Water Code § 31.015
If a qualifying environmental report is required before approval to construct a subsurface excavation, it must be submitted with proof of the needed approvals, and the commission must make it available for 30 days of public review and comment before considering the permit application.
- Jurisdiction
- United States — Texas
- Instrument
- Code
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
environmental review permits
Statute overview
About this statute
This page preserves the statute’s identified version, provision structure, official source link, and stored legal text for reading and research.
Ask AI about this statute
Water Code § 31.015
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign inLexChat organizes source-backed legal information for research. Verify amendments, commencement, and current legal force with the official publisher before relying on it.