The Energy and Water Utilities Regulatory Authority (Petroleum Products Prices Setting) (Amendment) Rules, 2020
These Rules may be cited by the listed amendment title and are to be read together with the 2009 principal Rules.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- Tanzania
- Instrument
- Rule
- Citation
- The Energy and Water Utilities Regulatory Authority (Petroleum Products Prices Setting) (Amendment) Rules, 2020
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
Statute overview
About this statute
These Rules may be cited by the listed amendment title and are to be read together with the 2009 principal Rules. The principal Rules are amended by deleting Schedules I to III and replacing them with new Schedules. This text lists several charges and costs, including TBS Charge, TASAC Fee, VAT, financing cost, and regulatory levy. This fragment appears to set an evaporation-loss allowance of 0.5% of MSP. The text lists petroleum price-cap components and local charges, including a 0.3% service levy on specified turnover bases.
Ask AI about this statute
The Energy and Water Utilities Regulatory Authority (Petroleum Products Prices Setting) (Amendment) Rules, 2020
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in