§ 70-312. Electric transmission or electric distribution lines; notice of widening of roads; contents.
A required notice must describe the work, where it will occur, and when it is scheduled to begin. If the starting time changes, notice of the change must be given as soon as practicable.
AI-assisted research synopsis — verify against the official legal text below.
- Jurisdiction
- United States — Nebraska
- Instrument
- Notice
- Version
- Undated source snapshot
- Language
- en
- Updated
- Official source
- View official record ↗
notice requirements road works
Publicly available, excluded from search-engine indexing
This page remains available for direct access and API use, but this release emits
noindex,follow for the following reason:
- The record does not meet this release's canonical indexing criteria.
(market-indexing-disabled)
Statute overview
About this statute
This page preserves the statute’s identified version, provision structure, official source link, and stored legal text for reading and research.
Ask AI about this statute
§ 70-312. Electric transmission or electric distribution lines; notice of widening of roads; contents.
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign in