Professional statute overview
Enactment structure, operative effect and source provenance
01
Purpose and legislative effect
“This section says the act is called the Water Code.”
Local custom is only one factor in judging the reasonableness of a water use, method of use, or diversion; it cannot by itself decide the issue. This section says the coordinated state water conservation, development, and utilization plan is called the “State Water Plan.” The American River Development is included in the State Water Plan. The State may not issue a water appropriation permit for a project that would flood any part of Gold Discovery Site State Park at Coloma unless the issuance is specifically authorized by law. This section gives the Georgetown Divide Public Utility District rights to pursue a federal permit and license, limits water-rights filings and permits for certain South Fork of the American River projects for set periods, and requires some applicants to evaluate alternatives or replace lost uses.
02
How the instrument operates
- 01
Start with the recorded version
Enacted 1943. The date shown identifies this source expression and should not be treated as proof that no later change exists.
- 02
Locate the controlling provision
Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.
- 03
Read conditions and exceptions together
Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.
- 04
Verify currency and official wording
Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.
03
Research entry points
Selected provisions across the instrument. Open any row to continue with the exact stored text.
The district may borrow money for construction work, issue debt instruments, and the board sets the interest rate, subject to a 5-year term limit, a 7% annual interest cap, and a debt ceiling tied to construction cost.
Section 23263.
If the survey shows the distribution system is feasible, the board must prepare a cost estimate and a statement of the estimated ad valorem tax rate needed for the district’s United States obligation.
Section 23511.
Certain conditions in an improvement district’s plans are binding on the affected land parcels and may be enforced.
Section 23650.
Notice of the hearing must be given by newspaper publication in each affected county and by posting in three public places within the proposed improvement district, both at least 14 days before the hearing.
Section 23904.
The board must file a verified financial statement by a specified monthly meeting deadline and include listed financial and accounting details.
Section 24274.
04
Source and current-law status
Source record view
Source record from leginfo.legislature.ca.gov · Enacted 1943
The source record does not state a definitive current-law status. Check the official publisher and later amendments before relying on this text.