United States — Louisiana Act or statute

United States — Louisiana legislation

RS 9:4820

This section sets when certain construction privileges become effective, how suspension affects priority, and when a claimant must file to keep priority.

liens and privilegesnotice filingpriority

Publicly available, excluded from search-engine indexing

This page remains available for direct research for the following reasons:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)
  • The record does not meet this release's canonical indexing criteria. (emergency-noindex)

Professional statute overview

Enactment structure, operative effect and source provenance

Official source

01

Purpose and legislative effect

“This section sets when certain construction privileges become effective, how suspension affects priority, and when a claimant must file to keep priority.”

Use this record to locate individual provisions, understand the instrument’s recorded structure, and move from a research summary to the exact source text.

02

How the instrument operates

  1. 01

    Start with the recorded version

    Undated source snapshot. The date shown identifies this source expression and should not be treated as proof that no later change exists.

  2. 02

    Locate the controlling provision

    Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.

  3. 03

    Read conditions and exceptions together

    Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.

  4. 04

    Verify currency and official wording

    Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.

03

Research entry points

Selected provisions across the instrument. Open any row to continue with the exact stored text.

RS 9:4820

This section sets when certain construction privileges become effective, how suspension affects priority, and when a claimant must file to keep priority.

Section 9:4820

04

Source and current-law status

Source record view

Source record from legis.la.gov · Undated source snapshot

Verify current force

The source record does not state a definitive current-law status. Check the official publisher and later amendments before relying on this text.

Source-indexed provision map

Sections and provisions

Search by section, heading, part or exact legal wording. Every result remains linked to the stored source record.

Showing 1 of 1 provisions

Commencement
§ 9:4820RS 9:4820Commencement

This section sets when certain construction privileges become effective, how suspension affects priority, and when a claimant must file to keep priority.

SUBPART D. CLAIMS AND PRIVILEGES; EFFECTIVENESS; PRESERVATION; RANKING; EXTINGUISHMENT §4820. Privileges; effective date A. Except as otherwise provided in this Part, the privileges granted by this Part arise and are effective as to third persons when the earlier of the following occurs: (1) Notice of the contract is filed as required by R.S. 9:4811. (2) The work is begun by placing materials at the site of the immovable to be used in the work or conducting other work at the site of the immovable the effect of which is visible from a simple inspection and reasonably indicates that the work has begun. For these purposes, the "site of the immovable" is defined as the area within the boundaries of the property. In determining when work has begun, services rendered by a professional consultant, professional subconsultant, or other surveyor, architect, or engineer, or the placing of materials having an aggregate price of less than one hundred dollars on the immovable, driving of test piling, cutting or removal of trees and debris, placing of fill dirt, demolition of existing structures, and clearing, grading, or leveling of the land surface shall not be considered. B.(1) If work for which notice of contract was not filed as required by R.S. 9:4811 is for the addition, modification, or repair of an existing building or other construction, the suspension of the work for thirty days or more shall cause that part of the work performed before the suspension to be considered, for the purposes of ranking privileges arising under this Part against the rights of third persons, a separate work from the work performed thereafter. A work is suspended if the cost of the work done, in labor and materials, is less than one hundred dollars during a period of thirty days or more. (2) A privilege arising under this Part with respect to work performed before the suspension, other than a privilege arising under R.S. 9:4801(2) or a privilege securing a claim arising under R.S. 9:4802(A)(2), retains its priority under R.S. 9:4821 over the rights of third persons acquired prior to the resumption of work only if the claimant having the privilege files a statement of claim or privilege no later than sixty days after the commencement of the suspension. C. A person acquiring or intending to acquire a mortgage, privilege, or other right in or on an immovable may conclusively rely upon an affidavit made by a qualified inspector to the effect that he inspected the immovable at a specified time and work had not then been commenced nor materials placed at its site, provided the inspection occurs, and the affidavit is filed, within four business days before or within four business days after the filing of the mortgage, privilege, or other document creating the right. Insofar as the rights of the person to whom or for whom the affidavit is given are concerned, the facts recited in the affidavit shall be deemed to be true at the time of the inspection and to remain true at the time of the filing of the mortgage, privilege, or other document, and the correctness of those facts may not be controverted to affect the priority of the rights of the person to whom or for whom it is given, unless actual fraud by such person is proved. A person who gives a false affidavit shall be responsible for any loss or damage suffered by any person whose rights are adversely affected. D. Notwithstanding the other provisions of this Part, the privileges granted upon an immovable by R.S. 9:4801(5) and those securing a claim arising under R.S. 9:4802(A)(5) shall have no effect as to third persons acquiring rights in, to, or on the immovable before the statement of claim or privilege is filed. E. If, following cancellation of a notice of contract in accordance with R.S. 9:4832(C), another notice of contract is filed, the date of the later filing shall be the date of filing of notice of contract for purposes of this Section. Acts 1981, No. 724, §1, eff. Jan. 1, 1982; Acts 1986, No. 424, §1; Acts 1988, No. 904, §1; Acts 1988, No. 999, §1; Acts 1991, No. 370, §1; Acts 1995, No. 666, §1; Acts 2003, No. 729, §1; Acts 2012, No. 425, §1; Acts 2019, No. 325, §1. {{NOTE: SEE ACTS 1988, NO. 999, §1.}} NOTE: See Acts 2019, No. 325, §§6, 7, and 10, regarding applicability.
Section 9:4820Verify source

Legislative relationships

0 referenced instruments

Names are derived from the stored provision headings and citation-enrichment layer. Treat this as a research index and verify each relationship against the source text.

No structured legislative relationships were detected

The statute remains fully searchable by provision. Consult the source text for amendments and cross-references that have not yet been indexed.

Recorded versions and source checkpoint

1 version available in this collection

Current-law checkpoint
  • Undated version · currentEnglish

Source-linked research

Ask AI about this statute

The overview, provisions, and source records above are public. Continue in a separate conversation with this statute’s jurisdiction and source version attached.

About this LexChat collection

Statute information is organised from identified legislative sources for professional research. Corrections can be reported to hello@esheria.ai.