwe burundu n’Iteka rya Perezida nº 017/01 ryo ku wa 18/03/1995; Pursuant to the Constitution of the Republic of Rwanda of 2003 revised in 2015, especially in Articles 35, 53, 64, 69, 70, 88, 90, 91, 106, 120, 168 and 176; Vu la Constitution de la République du Rwanda de 2003 révisée en 2015, spécialement en ses articles 35, 53, 64, 69, 70, 88, 90, 91, 106, 120, 168 and 176 ; Pursuant to Convention on Biological Diversity signed in RIO DE JANEIRO, BRAZIL, on 05 June, 1992 as ratified by the Presidential Order nº017/01 of 18/03/1995; Vu la Convention sur la diversité biologique signée à RIO DE JANEIRO, au BRESIL, le 05 juin 1992 telle que ratifiée par Arrêté Présidentiel nº 017/01 du 18/03/1995; Ishingiye ku Masezerano Mpuzamahanga y’Inyongera ya yerekeye CARTAGENA muri Umutekano w’Urusobe rw’Ibinyabuzima yashyiriweho umukono i Nairobi muri KENYA guhera tariki ya 15 COLOMBIYA Pursuant to CARTAGENA, COLUMBIA Protocol on biosafety to the Convention on Biological Diversity, signed in Nairobi, KENYA, from 15 to 26 May 2000 and in New York, the United States of America, from 05 June Vu le Protocole de CARTAGENA, COLOMBIE sur la biosécurité à la Convention sur la Diversité Biologique signé à Nairobi, KENYA, du 15 au 26 mai 2000, et à New York aux Etats-Unis d’Amérique, du 05 juin 2000 83 kugeza ku ya 26 Gicurasi 2000 n’i New York muri Leta Zunze Ubumwe za Amerika guhera tariki ya 05 Kamena 2000 kugeza ku ya 04 Kamena 2001 nk’uko yemejwe burundu n’Iteka rya Perezida nº 51/01 ryo ku wa 31/12/2007; Official Gazette n°21 of 23/05/2016 2000 to 04 June 2001 as ratified by Presidential Order nº 51/01 of 31/12/2007; au 04 juin 2001 tel que ratifié par Arrêté Présidentiel n° 51/01 du 31/12/2007; YEMEJE: ADOPTS : UMUTWE WA MBERE: INGINGO RUSANGE CHAPTER ONE: GENERAL PROVISIONS ADOPTE: CHAPITRE GENERALES PREMIER: DISPOSITIONS Ingingo ya 47: gukurikizwa Igihe iri tegeko ritangirira Article 47: Commencement Article 47: Entrée en vigueur Iri tegeko ritangira gukurikizwa ku munsi ritangarijweho mu Igazeti ya Leta ya Repubulika y'u Rwanda. This Law comes into force on the date of its publication in the Official Gazette of the Republic of Rwanda. La présente loi entre en vigueur le jour de sa publication au Journal Officiel de la République du Rwanda. Kigali, ku wa 02/05/2016 Kigali, on 02/05/2016 Kigali, le 02/05/2016 (sé) KAGAME Paul Perezida wa Repubulika (sé) MUREKEZI Anastase Minisitiri w’Intebe (sé) KAGAME Paul President of the Republic (sé) MUREKEZI Anastase Prime Minister (sé) KAGAME Paul Président de la République (sé) MUREKEZI Anastase Premier Ministre Bibonywe kandi bishyizweho Ikirango cya Repubulika: Seen and sealed with the Seal of the Republic: Vu et scellé du Sceau de la République: (sé) BUSINGYE Johnston (sé) BUSINGYE Johnston (sé) BUSINGYE Johnston Minisitiri w’Ubutabera/Intumwa Nkuru ya Leta Minister of Justice/Attorney General Ministre de la Justice/Garde des Sceaux 104
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
LAW N°13/2016 OF 02/05/2016 GOVERNING PETROLEUM EXPLORATION AND PRODUCTION ACTIVITIES
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in