Transportation Code § 223.248
The department must assume specified project risks and costs, with an exception for certain temporary easement or work area costs. A design-build contractor may instead assume some or all of those risks or costs if the final request for proposals says so.
- Jurisdiction
- United States — Texas
- Instrument
- Code
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
cost allocation design-build contracts project risk allocation
Statute overview
About this statute
This page preserves the statute’s identified version, provision structure, official source link, and stored legal text for reading and research.
Ask AI about this statute
Transportation Code § 223.248
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign inLexChat organizes source-backed legal information for research. Verify amendments, commencement, and current legal force with the official publisher before relying on it.