Water Code § 51.853
The commission may review all water rights permits affecting the Trinity River basin, and must do so at least every 10 years, working with the authority and all reservoir owners in the basin.
- Jurisdiction
- United States — Texas
- Instrument
- Code
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
water rights permits
Statute overview
About this statute
This page preserves the statute’s identified version, provision structure, official source link, and stored legal text for reading and research.
Ask AI about this statute
Water Code § 51.853
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign inLexChat organizes source-backed legal information for research. Verify amendments, commencement, and current legal force with the official publisher before relying on it.