MINISTERIAL ORDER No 001/2019 OF 15/04/2019 ESTABLISHING THE LIST OF PROJECTS THAT MUST UNDERGO ENVIRONMENTAL IMPACT ASSESSMENT, INSTRUCTIONS, REQUIREMENTS AND PROCEDURES TO CONDUCT ENVIRONMENTAL IMPACT ASSESSMENT
This Order sets out which projects must undergo an environmental impact assessment before they can be authorized for implementation, and it sets the instructions, requirements, and procedures for that assessment.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Rwanda
- Instrument
- Order
- Citation
- 001/2019 OF 15/04/2019
- Status
- Not in force
- Version
- Undated source snapshot
- Language
- mul
- Updated
- Official source
- View official record ↗
Statute overview
About this statute
This Order sets out which projects must undergo an environmental impact assessment before they can be authorized for implementation, and it sets the instructions, requirements, and procedures for that assessment. This article defines key terms used in the Order, including environmental assessment, public participation, Authority, developer, expert, and stakeholders. Projects listed in Annex I must undergo a full environmental impact assessment before implementation, and public institutions cannot approve or authorise listed projects without that prior assessment. Certain works, activities, and projects must undergo a partial environmental impact assessment before they can be authorised. Projects, works, and activities not listed in Annex I and II are not subject to environmental impact assessment, unless the Authority or authorised organ requests one in the stated circumstances.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of MINISTERIAL ORDER No 001/2019 OF 15/04/2019 ESTABLISHING THE LIST OF PROJECTS THAT MUST UNDERGO ENVIRONMENTAL IMPACT ASSESSMENT, INSTRUCTIONS, REQUIREMENTS AND PROCEDURES TO CONDUCT ENVIRONMENTAL IMPACT ASSESSMENT
Showing 13 of 13
- 1 Verify source ↗
Icyo iri teka rigamije
AI-assisted research summary: This Order sets out which projects must undergo an environmental impact assessment before they can be authorized for implementation, and it sets the instructions, requirements, and procedures for that assessment.
Ingingo ya mbere: Icyo iri teka rigamije Article One: Purpose of this Order Article premier: Objet du présent arrêté Iri teka rishyiraho: This Order establishes: Le présent arrêté établit: 1° urutonde igomba rw’imishinga gukorerwa isuzumangaruka ku bidukikije mbere y’uko ibona uburenganzira bwo gushyirwa mu bikorwa; 2° amabwiriza, ibisabwa n’uburyo bwo gukora isuzumangaruka ku bidukikije. 1° the list of projects that must undergo an environmental impact assessment before they obtain their implementation; authorisation for 1° la liste des projets devant faire l’objet d’une étude d’impact environnemental avant qu’ils obtiennent l’autorisation de leur mise en exécution; 2° instructions, requirements and procedures impact for conducting environmental assessment. 2° les instructions, conditions et procédures d’impact l’étude pour environnemental. mener - 2 Verify source ↗
Ibisobanuro by’amagambo
AI-assisted research summary: This article defines key terms used in the Order, including environmental assessment, public participation, Authority, developer, expert, and stakeholders.
Ingingo ya 2: Ibisobanuro by’amagambo Article 2: Definitions Article 2: Définitions iri Muri ibisobanuro bikurikira: teka, amagambo akurikira afite In this Order, the following terms have the following meanings: Dans le présent arrêté, les termes repris ci-après ont les significations suivantes: 1° isuzumangaruka ku bidukikije: uburyo bwimbitse bwo kugaragaza ingaruka z’umushinga ku bidukikije, ku mibereho y’abaturage n’ubukungu, mbere y’uko hafatwa kwemera umushinga; icyemezo cyo impact 1° environmental assessment: identifying systematic environmental, economic social impacts of a project, before a decision of its acceptance is made; of and process 1° étude d’impact environnemental: processus systématique d’identifier les impacts environnementaux, sociaux et économiques d’un projet, avant la prise de décision sur son approbation; 2° isuzumangaruka bidukikije ryuzuye: isuzumangaruka ku bidukikije rihuza byose ibyiciro bw’isuzumangaruka ku bidukikije; ku 2° full environmental impact assessment: environmental that covers all the steps of environmental impact assessment process; impact assessment 2° étude d’impact environnemental complète: d’impact étude environnemental qui couvre toutes les étapes du processus de l’étude d’impact environnemental; Official Gazette no.15 of 15/04/201996 3° isuzumangaruka ku bidukikije rihinnye: inyingo y’isuzumangaruka ku igarukira ku kugaragaza bidukikije ibibazo n’ibidukikije zikwiye mu kugabanya n’ingamba ubukana bwabyo; byerekeranye 3° partial environmental environmental impact assessment: impact assessment limited to identification of environmental issues and appropriate mitigation measures; 3° étude d’impact environnemental partielle: d’impact étude environnemental limitée à l’identification des problèmes environnementaux et des mesures d’atténuation appropriées; 4° uruhare rw’abaturage: uburyo bwo gutuma abaturage cyangwa izindi nzego bireba bagira uruhare mu igenamigambi, itegurwa ry’umushinga n’uburyo bwo gufata ibyemezo; 4° public participation: systematic way of involving public or relevant institutions in project and decision making process; development planning, 4° participation public: voie du systématique d’impliquer le public ou les institutions concernées dans les processus de planification, de développement et de prise de décision; 5° ikusanyabitekerezo: uburyo bwo gukusanya by’abaturage ibitekerezo cyangwa inzego bishobora kugirwaho ingaruka mu buryo butaziguye cyangwa buziguye hagamijwe n’umushinga kurengera uburenganzira bwabo, mbere y’uko umushinga wemererwa gukora; 6° Ikigo: Ikigo gifite kubungabunga ibidukikije mu nshingano zacyo; cy’Igihugu 5° public hearing: way of getting ideas from the people or institutions that might be affected directly or indirectly by the project with a view to protecting their rights, before a project gets authorisation; 6° Authority: the national authority in charge of conservation of environment; institutions 5° consultation publique: une manière de rassembler des avis de la population ou des d’être affectées directement ou indirectement par le projet afin que leurs droits puissent être sauvegardés, projet que n’obtienne une autorisation; susceptibles avant le 6° Office: office la conservation de l’environnement dans ses attributions; national ayant 7° urwego rwabiherewe uburenganzira: urwego rwa Leta rwahawe uburenganzira n’Ikigo bwo kwemeza isuzumangaruka ku bidukikije; 7° authorised organ: State organ authorised the by environmental impact assessment; the Authority approve to 7° organe autorisée: organe de l’État l’Office pour approuver autorisé par l’étude d’impact environnemental; 8° nyir’umushinga: umuntu wese wateguye cyangwa watangiye gushyira mu bikorwa umushinga mu rwego rwa Leta cyangwa urw’abikorera; 8° developer: any person who has proposed or has undertaken to implement a project in the public or private sector; 8° promoteur: toute personne qui a planifié ou entrepris de mettre en oeuvre un projet du secteur public ou privé; Official Gazette no.15 of 15/04/201997 9° impuguke: cyangwa umuryango inzobere mu kugenzura ingaruka ku bidukikije, umuntu ku giti cye bafite ubumenyi, bujuje ibisabwa mu mabwiriza y’isuzumangaruka ku bidukikije kandi isuzumangaruka gukora bemerewe cyangwa bidukikije ku inyigo hakurikijwe iri teka; 9° expert: environmental impact assessor or an individual or moral person that is technically the competent, requirements of the environmental impact assessment guidelines and is certified to conduct impact assessment or studies in accordance with this Order; environmental fulfils an 9° expert: une d’impact évaluateur environnemental personne ou physique ou morale qui est techniquement compétent, remplit les conditions des d’impact directives environnemental et agréé pour mener une étude environnemental d’impact conformément au présent arrêté; l’étude de 10° abafatanyabikorwa: abantu ku giti cyabo, amatsinda y’abantu, ibigo bya Leta, ibigo byigenga cyangwa imiryango itari iya Leta bafite inyungu cyangwa uruhare mu ku bidukikije n’ibikomoka k’umushinga. isuzumangaruka agencies, 10° stakeholders: individuals, communities, private government organisations, non-governmental organisations having an interest or stake in both the environmental impact assessment process and outcomes of the project. 10° parties prenantes: individus, communautés, agences gouvernementales, organisations privées, organisations non gouvernementales ayant un intérêt ou un enjeu dans le processus de l’étude d’impact environnemental et les résultats du projet. UMUTWE WA URUTONDE RW’IMISHINGA IGOMBA GUKORERWA ISUZUMANGARUKA KU BIDUKIKIJE II: CHAPTER II: LIST OF PROJECTS THAT MUST UNDERGO AN ENVIRONMENTAL IMPACT ASSESSMENT CHAPITRE II: LISTE DES PROJETS DEVANT FAIRE L’OBJET D’UNE ÉTUDE D’IMPACT ENVIRONNEMENTAL - 3 Verify source ↗
Urutonde rw’imirimo, ibikorwa
AI-assisted research summary: Projects listed in Annex I must undergo a full environmental impact assessment before implementation, and public institutions cannot approve or authorise listed projects without that prior assessment.
Ingingo ya 3: Urutonde rw’imirimo, ibikorwa n’imishinga gukorerwa bigomba isuzumangaruka ku bidukikije ryuzuye Article 3: List of works, activities and projects that must undergo a full environmental impact assessment Article 3: Liste des travaux, activités et projets devant faire l’objet d’une étude d’impact environnemental complète Nta rwego rwa Leta na rumwe rwemerewe gufata icyemezo, gutanga icyemezo, kwemeza cyangwa gutanga uburenganzira bwo gutangira gushyira mu bikorwa umushinga uri ku migereka y’iri teka hatabanje ku bidukikije. isuzumangaruka gukorwa Urutonde bigomba bidukikije rw’imirimo, gukorerwa ibikorwa n’imishinga ku isuzumangaruka kubona yo ryuzuye mbere No public institution is authorised to take a decision, to warrant a certificate, approve or authorise the commencement of a project mentioned in the annexes of this Order without prior environmental impact assessment. Aucune institution publique n’est autorisée de prendre la décision d’octroyer un certificat, approver ou autoriser le démarrage d’un project mentionné dans les annexes du présent arrêté sans une étude d’impact environnemental préalable. The list of works, activities and projects that must undergo a full environmental impact assessment La liste des travaux, activités et projets devant faire l’objet d’une étude d’impact environnemental Official Gazette no.15 of 15/04/201998 uburenganzira bwo gutangira gushyirwa mu bikorwa ruri ku mugereka wa I w’iri teka. before being granted authorisation for implementation is in Annex I of this Order. their complète avant l’obtention d’autorisation pour leur mise en oeuvre est en annexe I du présent arrêté. - 4 Verify source ↗
Urutonde rw’imirimo, ibikorwa
AI-assisted research summary: Certain works, activities, and projects must undergo a partial environmental impact assessment before they can be authorised.
Ingingo ya 4: Urutonde rw’imirimo, ibikorwa gukorerwa bigomba n’imishinga isuzumangaruka ku bidukikije rihinnye Article 4: List of works, activities and projects that must undergo a partial environmental impact assessment Article 4: Liste des travaux, activités et projets devant faire l’objet d’une étude d’impact environnemental partielle rw’imirimo, gukorerwa ibikorwa n’imishinga Urutonde ku isuzumangaruka bigomba bidukikije kubona uburenganzira bwo gutangira gushyirwa mu bikorwa ruri ku mugereka wa II w’iri teka. rihinnye mbere yo The list of works, activities and projects that must undergo a partial environmental impact assessment before being granted authorisation for their implementation is in Annex II of this Order. La liste des travaux, activités et projets devant faire l’objet d’une étude d’impact environnemental partielle avant l’obtention d’autorisation pour leur mise en œuvre est en annexe II du présent arrêté. Imirimo, ibikorwa n’imishinga bivugwa mu gika cya mbere cy’iyi ngingo bikorerwa inyigo kugira ngo hagatangwe icyemezo cy’uko byujuje ibisabwa mu kubungabunga ibidukikije. The works, activities and projects referred to in Paragraph One of this Article are subject to assessment for environmental clearance certificate. Les travaux, activités et projets visés à l’alinéa premier du présent article font l’objet d’une étude pour obtenir un certificat de conformité environnementale. - 5 Verify source ↗
Imirimo, ibikorwa n’imishinga
AI-assisted research summary: Projects, works, and activities not listed in Annex I and II are not subject to environmental impact assessment, unless the Authority or authorised organ requests one in the stated circumstances.
Ingingo ya 5: Imirimo, ibikorwa n’imishinga bitari ku rutonde Article 5: Works, activities and projects that are not included on the list Article 5: Travaux, activités et projets non inclus sur la liste Imishinga, imirimo cyangwa ibikorwa bitari ku rutonde ruri ku mugereka wa I n’uwa II y’iri teka ntibikorerwa isuzumangaruka ku bidukikije. Projects, works and activities which are not listed on the Annex I and II to this Order are not subject to the environmental impact assessment. Les projets, travaux et activités qui ne figurent pas sur l’annexe I et II du présent arrêté ne sont pas soumis à l’étude d’impact environnemental. Icyakora, iyo bigaragara ko umurimo, igikorwa cyangwa umushinga bitari ku rutonde ruri ku mugereka wa I n’uwa II y’iri teka bishobora ingaruka mbi kandi zitahinduka ku kugira bidukikije kandi bisa mu miterere n’umurimo, igikorwa cyangwa umushinga bivugwa mu mugereka wa I n’uwa II, Ikigo cyangwa urwego rwabiherewe uburenganzira bishobora gusaba nyir’umushinga gukora isuzumangaruka ku bidukikije. However, when it is evident that work, activity or project not listed on the Annex I and II to this Order has a negative and irreversible impact on the environment and is similar in nature to the work, activity or project listed in Annex I and II of this Order, the Authority or authorised organ may request the developer to conduct an environmental impact assessment Toutefois, lorsqu’il est évident que le travail, l’activité ou le projet qui ne figure pas sur annexe I et II du présent arrêté peut avoir un impact négatif et irréversible sur l’environnement et qu’il est similaire en nature au travail, à l’activité ou au projet figurant sur l’annexe I et II du présent article, autorisé peut demander au promoteur de mener une étude d’impact environnemental. l’Office ou l’organe Official Gazette no.15 of 15/04/201999 III: AMABWIRIZA, UMUTWE WA IBISABWA N’UBURYO BWO GUKORA ISUZUMANGARUKA KU BIDUKIKIJE III: INSTRUCTIONS, CHAPTER REQUIREMENTS AND PROCEDURES TO CONDUCT ENVIRONMENTAL IMPACT ASSESSMENT III: INSTRUCTIONS, CHAPITRE CONDITIONS ET PROCÉDURES POUR MENER D’IMPACT ENVIRONNEMENTAL ÉTUDE UNE - 6 Verify source ↗
Gusaba uruhushya rwo gukora
AI-assisted research summary: A developer for a project listed in Annex I or II must use a selected environmental impact assessment expert, and that expert must submit the application and terms of reference to the authorised organ.
Ingingo ya 6: Gusaba uruhushya rwo gukora isuzumangaruka ku bidukikije Article 6: Application for authorisation to conduct the environmental impact assessment Article 6: Demande d’autorisation pour mener une étude d’impact environnemental Nyir’umushinga uri ku rutonde rw’imishinga ikorerwa isuzumangaruka ku bidukikije ruri ku mugereka wa I n’uwa II y’iri teka ahitamo impuguke iri ku rutonde rw’abanyamwuga mu rutangazwa isuzumangaruka ku bidukikije hakurikijwe amategeko abigenga kugira ngo akore inyigo. Impuguke yatoranyijwe igomba kuba idafite inyungu zitaziguye cyangwa ziziguye muri uwo mushinga. izina rya yatoranyijwe, mu Impuguke nyir’umushinga, ishyikiriza urwego rwabiherewe uburenganzira gukora ubusabe isuzumangaruka ku bidukikije mu buryo bw’incamake y’umushinga hamwe n’imirongo ngenderwaho yifuza kwifashisha kugira ngo bisuzumwe kandi byemezwe. bwo Amakuru asabwa ku buryo burambuye aboneka mu mirongo ngenderwaho y’isuzumangaruka ku bidukikije ishyirwaho n’Ikigo. that require environmental The developer whose project is on the list of the projects impact assessment listed in Annex I and II of this Order, selects an expert from the list of environmental assessment practitioners published in accordance with relevant laws to conduct the study. une étude nécessitant Le promoteur dont le projet figure sur la liste des projets d’impact environnemental figurant sur l’annexe I et II du présent arrêté, choisit un expert sur la liste des praticiens d’étude d’impact environnemental publiée conformément à la législation en la matiѐre pour mener l’étude. The selected expert must not have any direct or indirect interests in that project. L’expert choisi ne doit avoir aucun intérêt direct ou indirect dans ce projet. The selected environmental impact assessment expert, on behalf of developer, submits an official application for environmental impact assessment of a proposed project to the authorised organ in form of a project brief together with proposed terms of reference for review and approval. L’expert d’étude d’impact environnemental choisi, au nom du promoteur, soumet à l’organe autorisé une demande officielle d’étude d’impact environnemental du projet proposé, sous la forme d’un descriptif de projet, assorti d’un mandat proposé pour examen et approbation. The details of the required information are found in the environmental impact assessment guidelines provided by the Authority. Les détails des informations requises se trouvent l’étude d’impact dans l’environnemental fournies par l’Office. les directives pour Nyuma yo kwakira no gusuzuma inshamake y’umushinga n’imirongo ngenderwaho yifuza kwifashisha, mu gihe cy’iminsi cumi n’ine (14), After reception and analysis of the project brief and proposed terms of reference, within fourteen (14) days, the authorised organ approves or request for Après réception et analyse d’un descriptif du projet et des termes de référence proposés, endéans quatorze (14) jours, l’organe autorisé approuve ou Official Gazette no.15 of 15/04/2019100 urwego rwabiherewe uburengenzira rwemeza cyangwa rugasaba ko hari ibyakosorwa ku mirongo ngenderwaho yatanzwe kugira ngo hakorwe isuzumangaruka ku bidukikije. updade of terms of reference for conducting the environmental impact assessment. demande la mise à jour des termes de référence pour mener l’étude d’impact environnemental. Article 6 of this Order. L’étude d’impact environnemental doit être basée sur les termes de référence mentionnés à l’article 6 du présent arrêté. The selected expert has a duty to involve the developer in all stages of the environmental impact assessment process. The expert has also a duty to appraise the developer of his or her responsibilities and obligations in implementation of the outcomes of the environmental impact assessment. L’expert sélectionné est tenu d’impliquer le promoteur dans toutes les étapes du processus d’étude d’impact environnemental. L’expert a également le devoir d’évaluer le promoteur de ses responsabilités et obligations dans la mise en l’étude d’impact œuvre des environnemental. résultats de Isuzumangaruka ku bidukikije rikorwa hitawe ku bitekerezo by’abafatanyabikorwa bose bireba. The environmental impact assessment is done with due consideration of the opinion of all the relevant stakeholders. L’étude d’impact environnemental est menée en tenant compte de l’avis de toutes les parties prenantes concernées. - 7 Verify source ↗
Isuzumangaruka ku bidukikije
AI-assisted research summary: The environmental impact assessment must follow the terms of reference in Article 6, and the selected expert must work with the project owner and analyze the owner’s implementation duties.
Ingingo ya 7: Isuzumangaruka ku bidukikije Article 7: Environmental impact assessment Article 7: Étude d’impact environnemental Isuzumangaruka rigomba gushingira ku mirongo ngenderwaho ivugwa mu ngingo ya 6 y’iri teka. bidukikije ku ifite Impuguke yatoranyijwe inshingano zo gukorana na nyir’umushinga ku byiciro byose by’imigendekere ku bidukikije. Impuguke ifite kandi inshingano yo gusesengura inshingano za nyir’umushinga mu gushyira mu bikorwa ibivuye mu isuzumangaruka ku bidukikije. y’isuzumangaruka The environmental impact assessment must be based on the terms of reference mentioned in - 8 Verify source ↗
Gutanga
AI-assisted research summary: The selected environmental impact assessment expert must submit a copy of the report to the authorised organ in electronic Word and PDF format after the assessment is completed.
Ingingo ya 8: Gutanga isuzumangaruka ku bidukikije raporo ku Article 8: Submission of the environmental impact assessment report Article 8: Soumission du rapport de l’étude d’impact environnemental isuzumangaruka ku Iyo hamaze gukorwa bidukikije, ku impuguke isuzumangaruka ku bidukikije ishyikiriza urwego rwabiherewe uburenganzira kopi ya raporo ikozwe mu buryo bw’ikoranabuhanga “word and PDF format”. yatoranyijwe Impuguke yatoranyijwe ku isuzumangaruka ku bidukikije ishobora gutanga inyongera kuri raporo Upon completion of the environmental impact assessment, the selected environmental impact assessment expert submits to the authorised organ a copy of the report in an electronic format “word and PDF format”. l’expert Lorsque l’étude d’impact environnemental est terminée, d’impact de environnemental choisi, soumet à l’organe autorisé une copie du rapport sous format électronique “word and PDF format”. l’étude Where impact assessment expert considers it necessary he or she environmental selected the L’expert de l’étude d’impact environnemental choisi peut fournir un addendum au rapport pour Official Gazette no.15 of 15/04/2019101 byari ku ngenderwaho iyo ibona ari ngombwa. bidateganyijwe mu mirongo may provide an addendum to the report for the facts that are not provided for under the terms of reference. les faits qui ne sont pas prévus dans les termes de référence lorsqu’il le juge nécessaire. - 9 Verify source ↗
Gusesengura raporo ku
AI-assisted research summary: The authorised organ must review an environmental impact assessment report, then within 20 working days accept it or ask the selected expert for more information.
Ingingo ya 9: Gusesengura raporo ku isuzumangaruka ku bidukikije Article 9: Analysis of environmental impact assessment report Article 9: Analyse du rapport de l’étude d’impact environnemental Nyuma yo kwakira raporo ku isuzumangaruka ku bidukikije, urwego rwabiherewe uburenganzira rurayisesengura hagamijwe kureba niba ihuye n’imirongo ngenderwaho n’amabwiriza. Upon reception of the environmental impact assessment report, the authorised organ analyses the report to verify conformity with the terms of reference and guidelines. Après réception du rapport de l’étude d’impact environnemental, l’organe autorisé analyse le rapport afin de vérifier sa conformité avec termes de référence et directives. igihe Mu gihe cy’iminsi makumyabiri (20) y’akazi uhereye raporo, urwego rwakiriye rwabiherewe uburenganzira rwemera cyangwa rugasaba ibisobanuro by’inyongera impuguke ku isuzumangaruka ku bidukikije yatoranyijwe. The authorised organ, within twenty (20) working days, after reception of the environmental impact assessment report, accept or request for additional information from selected environmental impact assessment expert. ariko Bitewe n’umwihariko w’umushinga, iminsi yavuzwe mu gika cya 2 cy’iyi ngingo ishobora kwiyongera kumenyeshwa impuguke ku isuzumangaruka ku bidukukije yatoranyijwe, mu nyandiko, mbere y’uko iminsi yavuzwe mu gika cya mbere cy’iyi ngingo irangira. bibanje Depending on the nature of the project, the period provided for in Paragraph 2 of this Article may be selected increased environmental in writing, before the lapse of the days mentioned in Paragraph One of this Article. impact assessment expert, informing after the du rapport Endéans vingt (20) jours ouvrables à partir de la réception d’impact environnemental, l’organe autorisé accepte ou demande des informations additionnelles à l’expert de l’étude d’impact environnemental choisi. d’étude Selon la nature du projet, le délai mentionné à l’alinéa 2 du présent article peut être prolongé après que l’étude d’impact environnemental choisi soit informé par écrit avant l’expiration du délai mentionné à l’alinéa premier du présent article. l’expert de rutangiza Iyo bibaye ngombwa ko urwego rwabiherewe ikusanyabitekerezo, uburenganzira hiyongeraho iminsi cumi n’itanu (15) y’akazi kuva rimenyekanisha itangazo ikusanyabitekerezo ryatanzweho. umunsi If it becomes necessary to hold public hearing, the authorised organ requires an additional period of fifteen (15) working days from the date of public hearing notification. Lorsque la consultation publique est nécessaire, l’organe autorisé prolonge ce délai de quinze (15) jours ouvrables à partir de la date de notification de ladite consultation. Official Gazette no.15 of 15/04/2019102 - 10 Verify source ↗
Uruhare rw’abaturage mu
AI-assisted research summary: The authorised organ must notify the public about the public hearing details and pay all costs of the process.
Ingingo ya 10: Uruhare rw’abaturage mu gutanga raporo y’isuzumangaruka ku bidukikije ibitekerezo kuri Article 10: Public participation to express views on the environmental impact assessment report bashobora gutanga Abafatanyabikorwa ibitekerezo byabo kuri raporo y’isuzumangaruka ku bidukikije kandi bakanagaragaza ingaruka umushinga ugiye gukorwa ushobora kugira. stakeholders may the The environmental report and express views on the impacts of the proposed project. impact assessment comment on Article 10: Participation du public pour exprimer les points de vue sur le rapport de l’étude d’impact environnemental Les parties prenantes peuvent commenter le rapport de l’étude d’impact environnemental et exprimer leurs points de vue sur les impacts du projet proposé. Urwego rwishyura n’ikusanyabitekerezo. rwabiherewe uburenganzira nirwo ajyanye amafaranga yose Mu rwego rwabiherewe kumenyesha abaturage ibi bikurikira: rw’ikusanyabitekerezo, urwego rugomba uburenganzira 1° igihe, umunsi n’ahantu ikusanyabitekerezo rizabera hakoreshejwe nibura bumwe mu buryo butatu (3) bukurikira: The authorised organ covers all costs of the public hearing process. L’organe autorisé couvre tous les coûts du processus de la consultation publique. In the framework of public hearing, the authorised organ must notify the public of the following: Dans le cadre de la consultation publique, l’organe autorisé doit notifier au public de ce qui suit: 1° the day, time and venue where the public hearing will take place by using at least any of the three (3) of the following means: 1° le jour, heure et lieu où se tiendra la consultation publique en utilisant au moins l’un des trois (3) moyens de communication suivants: a. gutangaza kabiri mu binyamakuru byo mu gihugu; b. gutangaza inshuro enye (4) kuri radiyo; c. kumanika amatangazo aho umushinga uzakorera; a. b. c. to publish a notice twice in any local newspapers; a. publier un avis deux fois dans un journal local; running announcements; four (4) radio to put up posters at the site of the proposed project; b. c. le passage de quatre (4) annonces à la radio; afficher les posters sur les lieux où le projet sera exécuté; 2° umwirondoro wa nyir’umushinga 2° the developer’s details including name and 2° les coordonnées du promoteur incluant ugaragaza amazina n’aho abarizwa. address. son nom et son adresse. Official Gazette no.15 of 15/04/2019103 - 11 Verify source ↗
Gufata icyemezo no gutanga
AI-assisted research summary: The authorised organ must notify the environmental impact assessment expert in writing of its decision, and the expert must send a copy to the developer within 24 hours of receiving it.
Ingingo ya 11: Gufata icyemezo no gutanga uburenganzira Article 11: Decision making and authorisation Article 11: Prise de décision et autorisation Urwego rwabiherewe uburenganzira rumenyesha impuguke ku isuzumangaruka ku bidukukije icyemezo cyafashwe mu nyandiko. The authorised organ communicates in writing its decision to the environemental impact assessment expert. L’organe autorisé communique sa décision à l’expert de l’étude d’impact environnemental par écrit. Mu gihe kitarenze amasaha makumyabiri n’ane (24) uhereye igihe impuguke ku isuzumangaruka ku bidukukije imenyesherejwe umwanzuro wafashwe, impuguke ku isuzumangaruka ku bidukikije igomba gushyikiriza nyir’umushinga rwabiherewe kopi y’umwanzuro w’urwego uburenganzira ku isuzumangaruka ku bidukikije. Within twenty-four (24) hours of receipt of the decision, the environmental impact assessment expert must submit a copy of the written decision by the authorised organ on the environmental impact assessment to the developer. Endéans vingt-quatre (24) heures suivant la réception de la décision, l’expert de l’étude d’impact environnemental doit soumettre au promoteur une copie de la décision écrite de l’organe d’impact sur environnemental. autorisé l’étude UMUTWE WA IV: INGINGO ZISOZA CHAPTER IV: FINAL PROVISIONS CHAPITRE IV: DISPOSITIONS FINALES - 12 Verify source ↗
Ivanwaho ry’iteka n’ingingo
AI-assisted research summary: This article repeals Ministerial Order No. 001/2018 and any prior provisions that conflict with this Order.
Ingingo ya 12: Ivanwaho ry’iteka n’ingingo zinyuranyije n’iri teka Article 12: Repealing provision Article 12: Disposition abrogatoire Iteka rya Minisitiri no 001/2018 ryo ku wa 25/04/2018 rigena urutonde rw’imirimo, ibikorwa n’imishinga bigomba gukorerwa isuzumangaruka z’amateka ku bidukikije n’ingingo ryo abanziriza bivanyweho. iri kandi zinyuranyije na zose Ministerial Order no 001/2018 of 25/04/2018 determining the list of works, activities and projects subject to an environmental impact assessment and all prior provisions contrary to this Order are repealed. L’Arrêté Ministériel no 001/2018 du 25/04/2018 portant la liste des travaux, activités et projets faisant l’objet d’une étude d’impact environmental et toutes les dispositions antérieures contraires au présent arrêté sont abrogées. - 13 Verify source ↗
Igihe iri teka ritangirira
AI-assisted research summary: This Order starts to apply on the day it is published in the Official Gazette of Rwanda.
Ingingo ya 13: Igihe iri teka ritangirira gukurikizwa Article 13: Commencement Article 13: Entrée en vigueur teka Iri ritangira gukurikizwa ku munsi ritangarijweho mu Igazeti ya Leta ya Repubulika y’u Rwanda. This Order comes into force on the date of its publication in the Official Gazette of the Republic of Rwanda. Le présent arrêté entre en vigueur le jour de sa publication au Journal Officiel de la République du Rwanda. Kigali, ku wa 15/04/2019 Kigali, on 15/04/2019 Kigali, le 15/04/2019 Official Gazette no.15 of 15/04/2019104 (sé) Dr BIRUTA Vincent Minisitiri w’Ibidukikije (sé) Dr BIRUTA Vincent Minister of Environment (sé) Dr BIRUTA Vincent Ministre de l’Environnement Bibonywe kandi bishyizweho ikirango cya Repubulika: Seen and sealed with the Seal of the Republic: Vu et scellé du Sceau de la République: (sé) BUSINGYE Johnston Minisitiri w’Ubutabera/Intumwa Nkuru ya Leta (sé) BUSINGYE Johnston Minister of Justice/Attorney General (sé) BUSINGYE Johnston Ministre de la Justice/Garde des Sceaux Official Gazette no.15 of 15/04/2019105 UMUGEREKA WA I W’ITEKA RYA MINISITIRI No 001/2019 RYO KU WA 15/04/2019 RISHYIRAHO URUTONDE RW’IMISHINGA IGOMBA ISUZUMANGARUKA GUKORERWA KU AMABWIRIZA, IBISABWA N’UBURYO BWO GUKORA ISUZUMANGARUKA KU BIDUKIKIJE BIDUKIKIJE, THE ANNEXE I TO MINISTERIAL ORDER No001/2019 15/04/2019 OF ESTABLISHING LIST OF PROJECTS THAT MUST UNDERGO IMPACT ENVIRONMENTAL ASSESSMENT, INSTRUCTIONS, REQUIREMENTS AND PROCEDURES TO CONDUCT ENVIRONMENTAL IMPACT ASSESSMENT ANNEXE I À L’ARRÊTÉ MINISTÉRIEL No001/2019 DU 15/04/2019 ÉTABLISSANT LA LISTE DES PROJETS DEVANT FAIRE L’OBJET D’UNE ÉTUDE ENVIRONNEMENTAL, D’IMPACT INSTRUCTIONS, CONDITIONS ET PROCÉDURES POUR MENER L’ÉTUDE D’IMPACT ENVIRONNEMENTAL URUTONDE RW’IMIRIMO, IBIKORWA N’IMISHINGA BIGOMBA ISUZUMANGARUKA GUKORERWA KU BIDUKIKIJE RYUZUYE LIST OF WORKS, ACTIVITIE AND PROJECTS THAT MUST UNDERGO A IMPACT FULL ENVIRONMENTAL ASSESSMENT LISTE DES TRAVAUX, ACTIVITÉS ET PROJETS DEVANT FAIRE L’OBJET D’IMPACT ÉTUDE D’UNE ENVIRONNEMENTAL COMPLÈTE 1° inyubako zose zigenewe guturwamo, ubucuruzi, gukorerwamo imirimo yo mu biro, imyidagaduro, by’ubusabane, ibikorwa umuco, insengero, hoteli, ubuvuzi, amashuri cyangwa izindi nyubako rusange zihurirwamo n’abantu benshi zujuje byibuze bibiri mu bikurikira: administrative 1° all buildings classified as residential, or commercial, institutional sports facilities, social, cultural, and assembly and religious buildings, hotels, health facilities, other buildings, educational publicly accessible facilities fulfilling at following least conditions: two of the or les bâtiments classés comme 1° tous commerciales, résidentielles, installations administratives ou institutionnelles, sportives, bâtiments à caractère social, culturel, de rassemblement hôtels, établissements de santé, bâtiments pour l'enseignement installations accessibles au public et remplissant au moins deux des conditions suivantes: religieux, autres ou ou a. zifite ubushobozi bwo kwakira abantu barenze magana atanu (500); a. having capacity to host more than a. five hundred (500) people; ayant une capacité d’accueil de plus de cinq cents (500) personnes; b. zifite ubuso bwubatse burenga metero kare igihumbi na magana atanu (1500 m²). b. having a total floor area exceeding one thousand and five hundred square meters (1500 sqm); b. ayant une surface de plancher totale supérieure à mille cinq cents mètres carrés (1500 m²); c. zubatse mu kibanza kirenze metero kare igihumbi (1000 m²). c. built in plot size exceeding one thousand square meters (1000 sqm). c. bâtis dans une superficie de la parcelle supérieure à mille mètres carrés (1000 m²). Official Gazette no.15 of 15/04/2019106 2° inganda; 2° industries; 2° industries; 3° inyubako zikorerwamo imirimo yateza impanuka; 3° buildings with activities which can cause hazards; 3° bâtiments où s’exercent des activités pouvant causer des accidents; 4° inyubako zigenewe kubikwamo ibikoresho byateza impanuka n’ibyangirika; 4° warehouses for storage of hazardous materials and perishables; 4° entrepôts pour le stockage des biens et matériaux dangereux et périssables; 5° inyubako zigenewe kubikwamo ibikomoka ku buhinzi byangirika ziri ku buso bungana cyangwa burenze kimwe cya kabiri cya hegitari (1/2 ha); 5° warehouses and storage facilities of perishable agricultural commodities occupying an area of a half a hectare (1/2 ha) and above; 5° entrepôts de denrées agricoles périssables occupant une superficie d’un demi-hectare (1/2 ha) et plus; 6° aho abantu bashyirwa mu rwego rw’igihano cyangwa kugororwa cyangwa kubera ikibazo cyo mu mutwe; 6° places where people are detained for punitive or corrective reasons or because of their mental condition; 6° lieux où les personnes sont détenues pour des raisons punitives ou correctives ou en raison de leur état mental; aho imirimo y’ubucuruzi itari 7° ahakorerwa iy’inganda cyangwa ibihacururizwa bishobora gufata umuriro, kuwukwirakwiza mu buryo bwihuse, kohereza imyuka ihumanya cyangwa guturika; ibihakorerwa 7° places of non-industrial commercial activities, where such activities or commercial products may cause fire, cause combustion with extreme rapidity, give rise to poisonous fumes or cause explosions; sites d’activités 7° commerciales non industrielles où les activités y effectués ou les produits objet du commerce sont susceptibles causer de une combustion avec une rapidité extrême, provoquer des fumées toxiques ou causer des explosions; l’incendie, provoquer 8° amagaraji bakanikiramo ibinyabiziga; 8°garages for vehicle repair and maintenance; 9° inyubako zigenewe ububiko bw’ibintu zifite ubuso bw’ubatse burenze metero kare igihumbi na magana atanu (1500 m2) n’ubuso bw’ikibanza burenze metero kare igihumbi (1000 m2); 9° warehouse with total floor area exceeding one thousand and five hundred square meters (1500 sqm) and plot size exceeding one thousand square meters (1000 sqm); 8° garages pour réparation et entretien de véhicules; 9° entrepôts de stockage avec une surface de plancher totale supérieure à mille cinq cent mètres carrés (1500 m²) et une superficie de terrain supérieure à un mille mètres carrés (1000 m²); Official Gazette no.15 of 15/04/2019107 10° amahoteli; 10° hotels; 10° hôtels; kubaka 11° imihanda mpuzamahanga, iyʼIgihugu nʼiyu’Uturere no gusana amateme manini; gusana no 11° construction and repair of international, national, District roads and repair of large bridges; 11° construction et réparation de routes internationales, nationales, de District et réparation de grands ponts; 12° kubaka ingomero z’amazi n’imiyoboro y’amashanyarazi; 12° construction of hydro-dams, hydropower plants and electrical lines of high and medium voltage; 12° construction des barrages hydroélectriques et lignes électriques; 13° kubaka peteroli na gazi ndetse n’ibigega byabyo; impombo z’ibikomoka kuri 13° construction of petroleum products and gas pipelines and their storage tanks; 13° construction d’oléoducs des produits pétroliers et du gaz ainsi que des réservoirs de stockage; 14° kubaka aho amato ahagarara, ibibuga by’indege na gari ya moshi; 14° construction of terminal ports, airports and railways; 14° construction de ports terminaux, aéroports et chemins de fer; ibikorwa 15° n’ubworozi bikoresha ifumbire mvaruganda n’imiti yica udukoko mu gishanga; by’ubuhinzi 15° agricultural and breeding activities which use chemical fertilizers and pesticides in wetlands; 15° activités agricoles et d’élevage qui utilisent des engrais chimiques et des pesticides dans les zones humides; 16° imishinga minini y’ishoramari mu buhinzi n’ubworozi ikoresha ifumbire mvaruganda n’imiti yica udukoko ikorerwa ku musozi; large scale 16° in agricultural and breeding activities which use chemical fertilizers and pesticides on hill sides; investment projects imirimo nʼibikorwa byo guhindura 17° uturemangingo twʼimbuto n’inyamaswa; 17° works and activities that involve genetic modification of seeds and animals; 16° projets d’investissements à grande échelle dans le domaine d’agriculture et d’élevage qui utilisent des engrais chimiques et des pesticides sur les collines; 17° œuvres et activités qui impliquent la modification génétique des graines et les animaux; 18° imirimo muri za pariki z’Igihugu no mu nkengero zazo; 18° works in areas designated as national parks and in their buffer zones; 18° travaux dans les parcs nationaux et dans ses zones tampon; imirimo yose 19° bwʼamabuye yʼagaciro; ijyanye n’ubucukuzi 19° all works related to mining; 19° tous les travaux liés à l’exploitation des mines; Official Gazette no.15 of 15/04/2019108 20° imirimo yose ijyanye n’ubucukuzi bwa kariyeri ntoya y’ubucuruzi n’inini; 20° commercial small and quarrying; large scale 20° l’exploitation commerciale de carrière à petite et à grande échelle; 21° kubaka ibiyaga-mpangano; 21° construction of artificial lakes; 21° construction des lacs artificiels; 22° kubaka ingomero zo kubika amazi; 22° construction of water storage dams; 22° construction des barrages de stockage d’eau; 23° ibikorwa cyangwa imirimo yo gutunganya ibishanga; 23° works or activities reclamation; for marshlands 23° les travaux ou activités pour l’amélioration des zones humides; 24° kubaka amabagiro. 24° construction of slaughter houses. 24° construction des abattoirs. Official Gazette no.15 of 15/04/2019109 Bibonywe kugira ngo bishyirwe ku mugereka w’Iteka rya Minisitiri No001/2019 ryo ku wa 15/04/2019 rishyiraho urutonde gukorerwa igomba rw’imishinga bidukikije, ku isuzumangaruka amabwiriza, ibisabwa n’uburyo bwo gukora isuzumangaruka ku bidukikije Seen to be annexed to Ministerial Order No001/2019 of 15/04/2019 establishing the that must undergo list of projects environmental assessment, impact instructions, requirements and procedures to impact assessment environmental conduct Vu pour être annexé à l’Arrêté Ministériel No 001/2019 du 15/04/2019 établissant la liste des projets devant faire l’objet d’une étude d’impact environnemental, instructions, conditions et procédures pour mener l’étude d’impact environnemental Kigali, ku wa 15/04/2019 Kigali, on 15/04/2019 Kigali, le 15/04/2019 (sé) Dr BIRUTA Vincent Minisitiri w’Ibidukikije (sé) Dr BIRUTA Vincent Minister of Environment (sé) Dr BIRUTA Vincent Ministre de l’Environnement Bibonywe kandi bishyizweho Ikirango cya Repubulika: Seen and sealed with the Seal of the Republic: Vu et scellé du Sceau de la République: (sé) BUSINGYE Johnston Minisitiri w’Ubutabera/Intumwa Nkuru ya Leta (sé) BUSINGYE Johnston Minister of Justice/Attorney General (sé) BUSINGYE Johnston Ministre de la Justice/Garde des Sceaux Official Gazette no.15 of 15/04/2019110 UMUGEREKA WA II W’ITEKA RYA MINISITIRI No 001/2019 RYO KU WA 15/04/2019 RISHYIRAHO URUTONDE RW’IMISHINGA IGOMBA ISUZUMANGARUKA GUKORERWA KU AMABWIRIZA, IBISABWA N’UBURYO BWO GUKORA ISUZUMANGARUKA KU BIDUKIKIJE BIDUKIKIJE, THE ANNEXE II TO MINISTERIAL ORDER No001/2019 15/04/2019 OF ESTABLISHING LIST OF PROJECTS THAT MUST UNDERGO IMPACT ENVIRONMENTAL ASSESSMENT, INSTRUCTIONS, REQUIREMENTS AND PROCEDURES TO CONDUCT ENVIRONMENTAL IMPACT ASSESSMENT ANNEXE II À L’ARRÊTÉ MINISTÉRIEL No 001/2019 DU 15/04/2019 ÉTABLISSANT LA LISTE DES PROJETS DEVANT FAIRE L’OBJET D’UNE ÉTUDE ENVIRONNEMENTAL, D’IMPACT INSTRUCTIONS, CONDITIONS ET PROCÉDURES POUR MENER L’ÉTUDE D’IMPACT ENVIRONNEMENTAL URUTONDE RW’IMIRIMO, IBIKORWA N’IMISHINGA BIGOMBA ISUZUMANGARUKA GUKORERWA KU BIDUKIKIJE RIHINNYE LIST OF WORKS, ACTIVITIE AND PROJECTS THAT MUST UNDERGO A PARTIAL ENVIRONMENTAL IMPACT ASSESSMENT LISTE DES TRAVAUX, ACTIVITÉS ET PROJETS DEVANT FAIRE L’OBJET D’IMPACT ÉTUDE D’UNE ENVIRONNEMENTAL PARTIELLE 1° iminara n’anteni; 1° towers and antennas; 1° tours et antennes; 2° inyubako zose, uretse izigomba gukorerwa isuzumangaruka ku bidukikije ryuzuye, zujuje byibuze bibiri mu bikurikira: 2° all types of buildings, except those qualified for full environmental impact assessment fulfilling at the following conditions: two of least 2° tous les types de bâtiments, à l’exception de ceux d’impact environnemental remplissant au moins deux des conditions suivantes: soumis l’étude à a. zifite ubushobozi bwo kwakira abantu barenga magana abiri (200) ariko batarenze magana atanu (500); a. with a capacity to host more than two hundred (200) people but not exceeding five hundred (500) people, a. ayant la capacité d’accueil de plus de deux cent (200) personnes mais ne (500) dépassant pas cinq cents personnes; b. zifite ubuso bwubatse burenga metero kare igihumbi na magana atanu (1500 m²).; b. with a total floor area exceeding one thousand and five hundred square meters (1500 sqm); b. ayant une surface de plancher totale supérieure à mille cinq cents mètres carrés (1500 m²), c. zubatse mu kibanza kirenze metero kare igihumbi (1000 m²). 3° ingomero z’amashanyarazi nto. c. built in a plot size exceeding one meters thousand (1000sqm). 3° micro hydroelectric power plants. square c. bâtis dans une superficie de la parcelle supérieure à mille mètres carrés (1000 m²). 3° des microcentrales hydroélectriques. Official Gazette no.15 of 15/04/2019111 Bibonywe kugira ngo bishyirwe ku mugereka w’Iteka rya Minisitiri no 001/2019 ryo ku wa 15/04/2019 rishyiraho urutonde gukorerwa igomba rw’imishinga bidukikije, ku isuzumangaruka amabwiriza, ibisabwa n’uburyo bwo gukora isuzumangaruka ku bidukikije Seen to be annexed to Ministerial Order no001/2019 of 15/04/2019 establishing the that must undergo list of projects environmental assessment, impact instructions, requirements and procedures to impact assessment environmental conduct Vu pour être annexé à l’Arrêté Ministériel no 001/2019 du 15/04/2019 établissant la liste des projets devant faire l’objet d’une étude d’impact environnemental, instructions, conditions et procédures pour mener l’étude d’impact environnemental Kigali, ku wa 15/04/2019 Kigali, on 15/04/2019 Kigali, le 15/04/2019 (sé) Dr BIRUTA Vincent Minisitiri w’Ibidukikije (sé) Dr BIRUTA Vincent Minister of Environment (sé) Dr BIRUTA Vincent Ministre de l’Environnement Bibonywe kandi bishyizweho ikirango cya Repubulika: Seen and sealed with the Seal of the Republic: Vu et scellé du Sceau de la République: (sé) BUSINGYE Johnston Minisitiri w’Ubutabera/Intumwa Nkuru ya Leta (sé) BUSINGYE Johnston Minister of Justice/Attorney General (sé) BUSINGYE Johnston Ministre de la Justice/Garde des Sceaux Official Gazette no.15 of 15/04/2019112
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
MINISTERIAL ORDER No 001/2019 OF 15/04/2019 ESTABLISHING THE LIST OF PROJECTS THAT MUST UNDERGO ENVIRONMENTAL IMPACT ASSESSMENT, INSTRUCTIONS, REQUIREMENTS AND PROCEDURES TO CONDUCT ENVIRONMENTAL IMPACT ASSESSMENT
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in