The Excise (Management and Tariff) (Remission) (Establishment of LPG Processing and Bulk Storage Facility Project) (M/S Oilcom (T) Limited) Order, 2024
This Order may be cited by the stated short title.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Tanzania
- Instrument
- Order
- Citation
- The Excise (Management and Tariff) (Remission) (Establishment of LPG Processing and Bulk Storage Facility Project) (M/S Oilcom (T) Limited) Order, 2024
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
Statute overview
About this statute
This Order may be cited by the stated short title. Excise duty on specified fuel, lubricants, and scheduled goods is remitted for M/S Oilcom (T) Limited for the LPG processing and bulk storage facility project, subject to stated conditions. The remission stops if the fuel, lubricants, or goods are used for another purpose or passed to someone without similar privileges, and the excise duty becomes payable. This Order expires on 10 May 2025, but it may be extended under the stated performance agreement. This section lists equipment, materials, and systems for an LPG processing and bulk storage facility project.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of The Excise (Management and Tariff) (Remission) (Establishment of LPG Processing and Bulk Storage Facility Project) (M/S Oilcom (T) Limited) Order, 2024
Showing 6 of 6
- 1 Verify source ↗
This Order may be cited as
AI-assisted research summary: This Order may be cited by the stated short title.
1. This Order may be cited as the Excise (Management and Tariff) (Remission) (Establishment of LPG Processing and Bulk Storage Facility Project) (M/S Oilcom (T) Limited) Order, 2024. - 2 Verify source ↗
Subject to the conditions specified in paragraph
AI-assisted research summary: Excise duty on specified fuel, lubricants, and scheduled goods is remitted for M/S Oilcom (T) Limited for the LPG processing and bulk storage facility project, subject to stated conditions.
2. Subject to the conditions specified in paragraph 3, and any other conditions as may be specified by the Commissioner General of Tanzania Revenue Authority, the whole of excise duty payable on fuel, lubricants and goods specified in the Schedule to this Order, imported or purchased locally prior to clearance through customs by or on behalf of M/S Oilcom (T) Limited to be used in the establishment of LPG processing and bulk storage facility project is hereby remitted. - 3 Verify source ↗
The remission granted under this Order shall
AI-assisted research summary: The remission stops if the fuel, lubricants, or goods are used for another purpose or passed to someone without similar privileges, and the excise duty becomes payable.
3. The remission granted under this Order shall cease to have effect and the excise duty shall become due and payable as if this Order had not been made if the said fuel, lubricants and goods are used for other purposes or are transferred, sold or disposed of in any way to another person not entitled to enjoy similar privileges as are conferred under this Order. Expiry - 4 Verify source ↗
This Order shall expire on the 10th day of May,
AI-assisted research summary: This Order expires on 10 May 2025, but it may be extended under the stated performance agreement.
4. This Order shall expire on the 10th day of May, 2025 and may be extended in accordance with the performance agreement between M/S Oilcom (T) Limited the Tanzania Investment Centre on behalf of and Government of Tanzania dated 23rd June, 2023. 1 Excise (Management and Tariff) (Remission) (Establishment of Lpg Processing and Bulk Storage Facility Project) (M/S Oilcom (T) Limited) GN. No. 375 (Contd) ____________ SCHEDULE ____________ (Made under paragraph 2) A - CAPITAL/DEEMED CAPITAL GOODS LIST No: HS CODE ITEM NAME MODEL/SPECIFICATION 1 2 3 4 5 6 7 8 9 7208.90. 00 Tank Steel Plates 7307.99. 00 Tank Steel Fittings 8515.39. 00 Welding Machines 7308.40. 00 8463.20. 00 8424.20. 00 Scaffolding Equipment Plate Roller Painting Machines 9031.80. 00 Corrosion Protection System 9026.80. 00 Tank Safety Fittings 8523.80. 10 Tank Monitoring Fittings SA 537 Class 2 of Steel for LPG Mounded Tanks to store 3750 MT of LPG Storage Tank with Design pressure of 17.5 Bar.
Part
SCHEDULE
- 13 Verify source ↗
3 Meter Internal Diameter as
AI-assisted research summary: This section lists equipment, materials, and systems for an LPG processing and bulk storage facility project.
13.3 Meter Internal Diameter as per ASME Sec VIII Div 2 Design Supply of Flanges, Fittings, Nozzle Pipes + Other Hardware Material for LPG Mounded Tanks Welding Machines (400-amp, 600 amp and 1000 amp) along with Panel and Cabling 200 m each for the Tank Fabrication Scaffolding Pipes along with required number of Clamps Rolling Machines for the Plate Rolling Machine, 75mm Thick x 3 m wide Airless Epoxy Painting Machines Impressed Current Cathodic Protection system with a Design Life of 50 Years and Working Life of 30 Years. With Anode flex 5000 Anodes. Duly Certified by NACE IV Level Technician. With Monolithic Joints for Flange Isolation for all the Bullets Number Servo Level Gauge + One Number of Radar Level Gauge + Temp and Pressure Transmitter + Temp and Pressure Gauge + Safety Valves. Complete Inventory Management Software TFMS system of with Provision to Control Incoming and Outgoing 2 UNIT OF MEAS URE QUANTI TY MT 6500 MT 80 NMB 50 MT 250 NMB NMB 1 3 SET 5 SET SET 4 4 Excise (Management and Tariff) (Remission) (Establishment of Lpg Processing and Bulk Storage Facility Project) (M/S Oilcom (T) Limited) GN. No. 375 (Contd) 10 8481.80. 00 Remote Operated Valves Set for Each Tank 11 12 8413.70. 00 8414.80. 99 LPG Pumps LPG Compressor 13 8428.90. 00 3" Tanker Loading Arm Equipment 14 15 16 17 18 19 8428.90. 00 Batch Controllers 8481.80. 00 7307.99. 00 Ball Valves Pipe Fittings 7307.99. 00 Carbon Steel Pipes 8413.81. 00 Firefighting Pump set 8413.81. 00 Fire Pump Jockey Pump Material status Storage Tank Liquid Outlet Nozzle (1 Nos Each Bullet) at the Bottom, 12” NB Storage Tank Liquid Inlet Nozzle (2 Nos Each Bullet) at the Top, 12” NB Storage Tank Vapour Inlet and Outlet (1 Nos Each Bullet) at the Top, 4” NB Storage Tank Liquid Return Line (1 Nos Each Bullet) at the Top, 4” NB Road Tanker Multistage Loading Pumps Tanker Unloading/Evacuation Compressor Each Set will consist of below: - QCDC Coupling - Break Away Coupling - Swivel Type Loading Arm of 3" Liquid and 2" NB Vapour line - Sight Flow Glass for Liquid Line - NRV for Liquid Line - Necessary Ball Valves and Other safety Fittings - Mass Flow Meter - Tanker Liquid Loading Line 1 Nos- 3” NB - Tanker Vapour Loading/Unloading line 1 Nos – 2” NB Batch Controller System for Tanker Loading system with Auto Cut off system and complete MIS Fire Safe Ball Valves of Class 300 (Various Sizes from 14 Inch to 1/2 Inch) SS304 U-Clamps + SS304 Gaskets + Earthing Copper Jumper Interconnecting LPG Product Piping of ASA 106 Gr B Sch 40/80 Fire Water Engine Complete Set with Engine + Pump + Battery + Heat Exchanger + Fuel tank + Stack Fire fighting Jockey Pump of 40 cum per Hr 80 Meter Head 3 SET 4 NMB NMB 10 5 SET 9 SET 1 NMB 250 MT 10 MT 250 NMB NMB 5 5 Excise (Management and Tariff) (Remission) (Establishment of Lpg Processing and Bulk Storage Facility Project) (M/S Oilcom (T) Limited) GN. No. 375 (Contd) 20 21 22 23 24 7308.90. 99 8424.10. 00 8481.80. 00 8424.20. 00 Water Tank Steel Plates & Profiles Fire Extinguishers Fire Hydrants Fire Monitors 7307.99. 00 Water Hydrant Pipe 25 8424.20. 00 Steel Structure Sprinklers 26 27 28 8424.20. 00 Jetty Piping Sprinklers 8481.80. 00 Tank Deluge System 8481.80. 00 Filling Shed Deluge System 29 8481.80. 00 Pump Shed Deluge System Tanker Loading Bay Deluge System Transformers Prefabricated Fire Water Tank - SA 36 Gr B / Q275R Steel Fire Extinguisher 10 Kg Capacity (DCP + ABC) Fire Hydrant with hose and Hose Box, 63mm Nozzle with 1800LPM Water Flow Rates Fire Monitors 63mm, UL Approved Galvanised ERW (API 5L) Pipe Thick. Hydrant of Piping (Various sizes from 11/2 inch to 24 Inch) Medium Velocity Sprinkler Nozzle (Model K22 with 120 Deg), UL approved System for Sphere + LPG Pump room + LPG Tanker Loading Shed + LPG Cylinder Filling Shed. Medium Velocity Sprinkler Nozzle System for LPG Jetty and piping Deluge Valve system for Tank Sprinkler with Low- and High- Pressure Switch system. Dry Type Gong 80 NB Deluge Valve system for Filling Shed with Low- and High- Pressure Switch system. Dry Type Gong, 80 NB Deluge Valve system for Pump Shed with Low- and High- Pressure Switch system. Dry Type Gong, 80 NB Deluge Valve system for tanker loading with Low- & High- Pressure Switch system. Dry Type Gong, 80 NB Electrical Transformer 2000 KVA and Sub-station 30 31 32 33 34 35 36 37 8481.80. 00 8504.22. 00 8502.13. 00 8502.11. 00 8502.13. 00 8502.12. 00 9405.40. 00 9405.40. 00 Generator Diesel Generator 500KVA Generator Diesel Generator 60KVA Generator Diesel Generator 1000 KVA NMB Generator Diesel Generator 100KVA NMB Perimeter Lights Lighting System-Well Head Lamps, Flameproof Enclosed, 40W LED Light NMB Lighting Poles Lighting System- High Mast NMB 4 MT 200 NMB NMB NMB 40 20 20 MT 200 NMB 1000 NMB 100 NMB NMB NMB NMB NMB NMB NMB 4 6 6 6 1 2 2 2 2 72 6 Excise (Management and Tariff) (Remission) (Establishment of Lpg Processing and Bulk Storage Facility Project) (M/S Oilcom (T) Limited) GN. No. 375 (Contd) 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 8535.40. 00 8535.90. 00 8537.10. 00 8537.10. 00 8537.10. 00 8537.10. 00 8537.20. 00 8537.10. 00 8471.30. 00 8536.50. 00 8536.90. 00 9031.90. 00 8414.80. 10 8481.80. 00 8481.80. 00 8481.80. 00 8481.80. 00 7307.99. 00 7307.99. 00 8481.80. 00 4009.42. 00 4009.42. 00 8422.30. 00 8422.30. 00 8422.30. 00 6 1 5 5 5 5 5 5 5 50 10 30 3 20 50 10 50 Lightning Protection Earthing System Lightning Arrestor, 60 m radius with Pole Static Earthing + Electrical Equipment Earthing Electrical Panel Power Factor Control Panel. Electrical Panel PMCC (Process Motor Control Centre) Electrical Panel Process Distribution Board Electrical Panel Light Distribution Board. UPS Electrical Panel Electrical Panel UPS Panel 10 KVA. Minimum. (With Battery Bank) Programmable Logic Controller Panel Operator station As HMI (Computer with Hard Disc and A4 Printer.) NMB SET NMB NMB NMB NMB NMB NMB NMB Switches Flame Proof ON/OFF Switches NMB Junction Boxes Leak Detectors Air Compressors Pipe Safety Fittings Pipe Safety Fittings Pipe Safety Fittings Pipe Safety Fittings LPG Import Pipeline - Liquid LPG Import Pipeline - Vapour Ball Valves High Pressure Hoses High Pressure Hoses LPG Cylinder Filling Machine LPG Cylinder Filling Machine LPG Cylinder Filling Machine Fire Proof Type FLP Junction Box Infra Red Type (30 Nos of Sensors), Honeywell USA Screw Type Air Compressors with Receiver Tanks NMB NMB NMB Thermal Stress Relief Valves NMB Pressure Gauges Temperature Gauges Needle Valves NMB NMB NMB 12" NB (ASA 106 Sch 80, 3LPE Coated) MT 400 4" NB (ASA 106 Sch 80, 3LPE Coated) Marine Grade Ball Valves and Other Instruments for Onshore Jetty Isolation Unloading Hose with High Mast Liquid 12 Inch NB x 25 m Long Unloading Hose with High Mast Vapour 4 Inch NB x 25 m Long 24 Post - 6 Kg Cylinder Filling Carousel Unit 12 Post - 6 Kg Cylinder Filling Carousel Unit 12 Post - 15 Kg Cylinder Filling Carousel Unit MT MT NMB NMB SET SET SET 5 75 50 2 2 2 2 2 Excise (Management and Tariff) (Remission) (Establishment of Lpg Processing and Bulk Storage Facility Project) (M/S Oilcom (T) Limited) GN. No. 375 (Contd) 63 64 65 66 67 68 69 70 8422.30. 00 8422.19. 00 8413.70. 00 8422.40. 00 8423.89. 90 8422.30. 00 8525.60. 00 8525.60. 00 LPG Cylinder Filling Machine LPG Cylinder Washing Machine LPG Pumps Pelleting Machine 38 Kg Cylinder Stationery Filling Scales Inline Cylinder Washing Machine LPG Cylinder Multistage Filling Pumps NMB NMB NMB LPG Cylinder Palletising System SET Weigh Bridges Truck Weighing Bridges Semi-Automatic Cylinder Painting Line SET NMB 10 4 10 1 8 1 Security Cameras NMB 50 DVR for Cameras NMB 5 Cylinder Painting Security System (CCTV) Security System (CCTV) B - BUILDING MATERIALS LIST No: HS CODE ITEM NAME MODEL/SPECIFICATION UNIT OF MEAS URE NMB QUANTI TY 9 Prefabricated Steel Structures Steel Structures MT - 258
AI-assisted research summary: This provision lists items, HS codes, and quantities for a project schedule under the remission notice.
258.8 Armoured Cable XLPE Various Sizes Galvanized Cable Trays Fire Resistant Instrumentation Cables MT MT 500 50 MT 100 Structural Steel Profiles MT 12000 1 2 3 4 5 6 7308.90 .99 9406.90 .90 8537.20 .00 7616.99 .00 8544.49 .00 7308.90 .99 Loading Bay Structures Fire Pump Shed & Control Room Main Incomer Cable Cable Trays Electrical Instrumentation Cables Prefabricated Steel C - VEHICLES LIST No: HS CODE ITEM NAME MODEL/SPECIFICATION UNIT OF MEASUR E QUANTI TY 1 2 3 8426.19. 00 8426.19. 00 8426.19. 00 Crane for the Tank Erection, 400 MT Crane for the Tank Erection, 80 MT Crane for the Tank Erection, Crawler Crane 400MT NMB Crawler Crane 80MT Crawler Crane 20MT NMB NMB 1 2 2 6 Excise (Management and Tariff) (Remission) (Establishment of Lpg Processing and Bulk Storage Facility Project) (M/S Oilcom (T) Limited) GN. No. 375 (Contd) 20 MT LPG Cylinder Distribution Trucks 8704.21. 90 Canter Trucks NMB 100 8704.22. 90 Bulk LPG Tanker Trucks LPG Tanker Trucks 20MT/22MT Capacity NMB 100 8427.20. 00 Forklifts Fork Lifts 3MT - Operations NMB 5 4 5 6 Dodoma, 7th May, 2024 MWIGULU LAMECK NCHEMBA MADELU Minister for Finance 7
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
The Excise (Management and Tariff) (Remission) (Establishment of LPG Processing and Bulk Storage Facility Project) (M/S Oilcom (T) Limited) Order, 2024
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in