The Energy and Water Utilities Regulatory Authority (Internal Review Procedure) Rules, 2023
Section 3 is titled “Interpretation” and appears in Part II, “Proceedings of the Review Panel.”
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Tanzania
- Instrument
- Rule
- Citation
- The Energy and Water Utilities Regulatory Authority (Internal Review Procedure) Rules, 2023
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
Statute overview
About this statute
Section 3 is titled “Interpretation” and appears in Part II, “Proceedings of the Review Panel.” This section concerns extending the time to file an application. 11. Hearing of application. 1 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) The Committee may make rules for its own proceedings. Section 19 is titled “Appeals” and appears in Part III, General Provisions.
Search within this statute
Search all stored provisions in this version.
Legal text
Provisions of The Energy and Water Utilities Regulatory Authority (Internal Review Procedure) Rules, 2023
Showing 28 of 28
- 3 Verify source ↗
Interpretation
AI-assisted research summary: Section 3 is titled “Interpretation” and appears in Part II, “Proceedings of the Review Panel.”
3. Interpretation. PART II PROCEEDINGS OF THE REVIEW PANEL
Part
PART II
- 7 Verify source ↗
Extension of time to file an application
AI-assisted research summary: This section concerns extending the time to file an application.
7. Extension of time to file an application. - 11 Verify source ↗
Hearing of application
AI-assisted research summary: 11. Hearing of application. 1 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd)
11. Hearing of application. 1 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) - 17 Verify source ↗
Committee may regulate its own proceedings
AI-assisted research summary: The Committee may make rules for its own proceedings.
17. Committee may regulate its own proceedings. - 19 Verify source ↗
Appeals
AI-assisted research summary: Section 19 is titled “Appeals” and appears in Part III, General Provisions.
19. Appeals. PART III GENERAL PROVISIONS - 4 Verify source ↗
(1) A person aggrieved by any substantive
AI-assisted research summary: A person aggrieved by a substantive decision made on behalf of the Authority under delegated power may apply to the Authority for review.
4.-(1) A person aggrieved by any substantive decision made on behalf of the Authority under delegated power may apply to the Authority for review. (2) The application under subrule (1) shall be made within fourteen days after receipt of the decision. (3) For the purpose of subrule (2) the date of receipt of decision shall be the date when the decision was properly served pursuant to rule 8. (4) The application for review shall be in a form prescribed in the Schedule. Cap. 285 Application for review Authority to constitute committee the - 5 Verify source ↗
(1) The Board shall, upon receipt of
AI-assisted research summary: The Board must form a committee within seven days after receiving an application under rule 4. The Board also appoints the committee chairperson, and the Director General nominates a secretary with legal background.
5.-(1) The Board shall, upon receipt of application under rule 4 and in any event not later than seven days constitute a committee consisting of: (a) two members from the Panel, one of whom shall be a lawyer and another one who is qualified in the field subject of the application; and (b) one member of the Board who did not participate 4 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) Invitation to make submissions Extension of time to file an application in the decision which is the subject of the review. (2) The Board shall appoint the chairperson of the Committee among members of the Committee appointed under subrule (1). (3) The Director General shall nominate one person among officials from the Authority with legal background to be the Secretary of the Committee. - 6 Verify source ↗
(1) The Committee shall cause the application for
AI-assisted research summary: The Committee must serve the review application on specified persons and invite submissions. Anyone served must file submissions supporting or opposing the application within 21 days of invitation. A person who has submitted a submission has a right of audience before the Committee at the hearing.
6.-(1) The Committee shall cause the application for review to be served to the following persons inviting them to make submissions to the said application. (a) the respondent; (b) the Minister; (c) the relevant sector Minister; (d) interested parties, if any; (e) the Consumer Consultative Council; and (f) any person the Committee considers necessary. (2) The person served with the invitation to make submissions under subrule (1) shall prepare submissions in support or opposing the application and submit the same to the Committee within twenty-one days from the date of invitation. (3) The person who has submitted submission under subrule (2) shall have the right of audience before the Committee during hearing. - 7 Verify source ↗
(1) The applicant may apply for extensions of
AI-assisted research summary: An applicant may seek more time to file a review application if sufficient cause is shown.
7.-(1) The applicant may apply for extensions of time to file the application for review on showing sufficient cause. (2) The application under subrule (1) shall be made to the Director General who upon receipt of the same shall forward it to the Committee for determination. (3) The Committee shall, after receipt of the application under subrule (2) deliberate on such application and make recommendations to the Board. (4) The Committee shall, while deliberating on the application under subrule (3) afford all parties opportunity to make submissions. 5 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) Service of documents - 8 Verify source ↗
Service of a document, to any party under these
AI-assisted research summary: This section says documents for a party under these rules must be served by personal delivery, registered mail with return receipt, or publication in two newspapers when the stated conditions are met.
8. Service of a document, to any party under these rules shall be by way of: (a) personal delivery the party or his to representative who shall acknowledge receipt by signing and return copy of the document to the Authority; in (b) registered mail with return receipt; or (c) publication two newspapers of general circulation in Tanzania, one in English and another in Kiswahili where the Authority has determined that: (i) (ii) (iii) there are reasons to believe that the party is keeping out of the way for the purpose of avoiding the service; the documents cannot for any other reason, be served in an ordinary way; or there is proof in writing from the local authority that efforts to serve the party were taken and that such efforts have failed due to reasons given under subparagraphs (i) and (ii). Quorum of the Committee Notice of hearing Hearing of application - 9 Verify source ↗
Quorum at any meeting of the Committee shall be
AI-assisted research summary: A meeting of the Committee needs at least three members to have quorum.
9. Quorum at any meeting of the Committee shall be at least three members. - 10 Verify source ↗
The parties shall be notified in writing the date
AI-assisted research summary: The parties must be given written notice of the hearing date and venue, and the notice must be signed by the Chairman or Secretary of the Committee.
10. The parties shall be notified in writing the date and venue of hearing and such notice shall be signed by the Chairman or Secretary of the Committee. - 11 Verify source ↗
(1) The Committee shall, after the expiration of
AI-assisted research summary: The Committee must start hearing the application after the 21-day submission period ends. During the hearing, the parties may appear in person or through an advocate or duly appointed representative, and submissions may be oral or written.
11.-(1) The Committee shall, after the expiration of twenty-one days to which the persons mentioned under Rule 5 are required to submit their submissions, commence hearing of the application. (2) During hearing the parties may appear in person, advocate or dully appointed representative. (3) During hearing submissions shall be made either orally or in writing. 6 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) Procedure on non- appearance Interim applications - 12 Verify source ↗
(1) Where the applicant does not appear on a day
AI-assisted research summary: If the applicant misses a fixed hearing day without reasonable cause, the Committee may recommend dismissal to the Board; if a party shows sufficient cause, they may ask the Board to set aside a dismissal or ex parte order.
12.-(1) Where the applicant does not appear on a day fixed for hearing without reasonable cause, the Committee the may recommend application. the Board for dismissal of to (2) Where the applicant appears and the respondent does not appear without reasonable cause, the application may proceed exparte. (3) A party may, upon showing sufficient cause apply to the Board to set aside the dismissal order under subrule (1) or the exparte order under subrule (2). - 13 Verify source ↗
(1) The Committee shall have powers to receive
AI-assisted research summary: The Committee may receive and decide pending applications, including requests for extension of time, and must let all parties make submissions while considering the application.
13.-(1) The Committee shall have powers to receive and determine any application made by the parties pending determination of the application including prayers for extension of time. (2) The Committee shall, while deliberating on the application under subrule (1) afford all parties to make submissions. Withdrawal of application - 14 Verify source ↗
(1) The applicant may, at any time prior to
AI-assisted research summary: The applicant may withdraw the application before it is determined. If a withdrawal application is received, the Committee must mark the application withdrawn and prepare recommendations to the Board.
14.-(1) The applicant may, at any time prior to determination of the application withdraw the application. (2) Upon receipt of an application for withdrawal, the Committee shall mark the application withdrawn and prepare recommendations to the Board. Recommend ations by the Committee - 15 Verify source ↗
(1) The Committee shall within three weeks after
AI-assisted research summary: The Committee must review the application and submissions, prepare a recommendation, and send it to the Board within three weeks after receiving the submissions.
15.-(1) The Committee shall within three weeks after receipt of the submissions under rule 6, consider the application together with any submissions received, prepare a recommendation and submit to the Board for decision. (2) The Committee shall, while preparing recommendations under subrule (1), decide whether cost be awarded and the quantum thereof. (3) Decisions of the Committee shall be by consensus and in the event no consensus is reached by way of majority vote. Venue and date - 16 Verify source ↗
(1) The Committee shall determine the date and
AI-assisted research summary: The Committee must set the hearing date and venue, consider the parties, witnesses, and budget limits, and may regulate its own proceedings.
16.-(1) The Committee shall determine the date and venue for the hearing. 7 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) (2) The Committee shall, in determining date and the the parties, witnesses and budgetary into consideration take venue under subrule (1) convenience of limitations. Committee may regulate its own proceedings Decision of the Board - 17 Verify source ↗
Subject to these Rules, the Committee shall have
AI-assisted research summary: The Committee may regulate its own procedure for its meetings and meeting transactions, subject to these Rules.
17. Subject to these Rules, the Committee shall have power to regulate its procedure in relation to its meetings and the transaction of its meetings - 18 Verify source ↗
The Board
AI-assisted research summary: The Board must consider the Committee’s recommendations within 21 days and may adopt them, adopt them with changes, or send them back for reconsideration.
18. The Board of recommendations by the Committee under rule 15 and in event not more than twenty-one days from the date thereof consider such recommendations and it may: receipt shall, upon (a) adopt the recommendations as they are; (b) adopt the recommendations with modifications; or (c) refer back the Committee with instructions for reconsideration. recommendations the to Appeal - 19 Verify source ↗
Any person aggrieved by the decision of the
AI-assisted research summary: A person aggrieved by the Board’s decision may appeal to the Tribunal within 21 days of the decision.
19. Any person aggrieved by the decision of the Board under rule 18 may, within twenty-one days from the date of decision appeal to the Tribunal. PART III GENERAL PROVISIONS Appointmen t of Review Panel Members Cap 414
Part
PART III
- 22 Verify source ↗
Disclosure of conflict of interests
AI-assisted research summary: Section 22 is titled “Disclosure of conflict of interests.”
22. Disclosure of conflict of interests. _________ SCHEDULE _________ 2 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) THE ENERGY AND WATER UTILITIES REGULATORY AUTHORITY ACT (CAP. 414) ______ RULES ______ (Made under section 40(1)(j)) ________ ENERGY AND WATER UTILITIES REGULATORY AUTHORITY (INTERNAL REVIEW PROCEDURE) RULES 2023 PART I PRELIMINARY PROVISIONS Citation - 20 Verify source ↗
(1) The Board shall nominate members of the
AI-assisted research summary: The Board must nominate Review Panel members from Authority employees, with specific experience and education requirements, and Panel members serve for three years.
20.-(1) The Board shall nominate members of the Review Panel from amongst employees of the Authority as follows: (a) two persons who have experience in law for at least ten years; (b) two persons who are graduates of a recognized university, having experience in regulatory matters and at least ten years of experience in one or more fields of economics, finance, engineering or management. (2) The members of the Panel shall serve for a term 8 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) of three years on such terms and conditions as the Board may determine. Obstruction of proceedings Disclosure of conflicts of interest - 21 Verify source ↗
Any person who obstructs the proceedings of the
AI-assisted research summary: A person who obstructs the Committee’s proceedings commits an offence and may be fined up to three million shillings, imprisoned for up to three years, or both.
21. Any person who obstructs the proceedings of the Committee commits an offence and shall, on conviction, be liable to a fine not exceeding three million shillings or imprisonment for a term not exceeding three years or to both. - 22 Verify source ↗
A member of the Committee having a conflict of
AI-assisted research summary: A Committee member with a conflict of interest must disclose it to the Committee and must not take part in deciding the matter.
22. A member of the Committee having a conflict of interest either by himself or his spouse or child, in any matter under discussion by the Committee, shall disclose such interest to the Committee and desist from and deciding such matter. ___________ SCHEDULE ___________ (Made under rule 4(4)) THE ENERGY AND WATER UTILITIES REGULATORY AUTHORITY (EWURA) APPLICATION FOR REVIEW FORM (9) Details of the Applicant: Name: ______________________________________________ Postal Address: _________________________________________________ Physical Address: __________________________________________ City: ____________________________________________________ Office Telephone: _________________________________________________ Mobile Telephone: ____________________________________ E-mail: ___________________________________________ 9 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) (2) Details of the Respondent: Name: _______________________________________________________ Postal Address: ____________________________________________________ Physical Address______________________________________________ City: ______________________________________________________ Office Telephone: _________________________________________ Mobile Telephone: ___________________________________________ E-mail: ____________________________________________________ (3) Details of the decision subject of the application (attach the decision) ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ _______________________________________ (4) Grounds for review (a separate sheet may be used): ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ __________________________________ (5) Reliefs sought ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ 10 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) ________________________________________________________________________ _______ (6) Any other relevant information: (7) I hereby declare that all the facts and information given in the application are correct to the best of my knowledge. Signature of the Applicant/Principal Officer of the Applicant Date______________________________________ Day Month Year For Authority’s Use Only Date Received: _________________________File No: _______________ 11 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) MAMLAKA YA UDHIBITI WA HUDUMA ZA NISHATI NA MAJI (EWURA) FOMU YA MAOMBI YA MAREJEO (1) Maelezo ya Mleta maombi: Jina: _________________________________________________________ Anuani ya posta: ____________________________________________ Anuani ya Makazi: _________________________________________ Mji:_______________________________________________________ Simu: ______________________________________________________ Namba ya Simu ya Mkononi: ____________________________________________ Anuani ya Barua Pepe:________________________________________ (2) Maelezo ya Mjibu maombi: Jina:______________________________________________________ Anuani ya posta: __________________________________________________ Anuani ya Makazi:___________________________________________ Mji: __________________________________________________ Namba ya Simu ya Ofisi: _______________________________________ Namba ya Simu ya Mkononi: ____________________________________________ Anuani ya Barua Pepe: ______________________________________ (3) Maelezo ya uamuzi unaoombewa mapitio (ambatisha nakala ya uamuzi ): ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ 12 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ____________________________________________________________ (4) Sababu za mapitio: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ _____________________________________________ (5) Nafuu Zinazoombwa ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ___________________________________________ (6) Maelezo mengine yeyote muhimu: __________________________________________________________ _____________________________________________________________ (7) Nathibitisha kwamba maelezo yote yaliyotolewa kwenye maombi haya ni kweli tupu kwa ufahamu wangu. ___________________ Saini ya Mleta maombi/Ofisa Mkuu wa mleta maombi Tarehe______________________________________ Siku Mwezi Mwaka 13 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) Kwa Matumizi ya Mamlaka tu: Tarehe Iliyopokelewa:__________________NambaFaili:_______________________ Dodoma, …..…………., 2023 JAMES A. MWAINYEKULE Mkurugenzi Mkuu 14
Part
PART I
- 1 Verify source ↗
These Rules may be cited as the Energy and
AI-assisted research summary: These Rules may be cited as the Energy and Water Utilities Regulatory Authority (Internal Review Procedure) Rules, 2023.
1. These Rules may be cited as the Energy and Water Utilities Regulatory Authority (Internal Review Procedure) Rules, 2023. Application - 2 Verify source ↗
These Rules shall apply in respect of the
AI-assisted research summary: These Rules apply to the procedure for reviewing substantive decisions made under delegated powers.
2. These Rules shall apply in respect of the procedure for review of substantive decisions made under delegated powers. Interpretatio n Cap. 414 - 3 Verify source ↗
In these Rules, unless the context otherwise
AI-assisted research summary: This section defines key terms used in the Rules, including applicant, Authority, Board, Committee, Director General, Panel, Respondent, substantive decision, and Tribunal.
3. In these Rules, unless the context otherwise requires: “Act” means the Energy and Water Utilities Regulatory Authority Act; “applicant” means a person who applies for a review of a decision under Part II; “Authority” means the Energy and Water Utilities Regulatory Authority established under section 4 of the Act; or its acronym “EWURA; “Board” means the Board of Directors of the Energy and Water Utilities Regulatory Authority established under section 8(1) of the Act; 3 Energy and Water Utilities Regulatory Authority (Internal Review Procedure) GN. No. 594 (Contd) “Committee” means the Internal Review Committee constituted pursuant to Rule 5; “Director General” means the Director General of the Energy and Water Utilities Regulatory Authority appointed under section 14(1) of the Act; “Panel” means the Review Panel established in accordance with section 26 of the Act; “Respondent” means a person against whom an application for review is made under Part II; “substantive decision” means decisions made based on merits and principles defining one’s rights as differentiated from procedural decisions which are made on rules and procedures employed to obtains ones rights; and “Tribunal” means the Fair Competition Tribunal established under the Fair Competition Act. PART II APPLICATION FOR REVIEW
Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.
Ask AI about this statute
The Energy and Water Utilities Regulatory Authority (Internal Review Procedure) Rules, 2023
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in