United States — Utah Act or statute

United States — Utah legislation

Utah Code § 10-20-703, 2019

Rights of a critical infrastructure materials operator with a vested critical infrastructure materials use. Notwithstanding a political subdivision's prohibition, restriction, or other limitation on a critical…

critical infrastructure materialsexpansionexpansion noticeinfrastructure expansionmeeting proceduremitigation measurespublic hearingpublic meeting/hearingregulatory noticevested use

Professional statute overview

Enactment structure, operative effect and source provenance

Official source

01

Purpose and legislative effect

“Rights of a critical infrastructure materials operator with a vested critical infrastructure materials use. Notwithstanding a political subdivision's prohibition, restriction, or other limitation on a critical infrastructure materials use”

Use this record to locate individual provisions, understand the instrument’s recorded structure, and move from a research summary to the exact source text.

02

How the instrument operates

  1. 01

    Start with the recorded version

    Enacted 2019. The date shown identifies this source expression and should not be treated as proof that no later change exists.

  2. 02

    Locate the controlling provision

    Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.

  3. 03

    Read conditions and exceptions together

    Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.

  4. 04

    Verify currency and official wording

    Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.

03

Research entry points

Selected provisions across the instrument. Open any row to continue with the exact stored text.

Subsection 10-20-703(2)

An operator with a vested critical infrastructure materials use is presumed to have a right to expand to new land, but must first give written notice to the applicable legislative body and then wait for the required public meeting or hearing.

Section 10-20-703(2)

Subsection 10-20-703(2)(d)(i)

An applicable legislative body must hold a public meeting or hearing at its next available meeting, no later than 30 days after receiving the notice under Subsection (2)(c), and must give reasonable advance written notice to each owner of the surface estate of…

Section 10-20-703(2)(d)(i)

Subsection 10-20-703(4)

If the applicable legislative body makes the finding of endangerment described in Subsection (2)(e)(i) : the critical infrastructure materials operator shall submit to the applicable legislative body the critical infrastructure materials

Section 10-20-703(4)

Subsection 10-20-703(4)(d)

The process under this Subsection (4) is not a land use application or conditional use application under this chapter.

Section 10-20-703(4)(d)

04

Source and current-law status

In force source record

Source record from le.utah.gov · Enacted 2019

In force

This source records the instrument as in force. Confirm subsequent amendments, commencement notices, and judicial treatment before relying on it.

Source-indexed provision map

Sections and provisions

Search by section, heading, part or exact legal wording. Every result remains linked to the stored source record.

Showing 39 of 39 provisions

Provision 36Substitution 3

Part 10-20-7

part 10-20-7 Vested Critical Infrastructure Materials Operations

§ 10-20-703Rights of a critical infrastructure materials operator with a vested critical infrastructure materials use.Substitution

Rights of a critical infrastructure materials operator with a vested critical infrastructure materials use. Notwithstanding a political subdivision's prohibition, restriction, or other limitation on a critical infrastructure materials use

Rights of a critical infrastructure materials operator with a vested critical infrastructure materials use. Notwithstanding a political subdivision's prohibition, restriction, or other limitation on a critical infrastructure materials use adopted after the establishment of the critical infrastructure materials use, the rights of a critical infrastructure materials operator with a vested critical infrastructure materials use include with respect to that existing legal use the right to: progress, extend, enlarge, grow, or expand the vested critical infrastructure materials use to any contiguous land that the critical infrastructure materials operator owns or controls before May 7, 2025; expand the vested critical infrastructure materials use to new land that is contiguous land to the surface or subsurface land on which the critical infrastructure materials operator has a vested critical infrastructure materials use, including the surface or subsurface land under Subsection (1)(a) ; use, operate, construct, reconstruct, restore, extend, expand, maintain, repair, alter, substitute, modernize, upgrade, and replace equipment, processes, facilities, and buildingson any surface or subsurface land that the critical infrastructure materials operator owns or controls before May 7, 2025; on any surface or subsurface land that the critical infrastructure materials operator owns or controls before May 7, 2025: increase production or volume; alter the method of extracting or processing, including with respect to the vested use, the right to stockpile or hold in reserve critical infrastructure materials, to recycle, and to batch and mix concrete and asphalt; and extract or process a different or additional critical infrastructure material than previously extracted or processed on the surface or subsurface land; and discontinue, suspend, terminate, deactivate, or continue and reactivate, temporarily or permanently, all or any part of the critical infrastructure materials use. As used in this Subsection (2) , "applicable legislative body" means the legislative body of each: county in whose unincorporated area the new land to be included in the vested critical infrastructure materials use is located; or municipality in which the new land to be included in the critical infrastructure materials use is located. A critical infrastructure materials operator with a vested critical infrastructure materials use is presumed to have a right to expand the vested critical infrastructure materials use to new land. Before expanding a vested critical infrastructure materials use to new land, a critical infrastructure materials operator shall provide written notice: of the critical infrastructure materials operator's intent to expand the vested critical infrastructure materials use; and to each applicable legislative body. An applicable legislative body shall: hold a public meeting or hearing at the applicable legislative body's next available meeting that is no later than 30 days after receiving the notice under Subsection (2)(c) ; and provide reasonable, advance, written notice of the intended expansion of the vested critical infrastructure materials use and the public meeting or hearing to each owner of the surface estate of the new land. A public meeting or hearing under Subsection (2)(d)(i) serves to provide sufficient public notice of the critical infrastructure materials operator's intent to expand the vested critical infrastructure materials use to the new land. After the public meeting or hearing under Subsection (2)(d)(i) , a critical infrastructure materials operator may expand a vested critical infrastructure materials use to new land without any action by an applicable legislative body, unless the applicable legislative body finds by the preponderance of the evidence on the record that the expansion to new land will endanger the public health, safety, and welfare. If the applicable legislative body makes the finding of endangerment described in Subsection (2)(e)(i), Subsection (4) applies. If a critical infrastructure materials operator expands a vested critical infrastructure materials use to new land, as authorized under this section: the critical infrastructure materials operator's rights under the vested critical infrastructure materials use with respect to land on which the vested critical infrastructure materials use occurs apply with equal force after the expansion to the new land; and the critical infrastructure materials protection area that includes land on which the vested critical infrastructure materials use occurs is expanded to include the new land. If the applicable legislative body makes the finding of endangerment described in Subsection (2)(e)(i) : the critical infrastructure materials operator shall submit to the applicable legislative body the critical infrastructure materials operator's plan for expansion under this section; by no later than 90 days after receipt of the plan for expansion described in Subsection (4)(a)(i) , the applicable legislative body shall notify the operator of: evidence that the expansion to new land will endanger the public health, safety, and welfare; and proposed measures to mitigate the endangerment of the public health, safety, and welfare; and the applicable legislative body shall hold a public hearing by no later than 30 days after the date the applicable legislative body complies with Subsection (4)(a)(ii) to present mitigation measures proposed under Subsection (4)(a)(ii) . The applicable legislative body may impose mitigation measures under this Subsection (4) that are reasonable and do not exceed requirements imposed by permits issued by a state agency such as an air quality permit. A political subdivision may not prohibit the expansion of a vested critical infrastructure materials use if the critical infrastructure materials operator agrees to comply with the mitigation measures described in Subsection (4)(b) . The process under this Subsection (4) is not a land use application or conditional use application under this chapter.
Section 10-20-703Verify source
§ 10-20-703(1)Subsection 10-20-703(1)Substitution

A critical infrastructure materials operator with a vested use may expand and continue that use on certain contiguous or owned/controlled land, despite later local limits.

Notwithstanding a political subdivision's prohibition, restriction, or other limitation on a critical infrastructure materials use adopted after the establishment of the critical infrastructure materials use, the rights of a critical infrastructure materials operator with a vested critical infrastructure materials use include with respect to that existing legal use the right to: progress, extend, enlarge, grow, or expand the vested critical infrastructure materials use to any contiguous land that the critical infrastructure materials operator owns or controls before May 7, 2025; expand the vested critical infrastructure materials use to new land that is contiguous land to the surface or subsurface land on which the critical infrastructure materials operator has a vested critical infrastructure materials use, including the surface or subsurface land under Subsection (1)(a) ; use, operate, construct, reconstruct, restore, extend, expand, maintain, repair, alter, substitute, modernize, upgrade, and replace equipment, processes, facilities, and buildingson any surface or subsurface land that the critical infrastructure materials operator owns or controls before May 7, 2025; on any surface or subsurface land that the critical infrastructure materials operator owns or controls before May 7, 2025: increase production or volume; alter the method of extracting or processing, including with respect to the vested use, the right to stockpile or hold in reserve critical infrastructure materials, to recycle, and to batch and mix concrete and asphalt; and extract or process a different or additional critical infrastructure material than previously extracted or processed on the surface or subsurface land; and discontinue, suspend, terminate, deactivate, or continue and reactivate, temporarily or permanently, all or any part of the critical infrastructure materials use.
Section 10-20-703(1)Verify source
§ 10-20-703(1)(a)Subsection 10-20-703(1)(a)Provision

A critical infrastructure materials operator may extend vested critical infrastructure materials use to contiguous land it owns or controls, if the land is contiguous and before May 7, 2025.

progress, extend, enlarge, grow, or expand the vested critical infrastructure materials use to any contiguous land that the critical infrastructure materials operator owns or controls before May 7, 2025;
Section 10-20-703(1)(a)Verify source
§ 10-20-703(1)(b)Subsection 10-20-703(1)(b)Provision

The critical infrastructure materials operator may expand a vested critical infrastructure materials use to contiguous new land, including surface or subsurface land under Subsection (1)(a).

expand the vested critical infrastructure materials use to new land that is contiguous land to the surface or subsurface land on which the critical infrastructure materials operator has a vested critical infrastructure materials use, including the surface or subsurface land under Subsection (1)(a) ;
Section 10-20-703(1)(b)Verify source
§ 10-20-703(1)(c)Subsection 10-20-703(1)(c)Substitution

use, operate, construct, reconstruct, restore, extend, expand, maintain, repair, alter, substitute, modernize, upgrade, and replace equipment, processes, facilities, and buildingson any surface or subsurface land that the critical

use, operate, construct, reconstruct, restore, extend, expand, maintain, repair, alter, substitute, modernize, upgrade, and replace equipment, processes, facilities, and buildingson any surface or subsurface land that the critical infrastructure materials operator owns or controls before May 7, 2025;
Section 10-20-703(1)(c)Verify source
§ 10-20-703(1)(d)Subsection 10-20-703(1)(d)Provision

on any surface or subsurface land that the critical infrastructure materials operator owns or controls before May 7, 2025: increase production or volume; alter the method of extracting or processing, including with respect to the vested

on any surface or subsurface land that the critical infrastructure materials operator owns or controls before May 7, 2025: increase production or volume; alter the method of extracting or processing, including with respect to the vested use, the right to stockpile or hold in reserve critical infrastructure materials, to recycle, and to batch and mix concrete and asphalt; and extract or process a different or additional critical infrastructure material than previously extracted or processed on the surface or subsurface land; and
Section 10-20-703(1)(d)Verify source
§ 10-20-703(1)(d)(i)Subsection 10-20-703(1)(d)(i)Provision

increase production or volume;

increase production or volume;
Section 10-20-703(1)(d)(i)Verify source
§ 10-20-703(1)(d)(ii)Subsection 10-20-703(1)(d)(ii)Provision

alter the method of extracting or processing, including with respect to the vested use, the right to stockpile or hold in reserve critical infrastructure materials, to recycle, and to batch and mix concrete and asphalt; and

alter the method of extracting or processing, including with respect to the vested use, the right to stockpile or hold in reserve critical infrastructure materials, to recycle, and to batch and mix concrete and asphalt; and
Section 10-20-703(1)(d)(ii)Verify source
§ 10-20-703(1)(d)(iii)Subsection 10-20-703(1)(d)(iii)Provision

extract or process a different or additional critical infrastructure material than previously extracted or processed on the surface or subsurface land; and

extract or process a different or additional critical infrastructure material than previously extracted or processed on the surface or subsurface land; and
Section 10-20-703(1)(d)(iii)Verify source
§ 10-20-703(1)(e)Subsection 10-20-703(1)(e)Provision

discontinue, suspend, terminate, deactivate, or continue and reactivate, temporarily or permanently, all or any part of the critical infrastructure materials use.

discontinue, suspend, terminate, deactivate, or continue and reactivate, temporarily or permanently, all or any part of the critical infrastructure materials use.
Section 10-20-703(1)(e)Verify source
§ 10-20-703(2)Subsection 10-20-703(2)Provision

An operator with a vested critical infrastructure materials use is presumed to have a right to expand to new land, but must first give written notice to the applicable legislative body and then wait for the required public meeting or hearing.

As used in this Subsection (2) , "applicable legislative body" means the legislative body of each: county in whose unincorporated area the new land to be included in the vested critical infrastructure materials use is located; or municipality in which the new land to be included in the critical infrastructure materials use is located. A critical infrastructure materials operator with a vested critical infrastructure materials use is presumed to have a right to expand the vested critical infrastructure materials use to new land. Before expanding a vested critical infrastructure materials use to new land, a critical infrastructure materials operator shall provide written notice: of the critical infrastructure materials operator's intent to expand the vested critical infrastructure materials use; and to each applicable legislative body. An applicable legislative body shall: hold a public meeting or hearing at the applicable legislative body's next available meeting that is no later than 30 days after receiving the notice under Subsection (2)(c) ; and provide reasonable, advance, written notice of the intended expansion of the vested critical infrastructure materials use and the public meeting or hearing to each owner of the surface estate of the new land. A public meeting or hearing under Subsection (2)(d)(i) serves to provide sufficient public notice of the critical infrastructure materials operator's intent to expand the vested critical infrastructure materials use to the new land. After the public meeting or hearing under Subsection (2)(d)(i) , a critical infrastructure materials operator may expand a vested critical infrastructure materials use to new land without any action by an applicable legislative body, unless the applicable legislative body finds by the preponderance of the evidence on the record that the expansion to new land will endanger the public health, safety, and welfare. If the applicable legislative body makes the finding of endangerment described in Subsection (2)(e)(i), Subsection (4) applies.
Section 10-20-703(2)Verify source
§ 10-20-703(2)(a)Subsection 10-20-703(2)(a)Provision

This subsection defines “applicable legislative body.”

As used in this Subsection (2) , "applicable legislative body" means the legislative body of each: county in whose unincorporated area the new land to be included in the vested critical infrastructure materials use is located; or municipality in which the new land to be included in the critical infrastructure materials use is located.
Section 10-20-703(2)(a)Verify source
§ 10-20-703(2)(a)(i)Subsection 10-20-703(2)(a)(i)Provision

county in whose unincorporated area the new land to be included in the vested critical infrastructure materials use is located; or

county in whose unincorporated area the new land to be included in the vested critical infrastructure materials use is located; or
Section 10-20-703(2)(a)(i)Verify source
§ 10-20-703(2)(a)(ii)Subsection 10-20-703(2)(a)(ii)Provision

municipality in which the new land to be included in the critical infrastructure materials use is located.

municipality in which the new land to be included in the critical infrastructure materials use is located.
Section 10-20-703(2)(a)(ii)Verify source
§ 10-20-703(2)(b)Subsection 10-20-703(2)(b)Provision

A critical infrastructure materials operator with a vested use is presumed to have a right to expand that use to new land.

A critical infrastructure materials operator with a vested critical infrastructure materials use is presumed to have a right to expand the vested critical infrastructure materials use to new land.
Section 10-20-703(2)(b)Verify source
§ 10-20-703(2)(c)Subsection 10-20-703(2)(c)Provision

A critical infrastructure materials operator must give written notice before expanding a vested critical infrastructure materials use to new land.

Before expanding a vested critical infrastructure materials use to new land, a critical infrastructure materials operator shall provide written notice: of the critical infrastructure materials operator's intent to expand the vested critical infrastructure materials use; and to each applicable legislative body.
Section 10-20-703(2)(c)Verify source
§ 10-20-703(2)(c)(i)Subsection 10-20-703(2)(c)(i)Provision

of the critical infrastructure materials operator's intent to expand the vested critical infrastructure materials use; and

of the critical infrastructure materials operator's intent to expand the vested critical infrastructure materials use; and
Section 10-20-703(2)(c)(i)Verify source
§ 10-20-703(2)(c)(ii)Subsection 10-20-703(2)(c)(ii)Provision

to each applicable legislative body.

to each applicable legislative body.
Section 10-20-703(2)(c)(ii)Verify source
§ 10-20-703(2)(d)Subsection 10-20-703(2)(d)Provision

The applicable legislative body must hold a public meeting or hearing within 30 days after receiving the notice under Subsection (2)(c), and must give reasonable advance written notice of the intended expansion and the meeting or hearing to each owner of the surface estate of the new land.

An applicable legislative body shall: hold a public meeting or hearing at the applicable legislative body's next available meeting that is no later than 30 days after receiving the notice under Subsection (2)(c) ; and provide reasonable, advance, written notice of the intended expansion of the vested critical infrastructure materials use and the public meeting or hearing to each owner of the surface estate of the new land. A public meeting or hearing under Subsection (2)(d)(i) serves to provide sufficient public notice of the critical infrastructure materials operator's intent to expand the vested critical infrastructure materials use to the new land.
Section 10-20-703(2)(d)Verify source
§ 10-20-703(2)(d)(i)Subsection 10-20-703(2)(d)(i)Provision

An applicable legislative body must hold a public meeting or hearing at its next available meeting, no later than 30 days after receiving the notice under Subsection (2)(c), and must give reasonable advance written notice to each owner of the surface estate of the new land.

An applicable legislative body shall: hold a public meeting or hearing at the applicable legislative body's next available meeting that is no later than 30 days after receiving the notice under Subsection (2)(c) ; and provide reasonable, advance, written notice of the intended expansion of the vested critical infrastructure materials use and the public meeting or hearing to each owner of the surface estate of the new land.
Section 10-20-703(2)(d)(i)Verify source
§ 10-20-703(2)(d)(i)(A)Subsection 10-20-703(2)(d)(i)(A)Provision

A public meeting or hearing must be held at the applicable legislative body's next available meeting, no later than 30 days after notice is received under Subsection (2)(c).

hold a public meeting or hearing at the applicable legislative body's next available meeting that is no later than 30 days after receiving the notice under Subsection (2)(c) ; and
Section 10-20-703(2)(d)(i)(A)Verify source
§ 10-20-703(2)(d)(i)(B)Subsection 10-20-703(2)(d)(i)(B)Provision

A person must give reasonable, advance, written notice of the intended expansion and the related public meeting or hearing to each owner of the surface estate of the new land.

provide reasonable, advance, written notice of the intended expansion of the vested critical infrastructure materials use and the public meeting or hearing to each owner of the surface estate of the new land.
Section 10-20-703(2)(d)(i)(B)Verify source
§ 10-20-703(2)(d)(ii)Subsection 10-20-703(2)(d)(ii)Provision

A public meeting or hearing under Subsection (2)(d)(i) provides sufficient public notice of the operator’s intent to expand the vested critical infrastructure materials use to new land.

A public meeting or hearing under Subsection (2)(d)(i) serves to provide sufficient public notice of the critical infrastructure materials operator's intent to expand the vested critical infrastructure materials use to the new land.
Section 10-20-703(2)(d)(ii)Verify source
§ 10-20-703(2)(e)Subsection 10-20-703(2)(e)Provision

A critical infrastructure materials operator may expand a vested use to new land after the required public meeting or hearing, unless the applicable legislative body finds on the record, by a preponderance of the evidence, that the expansion would endanger public health, safety, and welfare.

After the public meeting or hearing under Subsection (2)(d)(i) , a critical infrastructure materials operator may expand a vested critical infrastructure materials use to new land without any action by an applicable legislative body, unless the applicable legislative body finds by the preponderance of the evidence on the record that the expansion to new land will endanger the public health, safety, and welfare. If the applicable legislative body makes the finding of endangerment described in Subsection (2)(e)(i), Subsection (4) applies.
Section 10-20-703(2)(e)Verify source
§ 10-20-703(2)(e)(i)Subsection 10-20-703(2)(e)(i)Provision

A critical infrastructure materials operator may expand a vested critical infrastructure materials use to new land after the required public meeting or hearing, unless the applicable legislative body finds by the preponderance of the evidence on the record that the expansion would endanger public health, safety, and welfare.

After the public meeting or hearing under Subsection (2)(d)(i) , a critical infrastructure materials operator may expand a vested critical infrastructure materials use to new land without any action by an applicable legislative body, unless the applicable legislative body finds by the preponderance of the evidence on the record that the expansion to new land will endanger the public health, safety, and welfare.
Section 10-20-703(2)(e)(i)Verify source
§ 10-20-703(2)(e)(ii)Subsection 10-20-703(2)(e)(ii)Provision

If the applicable legislative body makes the finding of endangerment described in Subsection (2)(e)(i), Subsection (4) applies.

If the applicable legislative body makes the finding of endangerment described in Subsection (2)(e)(i), Subsection (4) applies.
Section 10-20-703(2)(e)(ii)Verify source
§ 10-20-703(3)Subsection 10-20-703(3)Provision

If a critical infrastructure materials operator expands a vested critical infrastructure materials use to new land, the operator’s rights continue to apply to the new land and the protection area is expanded to include it.

If a critical infrastructure materials operator expands a vested critical infrastructure materials use to new land, as authorized under this section: the critical infrastructure materials operator's rights under the vested critical infrastructure materials use with respect to land on which the vested critical infrastructure materials use occurs apply with equal force after the expansion to the new land; and the critical infrastructure materials protection area that includes land on which the vested critical infrastructure materials use occurs is expanded to include the new land.
Section 10-20-703(3)Verify source
§ 10-20-703(3)(a)Subsection 10-20-703(3)(a)Provision

The critical infrastructure materials operator’s rights for the vested critical infrastructure materials use continue to apply to the new land after expansion.

the critical infrastructure materials operator's rights under the vested critical infrastructure materials use with respect to land on which the vested critical infrastructure materials use occurs apply with equal force after the expansion to the new land; and
Section 10-20-703(3)(a)Verify source
§ 10-20-703(3)(b)Subsection 10-20-703(3)(b)Provision

the critical infrastructure materials protection area that includes land on which the vested critical infrastructure materials use occurs is expanded to include the new land.

the critical infrastructure materials protection area that includes land on which the vested critical infrastructure materials use occurs is expanded to include the new land.
Section 10-20-703(3)(b)Verify source
§ 10-20-703(4)Subsection 10-20-703(4)Provision

If the applicable legislative body makes the finding of endangerment described in Subsection (2)(e)(i) : the critical infrastructure materials operator shall submit to the applicable legislative body the critical infrastructure materials

If the applicable legislative body makes the finding of endangerment described in Subsection (2)(e)(i) : the critical infrastructure materials operator shall submit to the applicable legislative body the critical infrastructure materials operator's plan for expansion under this section; by no later than 90 days after receipt of the plan for expansion described in Subsection (4)(a)(i) , the applicable legislative body shall notify the operator of: evidence that the expansion to new land will endanger the public health, safety, and welfare; and proposed measures to mitigate the endangerment of the public health, safety, and welfare; and the applicable legislative body shall hold a public hearing by no later than 30 days after the date the applicable legislative body complies with Subsection (4)(a)(ii) to present mitigation measures proposed under Subsection (4)(a)(ii) . The applicable legislative body may impose mitigation measures under this Subsection (4) that are reasonable and do not exceed requirements imposed by permits issued by a state agency such as an air quality permit. A political subdivision may not prohibit the expansion of a vested critical infrastructure materials use if the critical infrastructure materials operator agrees to comply with the mitigation measures described in Subsection (4)(b) . The process under this Subsection (4) is not a land use application or conditional use application under this chapter.
Section 10-20-703(4)Verify source
§ 10-20-703(4)(a)Subsection 10-20-703(4)(a)Provision

If the legislative body makes the specified endangerment finding, the operator must submit its expansion plan, and the legislative body must give notice and hold a public hearing within set deadlines.

If the applicable legislative body makes the finding of endangerment described in Subsection (2)(e)(i) : the critical infrastructure materials operator shall submit to the applicable legislative body the critical infrastructure materials operator's plan for expansion under this section; by no later than 90 days after receipt of the plan for expansion described in Subsection (4)(a)(i) , the applicable legislative body shall notify the operator of: evidence that the expansion to new land will endanger the public health, safety, and welfare; and proposed measures to mitigate the endangerment of the public health, safety, and welfare; and the applicable legislative body shall hold a public hearing by no later than 30 days after the date the applicable legislative body complies with Subsection (4)(a)(ii) to present mitigation measures proposed under Subsection (4)(a)(ii) .
Section 10-20-703(4)(a)Verify source
§ 10-20-703(4)(a)(i)Subsection 10-20-703(4)(a)(i)Provision

The critical infrastructure materials operator must submit its expansion plan to the applicable legislative body.

the critical infrastructure materials operator shall submit to the applicable legislative body the critical infrastructure materials operator's plan for expansion under this section;
Section 10-20-703(4)(a)(i)Verify source
§ 10-20-703(4)(a)(ii)Subsection 10-20-703(4)(a)(ii)Provision

Within 90 days after receiving the expansion plan, the applicable legislative body must notify the operator of evidence of endangerment and proposed mitigation measures.

by no later than 90 days after receipt of the plan for expansion described in Subsection (4)(a)(i) , the applicable legislative body shall notify the operator of: evidence that the expansion to new land will endanger the public health, safety, and welfare; and proposed measures to mitigate the endangerment of the public health, safety, and welfare; and
Section 10-20-703(4)(a)(ii)Verify source
§ 10-20-703(4)(a)(ii)(A)Subsection 10-20-703(4)(a)(ii)(A)Provision

evidence that the expansion to new land will endanger the public health, safety, and welfare; and

evidence that the expansion to new land will endanger the public health, safety, and welfare; and
Section 10-20-703(4)(a)(ii)(A)Verify source
§ 10-20-703(4)(a)(ii)(B)Subsection 10-20-703(4)(a)(ii)(B)Provision

proposed measures to mitigate the endangerment of the public health, safety, and welfare; and

proposed measures to mitigate the endangerment of the public health, safety, and welfare; and
Section 10-20-703(4)(a)(ii)(B)Verify source
§ 10-20-703(4)(a)(iii)Subsection 10-20-703(4)(a)(iii)Provision

the applicable legislative body shall hold a public hearing by no later than 30 days after the date the applicable legislative body complies with Subsection (4)(a)(ii) to present mitigation measures proposed under Subsection (4)(a)(ii) .

the applicable legislative body shall hold a public hearing by no later than 30 days after the date the applicable legislative body complies with Subsection (4)(a)(ii) to present mitigation measures proposed under Subsection (4)(a)(ii) .
Section 10-20-703(4)(a)(iii)Verify source
§ 10-20-703(4)(b)Subsection 10-20-703(4)(b)Provision

The applicable legislative body may impose mitigation measures under this Subsection (4) that are reasonable and do not exceed requirements imposed by permits issued by a state agency such as an air quality permit.

The applicable legislative body may impose mitigation measures under this Subsection (4) that are reasonable and do not exceed requirements imposed by permits issued by a state agency such as an air quality permit.
Section 10-20-703(4)(b)Verify source
§ 10-20-703(4)(c)Subsection 10-20-703(4)(c)Provision

A political subdivision may not prohibit expansion of a vested critical infrastructure materials use if the operator agrees to comply with the mitigation measures in Subsection (4)(b).

A political subdivision may not prohibit the expansion of a vested critical infrastructure materials use if the critical infrastructure materials operator agrees to comply with the mitigation measures described in Subsection (4)(b) .
Section 10-20-703(4)(c)Verify source
§ 10-20-703(4)(d)Subsection 10-20-703(4)(d)Provision

The process under this Subsection (4) is not a land use application or conditional use application under this chapter.

The process under this Subsection (4) is not a land use application or conditional use application under this chapter.
Section 10-20-703(4)(d)Verify source

Legislative relationships

0 referenced instruments

Names are derived from the stored provision headings and citation-enrichment layer. Treat this as a research index and verify each relationship against the source text.

No structured legislative relationships were detected

The statute remains fully searchable by provision. Consult the source text for amendments and cross-references that have not yet been indexed.

Recorded versions and source checkpoint

1 version available in this collection

Current-law checkpoint
  • Undated version · currentEnglish · In force

Source-linked research

Ask AI about this statute

The overview, provisions, and source records above are public. Continue in a separate conversation with this statute’s jurisdiction and source version attached.

About this LexChat collection

Statute information is organised from identified legislative sources for professional research. Corrections can be reported to hello@esheria.ai.