United States — Louisiana Act or statute

United States — Louisiana legislation

RS 9:4811

A general contractor’s contract notice must be filed before work starts, and certain signatures and details must be included.

contract notice filinggeneral contractor workimmovable property

Publicly available, excluded from search-engine indexing

This page remains available for direct research for the following reasons:

  • The record does not meet this release's canonical indexing criteria. (market-indexing-disabled)
  • The record does not meet this release's canonical indexing criteria. (emergency-noindex)

Professional statute overview

Enactment structure, operative effect and source provenance

Official source

01

Purpose and legislative effect

“A general contractor’s contract notice must be filed before work starts, and certain signatures and details must be included.”

Use this record to locate individual provisions, understand the instrument’s recorded structure, and move from a research summary to the exact source text.

02

How the instrument operates

  1. 01

    Start with the recorded version

    Undated source snapshot. The date shown identifies this source expression and should not be treated as proof that no later change exists.

  2. 02

    Locate the controlling provision

    Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.

  3. 03

    Read conditions and exceptions together

    Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.

  4. 04

    Verify currency and official wording

    Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.

03

Research entry points

Selected provisions across the instrument. Open any row to continue with the exact stored text.

RS 9:4811

A general contractor’s contract notice must be filed before work starts, and certain signatures and details must be included.

Section 9:4811

04

Source and current-law status

Source record view

Source record from legis.la.gov · Undated source snapshot

Verify current force

The source record does not state a definitive current-law status. Check the official publisher and later amendments before relying on this text.

Source-indexed provision map

Sections and provisions

Search by section, heading, part or exact legal wording. Every result remains linked to the stored source record.

Showing 1 of 1 provisions

Repeal
§ 9:4811RS 9:4811Repeal

A general contractor’s contract notice must be filed before work starts, and certain signatures and details must be included.

SUBPART C. WORK PERFORMED BY GENERAL CONTRACTORS §4811. Notice of a contract with a general contractor to be filed A. Written notice of a contract between a general contractor and an owner shall be filed as provided in R.S. 9:4831 before the contractor begins work, as defined by R.S. 9:4820, on the immovable. The notice: (1) Shall be signed by the owner and contractor. (2) Shall contain a complete property description of the immovable upon which the work is to be performed and the name, if any, of the project. (3) Shall identify the parties and give their mailing addresses. (4) Shall state the price of the work or, if no price is fixed, describe the method by which the price is to be calculated and give an estimate of it. (5) Shall state when payment of the price is to be made. (6) Shall describe in general terms the work to be done. B. A notice of contract is not improperly filed because of an error in or omission from the notice in the absence of a showing of actual prejudice by a claimant or other person acquiring rights in the immovable. An error in or omission of the identity of the parties or their mailing addresses or the improper or insufficient description of the immovable shall be prima facie proof of actual prejudice. C. A notice of contract is not improperly filed because a proper bond is not attached. D. A general contractor shall not enjoy any privilege arising under this Part if the price of the work stipulated or reasonably estimated in his contract exceeds one hundred thousand dollars unless notice of the contract is timely filed. A general contractor who is deprived of his privilege by this Subsection shall not be entitled to file a statement of claim or privilege for any amounts due him. E. Repealed by Acts 2019, No. 325, §3. Acts 1988, No. 685, §1, eff. Jan. 1, 1989; Acts 2003, No. 729, §1; Acts 2019, No. 325, §§1, 3. NOTE: See Acts 2019, No. 325, §§6, 7, and 10, regarding applicability.
Section 9:4811Verify source

Legislative relationships

0 referenced instruments

Names are derived from the stored provision headings and citation-enrichment layer. Treat this as a research index and verify each relationship against the source text.

No structured legislative relationships were detected

The statute remains fully searchable by provision. Consult the source text for amendments and cross-references that have not yet been indexed.

Recorded versions and source checkpoint

1 version available in this collection

Current-law checkpoint
  • Undated version · currentEnglish

Source-linked research

Ask AI about this statute

The overview, provisions, and source records above are public. Continue in a separate conversation with this statute’s jurisdiction and source version attached.

About this LexChat collection

Statute information is organised from identified legislative sources for professional research. Corrections can be reported to hello@esheria.ai.