ARS § 48-2053
The board may, within 10 days after bids are opened and by a two-thirds vote, reject the proposed contract and have the sanitary district do the work itself. If that happens, the district is treated as the contractor, and it cannot assess more than the lowest responsible bid or estimate.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- United States — Arizona
- Instrument
- Act or statute
- Version
- Undated source snapshot
- Language
- en
- Updated
- Official source
- View official record ↗
assessment limits bidding contract award
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(emergency-noindex)
Statute overview
About this statute
This page preserves the statute’s identified version, provision structure, official source link, and stored legal text for reading and research.
Ask AI about this statute
ARS § 48-2053
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in