Maine Revised Statutes, Title 35-A, § 3131: Definitions, 1987

This section defines terms used in the subchapter, including several electricity-utility terms and size or capacity thresholds.

electric utilitiesenergy transmissionstatutory definitionsutility regulation

Professional statute overview

Enactment structure, operative effect and source provenance

Official source

01

Purpose and legislative effect

“This section defines terms used in the subchapter, including several electricity-utility terms and size or capacity thresholds.”

Use this record to locate individual provisions, understand the instrument’s recorded structure, and move from a research summary to the exact source text.

02

How the instrument operates

  1. 01

    Start with the recorded version

    Enacted 1987 · Source version 1 Oct 2025. The date shown identifies this source expression and should not be treated as proof that no later change exists.

  2. 02

    Locate the controlling provision

    Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.

  3. 03

    Read conditions and exceptions together

    Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.

  4. 04

    Verify currency and official wording

    Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.

03

Research entry points

Selected provisions across the instrument. Open any row to continue with the exact stored text.

Definitions

This section defines terms used in the subchapter, including several electricity-utility terms and size or capacity thresholds.

Section 3131

04

Source and current-law status

Source record view

Source record from legislature.maine.gov · Enacted 1987 · Source version 1 Oct 2025

Verify current force

The source record does not state a definitive current-law status. Check the official publisher and later amendments before relying on this text.

Source-indexed provision map

Sections and provisions

Search by section, heading, part or exact legal wording. Every result remains linked to the stored source record.

Showing 1 of 1 provisions

Interpretation
§ 3131DefinitionsInterpretation

This section defines terms used in the subchapter, including several electricity-utility terms and size or capacity thresholds.

As used in this subchapter, unless the context indicates otherwise, the following terms have the following meanings. [PL 1987, c. 141, Pt. A, §6 (NEW).] 1. Domestic transmission and distribution utility. "Domestic transmission and distribution utility" means any entity organized under the laws of this State to transmit or distribute electricity. [PL 1999, c. 398, Pt. A, §45 (AMD); PL 1999, c. 398, Pt. A, §§104, 105 (AFF).] 1-A. Electric utility. [PL 1999, c. 398, Pt. A, §45 (RP); PL 1999, c. 398, Pt. A, §§104, 105 (AFF).] 2. Energy. [PL 1999, c. 398, Pt. A, §45 (RP); PL 1999, c. 398, Pt. A, §§104, 105 (AFF).] 3. Foreign electric utility. "Foreign electric utility" means any entity organized under the laws of a state other than this State, or a province of Canada, that is authorized under the laws of the state or province in which it is organized to generate, transmit or distribute electricity, or to own, operate or otherwise participate in utility facilities or interests in utility facilities. [PL 1999, c. 398, Pt. A, §45 (AMD); PL 1999, c. 398, Pt. A, §§104, 105 (AFF).] 3-A. Fuel conversion. [PL 1999, c. 398, Pt. A, §45 (RP); PL 1999, c. 398, Pt. A, §§104, 105 (AFF).] 4. Generating capacity. [PL 1999, c. 398, Pt. A, §45 (RP); PL 1999, c. 398, Pt. A, §§104, 105 (AFF).] 4-A. High-impact electric transmission line. "High-impact electric transmission line" means a transmission line greater than 50 miles in length that is: A. Constructed to transmit direct current electricity; or [PL 2009, c. 655, Pt. A, §3 (NEW).] B. Capable of operating at 345 kilovolts or more and: (1) Is not a generator interconnection transmission facility as defined in section 3132, subsection 1‑B; and (2) Is not constructed primarily to provide electric reliability, as determined by the commission. [PL 2009, c. 655, Pt. A, §3 (NEW).] [IB 2021, c. 1, §2 (AMD).] 4-B. Nontransmission alternative. [PL 2023, c. 355, §1 (RP).] 4-C. Nonwires alternative. "Nonwires alternative" means an infrastructure, technology or application that either individually or collectively defers or reduces the need for capital investment in the transmission or distribution system and addresses system reliability needs proposed to be met by the transmission or distribution system investment. "Nonwires alternative" includes but is not limited to energy efficiency and conservation measures, energy storage, load management, demand response and distributed generation. [PL 2023, c. 355, §2 (AMD).] 4-D. Nonwires alternative coordinator. "Nonwires alternative coordinator" means the person or entity providing services under contract to the Office of the Public Advocate as described in section 1701, subsection 2‑A. [PL 2019, c. 298, §5 (NEW).] 5. Transmission capacity. "Transmission capacity" means an entitlement to transmission services over a transmission line with a capacity greater than 100 kilovolts for periods greater than 3 years. [PL 1987, c. 141, Pt. A, §6 (NEW).] 6. Utility facility. "Utility facility" means an item of plant used or useful in the transmission and distribution utility business, and includes, but is not limited to, such items of plant as transmission lines, office buildings and equipment and transportation equipment. [PL 1999, c. 398, Pt. A, §45 (AMD); PL 1999, c. 398, Pt. A, §§104, 105 (AFF).] 7. Corridor. "Corridor" means an area no greater than 1/2 mile in width in which a proposed transmission line is to be located. [PL 1991, c. 640, §1 (NEW).] 8. Cost-effective. "Cost-effective" means, with respect to nonwires alternatives, that benefits exceed costs, as determined by benefit-cost analysis conducted pursuant to section 3132‑C, subsection 2. [PL 2019, c. 298, §6 (NEW).]
Section 3131Verify source

Legislative relationships

0 referenced instruments

Names are derived from the stored provision headings and citation-enrichment layer. Treat this as a research index and verify each relationship against the source text.

No structured legislative relationships were detected

The statute remains fully searchable by provision. Consult the source text for amendments and cross-references that have not yet been indexed.

Recorded versions and source checkpoint

1 version available in this collection

Current-law checkpoint
  • 1 Oct 2025 · currentEnglish

Source-linked research

Ask AI about this statute

The overview, provisions, and source records above are public. Continue in a separate conversation with this statute’s jurisdiction and source version attached.

No legal research model is currently available.

Sign in

About this LexChat collection

Statute information is organised from identified legislative sources for professional research. Corrections can be reported to hello@esheria.ai.