Water Code § 13.504
If rent was raised in the 90 days before individual meters or submeters were installed because utility costs went up, the owner, operator, or manager must lower the rent and refund the collected increase.
- Jurisdiction
- United States — Texas
- Instrument
- Code
- Version
- Undated source snapshot
- Language
- en
- Official source
- View official record ↗
metering rent utilities
Statute overview
About this statute
This page preserves the statute’s identified version, provision structure, official source link, and stored legal text for reading and research.
Ask AI about this statute
Water Code § 13.504
Sign in to ask AI about this statute
Sign in to start authenticated, citation-grounded statute research.
Sign inLexChat organizes source-backed legal information for research. Verify amendments, commencement, and current legal force with the official publisher before relying on it.