AI-assisted research summary: The applicant gets construction approval for a petroleum products retail outlet, but must follow a long list of construction and safety conditions.
3. The applicant is hereby granted a construction approval to construct a petroleum products retail outlet at Plot No. 1, Block ‘AR’, Mtumba in Dodoma Region subject to the following conditions: (a) the retail station shall be constructed in accordance with the Tanzania Bureau of Standards TZS and TZS 1079:2009; 1115:2009 (b) due care shall be exercised during excavation and installation of underground tanks; 1 Petroleum (Emmanuel Haleluya Kessy – Vikonje) (Construction Approval) GN. NO. 952 (Contd.) (c) the layout of the retail station shall meet the minimum safety distances in accordance with Tanzania Bureau Standards TZS of 1079:2009; tanks (d) the underground associated pipelines shall be well protected from corrosion and the back filling shall be done properly using non-corrosive materials; and Cap. 340 (e) the underground storage tanks and pumps together with the connecting pipes and fittings shall be constructed so as to prevent any leakage of fuel; (f) underground storage tanks and dispensing pumps shall be calibrated by the Weights and Measures Agency established under the Weights and Measures Act; (g) the forecourt of the retail station shall be paved with impervious materials at the pump island with a drainage provision connected to oil and water separator; (h) an emergency shut off switch shall be installed in a conspicuous and accessible area; (i) ensuring that there shall be adequate and clean toilet facilities at all times; (j) clear and visible safety warning signs shall be installed at the entrance, exit and at the dispensing pumps, including "switch off engine", "switch off mobile phone" and "no smoking"; (k) each storage tank shall be fitted with vent pipes with a minimum height of 3.6 metres; (l) each pump shall be protected with crash barriers with the height of one meter above the ground; (m) the offloading manhole shall be constructed in industry accordance with good petroleum practices and the offloading receiving pipes shall be provided with couplings to prevent spillages during offloading; (n) the retail station shall be covered with a 2 Petroleum (Emmanuel Haleluya Kessy – Vikonje) (Construction Approval) GN. NO. 952 (Contd.) canopy covering at least the pump island and constructed good in petroleum industry practices; and accordance with (o) a price board shall be erected in a conspicuous place. Expiry of construction approval