AI-assisted research summary: The applicant is given permission to build a petroleum products retail outlet, but only if the listed construction and safety conditions are met.
2. In this Notice, Unless the context otherwise requires- “applicant” means Magige Mwita Magige of P.O. Box 1207 Butiama; “Authority” means the Energy and Water Utilities the Regulatory Authority established under Energy and Water Utilities Regulatory Authority Act; and “construction approval” means an approval issued by the Authority pursuant to Section 128(1) of the Petroleum Act. Granting of construction approval 3 The applicant is hereby granted a construction approval to construct a petroleum products retail outlet at Magunga Village in Buhemba Area, Butiama District in Mara Region subject to the following conditions: (a) the retail station shall be constructed in accordance with the Tanzania Bureau of Standards TZS 1115:2009 and TZS 1079:2009; care exercised during excavation and installation of underground shall be (b) due 1 Petroleum (Magige Mwita Magige) (Construction Approval) GN. NO. 445 (Contd.) Cap 340 tanks; (c) the layout of the retail station shall meet the minimum safety distances in accordance with Tanzania Bureau of Standards TZS 1079:2009; (d) the underground tanks and associated pipelines shall be well protected from corrosion and the back filling shall be done properly using non-corrosive materials; (e) the underground storage tanks and pumps together with the connecting pipes and fittings shall be constructed so as to prevent any leakage of fuel; (f) underground storage tanks and dispensing pumps shall be calibrated by the Weights and Measures Agency established under the Weights and Measures Act; (g) the forecourt of the retail station shall be paved with impervious materials at the pump island with a drainage provision connected to oil and water separator; (h) an emergency shut off switch shall be installed in a conspicuous and accessible area; (i) ensuring that there are adequate and clean toilet facilities at all times; (j) clear and visible safety warning signs shall be installed at the entrance, exit and at the dispensing pumps, including "switch off engine", "switch off mobile phone" and "no smoking"; (k) each storage tank shall be fitted with vent pipes with a minimum height of 3.6 metres; (l) each pump shall be protected with crash barriers with the height of one meter above the ground; (m) the offloading manhole shall be constructed in accordance with good petroleum industry practices and the offloading receiving pipes shall be provided with couplings to prevent 2 Petroleum (Magige Mwita Magige) (Construction Approval) GN. NO. 445 (Contd.) spillages during offloading; (n) the retail station shall be covered with a canopy covering at least the pump island and constructed in accordance with good petroleum industry practices; and (o) a price board shall be erected in a conspicuous place. Expiry of construction approval