THE ELECTRICITY (DEVELOPMENT OF SMALL POWER PROJECTS) RULES, 2016 | THE ELECTRICITY (DEVELOPMENT OF SMALL POWER PROJECTS) RULES, 2016 — Tanzania law | Esheria

THE ELECTRICITY (DEVELOPMENT OF SMALL POWER PROJECTS) RULES, 2016

This section is about a preliminary engineering assessment and an estimate of interconnection cost.

Jurisdiction
Tanzania
Instrument
Rule
Citation
THE ELECTRICITY (DEVELOPMENT OF SMALL POWER PROJECTS) RULES, 2016
Version
Undated source snapshot
Language
en
Official source
View official record ↗
adjudication appeals application processing audit compliance backup power pricing bid qualification bid submission bidding bulk supply carbon credits citation and title commercial operation commercial operation date commissioning procedure community notification competitive bidding compliance compliance payments consultation cost estimation cost recovery developer compliance distribution assets distribution planning +87 more

Statute overview

About this statute

This section is about a preliminary engineering assessment and an estimate of interconnection cost. This section is titled “Appeal.” Section title only: Maximum Allowable Generation Capacity. This section concerns applications for interconnection and the sale of electricity. Section 18 is titled “Obligation to Pay Interconnection Costs” and relates to procurement of wind and solar power projects through competitive bidding.

LexChat organizes source-backed legal information for research. Verify amendments, commencement, and current legal force with the official publisher before relying on it.