AI-assisted research summary: The applicant is allowed to build a petroleum products retail outlet, but only if the listed construction and safety conditions are followed.
3. The applicant is hereby granted a construction approval to construct a petroleum products retail outlet at Plot No. 1 Block ‘A’, Minara Mitatu Area, Morogoro Municipality in Morogoro Region subject to the following conditions: (a) the retail station shall be constructed accordance with Standards TZS 1115:2009 and TZS 1079:2009; in the Tanzania Bureau of (b) due care shall be exercised during excavation (c) (d) (e) and installation of underground tanks; the layout of the retail station shall meet the minimum safety distances in accordance with Tanzania Bureau of Standards TZS 1079:2009; the underground tanks and associated pipelines shall be well protected from corrosion and the back filling shall be done properly using non- corrosive materials; the underground storage tanks and pumps together with the connecting pipes and fittings 1 Petroleum (Daily Oil) (Construction Approval) GN NO. 902 (Contd.) shall be constructed so as to prevent any leakage of fuel; Cap. 340 (g) (f) underground storage tanks and dispensing pumps shall be calibrated by the Weights and Measures Agency established under the Weights and Measures Act; the forecourt of the retail station shall be paved with impervious materials at the pump island with a drainage provision connected to oil and water separator; (h) an emergency shut off switch shall be installed (i) (j) in a conspicuous and accessible area; ensuring that there shall be adequate and clean toilet facilities at all times; clear and visible safety warning signs shall be the installed at the entrance, exit and at dispensing pumps, "switch off engine", "switch off mobile phone" and "no smoking"; including (k) each storage tank shall be fitted with vent pipes (l) with a minimum height of 3.6 metres; each pump shall be protected with crash barriers with the height of one meter above the ground; (m) the offloading manhole shall be constructed in industry accordance with good petroleum practices and the offloading receiving pipes shall be provided with couplings to prevent spillages during offloading; the retail station shall be covered with a canopy covering at island and constructed in accordance with good petroleum industry practices; and the pump least (n) (o) a price board shall be erected in a conspicuous place. Expiry of construction approval