MINISTERIAL ORDER N°004/Minifom/2010 OF 14/09/2010 DETERMINING THE MODALITIES OF ENVIRONMENT CONSERVATION IN MINING AND QUARRY EXTRACTION
This provision says the Order sets the rules for conserving the environment in mining and quarry extraction activities.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Rwanda
- Instrument
- Order
- Citation
- 004/MINIFOM/2010 OF 14/09/2010
- Status
- Not in force
- Version
- Undated source snapshot
- Language
- mul
- Updated
- Official source
- View official record ↗
Statute overview
About this statute
This provision says the Order sets the rules for conserving the environment in mining and quarry extraction activities. People involved in prospecting, exploration, mining, or quarry extraction must carry out those activities in a way that does not harm the environment. A mining or quarrying license applicant must produce an environmental impact assessment. An environmental impact assessment for mining must describe and inventory key environmental features and assess impacts before mining starts. An application for mine and quarry prospection or exploration must include an environmental conservation plan, and that plan must be submitted to the Ministry for analysis and approval.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of MINISTERIAL ORDER N°004/Minifom/2010 OF 14/09/2010 DETERMINING THE MODALITIES OF ENVIRONMENT CONSERVATION IN MINING AND QUARRY EXTRACTION
Showing 21 of 21
- 1 Verify source ↗
Icyo iri teka rigamije
AI-assisted research summary: This provision says the Order sets the rules for conserving the environment in mining and quarry extraction activities.
Ingingo ya mbere: Icyo iri teka rigamije Article One: Purpose of this Order Article premier: Objet du présent arrêté Ingingo ya mbere: Icyo iri teka rigamije Article One: Purpose of this Order Article premier: Objet du présent arrêté teka Iri rigena uburyo bwo kubungabunga ibidukikije ahakorewa imirimo y‟ubucukuzi bwa mine na kariyeri. This Order determines the modalities of environment conservation applicable to mining and quarry extraction activities. Le présent arrêté fixe les modalités de sauvegarde de l‟environnement applicables aux activités d‟exploitation des mines et carrières. - 2 Verify source ↗
Kubaha ibidukikije
AI-assisted research summary: People involved in prospecting, exploration, mining, or quarry extraction must carry out those activities in a way that does not harm the environment.
Ingingo ya 2: Kubaha ibidukikije Article 2: Respect for environnent Article 2: Respect de l‟environnement UMUTWE WA II: INYIGO Y’INGARUKA KU BIDUKIKIJE CHAPTER II: ENVIRONMENTAL IMPACT ASSESSMENT CHAPITRE II: ETUDE DE L’IMPACT ENVIRONNEMENTAL Ingingo ya 2: Kubaha ibidukikije Article 2: Respect for environment Article 2: Respect de l’environnement Buri muntu urambagiza, ushakashaka n‟ucukura amabuye y‟agaciro na kariyeri, afite inshingano yo gukora ihungabana ry‟ibidukikije. ibikorwa birinda Any person involved in prospecting, exploring as well as mining and quarry extraction activities shall have the responsibilities to carry out his activities in a way that is not detrimental to environment. Toute personne impliquée dans les activités de prospection, de recherche ainsi que dans des activités d‟exploitation des mines et carrières a le devoir de mener ses activités de façon à ne pas nuire à l‟environnement. UMUTWE WA II: INYIGO Y’INGARUKA KU BIDUKIKIJE CHAPTER II: ENVIRONMENTAL IMPACT ASSESSMENT CHAPITRE II: ETUDE DE L’IMPACT ENVIRONNEMENTAL - 3 Verify source ↗
Imiterere y‟inyigo y‟ingaruka ku
AI-assisted research summary: A mining or quarrying license applicant must produce an environmental impact assessment.
Ingingo ya 3: Imiterere y‟inyigo y‟ingaruka ku bidukikije Article 3: Structure of environmental impact assessment Article 3: Forme d‟une environnemental étude d‟impact Ingingo ya 3: Imiterere y’inyigo y’ingaruka ku bidukikije Article 3: Structure of environmental impact assessment Article 3: Forme d’une étude d’impact environnemental Usaba uruhushya amabuye y‟agaciro na kariyeri agomba kwerekana inyigo y‟ingaruka ku bidukikije. rwo gucukura Any person applying for a mining and quarrying extraction license shall be required to produce an environmental impact assessment. Tout demandeur de permis d‟exploitation minière ou de carrières est tenu de présenter une étude d‟impact environnemental. - 4 Verify source ↗
Ibikubiye mu nyigo y‟ingaruka ku
AI-assisted research summary: An environmental impact assessment for mining must describe and inventory key environmental features and assess impacts before mining starts.
Ingingo ya 4: Ibikubiye mu nyigo y‟ingaruka ku bidukikije Article 4: Content of environmental assessment impact Article 4: Contenu de environnemental l‟étude d‟impact 51 III: WA GAHUNDA UMUTWE Y’IBIKORWA BYO KUBUNGABUNGA IBIDUKIKIJE N’INYIGO Y’INGARUKA KU BIDUKIKIJE AHACUKURWA AMABUYE Y’AGACIRO NA KARIYERI Official Gazette n° 41 bis of 11/10/2010 III: ENVIRONMENTAL CHAPTER CONSERVATION PLAN AND STUDY FOR ENVIRONMENTAL IMPACT ASSESSMENT ON A MINING AND QUARRYING EXTRACTION AREA CHAPITRE III: PLAN DE SAUVEGARDE DE L’ENVIRONNEMENT ET ETUDE D’IMPACT ENVIRONNEMENTAL SUR UNE ZONE D’EXPLOITATION DES MINES ET CARRIERES Ingingo ya 4: Ibikubiye mu nyigo y’ingaruka ku bidukikije Article 4: Content of environmental impact assessment Article 4: Contenu de environnemental l’étude d’impact Inyigo y‟ingaruka ku bidukikije igizwe n‟imiterere ndetse n‟urutonde rw‟urusobe rw‟ibinyabuzima, inyamaswa zo mu gasozi n„ibimera, imiterere y‟umwuka, amazi yo mu kuzimu n‟ayo hejuru y‟ubutaka, ubutaka n‟ubutumburuke bw‟ubutaka An environmental impact assessment shall include a description and an inventory of ecosystems, fauna and flora, quality of air, underground and surface waters, soil and topography and shall be to mining extraction and conducted prior L‟étude d‟impact environnemental doit inclure le descriptif et l‟inventaire de l‟écosystème, de la faune et de la flore, de la qualité de l‟air, des eaux souterraines et de surface, des sols et de la topographie avant les opérations minières et en 55 Official Gazette n° 41 bis of 11/10/2010 mbere y‟ibikorwa by‟ubucukuzi bw‟amabuye y‟agaciro, hakanagaragazwa ubwoko n‟umubare w‟ibizangizwa by‟ubucukuzi n‟ibikorwa bw‟amabuye y‟agaciro. specifying qualitatively and quantitatively negative effect of such mining activities. the les affectés aspects qui détaillant qualitativement et quantitativement par l‟activité minière. seront Inyigo y‟ingaruka ku bidukikije igizwe nibura n‟ibintu bikurikira: The environmental impact assessment shall include at least: L‟étude d‟impact comporte au moins les éléments suivants: 1° gusobanura neza umushinga w‟ubucukuzi 1° an outline of the mining extraction project and 1° un descriptif du projet d‟exploitation et son n‟intego yawo y‟ibanze; its main objective: objet principal; 2° gusesengura by‟umushinga bidukikije; ingaruka bishobora ibikorwa ku kugira 2° an analysis of a possible impact of the project 2° une analyse des effets éventuels des activities on the environment; activités du projet sur l‟environnement; 3° gusesengura ingaruka ishyirwa mu bikorwa ry‟umushinga rishobora kugira ku bidukikije, by‟umwihariko ku nyamaswa zo mu gasozi no ku bimera, ku mazi, ku mwuka no ku ihindagurika ry‟imiterere y‟ubutaka no ku nzira z‟amazi; the project 3° an analysis of a possible environmental impact the of environment, especially the impact on fauna and flora, water, quality of air as well as change of soil morphology and river courses; implementation on 3° une analyse de l‟impact éventuel de l‟exécution du projet sur l‟environnement, et en particulier l‟impact sur la faune, la flore, les eaux, la qualité de l‟air et les transformations de la morphologie des terres et du tracé des cours d‟eau; 4° ibikorwa bigamije kurinda ibidukikije, kugabanya cyangwa kuvanaho ibihumanya n‟uburyo ibyo bikorwa byarushaho kugira akamaro; 4° actions to be taken to protect environment, to mitigate or eliminate further pollution, and ways of improving the effectiveness of such actions; 4° les mesures envisagées pour la protection de l‟environnement, ou la l‟élimination de la pollution et les voies et moyens de rendre ces mesures plus efficaces; limitation 5° icyegeranyo cy‟ingaruka mbi n‟inziza ku bidukikije no ku mibereho y‟abaturage, harimo imbere ibidukikije; n‟ibyarushaho guteza 5° an estimate of negative and positive environmental and socio-economic impacts, including environmental impact on an development; 5° une estimation des impacts négatifs et positifs sur l‟environnement et l‟aspect socio-économique, y compris l‟impact sur l‟amélioration environnementale; 6° gusesengura neza ibyakosorwa mu mushinga ingaruka mbi ku kugira ngo hirindwe bidukikije. 6° thorough analysis of possible changes on the project to mitigate environmental impact. 56 6° une analyse approfondie des modifications l‟impact réduire éventuelles visant à environnemental. III: WA GAHUNDA UMUTWE Y’IBIKORWA BYO KUBUNGABUNGA IBIDUKIKIJE N’INYIGO Y’INGARUKA KU BIDUKIKIJE BY‘AHACUKURWA AMABUYE Y’AGACIRO NA KARIYERI Official Gazette n° 41 bis of 11/10/2010 III: ENVIRONMENTAL CHAPTER CONSERVATION PLAN AND STUDY FOR ENVIRONMENTAL IMPACT ASSESSMENT ON A MINING AND QUARRYING EXTRACTION AREA CHAPITRE III: PLAN DE SAUVEGARDE DE L’ENVIRONNEMENT ET ETUDE D’IMPACT ENVIRONNEMENTAL SUR UNE ZONE D’EXPLOITATION DES MINES ET CARRIERES - 5 Verify source ↗
Gusuzuma no kwemeza gahunda
AI-assisted research summary: An application for mine and quarry prospection or exploration must include an environmental conservation plan, and that plan must be submitted to the Ministry for analysis and approval.
Ingingo ya 5: Gusuzuma no kwemeza gahunda y‟ibikorwa byo kubungabunga ibidukikije Article 5: Analysis and approval of an environmental conservation plan Article 5: Analyse et approbation du plan de sauvegarde de l‟environnement Ingingo ya 5: Gusuzuma no kwemeza gahunda y’ibikorwa byo kubungabunga ibidukikije Article 5: Analysis and approval of an environmental conservation plan Article 5: Analyse et approbation du plan de sauvegarde de l’environnement Dosiye y‟usaba uruhushya rwo kurambagiza, cyangwa gukora ubushakashatsi bw‟amabuye y‟agaciro na kariyeri iherekezwa na gahunda yo iyo mirimo kurengera izakorerwa. ibidukikije by‟aho The application for mine and quarry prospection and exploration shall be accompanied with an environmental conservation plan on a mining and quarry extraction area. Le dossier de demande d‟un permis de prospection et de recherche des mines et carrières est accompagné d‟un plan de sauvegarde de l‟environnement sur la zone d‟exploitation des mines et carrières. Iyo gahunda igomba kugaragaza ibikorwa byo gusana ibyakwangiza gukumira ibyakwangizwa n‟imirimo ye. no plan This rehabilitation works related to damageable site. prevention present shall and Ce plan doit présenter les travaux de prévention et de réhabilitation relatifs aux lieux pouvant être endommagés. gahunda Iyo amafaranga azakoreshwa mu gukumira ibyakwangizwa no gusana ibyangijwe. yerekana kandi This plan shall also present the cost of prevention and rehabilitation works relating to damageable site. Ce plan doit également présenter le coût des travaux de prévention et de réhabilitation relatifs aux lieux pouvant être endommagés. Hagomba gutangwa ingwate mu buryo usaba bwemewe yihitiyemo uruhushya n‟amategeko y‟u Rwanda. kandi A bond shall be given in the form chosen by the license applicant and approved in conformity with Rwandan laws. Une caution doit être constituée dans la forme choisie par le demandeur du permis et en conformité avec la législation rwandaise. Iyo gahunda ishyikirizwa Minisiteri ifite mine na kariyeri mu nshingano zayo kugira ngo iyisuzume kandi iyemeze. That plan shall be submitted to the Ministry in charge of mines and quarries for analysis and approval. Ce plan est transmis au Ministère ayant les mines et carrières dans ses attributions pour analyse et approbation. - 6 Verify source ↗
Gusuzuma no kwemeza inyigo
AI-assisted research summary: Anyone starting a mining or quarry project must prepare an environmental impact assessment and submit it to RDB for analysis and approval.
Ingingo ya 6: Gusuzuma no kwemeza inyigo y‟ingaruka ku bidukikije Article 6: Analysis and approval of an environmental impact assessment Article 6: Analyse et approbation d‟une Etude d‟Impact Environnemental Ingingo ya 6: Gusuzuma no kwemeza inyigo y’ingaruka ku bidukikije Article 6: Analysis and approval of an environmental impact assessment Article 6: Analyse et approbation d’une étude d’impact environnemental Ushaka gukora umushinga wo gucukura amabuye Any person who wants to start a project for mining Toute personne qui veut exécuter un projet 57 Official Gazette n° 41 bis of 11/10/2010 y‟agaciro na kariyeri ategura inyigo y‟ingaruka ku bidukikije, cy‟Igihugu Gishinzwe (RDB), kugira ngo kiyisuzume kandi kiyemeze. akayishyikiriza Iterambere Ikigo quarry extraction an and environmental impact assessment which shall be submitted for analysis and approval to the Rwanda Development Board (RDB). establish shall d‟exploitation des mines et carrières élabore une étude d‟impact environnemental et la soumet au Rwanda Development Board (RDB) pour analyse et approbation. Kopi y‟inyigo y‟ingaruka ku bidukikije yemejwe ishyirwa muri dosiye rwo gucukura amabuye y‟agaciro cyangwa kariyeri, ishyikirizwa Minisiteri ifite mine na kariyeri mu nshingano zayo. isaba uruhushya That approval and a copy of environmental impact assessment approved shall be filed the application for mining or quarry extraction license and be transmitted to the Ministry in charge of mines and quarries. into Une copie de l‟étude d‟impact environnemental approuvée est consignée dans le dossier de demande de permis d‟exploitation des mines ou carrières qui est transmis au Ministère ayant les mines et carrières dans ses attributions. - 7 Verify source ↗
Raporo ku bidukikije mu gihe
AI-assisted research summary: During construction and the start of mining and quarrying, every exploiter must send the mines and quarries ministry a monthly report on how environmental impacts are being managed.
Ingingo ya 7: Raporo ku bidukikije mu gihe cy‟itangizwa ry‟ubucukuzi Article 7: Environmental report on starting time for mining and quarry extraction Article 7 : Rapport environnemental du début d‟exploitation des mines et carrières Ingingo ya 7: Raporo ku bidukikije mu gihe cy’itangizwa ry’ubucukuzi Article 7: Environmental report on starting mining and quarry extraction Article 7 : Rapport environnemental du début d’exploitation des mines et carrières Mu gihe cy‟iyubakwa n‟itangizwa ry‟ibikorwa by‟ubucukuzi, buri mucukuzi aha Minisiteri ifite mine na kariyeri mu nshingano zayo raporo ya buri kwezi agaragaza uko yacunze buri ngaruka yagaragajwe mu nyigo. During the period for construction and the start of mining and quarry extraction activities, every exploiter shall transmit to the Ministry in charge of mines and quarries a monthly report with details on ways of managing every environmental impact identified in the study. Iyo raporo igaragaza kandi uko ingaruka zicungwa mu gihe cy‟itunganywa ry‟ahazacukurwa mine na kariyeri. That report shall also present ways of managing environmental the preparatory impacts during works relating to mining and quarrying operation area. Pendant la période de construction et de démarrage des activités d‟exploitation des mines et carrières, tout exploitant transmet au Ministère ayant les mines et carrières dans ses attributions un rapport mensuel détaillant les moyens de gestion de chaque impact environnemental dégagé dans l‟étude. Ce rapport présente également les moyens de gestion des impacts environnementaux durant les travaux préparatoires zone à d‟exploitation des mines et carrières. relatifs la - 8 Verify source ↗
Raporo ku bidukikije mu gihe cyo
AI-assisted research summary: During mining and quarrying extraction, every exploiter must submit a monthly environmental report to the Ministry in charge of mines and quarries.
Ingingo ya 8: Raporo ku bidukikije mu gihe cyo gucukura amabuye y‟agaciro na kariyeri Article 8: Environmental report on mining and quarrying extraction period Article 8: Rapport environnemental sur la période d‟exploitation des mines et carrières Ingingo ya 8: Raporo ku bidukikije mu gihe cyo gucukura mine na kariyeri Article 8: Environmental report on mining and quarrying extraction period Article 8: Rapport environnemental sur la période d’exploitation des mines et carrières Mu gihe cyo gucukura mine na kariyeri, buri mucukuzi atanga raporo buri kwezi muri Minisiteri ifite mine na kariyeri mu nshingano zayo isobanura uko ingaruka zigenda zicungwa, mu buryo bukurikira: During the mining and quarrying extraction period, every exploiter shall submit to the Ministry in charge of mines and quarries a monthly report which explains ways of progressively managing environmental impacts as follows: 58 Pendant la période d‟exploitation des mines et carrières, tout exploitant transmet au Ministère ayant les mines et carrières dans ses attributions un rapport mensuel faisant état des moyens de gestion impacts environnementaux comme suit: progressive des 1° ihungabanywa ry‟ubutaka rishobora gutera ibikorwa isuri by‟imibereho myiza n‟ubukungu ; kwangiza cyangwa Official Gazette n° 41 bis of 11/10/2010 1° soil degradation likely to cause erosion or affect socio-economic activities; 1° dégradation du sol qui pourrait causer l‟érosion ou affecter les activités socio- économiques ; 2° ibimenyetso by‟uko ubutaka bushobora 2° risk of soil contamination; 2° risque de contamination du sol ; guhumanywa ; 3° kwirinda isakazwa ry‟ibihumanya byatejwe 3° prevention of contamination caused by 3° prévention de la contamination résultant n‟ibikorwa bya mbere ; previous activities; d‟activités antérieures ; 4° imbogamizi z‟imikingo idakomeye ; 4° risk of instability of banks; 4° risques d‟instabilité des talus ; 5° imbogamizi z‟ibidukikije zaturuka ku mitingito y‟isi. 5° environmental earthquake. risks resulting from 5° risques d‟événements sismiques. environnementaux résultant Article hydrogeology and surface waters Environmental 9: report on - 9 Verify source ↗
Raporo y‟ibidukikije byerekeye
AI-assisted research summary: During mining and quarrying extraction, every exploiter must send the Ministry in charge of mines and quarries a monthly report on how pollution of underground and surface waters is being prevented.
Ingingo ya 9 : Raporo y‟ibidukikije byerekeye amazi yo munsi no hejuru y‟ubutaka Article 9: Environmental report on hydrogeology and surface waters Article l‟hydrogéologie et les eaux de surface 9 : Rapport environnemental sur Article 9 : Rapport environnemental sur l’hydrogéologie et les eaux de surface Ingingo ya 9 : Raporo y’ibidukikije byerekeye amazi yo munsi no hejuru y’ubutaka Mu gihe cyo gucukura amabuye y‟agaciro na kariyeri, buri mucukuzi atanga raporo buri kwezi ifite mine na kariyeri mu muri Minisiteri nshingano zayo isobanura uko arwanya ingaruka ku mazi yo munsi no hejuru y‟ubutaka mu buryo bukurikira: During the mining and quarrying extraction period, every exploiter shall submit to the Ministry in charge of mines and quarries a monthly report which presents ways of preventing pollution of hydrogeology and surface waters as follows: 1° kugabanuka kw‟amazi agaburira amasoko ; 1° a decrease in groundwater ; 2° imbogamizi y‟amazi ; zo guhumanya amasoko 2° risks of contamination of groundwater; Pendant la période d‟exploitation des mines et carrières, tout exploitant transmet au Ministère ayant les mines et carrières dans ses attributions un rapport mensuel présentant les moyens de lutte contre la pollution des eaux souterraines et de surface comme suit: 1° 2° rabaissement des nappes phréatiques par l‟abstraction ; risques de contamination des nappes phréatiques ; 3° ingaruka zikomeye ku mibereho myiza 3° serious negative socio-economic impact; 3° effets potentiels socio-économiques ; n‟ubukungu ; 4° kuzitirwa kw‟amazi yo hejuru y‟ubutaka ; 5° imbogamizi zo guhumanywa kw‟amazi yo 4° blockage of surface water; 5° risks of contamination of surface water. 4° retenu et abstraction des eaux de surface ; 5° risques de contamination des eaux de hejuru y‟ubutaka. surface. 59 Official Gazette n° 41 bis of 11/10/2010 - 10 Verify source ↗
Raporo y‟ibidukikije ku
AI-assisted research summary: Every exploiter must submit a monthly report on land use and mining/quarrying infrastructure installations during the extraction period.
Ingingo ya 10 : Raporo y‟ibidukikije ku mikoreshereze y‟ubutaka mu gushyiraho ibikorwa remezo mu rwego rw‟ubucukuzi Article 10: Environmental report on land use as well as mining and quarrying infrastructure installations Article 10 : Rapport sur l‟utilisation des terres et les installations des infrastructures minières environnemental Ingingo ya 10 : Raporo y’ibidukikije ku mikoreshereze y’ubutaka mu gushyiraho ibikorwa remezo mu rwego rw’ubucukuzi Article 10: Environmental report on land use as well as mining and quarrying infrastructure installations Article 10 : Rapport environnemental sur l’utilisation des terres et les installations des infrastructures minières Mu gihe cyo gucukura amabuye y‟agaciro na kariyeri, buri mucukuzi ashyikiriza Minisiteri ifite ubucukuzi bwa mine na kariyeri mu nshingano zayo raporo ya buri kwezi ku mikoreshereze y‟ubutaka mu gushyiraho ibikorwa remezo mu rwego rw‟ubucukuzi ikubiyemo ibi bikurikira: During the mining and quarrying extraction period, every exploiter shall submit to the Ministry in charge of mines and quarries a monthly report on land use as well as mining and quarrying infrastructure installations as follows: Pendant la période d‟exploitation des mines et carrières, tout exploitant transmet au Ministère ayant les mines et carrières dans ses attributions un rapport mensuel sur l‟utilisation des terres et infrastructures minières les comme suit: installations des 1° kwimuka kw‟ababyaza umusaruro ubutaka; 1° displacement of land users; 1° déplacement des utilisateurs productifs du sol; 2° kubuzwa gukora cyangwa kwibwa bihari ; imirimo y‟ubucukuzi ibikoresho bya mine 2° stoppage of extraction or stealing of 2° blocage des travaux d‟exploitation ou equipment in place; détournement des équipements en place; 3° urujya n‟uruza ubucukuzi. rudakwiye rutambamira 3° backward and forward motion preventing 3° les va-et-vient entravant les travaux extraction works. d‟exploitation. - 11 Verify source ↗
Raporo y‟ibidukikije ku miterere
AI-assisted research summary: The environmental report must cover dust risks during construction and extraction, and gas emissions from processing, smelting, and vehicles.
Ingingo ya 11: Raporo y‟ibidukikije ku miterere y‟umwuka n‟ingaruka z‟ibipimo by‟ikirere Article 11: Environmental report on air quality and meteorological impacts Article 11 : Rapport environnemental sur la qualité de l‟air et les impacts météorologiques Ingingo ya 11: Raporo y’ibidukikije ku miterere y’umwuka n’ingaruka z’ibipimo by’ikirere Article 11: Environmental report on air quality and meteorological impacts Article 11 : Rapport environnemental sur la qualité de l’air et les impacts météorologiques Raporo ku miterere y‟umwuka n‟ingaruka z‟ibipimo by‟ikirere igaragaza ibi bikurikira : The environmental report on air quality and meteorological impacts shall present the following: 1° imbogamizi zituruka ku mukungugu mu bihe 1° byo kubaka no gucukura ; 2° gutumura ibyuka bya gaze bituruka ku myotsi yo mu itanura ishongesherezwamo amabuye y‟agaciro no ku modoka, bikaba bishobora kugira ingaruka ku buzima bw‟abantu no gutuma habaho imyuka yangiza agakingirizo k‟izuba. risks relating to dusts during the construction and extraction periods; 2° discharge of gas from processing and smelting works, vehicles, which is harmful severe to health, or Greenhouse gas emission. contributes to 2° 60 Le rapport environnemental sur la qualité de l‟air et les impacts météorologiques présente ce qui suit : 1° les risques liés aux poussières pendant les périodes de construction et d‟exploitation ; les dégagements gazeux résultant de la combustion lors du traitement et de la fonte des minerais et des véhicules, ce qui peut représenter des risques pour la santé ou contribuer aux gazes de serre. Official Gazette n° 41 bis of 11/10/2010 - 12 Verify source ↗
Raporo y‟ibidukikije ku ngaruka
AI-assisted research summary: The environmental report on socio-economic impacts must present the listed impacts.
Ingingo ya 12 : Raporo y‟ibidukikije ku ngaruka z‟imibereho y‟abaturage n‟ubukungu Article 12: Environmental economic impacts report onsocio- Article 12 : Rapport environnemental sur les impacts socio-économiques Ingingo ya 12 : Raporo y’ibidukikije ku ngaruka z’imibereho y’abaturage n’ubukungu Article 12: Environmental report on socio- economic impacts Article 12 : Rapport environnemental sur les impacts socio-économiques Raporo y‟ibidukikije ku ngaruka z‟imibereho y‟abaturage n‟ubukungu igaragaza ibi bikurikira : The environmental report on socio-economic impacts presents the following: Le rapport environnemental sur les impacts socio- économiques présente ce qui suit : 1° 2° ingaruka mbi z‟imibereho y‟abaturage ituruka ku bwiyongere bw‟abaturage mu karere. ingaruka nziza ku mibereho y‟abaturage baturiye umushinga w‟ubucukuzi - 13 Verify source ↗
Raporo y‟ibidukikije ku bumenyi
AI-assisted research summary: The article says the environmental report should cover impacts on ecology and tourist attractions, including protected species, historic and cultural sites, and the character of the area.
Ingingo ya 13 : Raporo y‟ibidukikije ku bumenyi bw‟indiri y‟urusobe rw‟ibinyabuzima n‟ahantu nyaburanga Article 13: Environmental report on Ecology and Tourist attractions Article 13 : Rapport l‟Ecologie et les Sites touristiques environnemental sur 52 Official Gazette n° 41 bis of 11/10/2010 Ingingo ya 13 : Raporo y’ibidukikije ku bumenyi bw’indiri y’urusobe rw’ibinyabuzima n’ahantu nyaburanga Raporo y‟ibidukikije ku bumenyi bw‟indiri y‟urusobe n‟ahantu rw‟ibinyabuzima nyaburanga igaragaza ibi bikurikira : 1° negative social impacts of an increase of the 1° population in the area. impacts sociaux négatifs de l‟augmentation de la population dans la région. 2° positive impacts on local community 2° livelihood nearby the extraction project. impacts positifs sur la vie des collectivités locales se trouvant aux environs du projet d‟exploitation. Article 13: Environmental report on Ecology and Tourist attractions Article 13 : Rapport environnemental sur l’Ecologie et les Sites touristiques environmental The ecology/heritage/tourist attractions presents following: report on the rapport Le sur l‟écologie/héritage/sites touristiques présente ce qui suit : environnemental 1° ingaruka ku bidukikije by‟ahantu no ku 1° nyamaswa n‟ibimera birinzwe ; impacts on the ecosystem and protected species; 1° impacts sur l‟écosystème et sur les espèces protégées ; 2° ihungabana by‟ibirango by‟amateka 2° degradation of historic and cultural sites; 2° dégradation des sites de valeur historique et n‟umuco ; culturelle ; 3° ingaruka ku miterere y‟ahantu nyaburanga, 3° no gutakaza iby‟ingenzi bihagize. impact on topographical aspects of tourist attractions, and loss of their features. 3° effets sur le caractère topographique des sites touristiques, y compris la perte de leurs traits distinctifs. - 14 Verify source ↗
Raporo y‟ibidukikije ku isuku
AI-assisted research summary: The exploiter must provide provisional estimates for environmental management operations, including a site rehabilitation plan.
Ingingo ya 14 : Raporo y‟ibidukikije ku isuku n‟umutekano mu kazi Article 14: Environmental report on hygiene and safety at work place Article 14 : Rapport l‟hygiène et sécurité au travail environnemental sur Ingingo ya 14 : Raporo y’ibidukikije ku isuku n’umutekano mu kazi Article 14: Environmental report on hygiene and safety at work place Article 14 : Rapport environnemental sur l’hygiène et sécurité au travail Raporo y‟ibidukikije ku isuku n‟umutekano mu The environmental report on hygiene and safety at Le rapport environnemental sur l‟hygiène et 61 Official Gazette n° 41 bis of 11/10/2010 kazi igaragaza impanuka zo mu kazi, indwara zo mu kazi n‟isuku z‟ahakorerwa akazi. work place presents job hazards, occupational diseases, hygiene at work place. sécurité au travail présente les accidents de travail, les maladies professionnelles et hygiène au travail. agomba ibiciro Umucukuzi by‟agateganyo gucunga by‟imirimo ibidukikije, harimo na gahunda yo gusana aho hantu hangiritse. gutanga yo The exploiter must provide provisional estimates for environment management operations, including the site rehabilitation plan. L‟exploitant doit présente les coûts prévisionnels des opérations de gestion de l‟environnement, y compris le programme de réhabilitation du site. - 15 Verify source ↗
Gahunda yo gufunga
AI-assisted research summary: Mining or quarry operators must prepare a closing plan if the site is to be closed, and that plan must be approved by the relevant mines/quarry and environment institutions.
Ingingo ya 15: Gahunda yo gufunga Article 15: Closing Plan Article 15 : Plan de fermeture UMUTWE WA IV: INGWATE YO GUSANA IBIDUKIKIJE CHAPTER REHABILITATION BOND IV: ENVIRONMENT CHAPITRE IV: REHABILITATION L’ENVIRONNEMENT CAUTION DE DE Ingingo ya 15: Gahunda yo gufunga Article 15: Closing plan Article 15 : Plan de fermeture Igihe bigaragaye ko mine cyangwa kariyeri igiye gufungwa, gahunda y‟imicungire y‟ifungwa ry‟aho gukorwa. Gahunda y‟imicungire yakozwe mu gihe cyo gucukura amabuye y‟agaciro na kariyeri igomba kugaragaza ibikorwa byose bijyanye n‟iryo funga. igomba hantu to close, In the event that the mining or quarry extraction there must be established a has management plan for the closing of the site. The management plan established during the period of quarry extraction must present any activities relating to the site closing. Si l‟exploitation minière ou de carrières doit fermer, un plan de gestion de la fermeture du site doit être établi. Le plan de gestion établi pendant la période d‟exploitation devra dégager toutes activités relatives à ladite fermeture. Gahunda y‟ifunga igomba kugaragaza: The closing plan shall specify: Le plan de fermeture devra préciser: 1° impamvu z‟ifunga; 1° reasons of closing; 1° les causes de la fermeture; 2° isubiranywa ry‟ahantu hari ibikoresho ; 2° rehabilitation of infrastructure area; 2° la réhabilitation des zones d‟infrastructure ; 3° uburyo bukoreshwa mu gufunga ahari 3° methods of closing the dumping areas; 3° les méthodes de fermeture des aires déchets; imyanda; 4° gahunda yo gufunga inyubako zo mu nsi 4° plan for the closing of underground 4° le plan de fermeture des ouvrages souterrains y‟ubutaka n‟imyobo yatera impanuka; 5° Gahunda yo gutunganya ahafunzwe kugeza igihe hatangiwe icyemezo cyo gufunga constructions and dangerous excavations; 5° Plan for the maintenance of the closed site until the issuing the closing certificate. Gahunda yo gufunga ahakorerwa ubucukuzi igomba kwemezwa n‟inzego zishinzwe ubucukuzi bw‟amabuye y‟agaciro na kariyeri n‟ibidukikije. The closing plan of the extraction site shall be approved by the mines and quarry extraction and environment institutions. et des excavations dangereuses; 5° Le plan d‟entretien des zones fermées jusqu‟au moment où un certificat de fermeture est livré. Le plan de fermeture du site d‟exploitation est institutions chargées de approuvé par l‟exploitation des mines et carrières et de l‟environnement. les 62 Official Gazette n° 41 bis of 11/10/2010 UMUTWE WA IV: INGWATE YO GUSANA IBIDUKIKIJE CHAPTER REHABILITATION BOND IV: ENVIRONMENT IV: CHAPITRE REHABILITATION L’ENVIRONNEMENT CAUTION DE DE - 16 Verify source ↗
Ingwate yo gusana
AI-assisted research summary: A rehabilitation bond is required to support site rehabilitation and closure; if final rehabilitation funds are insufficient, the mining license holder must do the extra work.
Ingingo ya 16: Ingwate yo gusana byangijwe ibintu Article 16: Rehabilitation bond Article 16: Caution de réhabilitation Ingingo ya 16: Ingwate yo gusana ibintu byangijwe Ingwate yo gusana ibidukikije itanga icyizere cyo gusana no gufunga ahantu, ariko iyo amafaranga yo kurangiza isana rya nyuma adahagije, imirimo y‟inyongera rwo gucukura amabuye y‟agaciro. ikorwa n‟ufite uruhushya Article 16: Rehabilitation bond Article 16: Caution de réhabilitation rehabilitation bond The environmental is a guarantee for the rehabilitation and closing of the site; however, in the case of insufficient funds for final rehabilitation, the additional works shall be carried out by the holder of the mining license. L La caution de réhabilitation de l‟environnement constitue une garantie pour la réhabilitation et la fermeture du site, mais en cas d‟insuffisance des fonds pour la réhabilitation finale, les travaux complémentaires sont à la charge de l‟exploitant. - 17 Verify source ↗
Kugena ingwate yo gusana ibintu
AI-assisted research summary: The rehabilitation bond is set based on the mining period and rehabilitation budget estimate, and it can be paid in cash or other lawful forms.
Ingingo ya 17: Kugena ingwate yo gusana ibintu byangijwe Article 17: Determination of rehabilitation bond Article 17: Détermination de la caution de réhabilitation Ingingo ya 17: Kugena ingwate yo gusana ibintu byangijwe Article 17: Determination of rehabilitation bond Article 17: Détermination de la caution de réhabilitation yo n‟inyigo Ingwate yo gusana igenwa hakurikijwe igihe gucukura bizamara, hashingiwe ku mubare w‟amafaranga yabazwe ku ngengo y‟imari y‟agateganyo y‟ibikorwa byo gusana nk‟uko kubungabunga bitaganywa ibidukikije, ukagabanya n‟igihe kibaze mu myaka ubucukuzi bugomba kumara. Ingengo y‟imari y‟agateganyo yo gusana ishobora gusubirwamo ku (5). Uko gipimo kitarengeje gusubiramo kugabanya umubare w‟amafaranga iyo gusana bwa nyuma bibaye ku gice kimwe cy‟ahacukurwa, nyuma y‟uko Ubuyobozi bwa Mine n‟Ibidukikije bwemeje iyo mirimo yo gusana. bishobora agaciro imyaka itanu the amount calculated on The rehabilitation bond shall be determined according to the duration of the extraction period based on the rehabilitation budget estimate as provided by the assessment of environmental management, divided by the number of years of the whole extraction period. The rehabilitation budget estimate shall be re-evaluated over a period not exceeding five (5) years. This re-evaluation may result in a reduction in the costs in case the final rehabilitation is done on part of the mining site, upon its approval by Mining and Environment Authorities Iyo isuzuma ry‟igiciro cyo gusana ibyangiritse ibarwa hashingiwe ku ridashobotse, mafaranga yose yinjiye ku ijanisha riri hagati ya 0,3 na 1%. ingwate In the case of failure to carry out appropriate evaluation of the rehabilitation costs, the bond shall be calculated at 0.3 to 1% of the gross turnover. 63 la La caution de réhabilitation de l‟environnement est déterminée sur base de durée de l‟exploitation, à hauteur d‟un montant calculé sur le budget prévisionnel de réhabilitation tel que prévu par l‟étude de gestion de l‟environnement, divisé par la durée de vie prévue de l‟exploitation exprimée en années. Le budget prévisionnel de réhabilitation avec une fréquence qui ne doit pas excéder cinq (5) ans. Cette réévaluation peut reconnaître une diminution des fonds en cas de réhabilitation définitive intervenue sur une partie du gisement, après acceptation de ces travaux de réhabilitation par les Administrations des Mines et de l‟Environnement. Dans l‟impossibilité d‟une évaluation adéquate des coûts de réhabilitation, la caution sera calculée sur base du chiffre d‟affaires brut à un taux compris entre 0,3 et 1%. Official Gazette n° 41 bis of 11/10/2010 Ingwate ishobora gutangwa mu mafaranga cyangwa hakoreshejwe uburyo bwose bwemewe n‟amategeko y‟u Rwanda. The rehabilitation bond shall be given by cash or in other forms accepted by the Rwandan Law. La caution de réhabilitation peut être fournie par argent toutes autres formes acceptées par la législation nationale. liquide ou par - 18 Verify source ↗
Gusana ku buryo bushimishije
AI-assisted research summary: A license owner gets the rehabilitation bond back if the authority approves the rehabilitation works; otherwise the owner must redo the works, and if rehabilitation is not done the Government may use the bond to restore the damaged site.
Ingingo ya 18: Gusana ku buryo bushimishije Article 18: Satisfactory rehabilitation Article 18: Réhabilitation satisfaisante Ingingo ya 18: Gusana ku buryo bushimishije Article 18: Satisfactory rehabilitation Article 18: Réhabilitation satisfaisante rwo uruhushya kurambagiza, gukora Iyo ubushakashatsi cyangwa gucukura rurangiye, ruhagaritswe cyangwa rusubijwe na nyirarwo kandi ubuyobozi bwa mine na kariyeri bukemera ko imirimo yo gusana yakozwe neza, uwari ufite uruhushya asubizwa ingwate ye. Where the expiry, withdrawal or renunciation of the prospection, exploration or extraction license, and after the approval of the rehabilitation works by the authorities in charge of mines and quarries, rehabilitation grant shall be given back to the license owner. Lorsque le permis de prospection, de recherche ou d‟exploitation expire, est retiré ou renoncé par son titulaire et que la bonne exécution des travaux de réhabilitation a été approuvée par l‟autorité chargée des mines et carrières, la caution de réhabilitation est remise au titulaire du permis. Iyo gusana bitemewe n‟ubuyobozi, risubirwamo hakurikije ibyo yasabwe. isanwa In case rehabilitation would not be approved by the authority, rehabilitation works shall be redone by the license owner in conformity with required conditions. Au cas où la réhabilitation n‟est pas acceptée par l‟autorité, les travaux de réhabilitation sont repris par le titulaire suivant les conditions exigées. Iyo gusana bidakozwe, Leta ikoresha ingwate yatanzwe mu gusana ahangijwe. Where rehabilitation shall be not executed, the Government shall utilize the bond for rehabilitating the damaged site. En cas d‟inexécution des travaux de réhabilitation, l‟Etat utilise la garantie pour la réhabilitation des lieux endommages. Ingingo ya zinyuranyije n’iri teka 19: Ivanwaho ry’ingingo - 19 Verify source ↗
Ivanwaho ry‟ingingo zinyuranyije
AI-assisted research summary: Any prior provisions that conflict with this Order are repealed.
Ingingo ya 19: Ivanwaho ry‟ingingo zinyuranyije n‟iri teka Article 19: Repealing provision Article 19 : Disposition abrogatoire Article 19: Repealing provision Article 19 : Disposition abrogatoire Ingingo zose z‟amateka abanziriza zinyuranyije na ryo zivanyweho. iri kandi All prior provisions contrary to this Order are hereby repealed. Toutes les dispositions antérieures contraires au présent arrêté sont abrogées. - 20 Verify source ↗
Igihe iri teka ritangira gukurikizwa
AI-assisted research summary: This Order starts to apply on the day it is published in the Official Gazette.
Ingingo ya 20: Igihe iri teka ritangira gukurikizwa Article 20: Commencement Article 20 : Entrée en vigueur 53 Official Gazette n° 41 bis of 11/10/2010 RYA MINISITIRI ITEKA N°004/Minifom/2010 RYO KUWA 14/09/2010 RIGENA UBURYO BWO KUBUNGABUNGA IBIDUKIKIJE MU BUCUKUZI BWA ZA MINE NA KARIYERI 14/09/2010 MINISTERIAL ORDER N°004/Minifom/2010 OF THE ENVIRONMENT MODALITIES CONSERVATION AND QUARRY EXTRACTION DETERMINING OF IN MINING MINISTERIEL ARRETE N°004/Minifom/2010 14/09/2010 DETERMINANT LES MODALITES DE SAUVEGARDE DE L’ENVIRONNEMENT APPLICABLES DANS L’EXPLOITATION DES MINES ET CARRIERES DU Minisitiri w’Amashyamba na Mine; The Minister of Forestry and Mines; Le Ministre des Forêts et Mines ; Ashingiye ku Itegeko Nshinga rya Repubulika y‟u Rwanda ryo kuwa 04 Kamena 2003, nk‟uko ryavuguruwe kugeza ubu, cyane cyane mu ngingo zaryo, iya 120, iya 121 n‟iya 201; Ashingiye ku Itegeko n° 37/2008 ryo kuwa 11/08/2008 rigenga ubucukuzi bw‟amabuye y‟agaciro na kariyeri, cyane cyane mu ngingo yaryo ya 99 ; Ashingiye ku Itegeko Ngenga n° 04/2005 ryo kuwa 08/04/2005 rigena uburyo bwo kurengera, kubungabunga no guteza imbere ibidukikije mu Rwanda, cyane cyane mu ngingo yaryo ya 9 n‟iya 67; Inama 08/06/2010, imaze kubisuzuma no kubyemeza; y‟Abaminisitiri yateranye kuwa Pursuant to the Constitution of the Republic of Rwanda of 04 June 2003 as amended to date, especially in Articles 120, 121 and 201; Vu la Constitution de la République du Rwanda du 04 juin 2003 telle que révisée à ce jour, spécialement en ses articles 120, 121 et 201; Pursuant to Law n° 37/2008 of 11/08/2008 on mining and quarry exploitation, especially in Ingingo ya 20: Igihe gukurikizwa iri teka ritangira Article 20: Commencement Article 20 : Entrée en vigueur teka Iri ritangira gukurikizwa ku munsi ritangarijweho mu Igazeti ya Leta ya Repubulika y‟u Rwanda. This Order shall come into force on the date of its publication in the Official Gazette of the Republic of Rwanda. Le présent arrêté entre en vigueur le jour de sa publication au Journal Officiel de la République du Rwanda. 64 Official Gazette n° 41 bis of 11/10/2010 Kigali, kuwa 14/09/2010 Kigali, on 14/09/2010 Kigali, le 14/09/2010 (sé) (sé) (sé) BAZIVAMO Christophe Minisitiri w‟Amashyamba na Mine BAZIVAMO Christophe Minister of Forestry and Mines BAZIVAMO Christophe Ministre des Forêts et Mines Bibonywe kandi bishyizweho Ikirango cya Repubulika: Seen and sealed with the Seal of the Republic: Vu et scellé du Sceau de la République : (sé) (sé) (sé) KARUGARAMA Tharcisse Minisitiri w‟Ubutabera/Intumwa Nkuru ya Leta KARUGARAMA Tharcisse Minister of Justice/Attorney General KARUGARAMA Tharcisse Ministre de la Justice/Garde des Sceaux 65 - 99
AI-assisted research summary: This article is an introductory provision that cites the mining and environmental laws it relies on.
Article 99 ; Vu la Loi n° 37/2008 du 11/08/2008 portant exploitation des mines carrières, spécialement en son article 99 ; et des Pursuant to Organic Law n° 04/2005 of 08/04/2005 protection, determining conservation and promotion of environment in Rwanda, especially in Articles 9 and 67; the modalities of Vu la Loi Organique n° 04/2005 du 08/04/2005 portant modalités de protéger, sauvegarder et promouvoir au Rwanda, spécialement en ses articles 9 et 67; l‟environnement After consideration and approval by the Cabinet, in its session of 08/06/2010; Après examen et adoption par le Conseil des Ministres, en sa séance du 08/06/2010 ; ATEGETSE : HEREBY ORDERS: ARRETE : 54 Official Gazette n° 41 bis of 11/10/2010 UMUTWE WA MBERE: RUSANGE INGINGO CHAPTER ONE: GENERAL PROVISIONS CHAPITRE PREMIER: DISPOSITIONS GENERALES
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
MINISTERIAL ORDER N°004/Minifom/2010 OF 14/09/2010 DETERMINING THE MODALITIES OF ENVIRONMENT CONSERVATION IN MINING AND QUARRY EXTRACTION
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in