AI-assisted research summary: The applicant is allowed to build a consumer installation at Lugoba Area, but only if the listed safety and construction conditions are met.
3. The applicant is hereby granted a construction approval to construct a Consumer installation at Lugoba Area, Bagamoyo District in Coast Region subject to the following conditions: (a) the consumer installation shall be constructed in accordance with the Tanzania Bureau of Standards TZS 1113:2009 and API 650; (b) due care shall be exercised during installation of the above ground storage tanks; 1 Consumer Installation (Gulf Concrete and Cement Products) (Construction Approval) GN. NO. 198 (Contd.) (c) the layout of the facility shall meet the minimum safety distances in accordance with Tanzania Bureau of Standards TZS 1113:2009; (d) the above ground tanks and associated pipelines shall be well protected from corrosion; (e) the above ground tanks shall be situated in a bund that have volumetric capacity of 10% more than the capacity of the largest tank in the bund; (f) above ground storage tanks and dispensing pumps shall be calibrated by the Weights and Measures Agency established under the Weights and Measures Act; (g) the tanks shall be properly labelled with earth installation, date of necessary resistance, date of calibration, maximum and safe capacity; information including (h) the bund shall be constructed with impermeable concrete walls with height of not greater than 1.8m; the bund surface shall be paved with concrete and provided with drainage system connected to well and properly designed oil water separator; the oil water separator shall have an outlet valve conspicuously displayed operating instructions; (i) (j) (k) area around the fuel dispensing area and pump house shall be paved with impervious materials such as concrete with a drainage provision connected to oil and water separator; the pump house shall be outside the bund provided with appropriate spill containment, shaded with adequate ventilation; (l) (m) an emergency shut off switch shall be installed in a conspicuous and accessible area; 2 Consumer Installation (Gulf Concrete and Cement Products) (Construction Approval) GN. NO. 198 (Contd.) (n) clear and visible safety warning signs shall be installed at the entrance, exit and at the dispensing pumps, including "switch off engine", "switch off mobile phone" and "no smoking"; (o) there shall be adequate firefighting system including fire water supply, fire pumps, fire foam system, sand bucket, fire alarm, extinguisher, hydrant system and sprinkler system at the storage tank; (p) each storage tank shall be fitted with a vent pipe or with appropriate pressure relief valve; (q) there shall be sprinkler system provided at each storage tank; (r) each pump shall be protected with crash barriers with the height of one meter above the ground; (s) the offloading area shall be constructed in accordance with good petroleum industry practices and the offloading receiving pipes shall be provided with couplings to prevent spillages during offloading; there shall be earthing bonding point at the offloading area and each storage shall be properly earthed; (t) (u) the pipelines at the facility shall be properly colour coded i. yellow strip for diesel, red fire for hydrant system, full yellow for foam system; and (v) the fuel dispensing shall be covered with a canopy covering at least the pump island and constructed in accordance with petroleum industry best practices. 3 Consumer Installation (Gulf Concrete and Cement Products) (Construction Approval) GN. NO. 198 (Contd.) Expiry of construction approval