MINISTERIAL ORDER No 003/MoE/25 OF 19/08/2025 RELATING TO ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT
This Order sets the list of works, activities, and projects that need environmental and social impact assessment before they may be authorised, and it sets the procedures for carrying out that assessment.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Rwanda
- Instrument
- Order
- Citation
- 003/MOE/25 OF 19/08/2025
- Status
- Not in force
- Version
- Undated source snapshot
- Language
- mul
- Updated
- Official source
- View official record ↗
Statute overview
About this statute
This Order sets the list of works, activities, and projects that need environmental and social impact assessment before they may be authorised, and it sets the procedures for carrying out that assessment. This article defines key terms used in the Order, including the Authority, authorised organ, developer, environmental and social impact assessment, practitioner, practitioners firm, public hearing, selected practitioner, and stakeholder consultation. Article 3 says works, activities, and projects listed in Annex 1 need a full environmental and social impact assessment, those in Annex 2 need a partial assessment, and the Authority or authorised organ may require a full assessment for Annex 2 projects suspected of causing negative and irreversible impacts. Developers may not carry out Annex 1 or 2 works, activities, or projects without an environmental and social impact assessment approval certificate, and State organs may not issue approvals without proof of that certificate. Works, activities and projects not listed in Annex 1 or 2 are exempt from environmental and social impact assessment, unless the Authority or authorised organ requests one in the conditions described.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of MINISTERIAL ORDER No 003/MoE/25 OF 19/08/2025 RELATING TO ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT
Showing 16 of 16
- 1 Verify source ↗
Icyo iri teka rigamije
AI-assisted research summary: This Order sets the list of works, activities, and projects that need environmental and social impact assessment before they may be authorised, and it sets the procedures for carrying out that assessment.
Ingingo ya mbere: Icyo iri teka rigamije Article One: Purpose of this Order Article premier : Objet du présent arrêté Ingingo ya mbere: Icyo iri teka rigamije Article One: Purpose of this Order Article premier : Objet du présent arrêté Iri teka rishyiraho – This Order establishes – Le présent arrêté établit – (a) urutonde rw’imirimo, ibikorwa bikorerwa bidukikije y’abaturage mbere ibona uburenganzira bwo n’imishinga isuzumangaruka n’imibereho y’uko gushyirwa mu bikorwa; ku (a) the list of works, activities and projects subject to environmental and social impact assessment before they obtain authorisation for their implementation; and (a) la liste des travaux, des activités et des projets faisant l’objet d’une étude d’impact environnemental et social avant qu’ils obtiennent l’autorisation de leur mise en exécution ; et (b) n’uburyo isuzumangaruka n’imibereho y’abaturage. bwo ku gukora bidukikije (b) modalities to conduct an environmental and social impact assessment. (b) les modalités pour mener une étude d’impact environnemental et social. - 2 Verify source ↗
Isobanura
AI-assisted research summary: This article defines key terms used in the Order, including the Authority, authorised organ, developer, environmental and social impact assessment, practitioner, practitioners firm, public hearing, selected practitioner, and stakeholder consultation.
Ingingo ya 2: Isobanura Article 2: Interpretation Article 2 : Interprétation Ingingo ya 2: Isobanura Article 2: Interpretation Article 2 : Interprétation Muri iri teka: In this Order: Dans le présent arrêté : (a) « urwego rwabiherewe uburenganzira » bivuga urwego rwa Leta rwahawe uburenganzira n’Ikigo bwo kwemeza isuzumangaruka ku bidukikije n’imibereho y’abaturage; (a) “authorised organ” means a State organ authorised by the Authority to approve the environmental and social impact assessment; (a) « organe autorisé » signifie un organe de l’État autorisé par l’office pour approuver d’impact l’étude environnemental et social ; (b) « Ikigo » bivuga urwego rwa Leta rufite kubungabunga ibidukikije mu nshingano; (c) « nyir’umushinga » bivuga umuntu y’ubucuruzi isosiyete byatangije cyangwa byateguye cyangwa (b) “Authority” means the State organ in the conservation of charge of environment; (b) « Office » signifie l’organe de l’État de ayant l’environnement dans ses attributions ; conservation la (c) “developer” means a person or company that has proposed or has undertaken a work, activity or project; (c) « promoteur » signifie une personne ou une société commerciale qui a planifié ou entrepris un travail, une 5 Official Gazette n° Special of 20/08/2025 umurimo, umushinga; igikorwa cyangwa activité ou un projet ; ikorwa (d) « isuzumangaruka ku bidukikije n’imibereho y’abaturage » bivuga inyigo hagamijwe kugaragaza, guteganya no gusuzuma ingaruka zishoboka ku bidukikije zitewe n’imibereho cyangwa n’umurimo, umushinga no kugaragaza ingamba zo kugabanya ubukana bw’izo ngaruka, mbere y’ishyirwa mu bikorwa ry’umurimo, ry’igikorwa cyangwa ry’umushinga; y’abaturage igikorwa biteganyijwe, (e) « isuzumangaruka ku bidukikije no ku mibereho y’abaturage ryuzuye » bivuga inyigo ikubiyemo ibyiciro byose ku bidukikije n’imibereho y’abaturage; by’isuzumangaruka (f) « isuzumangaruka ku bidukikije n’imibereho y’abaturage rihinnye » bivuga inyigo y’isuzumangaruka ku bidukikije n’imibereho y’abaturage ibibazo igarukira ku kugaragaza byerekeranye n’ibidukikije n’imibereho y’abaturage n’ingamba zikwiye mu kugabanya ubukana bwabyo; (d) “environmental and social impact assessment” means a study conducted to identify, predict and assess the potential environmental and social impacts of a proposed work, activity or propose mitigation project, and measures of impacts before implementation of the work, activity or project; those (d) « étude d’impact environnemental et social » signifie une étude menée pour identifier, prévoir et évaluer les impacts environnementaux et sociaux potentiels du travail, de l’activité ou du projet proposé, et proposer les mesures d’atténuation de ces impacts avant la mise en œuvre du travail, d’une activité ou d’un projet ; (e) « étude d’impact environnemental et social complète » signifie une étude qui comprend toutes les étapes d’une étude d’impact environnemental et social ; (f) « étude d’impact environnemental et social partielle » signifie une étude d’impact environnemental et social limitée à l’identification des problèmes environnementaux et sociaux et les mesures d’atténuation appropriées ; (e) “full social environmental and impact assessment” means a study includes all stages of an which environmental and impact assessment; social assessment” means (f) “partial environmental and social an impact environmental and impact assessment limited to the identification of environmental and social issues and appropriate mitigation measures; social 6 (g) « umunyamwuga » bivuga umuntu wemerewe n’Urugaga rushinzwe ubunyamwuga mu bidukikije mu Rwanda gukora isuzumangaruka ku bidukikije n’imibereho y’abaturage; (h) « isosiyeti y’abanyamwuga » bivuga isosiyeti cyangwa urundi rwego rufite ubuzimagatozi byemerewe n’Urugaga rushinzwe ubunyamwuga mu bidukikije mu Rwanda gukora bidukikije isuzumangaruka n’imibereho y’abaturage; ku (i) « cyangwa kugirwaho igikorwa ikusanyabitekerezo » bivuga uburyo bwo gukusanya ibitekerezo inzego by’abaturage ingaruka bishobora cyangwa n’umurimo, umushinga mu buryo butaziguye hagamijwe buziguye cyangwa bwabo kurengera uburenganzira igikorwa mbere y’uko umurimo, cyangwa umushinga byemerwa; Official Gazette n° Special of 20/08/2025 (g) “practitioner” means a person authorised by the Rwanda Association of Environmental Practitioners to conduct environmental and social impact assessment; Professional (h) “practitioners firm” means a company or any other legal person licensed by the Rwanda Association of Professional Environmental Practitioners to conduct environmental and social impact assessment; (i) “public hearing” means the process of collecting ideas from people or organs likely to be affected directly or indirectly by the work, activity or project in order to protect their rights before the work, activity or project gets authorisation; (g) « praticien » signifie une personne autorisée par l’Ordre de la profession de praticiens en environnement au Rwanda à mener une étude d’impact environnemental et social ; (h) « cabinet de praticiens » signifie une entreprise ou autre personne morale agréée par l’Ordre de la profession de praticiens au Rwanda pour réaliser l’étude d’impact environnemental et social ; environnement en (i) « consultation publique » signifie le processus de collecter les avis de la population ou des organes susceptibles d’être ou indirectement par le travail, l’activité ou le projet afin de protéger leurs droits avant que le travail, l’activité ou le projet n’obtienne une autorisation ; directement affectées (j) « umunyamwuga watoranyijwe » cyangwa umunyamwuga bivuga isosiyeti y’abanyamwuga batoranyijwe na nyir’umushinga ku rw’abanyamwuga mu rutonde isuzumangaruka bidukikije n’imibereho y’abaturage, kugira ngo ku (j) “selected practitioner” means a firm practitioner or practitioners selected by the developer from the list of environmental and social assessment practitioners to assess the impact of their work, activity or project on the environment and social; 7 (j) «praticien signifie un choisi » praticien ou un cabinet de praticiens sélectionné par le promoteur sur la liste de des l’étude sociale pour environnementale et évaluer l’impact environnemental et social de son travail, de son activité ou praticiens Official Gazette n° Special of 20/08/2025 de son projet ; z’umurimo, ingaruka basuzume z’igikorwa cyangwa z’umushinga bye ku bidukikije n’imibereho y’abaturage; (k) « kugisha cyangwa inama abafatanyabikorwa » bivuga uburyo buhamye bwo gushyira ibigo bya Leta bireba cyangwa undi muntu ufite inyungu uruhare mu mushinga, mu itegurwa ryawo, mu ku ingaruka kugaragaza bidukikije n’imibereho y’abaturage, mu ngamba zo kugabanya ubukana bw’izo ngaruka no mu ifatwa ry’ibyemezo. zawo (k) “stakeholder consultation” means a systematic way of involving relevant public institutions or any other person having an interest or stake in a project, in project planning, development, identification of environmental and social risks and mitigation measures and decision-making process. des signifie une d’impliquer parties (k) « consultation voie prenantes » les systématique institutions publiques concernées ou autre personne ayant un intérêt ou une participation dans un projet, dans la au du planification développement, à l’identification des risques environnementaux et sociaux et aux mesures d’atténuation et au processus de prise de décision. projet, - 3 Verify source ↗
Urutonde rw’imirimo,
AI-assisted research summary: Article 3 says works, activities, and projects listed in Annex 1 need a full environmental and social impact assessment, those in Annex 2 need a partial assessment, and the Authority or authorised organ may require a full assessment for Annex 2 projects suspected of causing negative and irreversible impacts.
Ingingo ya 3: Urutonde rw’imirimo, bikorerwa n’imishinga ibikorwa isuzumangaruka bidukikije ku n’imibereho y’abaturage Article 3: List of works, activities and projects subject to environmental and social impact assessment Article 3 : Liste des travaux, des activités et des projets faisant l’objet d’une étude d’impact environnemental et social Ingingo ya 3: Urutonde rw’imirimo, bikorerwa n’imishinga ibikorwa isuzumangaruka bidukikije ku n’imibereho y’abaturage Article 3: List of works, activities and projects subject to environmental and social impact assessment Article 3 : Liste des travaux, des activités et des projets faisant l’objet d’une étude d’impact environnemental et social (1) Urutonde rw’imirimo, ibikorwa bikorerwa n’imishinga bidukikije isuzumangaruka n’imibereho y’abaturage ryuzuye mbere yo kubona uburenganzira bwo gushyirwa mu bikorwa ruri ku mugereka wa 1. ku (2) Urutonde rw’imirimo, n’imishinga ibikorwa bikorerwa (1) The list of works, activities and projects subject to full environmental and social impact assessment before being granted authorisation for their implementation is in Annex 1. (1) La liste des travaux, des activités et des projets faisant l’objet d’une étude d’impact environnemental et social complète avant d’obtenir l’autorisation de les mettre en œuvre est en annexe 1. (2) The list of works, activities and partial subject to projects (2) La liste des travaux, des activités et des projets faisant l’objet d’une étude 8 Official Gazette n° Special of 20/08/2025 social impact environmental and assessment before being granted authorisation for their implementation is in Annex 2. d’impact environnemental et social partielle avant d’obtenir l’autorisation de les mettre en œuvre est en annexe 2. (3) However, the Authority or authorised organ may request the developer to conduct a full environmental and social impact assessment for a project listed in Annex 2 whenever suspected to have a negative and irreversible impact on society and environment. une étude (3) Toutefois, l’Office ou l’organe autorisé peut demander au promoteur de réaliser d’impact environnemental et social complète pour un projet en annexe 2 lorsqu’il est soupçonné d’avoir des impacts négatifs et irréversibles sur la société et sur l’environnement. - 4 Verify source ↗
Ibibujijwe byerekeye
AI-assisted research summary: Developers may not carry out Annex 1 or 2 works, activities, or projects without an environmental and social impact assessment approval certificate, and State organs may not issue approvals without proof of that certificate.
Ingingo ya 4: Ibibujijwe byerekeye imirimo, ibikorwa n’imishinga biri ku rutonde Article 4: Restrictions on works, activities and projects included on the list Article 4 : Restrictions sur les travaux, activités et projets figurant sur la liste Ingingo Imirimo, n’imishinga bitari ku rutonde ya 5: ibikorwa Article 4: Restrictions on works, activities and projects included on the list Article 4 : Restrictions sur les travaux, activités et projets figurant sur la liste (1) A developer cannot implement a work, activity or project provided for in Annex 1 and 2 without a certificate of approval of environmental and social impact assessment the authorised organ. issued by (1) Le promoteur ne peut pas mettre en œuvre un travail, une activité ou un projet prévu à l’annexe 1 et 2 sans certificat d’approbation de l’étude d’impact environnemental et social délivré par l’organe autorisé. ku bidukikije isuzumangaruka n’imibereho y’abaturage rihinnye mbere yo kubona uburenganzira bwo gushyirwa mu bikorwa ruri ku mugereka wa 2. (3) Icyakora, Ikigo cyangwa urwego uburenganzira rwabiherewe bishobora gusaba nyir’umushinga gukora isuzumangaruka ku bidukikije n’imibereho y’abaturage ryuzuye ku mushinga uri ku rutonde ku mugereka wa 2 igihe cyose haketswe ko uwo mushinga ufite ingaruka mbi ku bidukikije n’imibereho y’abaturage kandi zidashobora gukosorwa. Ingingo ya 4: Ibibujijwe byerekeye imirimo, ibikorwa n’imishinga biri ku rutonde (1) Nyir’umushinga ntashobora gushyira igikorwa mu bikorwa umurimo, cyangwa umushinga uteganyijwe ku mugereka wa 1 n’uwa 2 adafite yakoze icyemezo isuzumangaruka bidukikije n’imibereho y’abaturage gitangwa n’urwego rwabiherewe uburenganzira. gihamya ku ko (2) Urwego rwa Leta ntirwemerewe (2) A State organ is not allowed to issue a (2) Un organe de l’État n’est pas autorisé 9 icyemezo uruhushya, gutanga cyangwa umurimo, kwemerera igikorwa cyangwa umushinga biri ku mugereka wa 1 n’uwa 2 hatabanje kugaragazwa icyemezo gihamya ko nyir’umushinga yakoze isuzumangaruka bidukikije n’imibereho y’abaturage. ku Official Gazette n° Special of 20/08/2025 license, permit or other approval for a work, activity or project in Annex 1 and 2 without proof of a certificate of approval of environmental and social impact assessment. de délivrer une licence, un permis ou une autre approbation pour un travail, une activité ou un projet en annexe 1 et la preuve d’un certificat 2 sans l’étude d’impact d’approbation de environnemental et social. Ingingo Imirimo, n’imishinga bitari ku rutonde ya 5: ibikorwa - 5 Verify source ↗
Works, activities and projects not
AI-assisted research summary: Works, activities and projects not listed in Annex 1 or 2 are exempt from environmental and social impact assessment, unless the Authority or authorised organ requests one in the conditions described.
Article 5: Works, activities and projects not included on the list Article 5 : Travaux, activités et projets ne figurant pas sur la liste Article 5: Works, activities and projects not included on the list Article 5 : Travaux, activités et projets ne figurant pas sur la liste (1) Imirimo, ibikorwa n’imishinga bitari ku rutonde ruri ku mugereka wa 1 ntibikorerwa n’uwa 2 bidukikije isuzumangaruka n’imibereho y’abaturage. ku (1) Works, activities and projects not listed in Annex 1 and 2 are not subject to the environmental and impact assessment. social (1) Les travaux, les activités et les projets ne figurant pas à l’annexe 1 et 2 ne font pas l’étude d’impact environnemental et social. l’objet de y’abaturage (2) Iyo bigaragaye ko umurimo, igikorwa cyangwa umushinga bitari ku rutonde ruri ku mugereka wa 1 cyangwa uwa 2 bifite ingaruka mbi ku bidukikije kandi n’imibereho zidashobora gukosorwa kandi bikaba bifite nk’iy’umurimo, iy’igikorwa cyangwa iy’umushinga biri ku mugereka wa 1 cyangwa uwa 2, urwego Ikigo rwabiherewe uburenganzira bishobora gusaba nyir’umushinga gukora isuzumangaruka ku bidukikije n’imibereho y’abaturage. imiterere cyangwa (2) If it is evident that a work, activity or project not listed in Annex 1 or 2 has a negative and irreversible environment and social impact and it is similar in nature to the work, activity or project listed in Annex 1 or 2, the Authority or authorised organ may request the developer to conduct an environmental and social impact assessment. (2) Lorsqu’il est évident qu’un travail, une activité ou un projet ne figurant pas à l’annexe 1 ou 2 a un impact environnemental et social négatif et irréversible et est de même nature que le travail, l’activité ou le projet figurant à l’annexe 1 ou 2, l’Office ou l’organe autorisé peut demander au promoteur étude d’impact de mener une l’environnemental et social. 10 Official Gazette n° Special of 20/08/2025 - 6 Verify source ↗
Ibisabwa by’ibanze mu
AI-assisted research summary: Full environmental and social impact assessments must be done by an authorized practitioner firm; partial assessments may be done by a practitioner or a firm.
Ingingo ya 6 : Ibisabwa by’ibanze mu gukora isuzumangaruka ku bidukikije n’imibereho y’abaturage Article 6: Minimum requirements to conduct an environmental and social impact assessment Article 6 : Exigences minimales pour mener une étude d’impact environnemental et social Ingingo ya 6 : Ibisabwa by’ibanze mu gukora isuzumangaruka ku bidukikije n’imibereho y’abaturage to Article 6: Minimum requirements conduct an environmental and social impact assessment Article 6 : Exigences minimales pour mener une étude d’impact environnemental et social (1) Isuzumangaruka ku bidukikije n’imibereho y’abaturage ryuzuye rikorwa n’isosiyete y’abanyamwuga rushinzwe yemerewe n’Urugaga ubunyamwuga mu bidukikije mu Rwanda. Icyakora, isuzumangaruka n’imibereho ku rishobora rihinnye y’abaturage gukorwa n’umunyamwuga cyangwa isosiyeti y’abanyamwuga. bidukikije (2) Isosiyete y’abanyamwuga iteganyijwe mu gika cya (1) igomba kuba ifite impuguke mu gusuzuma ingaruka ku bidukikije n’imibereho y’abaturage zikenewe zo gukora isuzumangaruka bidukikije n’imibereho y’abaturage. ku is conducted by (1) A full environmental and social impact assessment a practitioner firm authorized by the Rwanda Association of Professional Environmental Practitioners. However, a partial environmental and social impact assessment may be conducted either by a practitioner or by a firm of practitioners. des (1) L’étude d’impact environnemental et social complète est menée par un cabinet de praticiens autorisé par en l’ordre environnement. Toutefois, une étude d’impact environnemental et social partielle peut être menée soit par un praticien, soit par un cabinet de praticiens. praticiens (2) The practitioners firm provided for in (1) must have both Paragraph environmental and social experts required to conduct environmental and social impact assessment. (2) Le cabinet de praticiens prévu au paragraphe (1) doit disposer des experts environnementaux et sociaux requis pour mener une étude d’impact environnemental et social. - 7 Verify source ↗
Uburyo bwo gusaba
AI-assisted research summary: For listed projects needing an environmental and social impact assessment, the developer must choose a practitioner, and the practitioner must have no direct or indirect interest in the project.
Ingingo ya 7: Uburyo bwo gusaba uruhushya rwo gukora isuzumangaruka ku bidukikije n’imibereho y’abaturage Article 7: Modalities for application for authorisation to conduct the environmental and social impact assessment Article 7 : Modalités de demande d’autorisation pour mener une étude d’impact environnemental et social 2 ya Ingingo ry’isuzumangaruka n’imibereho y’abaturage 8: ku Official Gazette n° Special of 20/08/2025 Ishingiro bidukikije Ingingo ya 7: Uburyo bwo gusaba uruhushya rwo gukora isuzumangaruka ku bidukikije n’imibereho y’abaturage Article 7: Modalities for application for authorisation to conduct the environmental and social impact assessment Article 7 : Modalités de demande d’autorisation pour mener une étude d’impact environnemental et social (1) Nyir’umushinga uri ku rutonde ikorerwa rw’imishinga bidukikije isuzumangaruka n’imibereho y’abaturage, ahitamo isosiyete umunyamwuga cyangwa ku (1) A developer whose project is on the list of projects that require environmental and social impact assessment, selects a practitioner or practitioners firm to conduct the study. (1) Le promoteur dont le projet figure sur la liste des projets nécessitant une étude d’impact environnemental et social, choisit un praticien ou un cabinet de praticiens pour mener l’étude. 11 Official Gazette n° Special of 20/08/2025 y’abanyamwuga kugira ngo bakore inyigo. (2) Umunyamwuga kuba watoranyijwe inyungu agomba itaziguye cyangwa iziguye muri uwo mushinga. adafite izina (3) Mu gihe hakorwa isuzumangaruka ku bidukikije n’imibereho y’abaturage umunyamwuga ryuzuye, rya watoranyijwe, mu nyir’umushinga, ashyikiriza urwego rwabiherewe uburenganzira ubusabe bwo gukora isuzumangaruka ku bidukikije n’imibereho y’abaturage iy’umurimo, iy’igikorwa cyangwa iy’umushinga biteganyijwe mu buryo bw’incamake hamwe n’inyandiko nsobanuramiterere yifuza kwifashisha kugira ngo bisuzumwe kandi byemezwe. (4) Mu gihe hakorwa isuzumangaruka ku bidukikije n’imibereho y’abaturage rihinnye, umunyamwuga watoranyijwe ashyikiriza urwego uburenganzira rwabiherewe incamake y’umurimo, iy’igikorwa cyangwa iy’umushinga na raporo ya gahunda kubungabunga ibidukikije n’imibereho y’abaturage yo (2) The selected practitioner must not have a direct or indirect interest in that project. (2) Le praticien choisi ne doit avoir un intérêt direct ou indirect dans ce projet. the assessment, (3) In case of full environmental and social impact selected practitioner, on behalf of the developer, submits to the authorized organ an application for environmental and social impact assessment of a proposed work, activity or project in brief terms of together with proposed reference for review and approval. (3) Dans le cas d’une étude d’impact environnemental et social complète, le praticien choisi, au nom du promoteur, l’organe autorisé une soumet à demande d’impact d’étude environnemental et social du travail, de l’activité ou du projet proposé en bref avec un projet des termes de référence pour examen et approbation. (4) In case of partial environmental and social impact assessment, the selected practitioner submits to the authorized organ a work, activity or project brief together with an environmental and social management plan report for review and approval. (4) Dans le cas d’une étude d’impact environnemental et social partielle, le praticien choisi soumet à l’organe autorisé le descriptif du travail, de l’activité ou du projet et le rapport du plan de gestion environnemental et social pour examen et approbation. 12 ngo kugira byemezwe. bisuzumwe kandi (5) Urwego rwabiherewe uburengenzira, nyuma yo gusura ahazakorerwa cyangwa umurimo, igikorwa umushinga uteganyijwe, rwemeza cyangwa rugasaba guhuza n’igihe nsobanuramiterere inyandiko watoranyijwe umunyamwuga azifashisha gukora bidukikije isuzumangaruka n’imibereho y’abaturage mu gihe kitarenze iminsi 14 ibarwa uhereye incamake ku munsi rwakiriyeho cyangwa y’umurimo, y’igikorwa n’inyandiko y’umushinga nsobanuramiterere yifuza kwifashisha. mu ku (6) Bitewe n’uko umurimo, igikorwa cyangwa umushinga biteye, urwego uburengenzira rwabiherewe rushobora gusaba umunyamwuga n’izindi watoranyijwe mpuguke n’ingaga zemejwe z’abanyamwuga bireba. gukorana Official Gazette n° Special of 20/08/2025 (5) The authorized organ, after visiting the proposed work, activity or project site, approves or requests for an update of terms of reference for conducting the impact environmental and assessment within 14 days from the date of receipt of the work, activity or project brief and proposed terms of reference. social (5) L’organe autorisé, après avoir visité le site du travail, de l’activité ou du projet, approuve ou demande la mise à jour des termes de référence pour mener l’étude d’impact environnemental et social endéans 14 jours à compter du jour de réception d’un descriptif du travail, de l’activité ou du projet et des termes de référence proposés. (6) Depending on the nature of the proposed work, activity or project, the the authorized organ may require to hire other selected practitioner experts relevant by professional associations. licensed (6) Selon la nature du travail, de l’activité ou du projet proposé, l’organe autorisé choisi exiger au praticien peut d’engager d’autres experts agréés par les professionnelles concernées. associations 13 ya Ingingo ry’isuzumangaruka n’imibereho y’abaturage 8: ku Official Gazette n° Special of 20/08/2025 Ishingiro bidukikije - 8 Verify source ↗
Basis of Environmental and social
AI-assisted research summary: An environmental and social impact assessment must be based on the approved brief and terms of reference, and relevant stakeholders’ views must be considered.
Article 8: Basis of Environmental and social impact assessment Article 8 : Base d’une étude d’impact environnemental et social Article 8: Basis of Environmental and social impact assessment Article 8 : Base d’une étude d’impact environnemental et social (1) Gukora isuzumangaruka ku bidukikije n’imibereho y’abaturage bishingira ku ncamake y’umurimo, iy’igikorwa cyangwa iy’umushinga nsobanuramiterere n’inyandiko byemejwe n’urwego rwabiherewe uburenganzira. (1) The environmental and social impact assessment is carried out on basis of the work, activity or project brief and terms of reference approved by the authorized organ. (1) L’étude d’impact environnemental et social est réalisée sur base du descriptif du travail, de l’activité ou du projet et les termes de référence approuvés par l’organe autorisé. (2) Isuzumangaruka ku n’imibereho y’abaturage hitawe ku by’abafatanyabikorwa bose bireba. bidukikije rikorwa bitekerezo (2) The environmental and social impact assessment due consideration of the opinion of all the relevant stakeholders. done with is (2) L’étude d’impact environnemental et social est menée en tenant compte de l’avis de toutes les parties prenantes concernées. - 9 Verify source ↗
Inshingano z'umunyamwuga
AI-assisted research summary: The selected practitioner must involve the developer, assess the developer’s capacity to meet plan obligations, consider environmental and social factors, and consult relevant stakeholders when doing the assessment.
Ingingo ya 9: Inshingano z'umunyamwuga watoranyijwe Article 9: Duties of the selected practitioner Article 9 : Attributions du praticien choisi ya Ingingo y’isuzumangaruka n’imibereho y’abaturage 10: Gutegura ku raporo bidukikije ya Ingingo y’isuzumangaruka n’imibereho y’abaturage 11: Gutanga ku raporo bidukikije 10: the Article environmental and social impact assessment report Preparation of Ingingo ya 9: Inshingano z'umunyamwuga watoranyijwe Article 9: Duties of the selected practitioner Article 9 : Attributions du praticien choisi (1) Umunyamwuga watoranyijwe akorana na nyir’umushinga ku by’imigendekere byiciro y’isuzumangaruka bidukikije ku n’imibereho y’abaturage. byose (1) The selected practitioner involves the the impact developer in all environmental and assessment process. stages of social (1) Le praticien choisi le promoteur dans toutes les étapes du d’impact d’étude processus environnemental et social. implique (2) Umunyamwuga watoranyijwe afite kandi inshingano yo gusesengura ubushobozi bwa nyir’umushinga bwo kuzuza inshingano ze zo gushyira mu bikorwa gahunda yo kubungabunga ibidukikije n’imibereho y’abaturage. (2) The selected practitioner has also a duty to appraise the capacity of the developer to fulfil their obligations in the the environmental and social management plan. implementation of (2) Le praticien choisi a également le devoir d’évaluer la capacité du promoteur de remplir ses obligations dans la mise en œuvre du plan de gestion environnementale et sociale. 14 (3) Umunyamwuga watoranyijwe yita ku bidukikije biva ku bikorwa bya muntu kamere n’ibidukikije n’ibijyanye n’imibereho y’abaturage mu gihe akora isuzumangaruka ku bidukikije n’imibereho y’abaturage. ku y’abaturage (4) Umunyamwuga watoranyijwe ukora bidukikije agisha abafatanyabikorwa bireba biteganywa akita ku nsobanuramiterere rwabiherewe isuzumangaruka n’imibereho inama kandi n’inyandiko yemejwe n’urwego uburenganzira. Official Gazette n° Special of 20/08/2025 (3) The selected practitioner considers the built and natural environment and conducting social environmental and impact assessment. aspects while social (4) A selected practitioner who undertakes the environmental and social impact assessment carries out consultations with and considers the approaches provided in the terms of reference approved by the authorized organ. stakeholders relevant ya Ingingo y’isuzumangaruka n’imibereho y’abaturage 10: Gutegura ku raporo bidukikije 10: Article the environmental and social impact assessment report Preparation of (3) Le praticien choisi tient compte de l’environnement bâti et naturel et des aspects sociaux pendant qu’il mène l’étude d’impact environnemental et social. (4) Le praticien choisi qui entreprend l’étude d’impact environnemental et social mène des consultations avec les parties prenantes concernées et prend en compte les approches prévues dans les termes de référence approuvés par l’organe autorisé. - 10 Verify source ↗
Préparation du rapport d’étude
AI-assisted research summary: The environmental and social impact assessment report must be prepared using the work, activity, or project brief and the approved terms of reference.
Article 10 : Préparation du rapport d’étude d’impact environnemental et social Article 10 : Préparation du rapport d’étude d’impact environnemental et social bidukikije (1) Gutegura raporo y’isuzumangaruka ku n’imibereho y’abaturage bishingira ku ncamake iy’igikorwa cyangwa y’umurimo, n’inyandiko iy’umushinga byemejwe nsobanuramiterere rwabiherewe n’urwego uburenganzira. (1) Preparation of the environmental and social impact assessment report is based on the work, activity or project brief and terms of reference approved by the authorized organ. (1) La préparation du rapport d’étude d’impact environnemental et social est basée sur le descriptif du travail, de l’activité ou du projet et les termes de référence approuvés par l’organe autorisé. (2) Imiterere raporo y’isuzumangaruka bidukikje n’imibereho y’abaturage ryuzuye iri ku ya (2) The structure of full environmental and social impact assessment report is in Annex 3. (2) La structure du rapport de l’étude d’impact environnemental et social complète est en annexe 3. 15 Official Gazette n° Special of 20/08/2025 ku mugereka wa 3. (3) Imiterere ya raporo y’isuzumangaruka bidukikje n’imibereho y’abaturage rihinnye iri ku mugereka wa 4. ku ya Ingingo y’isuzumangaruka n’imibereho y’abaturage 11: Gutanga ku raporo bidukikije (1) Iyo isuzumangaruka ku bidukikije n’imibereho y’abaturage rirangiye, watoranyijwe umunyamwuga ashyikiriza urwego rwabiherewe raporo mu buryo uburenganzira bw’ikoranabuhanga, muri Word na PDF kugira ngo isuzumwe kandi yemezwe. (2) Iyo umunyamwuga watoranyijwe abona ari ngombwa, mbere y’uko urwego rwabiherewe uburenganzira rufata icyemezo kuri raporo yatanze, watoranyijwe umunyamwuga ashobora gutanga inyongera kuri ku raporo bidukikije n’imibereho y’abaturage ku byari bidateganyijwe mu nyandiko nsobanuramiterere. y’isuzumangaruka (3) The structure of partial environmental and social impact assessment report is in Annex 4. (3) La structure du rapport de l’étude d’impact environnemental et social partielle est en annexe 4. - 11 Verify source ↗
Submission of environmental
AI-assisted research summary: A selected practitioner must submit the environmental and social impact assessment report to the authorized organ in Word and PDF after the assessment is completed.
Article 11: Submission of environmental and social impact assessment report Article 11 : Soumission du rapport de l’étude d’impact environnemental et social Article 11: Submission of environmental and social impact assessment report Article 11 : Soumission du rapport de l’étude d’impact environnemental et social (1) If the environmental and social impact assessment is completed, a selected practitioner submits a report to the authorized organ by electronic means in Word and PDF for review and approval. (1) Lorsque d’impact l’étude environnemental et social est terminée, le praticien choisi soumet à l’organe autorisé voie rapport électronique dans Word et PDF pour examen et approbation. par le (2) If the selected practitioner considers it necessary, before the authorized organ decides on the submitted report, the selected practitioner may provide an addendum to the environmental and social impact assessment report for the facts that were not initially covered within the terms of reference. (2) Lorsque le praticien choisi le juge nécessaire, avant que l'organe autorisé ne se prononce sur le rapport soumis, le fournir un praticien choisi peut addendum au l’étude d’impact environnemental et social pour les faits qui n’étaient pas couverts dans les termes de référence. rapport de 16 Official Gazette n° Special of 20/08/2025 - 12 Verify source ↗
Gusuzuma no Kumenyesha
AI-assisted research summary: The authorized organ must review the environmental and social impact assessment report and notify its decision in writing, or request more information, within 20 working days after receiving the report.
Ingingo ya 12: Gusuzuma no Kumenyesha icyemezo kuri raporo y’isuzumangaruka ku bidukikije n’imibereho y’abaturage Article 12: Review and notification of the decision on environmental and social impact assessment report Article 12 : Analyse et notification de la décision sur le rapport de l’étude d’impact environnemental et social Ingingo ya 12: Gusuzuma no Kumenyesha icyemezo kuri raporo y’isuzumangaruka ku bidukikije n’imibereho y’abaturage Article 12: Review and notification of the decision on environmental and social impact assessment report Article 12 : Analyse et notification de la décision sur le rapport de l’étude d’impact environnemental et social (1) Nyuma yo kwakira ku raporo y’isuzumangaruka bidukikije n’imibereho y’abaturage, urwego uburenganzira rwabiherewe rurayisuzuma hagamijwe kureba niba ihuye y’umurimo, y’igikorwa cyangwa y’umushinga n’inyandiko nsobanuramiterere. n’incamake (1) Upon receiving the environmental and social impact assessment report, the authorized organ reviews the report to make sure it complies with the work, activity or project brief and terms of reference. (1) Après réception du rapport de l’étude d’impact environnemental et social, l’organe autorisé analyse le rapport afin de s’assurer de sa conformité avec le descriptif du travail, de l’activité ou du projet et les termes de référence. (2) Urwego rwabiherewe uburenganzira rumenyesha mu nyandiko icyemezo raporo n’imibereho cyarwo kuri y’abaturage rugasaba cyangwa umunyamwuga watoranyijwe amakuru y’inyongera, mu gihe kitarenze iminsi 20 y’akazi ibarwa uhereye ku munsi rwakiriyeho raporo y’isuzumangaruka bidukikije n’imibereho y’abaturage. ku (2) The authorized organ notifies social its decision on in writing of the impact environmental and assessment report or requests for the additional information 20 selected working days from the date of the receipt of environmental and social impact assessment report. from practitioner, within (2) L’organe autorisé notifie par écrit sa décision sur le rapport de l’étude d’impact environnemental ou demande informations additionnelles au des praticien choisi, endéans 20 jours ouvrables à partir du jour de la réception du l’étude d’impact environnemental et social. rapport de (3) Bitewe n’imiterere y’umurimo, y’igikorwa cyangwa y’umushinga, igihe giteganywa mu gika cya (2) gishobora kongerwa nyuma yo kubimenyesha nyandiko umunyamwuga watoranyijwe na nyir’umushinga mbere y’uko icyo gihe kirangira. mu (3) Depending on the nature of the work, activity or project, the period provided for in Paragraph (2) may be increased after informing, in writing, the selected practitioner and developer before the expiration of that period. 17 (3) Selon la nature du travail, de l’activité ou du projet, le délai prévu au paragraphe (2) peut être prolongé après avoir informé, par écrit, le praticien choisi avant l’expiration de ce délai. promoteur le et - 13 Verify source ↗
Ikusanyabitekerezo
AI-assisted research summary: If needed, the authorized organ must hold a public hearing before approving the environmental and social impact assessment report.
Ingingo ya 13: Ikusanyabitekerezo Article 13: Public hearing Article 13 : Consultation publique Ingingo ya 13: Ikusanyabitekerezo Article 13: Public hearing Article 13 : Consultation publique Official Gazette n° Special of 20/08/2025 (1) Iyo mbere bibaye ngombwa, urwego rwabiherewe uburenganzira rukora yo ikusanyabitekerezo kwemeza raporo y’isuzumangaruka ku n’imibereho y’abaturage hagamijwe gukusanya ibitekerezo by’abaturage ku ngaruka z’umurimo, cyangwa z’umushinga biteganyijwe. z’igikorwa bidukikije (1) If it is necessary, the authorized organ conducts a public hearing before approval of the environmental and social impact assessment report in order to collect views of the public on impact of the proposed work, activity or project. (1) Lorsqu’il est nécessaire, l’organe une consultation autorisé mène l’approbation du avant publique rapport d’impact de environnemental et social afin de recueillir les avis du public sur l’impact du travail, de l’activité ou du projet proposé. l’étude (2) Urwego rwabiherewe uburenganzira rukora ikusanyabitekerezo hafi y’aho umurimo, cyangwa igikorwa biteganyijwe umushinga bizakorerwa. Urwego rwabiherewe uburenganzira rutumira abaturage mu ikusanyabitekerezo ku bufatanye n’ubuyobozi bw’inzego z’ibanze. (3) Ubutumire bw’ikusanyabitekerezo bwerekana isaha intego, umunsi, rizabera kandi abaturage n’aho batumizwa iminsi icumi mbere y’uko ikusanyabitekerezo riba hakoreshejwe bumwe mu buryo bukurikira: (2) The authorized organ conducts the public hearing at the vicinity of the proposed work, activity or project site. The authorized organ invites the public in public hearing in collaboration with local administrative authorities. (2) L’organe autorisé mène la consultation publique à proximité du lieu du travail, de l’activité ou du projet proposé. L’organe autorisé invite le public à la consultation publique en collaboration avec les autorités administratives locales. (3) The invitation to a public hearing indicates the purpose, date, time, and venue where the public hearing will take place and the public is convened within ten days before its occurrence by using one of the following means: (3) L’invitation à la consultation publique indique l’objet, le jour, l’heure et le lieu de la consultation publique et le public est convoqué dans dix jours qui précèdent sa tenue en utilisant l’un des moyens suivants : imwe, mu (a) ibinyamakuru byo mu Gihugu, rurimi cyangwa mu rwemewe mu inshuro rw’Ikinyarwanda rundi butegetsi; rurimi (a) local newspapers, in Ikinyarwanda or any other official language; once, (a) les journaux locaux, une fois, en Ikinyarwanda ou dans une autre langue officielle ; 18 (b) gutanga amatangazo kuri radiyo enye mu minsi inshuro itandukanye, rurimi rw’Ikinyarwanda cyangwa mu rwemewe mu rundi butegetsi. rurimi mu Official Gazette n° Special of 20/08/2025 (b) running announcements four times on radio station in different days, in Ikinyarwanda or any other official language. (b) les annonces diffusées à la radio quatre fois dans les jours différents, en Ikinyarwanda ou dans une autre langue officielle. - 14 Verify source ↗
Ingingo y’ururimi
AI-assisted research summary: This provision says the Order was drafted in English.
Ingingo ya 14: Ingingo y’ururimi Article 14: Language provision Article 14 : Disposition linguistique Ingingo ya 14: Ingingo y’ururimi Article 14: Language provision Article 14 : Disposition linguistique Iri teka rw’Icyongereza. ryateguwe mu rurimi This Order was drafted in English. Le présent arrêté a été rédigé en anglais. - 15 Verify source ↗
Ingingo ivanaho
AI-assisted research summary: This article repeals Ministerial Order No. 001/2019 of 15/04/2019.
Ingingo ya 15: Ingingo ivanaho Article 15: Repealing provision Article 15 : Disposition abrogatoire Ingingo ya 15: Ingingo ivanaho Article 15: Repealing provision Article 15 : Disposition abrogatoire Iteka rya Minisitiri no 001/2019 ryo ku wa urutonde rishyiraho 15/04/2019 rw’imishinga gukorerwa igomba isuzumangaruka ku bidukikije, amabwiriza, gukora ibisabwa isuzumangaruka ku bidukikije rivanyweho. n’uburyo bwo Ministerial Order no 001/2019 of 15/04/2019 establishing the list of projects that must undergo environmental impact assessment, instructions, requirements and procedures to conduct environmental impact assessment is repealed. no 001/2019 L’Arrêté Ministériel du 15/04/2019 établissant la liste des projets devant faire l’objet d’une étude d’impact environnemental, instructions, conditions et l’étude d’impact procédures pour mener environnemental est abrogé. - 16 Verify source ↗
Gutangira gukurikizwa
AI-assisted research summary: This Order starts on the date it is published in the Official Gazette of the Republic of Rwanda.
Ingingo ya 16: Gutangira gukurikizwa Article 16: Entry into force Article 16 : Entrée en vigueur 3 Official Gazette n° Special of 20/08/2025 ITEKA RYA MINISITIRI No 003/MoE/25 RYO KU WA 19/08/2025 RYEREKEYE ISUZUMANGARUKA KU BIDUKIKIJE N’IMIBEREHO Y’ABATURAGE MINISTERIAL ORDER No 003/MoE/25 OF TO ENVIRONMENTAL SOCIAL IMPACT ASSESSMENT RELATING 19/08/2025 AND ARRÊTÉ MINISTÉRIEL No 003/MoE/25 DU 19/08/2025 RELATIF À L’ÉTUDE D’IMPACT ENVIRONNEMENTAL ET SOCIAL Minisitiri w’Ibidukikije; The Minister of Environment; Le Ministre de l’Environnement ; Ashingiye Repubulika y’u Rwanda; ku Itegeko Nshinga rya Pursuant to the Constitution of the Republic of Rwanda; Vu la Constitution de la République du Rwanda ; Ashingiye ku Itegeko n° 48/2018 ryo ku wa 13/08/2018 rigenga ibidukikije, cyane cyane mu ngingo yaryo ya 30; Pursuant to Law n° 48/2018 of 13/08/2018 on environment, especially in Article 30; Vu la Loi n° 48/2018 du 13/08/2018 sur l’environnement, spécialement en son article 30 ; Asubiye ku Iteka rya Minisitiri no 001/2019 ryo ku wa 15/04/2019 rishyiraho urutonde rw’imishinga gukorerwa isuzumangaruka ku bidukikije, amabwiriza, ibisabwa gukora isuzumangaruka ku bidukikije; n’uburyo igomba bwo Inama y’Abaminisitiri yateranye ku wa 26/03/2025 no kubyemeza; kubisuzuma imaze reviewed Ministerial Order n° Having 001/2019 of 15/04/2019 establishing the list of projects that must undergo environmental impact assessment, instructions, requirements and procedures to conduct environmental impact assessment; Revu l’Arrêté Ministériel no 001/2019 du 15/04/2019 établissant la liste des projets devant faire l’objet d’une étude d’impact environnemental, instructions, conditions et procédures pour mener l’étude d’impact environnemental ; After consideration and approval by the Cabinet, in its meeting of 26/03/2025; Après examen et adoption par le Conseil des Ministres, en sa séance du 26/03/2025 ; ATEGETSE: ORDERS: ARRÊTE : 4 Official Gazette n° Special of 20/08/2025 Ingingo ya 16: Gutangira gukurikizwa Article 16: Entry into force Article 16 : Entrée en vigueur Iri teka ritangira gukurikizwa ku munsi ritangarijweho mu Igazeti ya Leta ya Repubulika y’u Rwanda. This Order comes into force on the date of its publication in the Official Gazette of the Republic of Rwanda. Le présent arrêté entre en vigueur le jour de sa publication au la République du Rwanda. Journal Officiel de 19 Official Gazette n° Special of 20/08/2025 Kigali, 19/08/2025 (sé) Dr ARAKWIYE Bernadette Minisitiri w’Ibidukikije Minister of Environment Ministre de l’Environnement Bibonywe kandi bishyizweho Ikirango cya Repubulika: Seen and sealed with the Seal of the Republic: Vu et scellé du Sceau de la République : (sé) Dr UGIRASHEBUJA Emmanuel Minisitiri w’Ubutabera akaba n’Intumwa Nkuru ya Leta Minister of Justice and Attorney General Ministre de la Justice et Garde des Sceaux 20 UMUGEREKA WA 1 W’ITEKA RYA MINISITIRI No 003/MoE/25 RYO KU WA 19/08/2025 RYEREKEYE ISUZUMANGARUKA KU BIDUKIKIJE N’IMIBEREHO Y’ABATURAGE RW’IMIRIMO, URUTONDE IBIKORWA N’IMISHINGA BIKORERWA ISUZUMANGARUKA KU BIDUKIKIJE N’IMIBEREHO Y’ABATURAGE RYUZUYE Official Gazette n° Special of 20/08/2025 ANNEX 1 TO MINISTERIAL ORDER No 003/MoE/25 OF 19/08/2025 RELATING TO ENVIRONMENTAL SOCIAL IMPACT ASSESSMENT AND ANNEXE 1 À L’ARRÊTÉ MINISTÉRIEL No 003/MoE/25 DU 19/08/2025 RELATIF À L’ÉTUDE D’IMPACT ENVIRONNEMENTAL ET SOCIAL LIST OF WORKS, ACTIVITIES AND FULL PROJECTS SUBJECT ENVIRONMENTAL SOCIAL IMPACT ASSESSMENT AND TO LISTE DES TRAVAUX, DES ACTIVITÉS ET DES PROJETS FAISANT L’OBJET D’IMPACT D’UNE ENVIRONNEMENTAL ET SOCIAL COMPLÈTE ÉTUDE (a) Inyubako biro, zigenewe guturwamo, iz’ubucuruzi, izikorerwamo imirimo yo mu iz’imyidagaduro, iz’ibikorwa by’ubusabane, iz’umuco, insengero, amashuri cyangwa izindi zihurirwamo nyubako n’abantu benshi zujuje kimwe muri ibi bikurikira: rusange (a) Buildings classified as administrative residential, or commercial, institutional, sports facilities, social, cultural, and assembly and religious buildings, educational buildings, or facilities other publicly accessible fulfilling at least one of the following: (a) Les ou classés bâtiments comme commerciaux, résidentiels, institutionnels, administratifs sportifs, les bâtiments à caractère social, culturel, de rassemblement ou pour religieux, l’enseignement ou pour d’autres installations accessibles au public et remplissant au moins l’un de ce qui suit: bâtiments les (i) zifite ubushobozi bwo kwakira (i) having capacity to host more than (i) avoir une capacité d’accueil de plus abantu barenze 500; 500 persons; de 500 personnes ; (ii) ziri ku buso burenga m2 1.500; (ii) having a total floor area exceeding (ii) avoir une surface de plancher totale 1,500 m2; supérieure à 1.500 m2 ; (iii)inyubako zo guturamo zigeretse (iii)residential building of G+4 and (iii)les bâtiments résidentiels de G+4 et kane kuzamura; above; plus ; 21 Official Gazette n° Special of 20/08/2025 (iv) inyubako zitari izo guturamo (iv) non-residential buildings of G+3 (iv) les bâtiments non résidentiels de zigeretse gatatu kuzamura. and above. G+3 et plus ; (b) inganda; (b) industries; (b) les industries ; (c) ibigo by’ubuvuzi; (c) health facilities; (c) les établissements de santé ; (d) inyubako zikorerwamo imirimo (d) buildings with activities which can yateza impanuka; cause hazards; (d) les bâtiments où s’exercent des activités pouvant causer des accidents ; (e) inyubako ibikoresho n’ibyangirika; zigenewe byateza kubikwamo impanuka (e) warehouses for storage of hazardous materials and perishables; (f) inyubako zigenewe kubikwamo ibikomoka ku buhinzi byangirika ziri ku buso bungana cyangwa burenze kimwe cya kabiri cya hegitari; (f) warehouses and storage facilities of perishable agricultural commodities occupying an area of a half of a hectare and above; (g) aho abantu bashyirwa mu rwego rwo kugororwa cyangwa kubera ikibazo cyo mu mutwe; (g) places where persons are detained for corrective reasons or because of their mental condition; (e) les entrepôts pour le stockage des biens et et des matériaux dangereux périssables ; (f) les entrepôts de denrées agricoles périssables occupant une superficie d’un demi-hectare et plus ; (g) les lieux où des personnes sont détenues motifs correctionnels ou en raison de leur état mental ; pour des (h) ahakorerwa imirimo y’ubucuruzi itari iy’inganda aho ibikorwa cyangwa ibihacururizwa bishobora guteza inkongi y’umuriro, gukwirakwiza inkongi buryo y’umuriro mu bwihuse, kohereza imyuka ihumanya cyangwa guturika; (h) places of non-industrial commercial activities where such activities or commercial products may cause fire, combustion with extreme rapidity, give rise to poisonous fumes or cause explosions; (h) les sites d’activités commerciales non industrielles où les activités ou les produits commerciaux peuvent causer l’incendie, la combustion avec une extrême, provoquer des rapidité toxiques ou causer des fumées explosions ; 22 Official Gazette n° Special of 20/08/2025 (i) amagaraji ibinyabiziga; bakanikiramo (i) garages for vehicle repair and (i) les garages pour la réparation et maintenance; l’entretien de véhicules ; (j) inyubako zigenewe ububiko zubatse ku buso burenze m2 1.500 n’ubuso bw’ikibanza burenze m2 1.000; (j) warehouses with a floor area exceeding 1,500 m2 and plot size exceeding 1,000 m2; (j) les entrepôts de stockage ayant une surface de plancher supérieure à 1.500 m2 et la superficie de la parcelle supérieure à 1.000 m2 ; (k) amahoteli; (l) kubaka no n’amateme iby’Igihugu nʼiby’Uturere; gusana imihanda mpuzamahanga, (k) hotels; (k) les hôtels ; (l) construction and repair of international, national, District roads and bridges; (l) la construction et la réparation des routes et des ponts internationaux, nationaux et de District ; (m) kubaka ingomero z’amazi n’imiyoboro n’amashanyarazi y’amashanyarazi ifite high voltage na medium voltage; (m) construction of hydroelectric dams, and hydro-electric power plants electrical lines of high and medium voltage; (m) la construction barrages centrales hydroélectriques, hydroélectriques lignes électriques à haute et moyenne tension; des des des et (n) kubaka ibitembo bitwara peteroli na (n) construction of petroleum and gas (n) la construction d’oléoducs des produits gazi; related facilities; pétroliers et du gaz ; (o) gucukura umutungo kamere; (o) extraction of natural resources; (o) l’extraction de ressources naturelles ; (p) kubaka aho amato ahagarara, ibibuga (p) construction of terminal ports, airports by’indege na gari ya moshi; and railways; (p) la construction de ports terminaux, d’aéroports et de chemins de fer ; (q) ibikorwa by’ubuhinzi iby’ubworozi bikoresha mvaruganda cyangwa udukoko ku butaka buhehereye; cyangwa ifumbire imiti yica (q) agricultural activities which use chemical fertilizers or pesticides in a wetland; (q) les activités agricoles qui utilisent des engrais chimiques ou des pesticides dans une zone humide ; 23 Official Gazette n° Special of 20/08/2025 (r) ibikorwa cyangwa by’ubuhinzi iby’ubworozi byaguye bikoresha ifumbire mvaruganda cyangwa imiti yica udukoko i musozi; (r) large scale agricultural activities which use chemical fertilizers or pesticides outdoor; (r) les activités agricoles à grande échelle qui utilisent des engrais chimiques ou des pesticides en plein air ; (s) imirimo muri za pariki z’Igihugu byanya cyangwa by’ubuhumekero byazo; mu (s) works in areas designated as national (s) les travaux dans les parcs nationaux ou parks or in their buffer zones; dans leurs zones tampons ; (t) imirimo ijyanye n’ubucukuzi (t) works related to mining; (t) les travaux liés à l’exploitation des bwʼamabuye yʼagaciro; mines ; (u) kariyeri ijyanye n’ubucukuzi buto (u) commercial small-scale and industrial (u) les carrières commerciales à petite n’inganda; quarries; échelle et industrielles ; (v) kubaka ibiyaga bihangano; (v) construction of artificial lakes; (v) la construction des lacs artificiels ; (w) kubaka ingomero zo kubika amazi; (w) construction of water storage dams; (w) la construction des barrages de stockage d’eau ; (x) imirimo cyangwa ibikorwa byo (x) works or activities for marshlands (x) les travaux ou les activités gutunganya ibishanga; reclamation; d’assainissement des marais ; (y) kubaka amabagiro; (y) construction of slaughter houses; (y) la construction des abattoirs ; (z) imishinga ijyanye n’imicungire (z) projects related to waste management; (z) les projets liés à la gestion des déchets ; y’imyanda; (aa) udukiriro. (aa) integrated craft production centres. (aa) les centres de production artisanale intégrés. 24 Official Gazette n° Special of 20/08/2025 Bibonywe kugira ngo bishyirwe ku mugereka w’Iteka rya Minisitiri no 003/MoE/25 ryo ku wa 19/08/2025 ryerekeye isuzumangaruka ku bidukikije n’imibereho y’abaturage Seen to be annexed to Ministerial Order no 003/MoE/25 of 19/08/2025 relating to environmental and social impact assessment Vu pour être annexé à l’Arrêté Ministériel no 003/MoE/25 du 19/08/2025 relatif à l’étude d’impact environnemental et social 25 Kigali, 19/08/2025 Official Gazette n° Special of 20/08/2025 (sé) Dr ARAKWIYE Bernadette Minisitiri w’Ibidukikije Minister of Environment Ministre de l’Environnement Bibonywe kandi bishyizweho Ikirango cya Repubulika: Seen and sealed with the Seal of the Republic: Vu et scellé du Sceau de la République : (sé) Dr UGIRASHEBUJA Emmanuel Minisitiri w’Ubutabera akaba n’Intumwa Nkuru ya Leta Minister of Justice and Attorney General Ministre de la Justice et Garde des Sceaux 26 Official Gazette n° Special of 20/08/2025 UMUGEREKA WA 2 W’ITEKA RYA MINISITIRI No 003/MoE/25 RYO KU WA 19/08/2025 RYEREKEYE ISUZUMANGARUKA KU BIDUKIKIJE N’IMIBEREHO Y’ABATURAGE ANNEX 2 TO MINISTERIAL ORDER No 003/MoE/25 OF 19/08/2025 RELATING TO ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT ANNEXE 2 À L’ARRÊTÉ MINISTÉRIEL No 003/MoE/25 DU 19/08/2025 RELATIF À L’ÉTUDE D’IMPACT ENVIRONNEMENTAL ET SOCIAL URUTONDE IBIKORWA BIKORERWA KU BIDUKIKIJE Y’ABATURAGE RIHINNYE RW’IMIRIMO, N’IMISHINGA ISUZUMANGARUKA N’IMIBEREHO LIST OF WORKS, ACTIVITIES AND PROJECTS SUBJECT TO PARTIAL ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT LISTE DES TRAVAUX, DES ACTIVITÉS ET DES PROJETS FAISANT L’OBJET D’IMPACT D’UNE ENVIRONNEMENTAL ET SOCIAL PARTIELLE ÉTUDE (a) Iminara n’anteni; (a) Towers and antennas; (a) Les tours et les antennes ; (b) inyubako zose zujuje nibura kimwe muri ibi bikurikira: (b) all types of buildings, fulfilling at least one of the following conditions: (b) les types de bâtiments remplissant au moins une des conditions suivantes : (i) kuba zifite ubushobozi bwo kwakira abantu barenga 200 ariko batarenze 500; (i) having a capacity to host more than 200 persons but not exceeding 500 persons; (i) ayant la capacité d’accueil de plus de 200 personnes mais ne dépassant pas 500 personnes ; (ii) kuba zifite ubuso bwubatse kuva kuri m2 1.000 kugera kuri m2 1.500; (iii) kuba ari inyubako zo guturamo zigeretse kuva kuri kabiri ariko zitarenza gatatu; (ii) having a total floor area from 1,000 m2 to 1,500 m2; (ii) ayant une surface de plancher totale de 1.000 m2 à 1.500 m2 ; (iii) to be residential building of G+2 (iii) être les bâtiments résidentielles de and G+3; G+2 et de G+3 ; (iv) izindi nyubako zitari izo guturamo (iv) other non-residential buildings of (iv) d’autres bâtiments non zigeretse kabiri. G+2; résidentiels de G+2 ; 27 Official Gazette n° Special of 20/08/2025 (c) ibinamba; (d) kubaka ikawa; (c) vehicle washing stations; (c) les stations de lavage des véhicules ; inganda zitonorerwamo (d) construction of coffee washing (d) la construction des stations de lavage stations; du café ; (e) kubaka sitasiyo zitanga umuriro ku modoka zikoresha amashanyarazi. (e) construction of electric vehicles (e) la construction des bornes de recharge recharging stations. pour les véhicules électriques. Bibonywe kugira ngo bishyirwe ku mugereka w’Iteka rya Minisitiri no 003/MoE/25 ryo ku wa 19/08/2025 ryerekeye isuzumangaruka ku bidukikije n’imibereho y’abaturage Seen to be annexed to Ministerial Order no 003/MoE/25 of 19/08/2025 relating to environmental impact and assessment social Vu pour être annexé à l’Arrêté Ministériel no 003/MoE/25 du 19/08/2025 relatif à l’étude d’impact environnemental et social 28 Official Gazette n° Special of 20/08/2025 Kigali, 19/08/2025 (sé) Dr ARAKWIYE Bernadette Minisitiri w’Ibidukikije Minister of Environment Ministre de l’Environnement Bibonywe kandi bishyizweho Ikirango cya Repubulika: Seen and sealed with the Seal of the Republic: Vu et scellé du Sceau de la République : (sé) Dr UGIRASHEBUJA Emmanuel Minisitiri w’Ubutabera akaba n’Intumwa Nkuru ya Leta Minister of Justice and Attorney General Ministre de la Justice et Garde des Sceaux 29 Official Gazette n° Special of 20/08/2025 UMUGEREKA WA 3 W’ITEKA RYA MINISITIRI No 003/MoE/25 RYO KU WA 19/08/2025 RYEREKEYE ISUZUMANGARUKA KU BIDUKIKIJE N’IMIBEREHO Y’ABATURAGE ANNEX 3 TO MINISTERIAL ORDER No 003/MoE/25 OF 19/08/2025 RELATING TO ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT ANNEXE 3 À L’ARRÊTÉ MINISTÉRIEL No 003/MoE/25 DU 19/08/2025 RELATIF À L’ÉTUDE D’IMPACT ENVIRONNEMENTAL ET SOCIAL YA IMITERERE Y’ISUZUMANGARUKA BIDUKIKIJE Y’ABATURAGE RYUZUYE RAPORO KU N’IMIBEREHO STRUCTURE ENVIRONMENTAL AND IMPACT ASSESSMENT REPORT OF FULL SOCIAL STRUCTURE DU RAPPORT DE D’IMPACT L’ÉTUDE ENVIRONNEMENTAL ET SOCIAL COMPLÈTE ISHAKIRO TABLE OF CONTENTS TABLE DES MATIЀRES Incamake Executive summary Résumé analytique Incamake igaragaza mu buryo bwumvikana ibyavuye mu isuzumangaruka ku bidukikije igatanga n’imibereho y’abaturage kandi inama ku bikwiye gukorwa. The executive summary Concisely discusses significant findings of the environmental and social impact assessment and recommended actions. Le résumé analytique examine de manière concise les principales constatations de l’étude d’impact environnemental et social et les actions recommandées. Umutwe wa mbere: Intangiriro Chapter One: Introduction Chapitre premier : Introduction Intangiriro ya raporo igaragaza muri make – The introduction of a report presents a brief of – L’introduction brièvement– du rapport présente (a) amateka y’umushinga; (a) the background of the project; (a) le contexte du projet ; (b) intego; (b) the purpose; (b) l’objectif ; (c) uburyo buzakoreshwa; (c) the methodology; and (c) la méthodologie ; et 30 Official Gazette n° Special of 20/08/2025 (d) n’uko izaba imeze. (d) the structure. (d) la structure. Umutwe wa 2: Ibisobanuro by’umushinga Chapter 2: Project description Chapitre 2 : Description du projet (1) Uyu mutwe ugaragaza – (1) This chapter describes – (1) Le présent chapitre décrit – (a) aho umushinga uherereye; (a) the project location; (a) l’emplacement du projet ; (b) impamvu yo kubaho (b) the project rationale; (b) la justification du projet ; k’umushinga; (c) ibikenewe mushinga; n’ibyifuzwa mu (c) the project need and desirability; (c) la nécessité et l’opportunité du projet ; (d) ibigize umushinga; (d) the project components; and (d) les composantes du projet ; et (e) n’ibikorwa mu cy’ishyirwa ry’umushinga. mu gihe cyose bikorwa (e) the activities during all phases of the project implementation. (2) Amashusho, amakarita, ndangamiterere bigaragazwa igihe biri ngombwa. ibishushanyo, n’ibishushanyo by’umushinga (2) Graphics, drawings, maps, and site layout designs of the proposed project is necessary. are used when it (e) les activités pendant toutes les phases de la mise en œuvre du projet. (2) Les graphiques, les dessins, les cartes et la conception de l’aménagement du site du projet proposé sont utilisés en cas de besoin. Umutwe wa ibidukikije n’imibereho y’abaturage byari bisanzwe bimeze 3: Uko Chapter 3: Baseline environmental and social condition Chapitre : État 3 environnemental et social de référence Uyu mutwe ugaragaza imiterere y’ibidukijije kamere, ibidukikije bikomoka ku bikorwa bya muntu n’imibereho y’abaturage mbere This chapter describes the existing natural, built environmental and social conditions in the project area before the implementation of Le présent chapitre décrit les conditions environnementales et sociales, naturelles et construites existant dans la zone du projet 31 Official Gazette n° Special of 20/08/2025 y’uko umushinga ushyirwa mu bikorwa. Ukubiyemo ku buryo burambuye amakuru ku – the project. It includes detailed information on – avant sa mise en œuvre t. Il comprend des informations détaillées sur– (a) imiterere y’ubutaka; (a) topography; (a) la topographie ; (b) urusobe rw’ibinyabuzima n’ibyanya (b) biodiversity and natural habitat; (b) la biodiversité et l’habitat naturel ; bibamo; (c) ikirere; (c) climate; (c) le climat ; (d) ubumenyi bw’ikirere; (d) meteorology; (d) la météorologie ; (e) ubwiza bw’umwuka; (e) air quality; (e) la qualité de l’air ; (f) urusaku; (f) noise condition; (f) les nuisances sonores ; (g) umutungo kamere w’amazi; (g) water resources; (g) les ressources en eau ; (h) ubutaka n’imikoreshereje yabwo; (h) soil and land use; (h) le sol et l’utilisation des terres ; (i) umurimo y’akazi; n’imiterere rusange (i) labour and working conditions; (i) le travail et les conditions de travail ; (j) ubuzima n’umutekano by’abaturage; (j) community health and safety; and (j) la santé et communauté ; et la sécurité de la (k) n’uburenganzira mutungo n’umurage ndangamuco byo mu gace umushinga uzakorerwamo. ku (k) property rights and cultural heritage (k) les droits de propriété et le patrimoine of the project area. culturel de la zone du projet. 32 Official Gazette n° Special of 20/08/2025 Umutwe wa 4: Politiki, amategeko n’inzego birebwa n’umushinga Chapter 4: Policy, legal and institutional framework relating to the project Chapitre 4 : Politique, cadre juridique et institutionnel relatif au projet Uyu mutwe ugaragaza politiki, amategeko ngenderwaho n’ibipimo n’amabwiriza birebwa n’umushinga n’uko ishyirwa mu bikorwa rizabyubahiriza. Ugaragaza kandi inzego zirebwa no gutanga impushya, n’igenzura iyubahirizwa ry’umushinga. ry’umushinga the project and how This chapter describes the policies, laws and regulations and applicable standards relevant to the project implementation will comply with them. It also describes relevant institutions in terms of permitting, compliance and monitoring of the project. Le présent chapitre décrit les politiques, les lois et les règlements ainsi que les normes applicables au projet et la manière dont la mise en œuvre du projet s’y conformera. Elle décrit également les institutions compétentes en matière d’autorisation, de conformité et de suivi du projet. Umutwe wa 5: Kugisha inama abaturage n’abafatanyabikorwa Chapter 5: Public and consultations stakeholder Chapitre 5 : Consultation du public et des parties prenantes ukusanya Uyu mutwe ibitekerezo bantu by’abafatanyabikorwa, umushinga ureba n’abaturage bashobora kugirwaho n’umushinga. Umunyamwuga agomba kwita cyane ku byiciro byihariye no ku bitsina byombi. ingaruka abandi This chapter focuses on the collection of views on the project from stakeholders, other interested persons and people likely to be affected. A practitioner must consider special groups and all genders. Se concentre sur la collecte de points de vue sur le projet auprès des parties prenantes, d’autres personnes intéressées et des personnes susceptibles d’être affectées. Le praticien doit tenir compte des groupes spéciaux et de tous les genres. Umutwe wa 6: Ibyago n’ingaruka bishobora kubaho ku bidukikije no ku mibereho y’abaturage Chapter 6: Potential environmental and social risks and impacts Chapitre environnementaux et sociaux potentiels : Risques et 6 impacts Uyu mutwe usobanura – This chapter describes – Le présent chapitre décrit – (a) ibyago n’ingaruka bishobora guterwa n’umushinga bidukikije by’ibinyabuzima n’ibya kamere, ku mibereho myiza n’ubukungu no ku bidukikije bishingiye ku muco kuva ku (a) potential risks and impacts to the physical and biological environment, life and cultural socio-economic environment as the result of the project at preparatory, construction, 33 (a) les risques et les impacts potentiels sur le milieu physique et biologique, sur la sur vie l’environnement culturel résultant du projet aux stades de la préparation, de socio-économique et Official Gazette n° Special of 20/08/2025 umushinga utegurwa, ushyirwa mu bikorwa no kugeza urangiye; operation stages; and decommissioning la construction, de l’exploitation et de la désaffectation ; (b) ibyago n’ingaruka bijyanye n’akazi (b) risks and impacts related to labour n’uburyo gakorwamo; and working conditions; (b) les risques et les impacts liés à la main- d’œuvre et aux conditions de travail ; (c) ibyago bijyanye n’ingaruka n’amategeko n’amabwiriza yerekeye ubuzima n’umutekano ku kazi; (c) risks and impacts related to health and and safety laws occupational regulations; (c) les risques et les impacts liés aux lois et réglementations en matière de santé et de sécurité au travail ; (d) ibyago n’ingaruka n’ubuzima by’abaturage; bijyanye n’umutekano (d) risks and impacts related to community health and safety; (d) les risques et les impacts liés à la santé et à la sécurité de la communauté ; (e) ibyago n’ingaruka zijyanye (e) risks and impacts related to cultural (e) les risques et les impacts liés au n’umurage ndangamuco; heritage; patrimoine culturel ; (f) ibyago zijyanye n’ingaruka n’amategeko n’amabwiriza yerekeye uburinganire n’ubwuzuzanye. (f) risks and impacts related to gender- related laws and regulations. (f) les risques et les impacts liés aux lois et en matière aux d’égalité entre les hommes et les femmes. réglementations Umutwe wa 7: Ingamba zo kugabanya ubukana bw’ingaruka z’umushinga Chapter 7: Mitigation measures of the impacts of the project Chapitre 7 : Mesures d’atténuation des impacts du projet Uyu mutwe ugaragaza – This chapter provides – Le présent chapitre fournit – (a) ingamba zo kugabanya ingaruka mbi; (a) mitigation measures with technical (a) des mesures d’atténuation avec des details; détails techniques ; (b) uburyo bwo kwishyura cyangwa bikumira gushyiraho ibikorwa (b) offset and prevent negative impacts as the result of the proposed project (b) des moyens de compenser et de prévenir divers impacts résultant du 34 ingaruka z’umushinga wateganyijwe mu no kuwushyira mu bikorwa; kuwubaka gihe cyo (c) incamake y’ingaruka zose ziteganywa ku bidukikije no ku mibereho y’abaturage. Official Gazette n° Special of 20/08/2025 during construction and operation; projet proposé pendant la construction et l’exploitation ; (c) the summary of all anticipated adverse environmental and social impacts. (c) le résume de toutes les incidences sur négatives l’environnement et sur la société. anticipées Umutwe wa 8: Gahunda y’imicungire y’ibidukikije n’imibereho y’abaturage Chapter 8: Environmental and social management plan Chapitre Plan 8 environnementale et sociale : de gestion Uyu mutwe ugaragaza ibi bikurikira: This chapter outlines the following: Le présent chapitre décrit ce qui suit : (a) ibyago n’ingaruka umushinga (a) the potential risks and impacts of the (a) les risques et les impacts potentiels du ushobora guteza; project; projet ; (b) ingamba zo kugabanya ubukana no gukurikirana ingaruka ku bidukikije n’imibereho y’abaturage mu gihe cyose cy’ishyirwa mu bikorwa ry’umushinga; (b) measures for mitigation and monitoring of environmental and social impacts throughout the project lifecycle; (b) les mesures d’atténuation et de suivi des impacts environnementaux et sociaux tout au long du cycle de vie du projet ; (c) ikiguzi bisaba; (d) ingengabihe; (c) cost; (d) calendar; (c) le coût ; (d) le calendrier ; (e) ibipimo ngamba; byo gukurikirana izo (e) measures monitoring indicators; (e) les indicateurs de suivi de ces mesures ; (f) uburyo bwo gutanga ubutabazi (f) emergency response procedures; and (f) les procédures d’intervention en cas bwihuse; d’urgence ; et 35 Official Gazette n° Special of 20/08/2025 (g) n’ufite inshingano zo gushyira mu (g) responsible person to implement (g) la personne responsable de la mise en bikorwa izo ngamba. measures. œuvre des mesures. Umutwe wa 9: Kubona ubutaka no gutuza abaturage Chapter resettlement 9: Land acquisition and Chapitre 9 : Acquisition de terre et réinstallation Uyu mutwe usobanura ibi bikurikira: This chapter describes the following: Le présent chapitre décrit ce qui suit : (a) nyir’umushinga agomba kwerekana muri ubutaka buzakorerwaho umushinga ari ubwe; raporo niba (a) the project developer shows in the report whether he or she is the owner of the land on which the project is to be implemented; (a) le promoteur indique dans le rapport s’il est le propriétaire du terrain sur lequel le projet doit être mis en œuvre ; (b) igishushanyo cy’umushinga; mbonera (b) project design; (b) la conception du projet ; (c) indishyi n’inyungu bagizweho ingaruka n’umushinga; ku bantu (c) compensation and benefits for affected persons; (c) les compensations et les avantages pour les personnes affectées ; (d) imikoranire n’abaturage; (d) community engagement; (d) l’engagement communautaire ; (e) uburyo bwo gukemura ibibazo; (e) grievance redress mechanism; (e) le mécanisme de règlement des griefs ; (f) gutegura no gushyira mu bikorwa umushinga; (f) planning and implementation of the project; (f) la planification et la mise en œuvre du projet ; (g) ubufatanye n’izindi nzego zibishinzwe; (g) collaboration with other responsible agencies; (g) la collaboration avec d’autres agences responsables ; (h) ubushobozi bwa tekiniki n’amafaranga bya nyir’umushinga; (h) technical and financial capabilities of the project developer; (h) la capacité technique et financière du promoteur du projet ; 36 Official Gazette n° Special of 20/08/2025 ikubiyemo imibereho (i) gahunda y’ibikorwa byo kwimura ingamba zo abantu kugarura itunganyijwe, itegurwa mbere yo gushyira mu iyo bibaye bikorwa umushinga ngombwa kwimura abantu. (i) the resettlement action plan which includes restoration livelihood measures, developed prior to the implementation of the project when deemed necessary to relocate people. (i) le plan d’action de réinstallation qui de des comprend rétablissement de subsistance, élaboré avant la mise en œuvre du projet lorsqu’il est nécessaire de déplacer des personnes. des moyens mesures Umutwe wa 10: Imiterere ya tekiniki ku bidukikije no ku mibereho y’abaturage Chapter 10: Environmental and social technical specifications Chapitre 10 : Spécifications techniques environnementale et sociale Muri uyu mutwe, ku mushinga ukenera inyubako n’ibikoresho mu gihe cy’ishyirwa mu bikorwa ryawo, nyir’umushinga – In this chapter, for a project that needs during and construction implementation, the project developer – supply (a) agaragaza muri raporo imiterere ya tekiniki ku bidukikije no ku mibereho masezerano y’abaturage mu n’ayigemura y’ubwubatsi ry’ibikoresho; (b) kandi ashyiraho ingamba zizatuma w’ubwubatsi ibikoresho ukora cyangwa ugemura akurikiza iyo miterere ya tekiniki. umurimo (a) includes in the report, environmental and social technical specifications to be the contract of construction or supply; and included in (b) sets up mechanism to ensure that the contractor or supplier complies with those specifications. Dans le présent chapitre, pour le projet dont la mise en œuvre nécessite des travaux de construction et des fournitures pendant la mise en œuvre, le promoteur du projet - (a) inclue dans le rapport les spécifications techniques et sociales à inclure dans le contrat de construction ou de fourniture ; environnementales (b) met en place un mécanisme pour s’assurer que l’entrepreneur ou le fournisseur ces spécifications. conforme se à Umutwe wa 11: Uburyo bwo gukemura ibibazo Chapter 11: Grievance redress mechanism Chapitre 11 : Mécanisme de régler des griefs Uyu mutwe ugaragaza uburyo bwo gukemura ibibazo kugira ngo abaturage bazagirwaho ingaruka n’umushinga bajye This chapter describes grievance redress mechanisms to ensure that project affected persons raise their complaints or concerns, Le présent chapitre décrit les mécanismes de recours pour garantir que les personnes affectées par le projet puissent déposer leurs 37 Official Gazette n° Special of 20/08/2025 batanga ibibazo byabo nta kiguzi, no kwizera ko bizakemurwa ku gihe kandi bigahabwa ibisubizo bikwiye. without cost, and with the assurance of a timely and satisfactory resolution. plaintes ou préoccupations, sans frais, et avec l’assurance d’une et satisfaisante. résolution rapide wa Umutwe n’ibyifuzonama 12: Imyanzuro Chapter recommendations 12: Conclusions and 12 : Chapitre recommandations Conclusions et byagaragajwe mu Uyu mutwe werekana mu ncamake iby’ingenzi gihe cy’isuzumangaruka ku bidukikije no ku mibereho y’abaturage. Ugaragaza kandi n’ifatwa ibyifuzonama ry’ibyemezo, bikorwa ry’umushinga n’izindi nyigo cyangwa izindi ngamba zishobora gufatwa. birebana ishyirwa mu This chapter summarizes the key findings from the environmental and social impact assessment process. includes recommendations decision-making, for project implementation and any additional studies or actions to be taken. also It Le présent chapitre résume les principaux résultats du processus de l’étude d’impact environnemental et social. Il comprend également des recommandations pour la prise de décision, la mise en œuvre du projet et toute étude à entreprendre. complémentaire action ou Umutwe wa 13: Imigereka Chapter 13: Annexes Chapitre 13 : Annexes Uyu mutwe ugaragaza ibi bikurikira: This chapter provides the following: Le présent chapitre indique ce qui suit : (a) inyandikomvugo y’inama (a) minutes of public and stakeholder z’abaturage n’abafatanyabikorwa; consultation meetings; (a) les procès-verbaux des réunions de consultation des parties prenantes ; (b) urutonde n’abafatanyabikorwa inama; rw’abaturage bagishijwe (c) ikimenyetso kigaragaza nyir’ubutaka, icy’uko yabutijwe cyangwa icy’andi masezerano; (b) a list of consulted public and (b) une liste du public et des parties stakeholders; prenantes consultés ; (c) proof of land ownership, concession or any other agreement; (c) une preuve de propriété foncière, de concession ou de tout autre accord ; (d) ibishushanyo; (d) drawings and designs; (d) les dessins et les conceptions ; 38 Official Gazette n° Special of 20/08/2025 (e) amakuru yavuye mu nyigo; (e) data from conducted studies; (e) les données provenant d’études menées; (f) urutonde rw’abanyamwuga bagize isuzumangaruka, bafite uruhare ubumenyi bujyanye n’umushinga; n’uburambe mu (f) the list of practitioners involved in the assessment with their qualifications and experience related to the project; and (f) une liste des praticiens impliqués dans l’étude avec leurs qualifications et leur expérience en rapport avec le projet ; et (g) n’izindi nyandiko za ngombwa. (g) any other relevant documents. (g) tout autre document pertinent. Bibonywe kugira ngo bishyirwe ku mugereka w’Iteka rya Minisitiri no 003/MoE/25 ryo ku wa 19/08/2025 ryerekeye isuzumangaruka ku bidukikije n’imibereho y’abaturage Seen to be annexed to Ministerial Order no 003/MoE/25 of 19/08/2025 relating to environmental impact and assessment social Vu pour être annexé à l’Arrêté Ministériel no 003/MoE/25 du 19/08/2025 relatif à l’étude d’impact environnemental et social 39 Kigali, 19/08/2025 Official Gazette n° Special of 20/08/2025 (sé) Dr ARAKWIYE Bernadette Minisitiri w’Ibidukikije Minister of Environment Ministre de l’Environnement Bibonywe kandi bishyizweho Ikirango cya Repubulika: Seen and sealed with the Seal of the Republic: Vu et scellé du Sceau de la République : (sé) Dr UGIRASHEBUJA Emmanuel Minisitiri w’Ubutabera akaba n’Intumwa Nkuru ya Leta Minister of Justice and Attorney General Ministre de la Justice et Garde des Sceaux 40 UMUGEREKA WA 4 W’ITEKA RYA MINISITIRI No 003/MoE/25 RYO KU WA 19/08/2025 RYEREKEYE ISUZUMANGARUKA KU BIDUKIKIJE N’IMIBEREHO Y’ABATURAGE YA IMITERERE Y’ISUZUMANGARUKA BIDUKIKIJE Y’ABATURAGE RIHINNYE RAPORO KU N’IMIBERO Official Gazette n° Special of 20/08/2025 003/MoE/25 ANNEX 4 TO MINISTERIAL ORDER No No 19/08/2025 RELATING TO ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT OF STRUCTURE ENVIRONMENTAL AND IMPACT ASSESSMENT REPORT OF PARTIAL SOCIAL ANNEXE 4 À L’ARRÊTÉ MINISTÉRIEL No 003/MoE/25 DU 19/08/2025 RELATIF À L’ÉTUDE D’IMPACT ENVIRONNEMENTAL ET SOCIAL STRUCTURE DU RAPPORT D’ÉTUDE D’IMPACT ENVIRONNEMENTAL ET SOCIAL PARTIELLE ISHAKIRO TABLE OF CONTENTS TABLE DES MATIЀRES Umutwe wa mbere: Ibyerekeye umushinga Chapter One: Project description Chapitre premier : Description du projet (1) Uyu mutwe ugaragaza ibi bikurikira: (1) This chapter describes the following: (1) Le présent chapitre décrit ce qui suit : (a) aho umushinga uherereye; (a) project location; (a) l’emplacement du projet ; (b) impamvu y’umushinga; (b) rationale of the project; (b) la justification du projet ; (c) ibikenewe mushinga; n’ibyifuzwa mu (c) the project need and desirability; (c) la nécessité et l’opportunité du projet ; (d) ibigize umushinga; (d) components of the project; and (d) les composantes du projet ; et (e) n’ibizakorwa mu byiciro byo gushyira mu bikorwa umushinga. (e) activities during phases of the (e) les activités au cours des phases de project implementation. sa mise en œuvre. (2) Amashusho, ibishushanyo, amakarita, ndangamiterere n’ibishushanyo (2) Graphics, drawings, maps and site layout designs of the project are used (2) Les graphiques, les dessins, les cartes et les plans d’aménagement du site du 41 Official Gazette n° Special of 20/08/2025 by’umushinga bigaragazwa igihe biri ngombwa. when necessary. projet sont utilisés en cas de besoin. Umutwe wa 2: Uko ibidukikije n’imibereho y’abaturage byari bisanzwe bimeze Chapter 2: Baseline environmental and social condition Chapitre : État 2 environnemental et social de référence Uyu mutwe ugaragaza ibi bikurikira: This chapter describes the following: Le présent chapitre décrit ce qui suit : (a) imiterere kamere, y’ibidukijije ibidukikije bikomoka ku bikorwa bya muntu n’imibereho y’abaturage mbere ushyirwa mu y’uko bikorwa; umushinga (b) amakuru arambuye ku miterere y’ubutaka, ku rusobe rw’ibinyabuzima n’ibyanya bibamo; (a) existing natural, built environmental and social conditions in the project area before the implementation of the project; (a) Les conditions environnementales et sociales, construites naturelles et existant dans la zone du projet avant sa mise en œuvre ; (b) detailed information on topography, biodiversity and natural habitat; (b) les la informations détaillées sur topographie, la biodiversité et l’habitat naturel ; (c) ikirere n’ubumenyi bw’ikirere; (c) climate and meteorology; (c) le climat et la météorologie ; (d) ubwiza bw’umwuka; (d) air quality; (d) la qualité de l’air ; (e) urusaku; (e) noise condition; (e) les nuisances sonores ; (f) umutungo kamere w’amazi; (f) water resources; (f) les ressources en eau ; (g) ubutaka n’imikoreshereze yabwo; (g) soil and land use; (g) le sol et l’utilisation des terres ; (h) umurimo n’imiterere rusange y’akazi; (h) labour and working conditions; (h) le travail et les conditions de travail ; (i) ubuzima n’umutekano by’abaturage; (i) community health and safety; and 42 (i) la santé et communauté ; et la sécurité de la (j) n’uburenganzira mutungo n’umurage ndangamuco byo mu gace umushinga uzakorerwamo. ku Official Gazette n° Special of 20/08/2025 (j) property rights and cultural heritage (j) les droits de propriété et le patrimoine of the project area. culturel de la zone du projet. Umutwe wa 3: Gahunda y’imicungire y’ibidukikije n’iy’imibereho y’abaturage Chapter 3: Environmental and social management plan Chapitre Plan 3 environnementale et sociale : de gestion Uyu mutwe ugaragaza ibi bikurikira: This chapter outlines the following: Le présent chapitre décrit ce qui suit : (a) ingaruka zihariye z’umushinga; (a) the potential risks and impacts of the (a) les risques et les impacts potentiels du project; projet ; (b) ingamba zo gukumira ingaruka ku bidukikije n’imibereho y’abaturage zateganyijwe mu gihe umushinga uzamara; (b) mitigation and monitoring of environmental and social aspects throughout the project lifecycle; (b) les mesures d’atténuation et de suivi des aspects environnementaux et sociaux tout au long du cycle de vie du projet ; (c) ikiguzi bisaba; (d) ingengabihe; (c) cost; (d) calendar; (c) le coût ; (d) le calendrier ; (e) ibipimo by’ishyirwa mu bikorwa (e) monitoring indicators; (e) les indicateurs de suivi ; ry’ingamba; (f) uburyo bwo gutanga ubutabazi (f) emergency response procedures; and (f) les procédures d’intervention en cas bwihuse; d’urgence ; et (g) n’ufite inshingano zo gushyira mu (g) responsible person to implement (g) la personne responsable de la mise en bikorwa izo ngamba. measures. œuvre des mesures. 43 Official Gazette n° Special of 20/08/2025 Bibonywe kugira ngo bishyirwe ku rya Minisitiri no mugereka w’Iteka 003/MoE/25 19/08/2025 ryo ku wa ryerekeye isuzumangaruka ku bidukikije n’imibereho y’abaturage Seen to be annexed to Ministerial Order no 003/MoE/25 of 19/08/2025 relating to environmental impact and assessment social Vu pour être annexé à l’Arrêté Ministériel no 003/MoE/25 du 19/08/2025 relatif à l’étude d’impact environnemental et social 44 Kigali, 19/08/2025 Official Gazette n° Special of 20/08/2025 (sé) Dr ARAKWIYE Bernadette Minisitiri w’Ibidukikije Minister of Environment Ministre de l’Environnement Bibonywe kandi bishyizweho Ikirango cya Repubulika: Seen and sealed with the Seal of the Republic: Vu et scellé du Sceau de la République : (sé) Dr UGIRASHEBUJA Emmanuel Minisitiri w’Ubutabera akaba n’Intumwa Nkuru ya Leta Minister of Justice and Attorney General Ministre de la Justice et Garde des Sceaux 45
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
MINISTERIAL ORDER No 003/MoE/25 OF 19/08/2025 RELATING TO ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT