The Land Survey and Surveyors (Amendment) Regulations, 2020 — Part 4 | The Land Survey and Surveyors (Amendment) Regulations, 2020 — Tanzania law | Esheria

The Land Survey and Surveyors (Amendment) Regulations, 2020

Part 4 of 4 · provisions 601–627

The members state the company has never carried on any activity since incorporation and resolve that the directors should process its strike-off as required by law.

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Tanzania
Instrument
Regulation
Citation
The Land Survey and Surveyors (Amendment) Regulations, 2020
Version
Undated source snapshot
Language
en
Official source
View official record ↗
Complete work
View statute overview
amendment approval expiry architecture associations building survey business closure citation company strike-off construction construction approval construction approval expiry construction approvals construction compliance construction management construction services consultancy consultancy registration corporate notice corporate records definitions development cost advisory services digital consultancy economics Employment law +59 more

Statute overview

About this statute

The members state the company has never carried on any activity since incorporation and resolve that the directors should process its strike-off as required by law. The directors of Cotanak Foods and Cooking Oil Industry Limited state that the company has closed its business activities from 28/02/2020. This section names Hashim Mohamed Abdallah as Director/Secretary. The board agreed to voluntarily wind up the company and authorized Hashim Mohamed Abdallah to carry out the steps needed to implement that decision. This provision says natural persons are allowed to practice architecture in Tanzania.

Legal text

Provisions of The Land Survey and Surveyors (Amendment) Regulations, 2020

Showing 27 of 627

Part

SCHEDULE

  1. 2

    Unless the context otherwise requires

    Verify source ↗

    AI-assisted research summary: This section defines “Applicant,” “Authority,” and “Construction Approval.”

    2. Unless the context otherwise requires: Cap. 414 Cap 392 Granting of a Construction Approval “Applicant” means Karagwe Oils Co. Ltd – Seleman Zahor Mansoory of P. O. Box 484 Karagwe; “Authority” means the Energy and Water Utilities the Regulatory Authority established under Energy and Water Utilities Regulatory Authority Act; and “Construction Approval” means an approval issued by the Authority pursuant to Section 128(1) the Petroleum Act.
  2. 3

    The Applicant is hereby granted a Construction

    Verify source ↗

    AI-assisted research summary: The applicant is granted a construction approval for a petroleum retail outlet, but must meet detailed construction and safety conditions.

    3. The Applicant is hereby granted a Construction Approval to construct a petroleum products retail outlet at Plot no 434 Block "A" at Kyamyorwa Village, Kashangwa ward in Muleba District, Kagera Region subject to the following conditions: (a) the retail station shall be constructed in accordance with the Tanzania Bureau of Standards TZS 1115:2009 and TZS 1079:2009; 1 Petroleum (Karagwe Oils Co. Ltd – Seleman Zahor Mansoory) (Construction Approval) GN. NO. 212 (Contd.) Cap 340 (b) due care shall be exercised during excavation and installation of underground tanks; (c) the layout of the retail station shall meet the minimum safety distances in accordance with Tanzania Bureau of Standards TZS 1079:2009; (d) the underground tanks and associated pipelines shall be well protected from corrosion and the back filling shall be done properly using non-corrosive materials; (e) the underground storage tanks and pumps together the connecting pipes and fittings shall be with constructed so as to prevent any leakage of fuel; (f) underground storage tanks and dispensing pumps shall be calibrated by the Weights and Measures Agency established under the Weights and Measures Act; (g) the forecourt of the retail station shall be paved with impervious materials at the pump island with a drainage provision connected to oil and water separator; (h) an emergency shut off switch shall be installed in a conspicuous and accessible area; (i) ensuring that there shall be adequate and clean toilet facilities at all times; (j) clear and visible safety warning signs shall be installed at the entrance, exit and at the dispensing pumps, including but not limited to "switch off engine", "switch off mobile phone" and "no smoking"; (k) each storage tank shall be fitted with vent pipes with a minimum height of 3.6 metres; (l) each pump shall be protected with crash barriers with the height of one meter above the ground; (m) the offloading manhole shall be constructed in accordance with good petroleum industry practices and the offloading receiving pipes should be provided with couplings to prevent spillages during offloading; (n) the retail station shall be covered with a canopy covering at least the pump island and constructed in accordance with good petroleum industry practices; and (o) a price board shall be erected in a conspicuous place. 2 Petroleum (Karagwe Oils Co. Ltd – Seleman Zahor Mansoory) (Construction Approval) GN. NO. 212 (Contd.) Expiry of a Construction Approval
  3. 4

    AI-assisted research summary: The construction approval will automatically expire if the construction does not take effect within 24 months from the date of issue.

    4. The Construction shall automatically expire or cease to have effect if such construction fails to take effect within twenty-four months from the date of issue. Approval Dodoma, ................., 2020 NZINYANGWA E. MCHANY Director General 3 Petroleum (Martin Robert Kisanga) (Construction Approval) GN. NO. 213 (Contd.) GOVERNMENT NOTICE NO. 213 published on 13/3/2020 THE PETROLEUM ACT, (CAP. 392) ______ NOTICE ______ (Made under section 128(3)) ________ THE PETROLEUM (MARTIN ROBERT KISANGA) (CONSTRUCTION APPROVAL) NOTICE, 2020 Citation
  4. 1

    This Notice may be cited as the Petroleum

    Verify source ↗

    AI-assisted research summary: This Notice may be cited as the Petroleum (Construction (Martin Robert Kisanga) Approval) Notice, 2020.

    1. This Notice may be cited as the Petroleum (Construction (Martin Robert Kisanga) Approval) Notice, 2020. Interpretation
  5. 2

    Unless the context otherwise requires

    Verify source ↗

    AI-assisted research summary: This section defines “Applicant,” “Authority,” and “Construction Approval,” unless the context requires otherwise.

    2. Unless the context otherwise requires: “Applicant” means Martin Robert Kisanga of P.O. Box Cap. 414 Cap 392 Granting of a Construction Approval 72358 Dar es Salaam; “Authority” means the Energy and Water Utilities Regulatory Authority established under the Energy and Water Utilities Regulatory Authority Act; and “Construction Approval” means an approval issued by the Authority pursuant to Section 128(1) the Petroleum Act.
  6. 3

    The Applicant is hereby granted a Construction

    Verify source ↗

    AI-assisted research summary: The Applicant is granted approval to build a petroleum products retail outlet, but only if the listed construction and safety conditions are followed.

    3. The Applicant is hereby granted a Construction Approval to construct a petroleum products retail outlet at Plot No. 1508 Block “BB” Ilala situated at Pugu Bombani Area Municipality in Dar es Salaam Region subject to the following conditions: in (a) the retail station shall be constructed in accordance with the Tanzania Bureau of Standards TZS 1115:2009 and TZS 1079:2009; (b) due care shall be exercised during excavation and installation of underground tanks; 1 Petroleum (Martin Robert Kisanga) (Construction Approval) GN. NO. 213 (Contd.) Cap 340 (c) the layout of the retail station shall meet the minimum safety distances in accordance with Tanzania Bureau of Standards TZS 1079:2009; (d) the underground tanks and associated pipelines shall be well protected from corrosion and the back filling shall be done properly using non-corrosive materials; (e) the underground storage tanks and pumps together with the connecting pipes and fittings shall be constructed so as to prevent any leakage of fuel; (f) underground storage tanks and dispensing pumps shall be calibrated by the Weights and Measures Agency established under the Weights and Measures Act; (g) the forecourt of the retail station shall be paved with impervious materials at the pump island with a drainage provision connected to oil and water separator; (h) an emergency shut off switch shall be installed in a conspicuous and accessible area; (i) ensuring that there shall be adequate and clean toilet facilities at all times; (j) clear and visible safety warning signs shall be installed at the entrance, exit and at the dispensing pumps, including but not limited to "switch off engine", "switch off mobile phone" and "no smoking"; (k) each storage tank shall be fitted with vent pipes with a minimum height of 3.6 metres; (l) each pump shall be protected with crash barriers with the height of one meter above the ground; (m) the offloading manhole shall be constructed in accordance with good petroleum industry practices and the offloading receiving pipes should be provided with couplings to prevent spillages during offloading; (n) the retail station shall be covered with a canopy covering at least the pump island and constructed in accordance with good petroleum industry practices; and (o) a price board shall be erected in a conspicuous place. 2 Petroleum (Martin Robert Kisanga) (Construction Approval) GN. NO. 213 (Contd.) Expiry of a Construction Approval
  7. 4

    AI-assisted research summary: The construction approval automatically expires if the construction does not take effect within 24 months from the date of issue.

    4. The Construction shall automatically expire or cease to have effect if such construction fails to take effect within twenty-four months from the date of issue. Approval Dodoma, ................., 2020 NZINYANGWA E. MCHANY Director General 3 Petroleum (Nassoro Ally Hemed) (Construction Approval) GN. NO. 214 (Contd.) GOVERNMENT NOTICE NO. 214 published on 13/3/2020 THE PETROLEUM ACT, (CAP. 392) ______ NOTICE _____ (Made under section 128(3)) ________ THE PETROLEUM (NASSORO ALLY HEMED) (CONSTRUCTION APPROVAL) NOTICE, 2020 Citation
  8. 1

    This Notice may be cited as the Petroleum

    Verify source ↗

    AI-assisted research summary: This section gives the short title of the Notice.

    1. This Notice may be cited as the Petroleum (Nassoro Ally Hemed) (Construction Approval) Notice, 2020. Interpretation
  9. 2

    Unless the context otherwise requires

    Verify source ↗

    AI-assisted research summary: This section defines the terms “Applicant,” “Authority,” and “Construction Approval,” unless the context otherwise requires.

    2. Unless the context otherwise requires: “Applicant” means Nassoro Ally Hemed of P.O. Box Cap. 414 Cap 392 Granting of a Construction Approval 338 Handeni; “Authority” means the Energy and Water Utilities Regulatory Authority established under the Energy and Water Utilities Regulatory Authority Act; and “Construction Approval” means an approval issued by the Authority pursuant to Section 128(1) the Petroleum Act.
  10. 3

    The Applicant is hereby granted a Construction

    Verify source ↗

    AI-assisted research summary: The Applicant is granted a construction approval for a petroleum products retail outlet, but must follow a long list of construction and safety conditions.

    3. The Applicant is hereby granted a Construction Approval to construct a petroleum products retail outlet at Plot no. 2, Block ‘L’, Chamakweza Area, Chalinze Urban in Coast Region subject to the following conditions: (a) the retail station shall be constructed in accordance with the Tanzania Bureau of Standards TZS 1115:2009 and TZS 1079:2009; (b) due care shall be exercised during excavation and installation of underground tanks; 1 Petroleum (Nassoro Ally Hemed) (Construction Approval) GN. NO. 214 (Contd.) Cap 340 (c) the layout of the retail station shall meet the minimum safety distances in accordance with Tanzania Bureau of Standards TZS 1079:2009; (d) the underground tanks and associated pipelines shall be well protected from corrosion and the back filling shall be done properly using non-corrosive materials; (e) the underground storage tanks and pumps together with the connecting pipes and fittings shall be constructed so as to prevent any leakage of fuel; (f) underground storage tanks and dispensing pumps shall be calibrated by the Weights and Measures Agency established under the Weights and Measures Act; (g) the forecourt of the retail station shall be paved with impervious materials at the pump island with a drainage provision connected to oil and water separator; (h) an emergency shut off switch shall be installed in a conspicuous and accessible area; (i) ensuring that there shall be adequate and clean toilet facilities at all times; (j) clear and visible safety warning signs shall be installed at the entrance, exit and at the dispensing pumps, including but not limited to "switch off engine", "switch off mobile phone" and "no smoking"; (k) each storage tank shall be fitted with vent pipes with a minimum height of 3.6 metres; (l) each pump shall be protected with crash barriers with the height of one meter above the ground; (m) the offloading manhole shall be constructed in accordance with good petroleum industry practices and the offloading receiving pipes should be provided with couplings to prevent spillages during offloading; (n) the retail station shall be covered with a canopy covering at least the pump island and constructed in accordance with good petroleum industry practices; and (o) a price board shall be erected in a conspicuous place. 2 Petroleum (Nassoro Ally Hemed) (Construction Approval) GN. NO. 214 (Contd.) Expiry of a Construction Approval
  11. 4

    AI-assisted research summary: The construction approval expires if it does not take effect within 24 months from the date of issue.

    4. The Construction shall automatically expire or cease to have effect if such construction fails to take effect within twenty-four months from the date of issue. Approval Dodoma, ................., 2020 NZINYANGWA E. MCHANY Director General 3 Petroleum (Peter Gidion Mwalongo) (Construction Approval) GN. NO. 215 (Contd.) GOVERNMENT NOTICE NO. 215 published on 13/3/2020 THE PETROLEUM ACT, (CAP. 392) ______ NOTICE _____ (Made under section 128(3)) ________ THE PETROLEUM (PETER GIDION MWALONGO) (CONSTRUCTION APPROVAL) NOTICE, 2020 Citation
  12. 1

    This Notice may be cited as the Petroleum (Peter

    Verify source ↗

    AI-assisted research summary: This provision gives the Notice its short title and then begins an Interpretation section.

    1. This Notice may be cited as the Petroleum (Peter Gidion Mwalongo)(Construction Approval) Notice, 2020. Interpretation
  13. 2

    Unless the context otherwise requires

    Verify source ↗

    AI-assisted research summary: This section defines “Applicant,” “Authority,” and “Construction Approval,” subject to the usual context qualifier.

    2. Unless the context otherwise requires: “Applicant” means Peter Gidion Mwalongo of P.O. Box Cap. 414 Cap 392 Granting of a Construction Approval 3767 Mbeya; “Authority” means the Energy and Water Utilities Regulatory Authority established under the Energy and Water Utilities Regulatory Authority Act; and “Construction Approval” means an approval issued by the Authority pursuant to Section 128(1) the Petroleum Act.
  14. 3

    The Applicant is hereby granted a Construction

    Verify source ↗

    AI-assisted research summary: The Applicant is approved to build a petroleum retail outlet, but only if the listed construction and safety conditions are met.

    3. The Applicant is hereby granted a Construction Approval to construct a petroleum products retail outlet at Plot No. 714, Block ‘Y’, Mwakibete Area in Mbeya Region subject to the following conditions: (a) the retail station shall be constructed in accordance with the Tanzania Bureau of Standards TZS 1115:2009 and TZS 1079:2009; (b) due care shall be exercised during excavation and installation of underground tanks; 1 Petroleum (Peter Gidion Mwalongo) (Construction Approval) GN. NO. 215 (Contd.) Cap 340 (c) the layout of the retail station shall meet the minimum safety distances in accordance with Tanzania Bureau of Standards TZS 1079:2009; (d) the underground tanks and associated pipelines shall be well protected from corrosion and the back filling shall be done properly using non-corrosive materials; (e) the underground storage tanks and pumps together with the connecting pipes and fittings shall be constructed so as to prevent any leakage of fuel; (f) underground storage tanks and dispensing pumps shall be calibrated by the Weights and Measures Agency established under the Weights and Measures Act; (g) the forecourt of the retail station shall be paved with impervious materials at the pump island with a drainage provision connected to oil and water separator; (h) an emergency shut off switch shall be installed in a conspicuous and accessible area; (i) ensuring that there shall be adequate and clean toilet facilities at all times; (j) clear and visible safety warning signs shall be installed at the entrance, exit and at the dispensing pumps, including but not limited to "switch off engine", "switch off mobile phone" and "no smoking"; (k) each storage tank shall be fitted with vent pipes with a minimum height of 3.6 metres; (l) each pump shall be protected with crash barriers with the height of one meter above the ground; (m) the offloading manhole shall be constructed in accordance with good petroleum industry practices and the offloading receiving pipes should be provided with couplings to prevent spillages during offloading; (n) the retail station shall be covered with a canopy covering at least the pump island and constructed in accordance with good petroleum industry practices; and (o) a price board shall be erected in a conspicuous place. 2 Petroleum (Peter Gidion Mwalongo) (Construction Approval) GN. NO. 215 (Contd.) Expiry of a Construction Approval
  15. 4

    The Construction Approval shall automatically

    Verify source ↗

    AI-assisted research summary: The Construction Approval automatically ends if the construction does not take effect within 24 months from the date of issue.

    4. The Construction Approval shall automatically expire or cease to have effect if such construction fails to take effect within twenty-four months from the date of issue. Dodoma, ................., 2020 NZINYANGWA E. MCHANY Director General 3 Petroleum (Shiuya Company Limited) (Construction Approval) GN. NO. 216 (Contd.) GOVERNMENT NOTICE NO. 216 published on 13/3/2020 THE PETROLEUM ACT, (CAP. 392) ______ NOTICE ______ (Made under section 128(3)) ________ THE PETROLEUM (SHIUYA COMPANY LIMITED) (CONSTRUCTION APPROVAL) NOTICE, 2020 Citation
  16. 1

    This Notice may be cited as the Petroleum

    Verify source ↗

    AI-assisted research summary: This section gives the short citation name for the Notice.

    1. This Notice may be cited as the Petroleum (Construction (Shiuya Company Limited) Approval) Notice, 2020. Interpretation
  17. 2

    Unless the context otherwise requires

    Verify source ↗

    AI-assisted research summary: This section defines “Applicant,” “Authority,” and “Construction Approval” for the provision.

    2. Unless the context otherwise requires: “Applicant” means Shiuya Company Limited of P.O. Cap. 414 Cap 392 Granting of a Construction Approval Box 66 Mbozi; “Authority” means the Energy and Water Utilities Regulatory Authority established under the Energy and Water Utilities Regulatory Authority Act; and “Construction Approval” means an approval issued by the Authority pursuant to Section 128(1) the Petroleum Act.
  18. 3

    The Applicant is hereby granted a Construction

    Verify source ↗

    AI-assisted research summary: The Applicant is granted construction approval for a petroleum products retail outlet, but must follow listed construction and safety conditions.

    3. The Applicant is hereby granted a Construction Approval to construct a petroleum products retail outlet at Plot No. 1508 Block “BB” situated at Plot No. 1, Block ‘C’, Ihanda Area, Mbozi District in Songwe Region subject to the following conditions: (a) the retail station shall be constructed in accordance with the Tanzania Bureau of Standards TZS 1115:2009 and TZS 1079:2009; 1 Petroleum (Shiuya Company Limited) (Construction Approval) GN. NO. 216 (Contd.) Cap 340 (b) due care shall be exercised during excavation and installation of underground tanks; (c) the layout of the retail station shall meet the minimum safety distances in accordance with Tanzania Bureau of Standards TZS 1079:2009; (d) the underground tanks and associated pipelines shall be well protected from corrosion and the back filling shall be done properly using non-corrosive materials; (e) the underground storage tanks and pumps together the connecting pipes and fittings shall be with constructed so as to prevent any leakage of fuel; (f) underground storage tanks and dispensing pumps shall be calibrated by the Weights and Measures Agency established under the Weights and Measures Act; (g) the forecourt of the retail station shall be paved with impervious materials at the pump island with a drainage provision connected to oil and water separator; (h) an emergency shut off switch shall be installed in a conspicuous and accessible area; (i) ensuring that there shall be adequate and clean toilet facilities at all times; (j) clear and visible safety warning signs shall be installed at the entrance, exit and at the dispensing pumps, including but not limited to "switch off engine", "switch off mobile phone" and "no smoking"; (k) each storage tank shall be fitted with vent pipes with a minimum height of 3.6 metres; (l) each pump shall be protected with crash barriers with the height of one meter above the ground; (m) the offloading manhole shall be constructed in accordance with good petroleum industry practices and the offloading receiving pipes should be provided with couplings to prevent spillages during offloading; (n) the retail station shall be covered with a canopy covering at least the pump island and constructed in accordance with good petroleum industry practices; and (o) a price board shall be erected in a conspicuous place. 2 Petroleum (Shiuya Company Limited) (Construction Approval) GN. NO. 216 (Contd.) Expiry of a Construction Approval
  19. 4

    AI-assisted research summary: The construction approval automatically expires if the construction does not take effect within 24 months from the date of issue.

    4. The Construction shall automatically expire or cease to have effect if such construction fails to take effect within twenty-four months from the date of issue. Approval Dodoma, NZINYANGWA E. MCHANY Director General ................., 2020 3 Petroleum (Sokoine George Mwalingo) (Construction Approval) GN. NO. 217 (Contd.) GOVERNMENT NOTICE NO. 217 published on 13/3/2020 THE PETROLEUM ACT, (CAP. 392) ______ NOTICE _____ (Made under section 128(3)) ________ THE PETROLEUM (SOKOINE GEORGE MWALINGO) (CONSTRUCTION APPROVAL) NOTICE, 2020 Citation
  20. 1

    This Notice may be cited as the Petroleum

    Verify source ↗

    AI-assisted research summary: This Notice is cited as the Petroleum (Construction (Sokoine George Mwalingo) Approval) Notice, 2020, and the section begins an Interpretation part.

    1. This Notice may be cited as the Petroleum (Construction (Sokoine George Mwalingo) Approval) Notice, 2020. Interpretation
  21. 2

    Unless the context otherwise requires

    Verify source ↗

    AI-assisted research summary: This section defines “Applicant,” “Authority,” and “Construction Approval,” unless the context requires otherwise.

    2. Unless the context otherwise requires: “Applicant” means Sokoine George Mwalingo of P.O. Cap. 414 Cap 392 Granting of a Construction Approval Box 5 Tunduma; “Authority” means the Energy and Water Utilities Regulatory Authority established under the Energy and Water Utilities Regulatory Authority Act; and “Construction Approval” means an approval issued by the Authority pursuant to Section 128(1) the Petroleum Act.
  22. 3

    The Applicant is hereby granted a Construction

    Verify source ↗

    AI-assisted research summary: The Applicant is granted a Construction Approval, but must build and equip the petroleum retail outlet to the listed safety and construction conditions.

    3. The Applicant is hereby granted a Construction Approval to construct a petroleum products retail outlet at Plot No. 13, Block ‘A’, Mponela (Chimbuya) Village, Isandula Ward, Mbozi District in Songwe Region subject to the following conditions: (a) the retail station shall be constructed in accordance with the Tanzania Bureau of Standards TZS 1115:2009 and TZS 1079:2009; (b) due care shall be exercised during excavation and installation of underground tanks; 1 Petroleum (Sokoine George Mwalingo) (Construction Approval) GN. NO. 217 (Contd.) Cap 340 (c) the layout of the retail station shall meet the minimum safety distances in accordance with Tanzania Bureau of Standards TZS 1079:2009; (d) the underground tanks and associated pipelines shall be well protected from corrosion and the back filling shall be done properly using non-corrosive materials; (e) the underground storage tanks and pumps together with the connecting pipes and fittings shall be constructed so as to prevent any leakage of fuel; (f) underground storage tanks and dispensing pumps shall be calibrated by the Weights and Measures Agency established under the Weights and Measures Act; (g) the forecourt of the retail station shall be paved with impervious materials at the pump island with a drainage provision connected to oil and water separator; (h) an emergency shut off switch shall be installed in a conspicuous and accessible area; (i) ensuring that there shall be adequate and clean toilet facilities at all times; (j) clear and visible safety warning signs shall be installed at the entrance, exit and at the dispensing pumps, including but not limited to "switch off engine", "switch off mobile phone" and "no smoking"; (k) each storage tank shall be fitted with vent pipes with a minimum height of 3.6 metres; (l) each pump shall be protected with crash barriers with the height of one meter above the ground; (m) the offloading manhole shall be constructed in accordance with good petroleum industry practices and the offloading receiving pipes should be provided with couplings to prevent spillages during offloading; (n) the retail station shall be covered with a canopy covering at least the pump island and constructed in accordance with good petroleum industry practices; and (o) a price board shall be erected in a conspicuous place. 2 Petroleum (Sokoine George Mwalingo) (Construction Approval) GN. NO. 217 (Contd.) Expiry of a Construction Approval
  23. 4

    AI-assisted research summary: The construction approval automatically expires if the construction does not take effect within 24 months from the date of issue.

    4. The Construction shall automatically expire or cease to have effect if such construction fails to take effect within twenty-four months from the date of issue. Approval Dodoma, ................., 2020 NZINYANGWA E. MCHANY Director General 3 Petroleum (Summer Estate Limited) (Construction Approval) GN. NO. 218 (Contd.) GOVERNMENT NOTICE NO. 218 published on 13/3/2020 THE PETROLEUM ACT, (CAP. 392) ______ NOTICE ______ (Made under section 128(3)) ________ THE PETROLEUM (SUMMER ESTATE LIMITED) (CONSTRUCTION APPROVAL) NOTICE, 2020 Citation
  24. 1

    This Notice may be cited as the Petroleum

    Verify source ↗

    AI-assisted research summary: This section gives the short title of the Notice and begins the Interpretation section.

    1. This Notice may be cited as the Petroleum (Construction (Summer Estate Limited) Approval) Notice, 2020. Interpretation
  25. 2

    Unless the context otherwise requires

    Verify source ↗

    AI-assisted research summary: This section defines “Applicant,” “Authority,” and “Construction Approval,” unless the context otherwise requires.

    2. Unless the context otherwise requires: “Applicant” means Summer Estate Limited of P.O. Box Cap. 414 Cap 392 Granting of a Construction Approval 702 Mbeya; “Authority” means the Energy and Water Utilities Regulatory Authority established under the Energy and Water Utilities Regulatory Authority Act; and “Construction Approval” means an approval issued by the Authority pursuant to Section 128(1) the Petroleum Act.
  26. 3

    The Applicant is hereby granted a Construction

    Verify source ↗

    AI-assisted research summary: The Applicant is granted construction approval for a petroleum products retail outlet, but must follow the listed safety and construction conditions.

    3. The Applicant is hereby granted a Construction Approval to construct a petroleum products retail outlet at Plot No. 1508 Block “BB” situated atPlot No. 68, Block ‘B’, Ibanda Area, Kyela District in Mbeya Region subject to the following conditions: (a) the retail station shall be constructed in accordance with the Tanzania Bureau of Standards TZS 1115:2009 and TZS 1079:2009; (b) due care shall be exercised during excavation and installation of underground tanks; 1 Petroleum (Summer Estate Limited) (Construction Approval) GN. NO. 218 (Contd.) Cap 340 (c) the layout of the retail station shall meet the minimum safety distances in accordance with Tanzania Bureau of Standards TZS 1079:2009; (d) the underground tanks and associated pipelines shall be well protected from corrosion and the back filling shall be done properly using non-corrosive materials; (e) the underground storage tanks and pumps together with the connecting pipes and fittings shall be constructed so as to prevent any leakage of fuel; (f) underground storage tanks and dispensing pumps shall be calibrated by the Weights and Measures Agency established under the Weights and Measures Act; (g) the forecourt of the retail station shall be paved with impervious materials at the pump island with a drainage provision connected to oil and water separator; (h) an emergency shut off switch shall be installed in a conspicuous and accessible area; (i) ensuring that there shall be adequate and clean toilet facilities at all times; (j) clear and visible safety warning signs shall be installed at the entrance, exit and at the dispensing pumps, including but not limited to "switch off engine", "switch off mobile phone" and "no smoking"; (k) each storage tank shall be fitted with vent pipes with a minimum height of 3.6 metres; (l) each pump shall be protected with crash barriers with the height of one meter above the ground; (m) the offloading manhole shall be constructed in accordance with good petroleum industry practices and the offloading receiving pipes should be provided with couplings to prevent spillages during offloading; (n) the retail station shall be covered with a canopy covering at least the pump island and constructed in accordance with good petroleum industry practices; and (o) a price board shall be erected in a conspicuous place. 2 Petroleum (Summer Estate Limited) (Construction Approval) GN. NO. 218 (Contd.) Expiry of a Construction Approval
  27. 4

    AI-assisted research summary: The construction automatically expires or stops having effect if it does not take effect within 24 months from the date of issue.

    4. The Construction shall automatically expire or cease to have effect if such construction fails to take effect within twenty-four months from the date of issue. Approval Dodoma, ................., 2020 NZINYANGWA E. MCHANY Director General 3

Provision text is displayed from LexChat’s stored statute record. Use the official source links to verify amendments, commencement, and current legal force.