Additional feasibility consultant considerations for proposed incorporation of community council area -- Additional feasibility study requirements. As used in this section: "Applicable community c…

annexationcommunity council areacommunity council area incorporationcost analysiscost evaluationcost projectioncost savingsdemographicseconomic developmentemployee impactsemployee termination costsemployee transferfeasibility studyhearingsincorporationincorporation costslocal governmentmunicipal financemunicipal incorporationmunicipal planningmunicipal servicesmunicipal services districtpay and benefitsprojectionspublic facilitiespublic hearingpublic noticepublic noticespublic services cost analysisqualitative benefitsreport objection processutility service coverage

Professional statute overview

Enactment structure, operative effect and source provenance

Official source

01

Purpose and legislative effect

“Additional feasibility consultant considerations for proposed incorporation of community council area -- Additional feasibility study requirements. As used in this section: "Applicable community council" means the community council that”

Use this record to locate individual provisions, understand the instrument’s recorded structure, and move from a research summary to the exact source text.

02

How the instrument operates

  1. 01

    Start with the recorded version

    Legal dates not recorded. The date shown identifies this source expression and should not be treated as proof that no later change exists.

  2. 02

    Locate the controlling provision

    Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.

  3. 03

    Read conditions and exceptions together

    Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.

  4. 04

    Verify currency and official wording

    Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.

03

Research entry points

Selected provisions across the instrument. Open any row to continue with the exact stored text.

Subsection 10-2a-205.5(4)(a)

The feasibility consultant must assume future service levels that reasonably match current district service levels and must consider specified cost, savings, inflation, and population-growth factors when calculating present-value service costs.

Section 10-2a-205.5(4)(a)

Subsection 10-2a-205.5(6)(c)

Refers to the municipal services district that provides service to the community council area.

Section 10-2a-205.5(6)(c)

Subsection 10-2a-205.5(8)

A feasibility study report, including a modified report under Subsection (7), may not be challenged unless the challenge is based on collusion or fraud.

Section 10-2a-205.5(8)

Subsection 10-2a-205.5(12)

Unless the request sponsors and county agree otherwise, feasibility-study conditions needed for incorporation are binding on the community council municipality and county if incorporation occurs.

Section 10-2a-205.5(12)

04

Source and current-law status

In force source record

Source record from le.utah.gov · Legal dates not recorded

In force

This source records the instrument as in force. Confirm subsequent amendments, commencement notices, and judicial treatment before relying on it.

Source-indexed provision map

Sections and provisions

Search by section, heading, part or exact legal wording. Every result remains linked to the stored source record.

Showing 95 of 95 provisions

Provision 95

Part 10-2a-2

part 10-2a-2 Incorporation of a Municipality

§ 10-2a-205.5Additional feasibility consultant considerations for proposed incorporation of community council area -- Additional feasibility study requirements.Provision

Additional feasibility consultant considerations for proposed incorporation of community council area -- Additional feasibility study requirements. As used in this section: "Applicable community council" means the community council that

Additional feasibility consultant considerations for proposed incorporation of community council area -- Additional feasibility study requirements. As used in this section: "Applicable community council" means the community council that represents the community council area that is proposed to be incorporated. "Request sponsors" means the sponsors of a feasibility request relating to the proposed incorporation of a community council area. Subsections 10-2a-205(3)(a) and (b) do not apply to a feasibility study for a proposed incorporation of a community council area. A feasibility consultant conducting a feasibility study for a proposed incorporation of a community council area shall consider: population and population density within the community council area; current and five-year projections of demographics and economic base in the community council area, including household size and income, commercial and industrial development, and public facilities; projected population growth in the community council area during the next five years; subject to Subsection (4)(a), the present and five-year projections of the cost, including overhead, of providing the same or a similar service in the community council area as is provided by the municipal services district, including a comparison of: the estimated cost if the municipal services district continues to provide service; the estimated cost if the community council municipality provides service directly or through a contract with another service provider; and the estimated cost if an unincorporated island within the community council area is annexed under Section 10-2-814 and the annexing municipality provides service; subject to Subsection (4)(a), evaluating the present and five-year projections of the cost, including overhead, of a municipal services district providing municipal services to the community council area, comparing those costs assuming that the community council area is included in the service area of the municipal services district with those costs assuming that the community council area is excluded from the service area of the municipal services district; a projection of any new taxes per household that may be levied within the community council municipality within five years after incorporation; the fiscal impact that the community council area's incorporation will have on other municipalities and unincorporated areas served by the municipal services district, including any rate increase that may become necessary to maintain required coverage ratios for the municipal services district's debt if, after incorporation: the municipal services district continues to provide service to the community council area; or the community council area provides service directly or through contract with another service provider; the physical and other assets that will be required by the municipal services district to provide, without interruption or diminution of service, the same or a similar service to the community council municipality upon incorporation; the physical and other assets that will no longer be required by the municipal services district to continue to provide the current level of service to the remainder of the service area without the community council area if the community council area incorporates and provides services directly or through contract with another service provider; the number and classification of municipal services district employees who will no longer be required to serve the remaining portions of the service area if a community council area provides service directly or through contract with another service provider upon incorporation, including the dollar amount of the wages, salaries, and benefits attributable to the employees and the estimated cost associated with termination of the employees if the community council municipality does not employ the employees; if the community council municipality will provide service directly or through another service provider, the effects of maintaining as a base, for a period of three years, the existing schedule of pay and benefits for municipal services district employees who may be transferred to the employment of the community council municipality or to another service provider with which the community council municipality contracts for service; and any other factor that the feasibility consultant considers relevant to the cost of providing municipal services as a result of a community council area's incorporation or the annexation of one or more unincorporated islands under Section 10-2-814 . For purposes of Subsections (3)(d) and (e): the feasibility consultant shall assume a level and quality of service to be provided in the future to the community council municipality that fairly and reasonably approximates the level and quality of service that the municipal services district provides to the community council area at the time of the feasibility study; in determining the present-value cost of a service that the municipal services district provides, the feasibility consultant shall consider: the cost to the community council municipality of providing the service for the first five years after incorporation; the municipal services district's present and five-year projected cost of providing the same service to the community council area; the present and five-year projected cost of providing the same or a similar service to the community council area if service is provided by a municipality to which one or more unincorporated islands are annexed under Section 10-2-814 ; evaluate and detail the expected cost savings and qualitative benefits that result from a service provider other than the proposed municipality providing some municipal services; incorporate into the overall cost projection for the proposed municipality the potential for municipal services to be provided by a service provider other than the proposed municipality; and evaluate and detail projected costs for municipal services based on the proposed municipality providing municipal services as compared to service providers other than the proposed municipality providing municipal services funded by those other service providers; and the feasibility consultant shall consider inflation and anticipated population growth in calculating the cost of providing service. A feasibility consultant may not consider an allocation of municipal services district assets or a transfer of municipal services district employees to the extent that the allocation or transfer would impair the municipal services district's ability to continue to provide the current level of service to the remainder of the municipal services district's service area without the community council area, unless the municipal services district consents to the allocation or transfer. A feasibility consultant shall prepare a written report of the results of the feasibility study. A report under Subsection (5)(a) shall: contain a recommendation as to whether the proposed incorporation of the community council area is functionally and financially feasible for the community council area; include any conditions the feasibility consultant determines are required to be satisfied to make the incorporation functionally and financially feasible; and compare the costs of incorporation to the costs of the unincorporated islands within the community council area being annexed under Section 10-2-814 . Before finalizing a written report under this Subsection (5), the feasibility consultant shall provide a copy of a draft feasibility study report to the request sponsors and the county for their review and comments. Based on comments provided under Subsection (5)(c)(i), a feasibility consultant may adjust the draft feasibility study report before finalizing the report. Upon completion of the feasibility study and preparation of a written report, the feasibility consultant shall deliver a copy of the report to: the applicable community council; the request sponsors; the municipal services district that provides service to the community council area; the county in which the community council area is located; and each municipality that borders any part of the community council area. If the request sponsors or the county in which the community council area is located disagrees with any aspect of a feasibility study report or, if applicable, a feasibility study report modified under Subsection (7)(c), the request sponsors or county may, within 20 business days after receiving a copy of the report under Subsection (6) or a copy of a modified feasibility study report under Subsection (7)(c)(ii), submit to the feasibility consultant a written objection detailing the disagreement. Request sponsors who submit a written objection under Subsection (7)(a)(i) shall simultaneously deliver a copy of the objection to the county. A county that submits a written objection under Subsection (7)(a)(i) shall simultaneously deliver a copy of the objection to the request sponsors. The request sponsors or a county may, within 10 business days after receiving an objection under Subsection (7)(a)(i), submit to the feasibility consultant a written response to the objection. The request sponsors who submit a response under Subsection (7)(b)(i) shall simultaneously deliver a copy of the response to the county. A county that submits a response under Subsection (7)(b)(i) shall simultaneously deliver a copy of the response to the request sponsors. If an objection is filed under Subsection (7)(a)(i), the feasibility consultant shall, within 20 business days after the expiration of the deadline under Subsection (7)(b)(i) for submitting a response to an objection: modify the feasibility study report; or explain in writing why the feasibility consultant is not modifying the feasibility study report; and deliver the modified feasibility study report or written explanation to: the request sponsors; the municipal services district that provides service to the community council area; the county in which the community council area is located; and each municipality that borders any part of the community council area. Within seven days after the expiration of the deadline under Subsection (7)(a)(i) for submitting an objection or, if an objection is submitted, within seven days after receiving a modified feasibility study report or written explanation under Subsection (7)(c), but at least 30 days before a public hearing under Subsection (9), the applicable community council shall: make a copy of the report available to the public at the primary office of the applicable community council; and post a copy of the report on the website of the applicable community council, if the applicable community council has a website. A feasibility study report or, if a feasibility study report is modified under Subsection (7), a modified feasibility study report may not be challenged unless the basis of the challenge is that the report results from collusion or fraud. Subsection (8)(a) does not apply to an objection to a feasibility study report or a modified feasibility study report under Subsection (7). Following the expiration of the deadline under Subsection (7)(a)(i) for submitting an objection, or, if an objection is submitted under Subsection (7)(a)(i), following the applicable community council's receipt of the modified feasibility study report or written explanation under Subsection (7)(c), the applicable community council shall, at the applicable community council's next regular meeting, schedule at least one public hearing to be held: within the following 60 days; and for the purpose of allowing: the feasibility consultant to present the results of the feasibility study; and the public to become informed about the feasibility study results, to ask the feasibility consultant questions about the feasibility study, and to express the public's views about the proposed incorporation of the community council area. At a public hearing under Subsection (9)(a), the applicable community council shall: provide a copy of the feasibility study for public review; and allow the public to: ask the feasibility consultant questions about the feasibility study; and express the public's views about the advantages and disadvantages of the proposed incorporation as compared to a potential annexation under Section 10-2-814 . The applicable community council shall publish notice of a hearing under Subsection (9)(a), as a class A notice under Section 63G-30-102 , for three consecutive weeks immediately before the public hearing. A notice under Subsection (9)(c)(i) shall state: the date, time, and location of the public hearing; and that a copy of the feasibility study report may be obtained, free of charge, at the office of the applicable community council or, if applicable, on the applicable community council's website. A community council area may not incorporate if the feasibility study concludes that incorporation of the community council area is not functionally and financially feasible. Notwithstanding any other provision of this part: the lieutenant governor shall pay the fees and costs of a feasibility consultant using funds from the Municipal Incorporation Expendable Special Revenue Fund under Section 10-2a-220 ; and if the community council area incorporates as a municipality, the newly incorporated municipality shall pay incorporation costs to the lieutenant governor and county as provided in Section 10-2a-220 . Unless the request sponsors and county agree otherwise, conditions that a feasibility study report indicates are necessary to be met for the incorporation of the community council area to be functionally and financially feasible for the proposed community council municipality are binding on the community council municipality and county if the incorporation occurs.
Section 10-2a-205.5Verify source
§ 10-2a-205.5(1)Subsection 10-2a-205.5(1)Provision

This subsection defines “applicable community council” and “request sponsors.”

As used in this section: "Applicable community council" means the community council that represents the community council area that is proposed to be incorporated. "Request sponsors" means the sponsors of a feasibility request relating to the proposed incorporation of a community council area.
Section 10-2a-205.5(1)Verify source
§ 10-2a-205.5(1)(a)Subsection 10-2a-205.5(1)(a)Provision

“Applicable community council” means the community council representing the community council area proposed to be incorporated.

"Applicable community council" means the community council that represents the community council area that is proposed to be incorporated.
Section 10-2a-205.5(1)(a)Verify source
§ 10-2a-205.5(1)(b)Subsection 10-2a-205.5(1)(b)Provision

“Request sponsors” means the sponsors of a feasibility request for the proposed incorporation of a community council area.

"Request sponsors" means the sponsors of a feasibility request relating to the proposed incorporation of a community council area.
Section 10-2a-205.5(1)(b)Verify source
§ 10-2a-205.5(2)Subsection 10-2a-205.5(2)Provision

Subsections 10-2a-205(3)(a) and (b) do not apply to a feasibility study for a proposed incorporation of a community council area.

Subsections 10-2a-205(3)(a) and (b) do not apply to a feasibility study for a proposed incorporation of a community council area.
Section 10-2a-205.5(2)Verify source
§ 10-2a-205.5(3)Subsection 10-2a-205.5(3)Provision

A feasibility consultant must consider specified population, cost, tax, asset, employee, and fiscal-impact factors for a proposed community council area incorporation.

A feasibility consultant conducting a feasibility study for a proposed incorporation of a community council area shall consider: population and population density within the community council area; current and five-year projections of demographics and economic base in the community council area, including household size and income, commercial and industrial development, and public facilities; projected population growth in the community council area during the next five years; subject to Subsection (4)(a), the present and five-year projections of the cost, including overhead, of providing the same or a similar service in the community council area as is provided by the municipal services district, including a comparison of: the estimated cost if the municipal services district continues to provide service; the estimated cost if the community council municipality provides service directly or through a contract with another service provider; and the estimated cost if an unincorporated island within the community council area is annexed under Section 10-2-814 and the annexing municipality provides service; subject to Subsection (4)(a), evaluating the present and five-year projections of the cost, including overhead, of a municipal services district providing municipal services to the community council area, comparing those costs assuming that the community council area is included in the service area of the municipal services district with those costs assuming that the community council area is excluded from the service area of the municipal services district; a projection of any new taxes per household that may be levied within the community council municipality within five years after incorporation; the fiscal impact that the community council area's incorporation will have on other municipalities and unincorporated areas served by the municipal services district, including any rate increase that may become necessary to maintain required coverage ratios for the municipal services district's debt if, after incorporation: the municipal services district continues to provide service to the community council area; or the community council area provides service directly or through contract with another service provider; the physical and other assets that will be required by the municipal services district to provide, without interruption or diminution of service, the same or a similar service to the community council municipality upon incorporation; the physical and other assets that will no longer be required by the municipal services district to continue to provide the current level of service to the remainder of the service area without the community council area if the community council area incorporates and provides services directly or through contract with another service provider; the number and classification of municipal services district employees who will no longer be required to serve the remaining portions of the service area if a community council area provides service directly or through contract with another service provider upon incorporation, including the dollar amount of the wages, salaries, and benefits attributable to the employees and the estimated cost associated with termination of the employees if the community council municipality does not employ the employees; if the community council municipality will provide service directly or through another service provider, the effects of maintaining as a base, for a period of three years, the existing schedule of pay and benefits for municipal services district employees who may be transferred to the employment of the community council municipality or to another service provider with which the community council municipality contracts for service; and any other factor that the feasibility consultant considers relevant to the cost of providing municipal services as a result of a community council area's incorporation or the annexation of one or more unincorporated islands under Section 10-2-814 .
Section 10-2a-205.5(3)Verify source
§ 10-2a-205.5(3)(a)Subsection 10-2a-205.5(3)(a)Provision

population and population density within the community council area;

population and population density within the community council area;
Section 10-2a-205.5(3)(a)Verify source
§ 10-2a-205.5(3)(b)Subsection 10-2a-205.5(3)(b)Provision

current and five-year projections of demographics and economic base in the community council area, including household size and income, commercial and industrial development, and public facilities;

current and five-year projections of demographics and economic base in the community council area, including household size and income, commercial and industrial development, and public facilities;
Section 10-2a-205.5(3)(b)Verify source
§ 10-2a-205.5(3)(c)Subsection 10-2a-205.5(3)(c)Provision

projected population growth in the community council area during the next five years;

projected population growth in the community council area during the next five years;
Section 10-2a-205.5(3)(c)Verify source
§ 10-2a-205.5(3)(d)Subsection 10-2a-205.5(3)(d)Provision

subject to Subsection (4)(a), the present and five-year projections of the cost, including overhead, of providing the same or a similar service in the community council area as is provided by the municipal services district, including a

subject to Subsection (4)(a), the present and five-year projections of the cost, including overhead, of providing the same or a similar service in the community council area as is provided by the municipal services district, including a comparison of: the estimated cost if the municipal services district continues to provide service; the estimated cost if the community council municipality provides service directly or through a contract with another service provider; and the estimated cost if an unincorporated island within the community council area is annexed under Section 10-2-814 and the annexing municipality provides service;
Section 10-2a-205.5(3)(d)Verify source
§ 10-2a-205.5(3)(d)(i)Subsection 10-2a-205.5(3)(d)(i)Provision

the estimated cost if the municipal services district continues to provide service;

the estimated cost if the municipal services district continues to provide service;
Section 10-2a-205.5(3)(d)(i)Verify source
§ 10-2a-205.5(3)(d)(ii)Subsection 10-2a-205.5(3)(d)(ii)Provision

the estimated cost if the community council municipality provides service directly or through a contract with another service provider; and

the estimated cost if the community council municipality provides service directly or through a contract with another service provider; and
Section 10-2a-205.5(3)(d)(ii)Verify source
§ 10-2a-205.5(3)(d)(iii)Subsection 10-2a-205.5(3)(d)(iii)Provision

the estimated cost if an unincorporated island within the community council area is annexed under Section 10-2-814 and the annexing municipality provides service;

the estimated cost if an unincorporated island within the community council area is annexed under Section 10-2-814 and the annexing municipality provides service;
Section 10-2a-205.5(3)(d)(iii)Verify source
§ 10-2a-205.5(3)(e)Subsection 10-2a-205.5(3)(e)Provision

Subject to Subsection (4)(a), compare the present and five-year projected costs, including overhead, of a municipal services district serving the community council area with the costs if that area were excluded from the district service area.

subject to Subsection (4)(a), evaluating the present and five-year projections of the cost, including overhead, of a municipal services district providing municipal services to the community council area, comparing those costs assuming that the community council area is included in the service area of the municipal services district with those costs assuming that the community council area is excluded from the service area of the municipal services district;
Section 10-2a-205.5(3)(e)Verify source
§ 10-2a-205.5(3)(f)Subsection 10-2a-205.5(3)(f)Provision

a projection of any new taxes per household that may be levied within the community council municipality within five years after incorporation;

a projection of any new taxes per household that may be levied within the community council municipality within five years after incorporation;
Section 10-2a-205.5(3)(f)Verify source
§ 10-2a-205.5(3)(g)Subsection 10-2a-205.5(3)(g)Provision

the fiscal impact that the community council area's incorporation will have on other municipalities and unincorporated areas served by the municipal services district, including any rate increase that may become necessary to maintain

the fiscal impact that the community council area's incorporation will have on other municipalities and unincorporated areas served by the municipal services district, including any rate increase that may become necessary to maintain required coverage ratios for the municipal services district's debt if, after incorporation: the municipal services district continues to provide service to the community council area; or the community council area provides service directly or through contract with another service provider;
Section 10-2a-205.5(3)(g)Verify source
§ 10-2a-205.5(3)(g)(i)Subsection 10-2a-205.5(3)(g)(i)Provision

the municipal services district continues to provide service to the community council area; or

the municipal services district continues to provide service to the community council area; or
Section 10-2a-205.5(3)(g)(i)Verify source
§ 10-2a-205.5(3)(g)(ii)Subsection 10-2a-205.5(3)(g)(ii)Provision

The community council area may provide service directly or by contract with another service provider.

the community council area provides service directly or through contract with another service provider;
Section 10-2a-205.5(3)(g)(ii)Verify source
§ 10-2a-205.5(3)(h)Subsection 10-2a-205.5(3)(h)Provision

the physical and other assets that will be required by the municipal services district to provide, without interruption or diminution of service, the same or a similar service to the community council municipality upon incorporation;

the physical and other assets that will be required by the municipal services district to provide, without interruption or diminution of service, the same or a similar service to the community council municipality upon incorporation;
Section 10-2a-205.5(3)(h)Verify source
§ 10-2a-205.5(3)(i)Subsection 10-2a-205.5(3)(i)Provision

the physical and other assets that will no longer be required by the municipal services district to continue to provide the current level of service to the remainder of the service area without the community council area if the community

the physical and other assets that will no longer be required by the municipal services district to continue to provide the current level of service to the remainder of the service area without the community council area if the community council area incorporates and provides services directly or through contract with another service provider;
Section 10-2a-205.5(3)(i)Verify source
§ 10-2a-205.5(3)(j)Subsection 10-2a-205.5(3)(j)Provision

the number and classification of municipal services district employees who will no longer be required to serve the remaining portions of the service area if a community council area provides service directly or through contract with

the number and classification of municipal services district employees who will no longer be required to serve the remaining portions of the service area if a community council area provides service directly or through contract with another service provider upon incorporation, including the dollar amount of the wages, salaries, and benefits attributable to the employees and the estimated cost associated with termination of the employees if the community council municipality does not employ the employees;
Section 10-2a-205.5(3)(j)Verify source
§ 10-2a-205.5(3)(k)Subsection 10-2a-205.5(3)(k)Provision

if the community council municipality will provide service directly or through another service provider, the effects of maintaining as a base, for a period of three years, the existing schedule of pay and benefits for municipal services

if the community council municipality will provide service directly or through another service provider, the effects of maintaining as a base, for a period of three years, the existing schedule of pay and benefits for municipal services district employees who may be transferred to the employment of the community council municipality or to another service provider with which the community council municipality contracts for service; and
Section 10-2a-205.5(3)(k)Verify source
§ 10-2a-205.5(3)(l)Subsection 10-2a-205.5(3)(l)Provision

any other factor that the feasibility consultant considers relevant to the cost of providing municipal services as a result of a community council area's incorporation or the annexation of one or more unincorporated islands under Section

any other factor that the feasibility consultant considers relevant to the cost of providing municipal services as a result of a community council area's incorporation or the annexation of one or more unincorporated islands under Section 10-2-814 .
Section 10-2a-205.5(3)(l)Verify source
§ 10-2a-205.5(4)Subsection 10-2a-205.5(4)Provision

A feasibility consultant must use specified service-cost assumptions and comparisons, include inflation and population growth, and must not rely on certain asset or employee transfers if they would harm service levels unless the district consents.

For purposes of Subsections (3)(d) and (e): the feasibility consultant shall assume a level and quality of service to be provided in the future to the community council municipality that fairly and reasonably approximates the level and quality of service that the municipal services district provides to the community council area at the time of the feasibility study; in determining the present-value cost of a service that the municipal services district provides, the feasibility consultant shall consider: the cost to the community council municipality of providing the service for the first five years after incorporation; the municipal services district's present and five-year projected cost of providing the same service to the community council area; the present and five-year projected cost of providing the same or a similar service to the community council area if service is provided by a municipality to which one or more unincorporated islands are annexed under Section 10-2-814 ; evaluate and detail the expected cost savings and qualitative benefits that result from a service provider other than the proposed municipality providing some municipal services; incorporate into the overall cost projection for the proposed municipality the potential for municipal services to be provided by a service provider other than the proposed municipality; and evaluate and detail projected costs for municipal services based on the proposed municipality providing municipal services as compared to service providers other than the proposed municipality providing municipal services funded by those other service providers; and the feasibility consultant shall consider inflation and anticipated population growth in calculating the cost of providing service. A feasibility consultant may not consider an allocation of municipal services district assets or a transfer of municipal services district employees to the extent that the allocation or transfer would impair the municipal services district's ability to continue to provide the current level of service to the remainder of the municipal services district's service area without the community council area, unless the municipal services district consents to the allocation or transfer.
Section 10-2a-205.5(4)Verify source
§ 10-2a-205.5(4)(a)Subsection 10-2a-205.5(4)(a)Provision

The feasibility consultant must assume future service levels that reasonably match current district service levels and must consider specified cost, savings, inflation, and population-growth factors when calculating present-value service costs.

For purposes of Subsections (3)(d) and (e): the feasibility consultant shall assume a level and quality of service to be provided in the future to the community council municipality that fairly and reasonably approximates the level and quality of service that the municipal services district provides to the community council area at the time of the feasibility study; in determining the present-value cost of a service that the municipal services district provides, the feasibility consultant shall consider: the cost to the community council municipality of providing the service for the first five years after incorporation; the municipal services district's present and five-year projected cost of providing the same service to the community council area; the present and five-year projected cost of providing the same or a similar service to the community council area if service is provided by a municipality to which one or more unincorporated islands are annexed under Section 10-2-814 ; evaluate and detail the expected cost savings and qualitative benefits that result from a service provider other than the proposed municipality providing some municipal services; incorporate into the overall cost projection for the proposed municipality the potential for municipal services to be provided by a service provider other than the proposed municipality; and evaluate and detail projected costs for municipal services based on the proposed municipality providing municipal services as compared to service providers other than the proposed municipality providing municipal services funded by those other service providers; and the feasibility consultant shall consider inflation and anticipated population growth in calculating the cost of providing service.
Section 10-2a-205.5(4)(a)Verify source
§ 10-2a-205.5(4)(a)(i)Subsection 10-2a-205.5(4)(a)(i)Provision

The feasibility consultant must assume future service levels and quality that fairly and reasonably approximate what the municipal services district provides to the community council area at the time of the feasibility study.

the feasibility consultant shall assume a level and quality of service to be provided in the future to the community council municipality that fairly and reasonably approximates the level and quality of service that the municipal services district provides to the community council area at the time of the feasibility study;
Section 10-2a-205.5(4)(a)(i)Verify source
§ 10-2a-205.5(4)(a)(ii)Subsection 10-2a-205.5(4)(a)(ii)Provision

The feasibility consultant must consider several specified cost comparisons when determining the present-value cost of a service provided by the municipal services district.

in determining the present-value cost of a service that the municipal services district provides, the feasibility consultant shall consider: the cost to the community council municipality of providing the service for the first five years after incorporation; the municipal services district's present and five-year projected cost of providing the same service to the community council area; the present and five-year projected cost of providing the same or a similar service to the community council area if service is provided by a municipality to which one or more unincorporated islands are annexed under Section 10-2-814 ; evaluate and detail the expected cost savings and qualitative benefits that result from a service provider other than the proposed municipality providing some municipal services; incorporate into the overall cost projection for the proposed municipality the potential for municipal services to be provided by a service provider other than the proposed municipality; and evaluate and detail projected costs for municipal services based on the proposed municipality providing municipal services as compared to service providers other than the proposed municipality providing municipal services funded by those other service providers; and
Section 10-2a-205.5(4)(a)(ii)Verify source
§ 10-2a-205.5(4)(a)(ii)(A)Subsection 10-2a-205.5(4)(a)(ii)(A)Provision

the cost to the community council municipality of providing the service for the first five years after incorporation;

the cost to the community council municipality of providing the service for the first five years after incorporation;
Section 10-2a-205.5(4)(a)(ii)(A)Verify source
§ 10-2a-205.5(4)(a)(ii)(B)Subsection 10-2a-205.5(4)(a)(ii)(B)Provision

the municipal services district's present and five-year projected cost of providing the same service to the community council area;

the municipal services district's present and five-year projected cost of providing the same service to the community council area;
Section 10-2a-205.5(4)(a)(ii)(B)Verify source
§ 10-2a-205.5(4)(a)(ii)(C)Subsection 10-2a-205.5(4)(a)(ii)(C)Provision

the present and five-year projected cost of providing the same or a similar service to the community council area if service is provided by a municipality to which one or more unincorporated islands are annexed under Section 10-2-814 ;

the present and five-year projected cost of providing the same or a similar service to the community council area if service is provided by a municipality to which one or more unincorporated islands are annexed under Section 10-2-814 ;
Section 10-2a-205.5(4)(a)(ii)(C)Verify source
§ 10-2a-205.5(4)(a)(ii)(D)Subsection 10-2a-205.5(4)(a)(ii)(D)Provision

evaluate and detail the expected cost savings and qualitative benefits that result from a service provider other than the proposed municipality providing some municipal services;

evaluate and detail the expected cost savings and qualitative benefits that result from a service provider other than the proposed municipality providing some municipal services;
Section 10-2a-205.5(4)(a)(ii)(D)Verify source
§ 10-2a-205.5(4)(a)(ii)(E)Subsection 10-2a-205.5(4)(a)(ii)(E)Provision

The proposed municipality must factor into its overall cost projection the possibility that municipal services may be provided by another service provider.

incorporate into the overall cost projection for the proposed municipality the potential for municipal services to be provided by a service provider other than the proposed municipality; and
Section 10-2a-205.5(4)(a)(ii)(E)Verify source
§ 10-2a-205.5(4)(a)(ii)(F)Subsection 10-2a-205.5(4)(a)(ii)(F)Provision

A person must evaluate and detail projected municipal service costs by comparing the proposed municipality’s services with services from other providers funded by those providers.

evaluate and detail projected costs for municipal services based on the proposed municipality providing municipal services as compared to service providers other than the proposed municipality providing municipal services funded by those other service providers; and
Section 10-2a-205.5(4)(a)(ii)(F)Verify source
§ 10-2a-205.5(4)(a)(iii)Subsection 10-2a-205.5(4)(a)(iii)Provision

The feasibility consultant must consider inflation and anticipated population growth when calculating the cost of providing service.

the feasibility consultant shall consider inflation and anticipated population growth in calculating the cost of providing service.
Section 10-2a-205.5(4)(a)(iii)Verify source
§ 10-2a-205.5(4)(b)Subsection 10-2a-205.5(4)(b)Provision

A feasibility consultant may not consider certain municipal services district asset allocations or employee transfers if they would reduce service levels to the rest of the district, unless the district consents.

A feasibility consultant may not consider an allocation of municipal services district assets or a transfer of municipal services district employees to the extent that the allocation or transfer would impair the municipal services district's ability to continue to provide the current level of service to the remainder of the municipal services district's service area without the community council area, unless the municipal services district consents to the allocation or transfer.
Section 10-2a-205.5(4)(b)Verify source
§ 10-2a-205.5(5)Subsection 10-2a-205.5(5)Provision

A feasibility consultant must prepare a written feasibility report, include required findings and cost comparisons, provide a draft to the request sponsors and county for review, and may revise the draft based on comments.

A feasibility consultant shall prepare a written report of the results of the feasibility study. A report under Subsection (5)(a) shall: contain a recommendation as to whether the proposed incorporation of the community council area is functionally and financially feasible for the community council area; include any conditions the feasibility consultant determines are required to be satisfied to make the incorporation functionally and financially feasible; and compare the costs of incorporation to the costs of the unincorporated islands within the community council area being annexed under Section 10-2-814 . Before finalizing a written report under this Subsection (5), the feasibility consultant shall provide a copy of a draft feasibility study report to the request sponsors and the county for their review and comments. Based on comments provided under Subsection (5)(c)(i), a feasibility consultant may adjust the draft feasibility study report before finalizing the report.
Section 10-2a-205.5(5)Verify source
§ 10-2a-205.5(5)(a)Subsection 10-2a-205.5(5)(a)Provision

A feasibility consultant must prepare a written report of the feasibility study results.

A feasibility consultant shall prepare a written report of the results of the feasibility study.
Section 10-2a-205.5(5)(a)Verify source
§ 10-2a-205.5(5)(b)Subsection 10-2a-205.5(5)(b)Provision

A report under Subsection (5)(a) shall: contain a recommendation as to whether the proposed incorporation of the community council area is functionally and financially feasible for the community council area; include any conditions the

A report under Subsection (5)(a) shall: contain a recommendation as to whether the proposed incorporation of the community council area is functionally and financially feasible for the community council area; include any conditions the feasibility consultant determines are required to be satisfied to make the incorporation functionally and financially feasible; and compare the costs of incorporation to the costs of the unincorporated islands within the community council area being annexed under Section 10-2-814 .
Section 10-2a-205.5(5)(b)Verify source
§ 10-2a-205.5(5)(b)(i)Subsection 10-2a-205.5(5)(b)(i)Provision

A recommendation must address whether the proposed incorporation is functionally and financially feasible for the community council area.

contain a recommendation as to whether the proposed incorporation of the community council area is functionally and financially feasible for the community council area;
Section 10-2a-205.5(5)(b)(i)Verify source
§ 10-2a-205.5(5)(b)(ii)Subsection 10-2a-205.5(5)(b)(ii)Provision

include any conditions the feasibility consultant determines are required to be satisfied to make the incorporation functionally and financially feasible; and

include any conditions the feasibility consultant determines are required to be satisfied to make the incorporation functionally and financially feasible; and
Section 10-2a-205.5(5)(b)(ii)Verify source
§ 10-2a-205.5(5)(b)(iii)Subsection 10-2a-205.5(5)(b)(iii)Provision

compare the costs of incorporation to the costs of the unincorporated islands within the community council area being annexed under Section 10-2-814 .

compare the costs of incorporation to the costs of the unincorporated islands within the community council area being annexed under Section 10-2-814 .
Section 10-2a-205.5(5)(b)(iii)Verify source
§ 10-2a-205.5(5)(c)Subsection 10-2a-205.5(5)(c)Provision

Before finalizing the report, the feasibility consultant must give the request sponsors and the county a draft feasibility study report, and may revise it based on comments.

Before finalizing a written report under this Subsection (5), the feasibility consultant shall provide a copy of a draft feasibility study report to the request sponsors and the county for their review and comments. Based on comments provided under Subsection (5)(c)(i), a feasibility consultant may adjust the draft feasibility study report before finalizing the report.
Section 10-2a-205.5(5)(c)Verify source
§ 10-2a-205.5(5)(c)(i)Subsection 10-2a-205.5(5)(c)(i)Provision

Before a written report is finalized, the feasibility consultant must give the request sponsors and the county a draft feasibility study report for review and comments.

Before finalizing a written report under this Subsection (5), the feasibility consultant shall provide a copy of a draft feasibility study report to the request sponsors and the county for their review and comments.
Section 10-2a-205.5(5)(c)(i)Verify source
§ 10-2a-205.5(5)(c)(ii)Subsection 10-2a-205.5(5)(c)(ii)Provision

A feasibility consultant may adjust the draft feasibility study report before finalizing it, based on comments under Subsection (5)(c)(i).

Based on comments provided under Subsection (5)(c)(i), a feasibility consultant may adjust the draft feasibility study report before finalizing the report.
Section 10-2a-205.5(5)(c)(ii)Verify source
§ 10-2a-205.5(6)Subsection 10-2a-205.5(6)Provision

After the feasibility study and written report are completed, the feasibility consultant must deliver a copy of the report to the listed recipients.

Upon completion of the feasibility study and preparation of a written report, the feasibility consultant shall deliver a copy of the report to: the applicable community council; the request sponsors; the municipal services district that provides service to the community council area; the county in which the community council area is located; and each municipality that borders any part of the community council area.
Section 10-2a-205.5(6)Verify source
§ 10-2a-205.5(6)(a)Subsection 10-2a-205.5(6)(a)Provision

Refers to the applicable community council.

the applicable community council;
Section 10-2a-205.5(6)(a)Verify source
§ 10-2a-205.5(6)(b)Subsection 10-2a-205.5(6)(b)Provision

Refers to the request sponsors.

the request sponsors;
Section 10-2a-205.5(6)(b)Verify source
§ 10-2a-205.5(6)(c)Subsection 10-2a-205.5(6)(c)Provision

Refers to the municipal services district that provides service to the community council area.

the municipal services district that provides service to the community council area;
Section 10-2a-205.5(6)(c)Verify source
§ 10-2a-205.5(6)(d)Subsection 10-2a-205.5(6)(d)Provision

the county in which the community council area is located; and

the county in which the community council area is located; and
Section 10-2a-205.5(6)(d)Verify source
§ 10-2a-205.5(6)(e)Subsection 10-2a-205.5(6)(e)Provision

This applies to each municipality that borders any part of the community council area.

each municipality that borders any part of the community council area.
Section 10-2a-205.5(6)(e)Verify source
§ 10-2a-205.5(7)Subsection 10-2a-205.5(7)Provision

If the request sponsors or the county in which the community council area is located disagrees with any aspect of a feasibility study report or, if applicable, a feasibility study report modified under Subsection (7)(c), the request

If the request sponsors or the county in which the community council area is located disagrees with any aspect of a feasibility study report or, if applicable, a feasibility study report modified under Subsection (7)(c), the request sponsors or county may, within 20 business days after receiving a copy of the report under Subsection (6) or a copy of a modified feasibility study report under Subsection (7)(c)(ii), submit to the feasibility consultant a written objection detailing the disagreement. Request sponsors who submit a written objection under Subsection (7)(a)(i) shall simultaneously deliver a copy of the objection to the county. A county that submits a written objection under Subsection (7)(a)(i) shall simultaneously deliver a copy of the objection to the request sponsors. The request sponsors or a county may, within 10 business days after receiving an objection under Subsection (7)(a)(i), submit to the feasibility consultant a written response to the objection. The request sponsors who submit a response under Subsection (7)(b)(i) shall simultaneously deliver a copy of the response to the county. A county that submits a response under Subsection (7)(b)(i) shall simultaneously deliver a copy of the response to the request sponsors. If an objection is filed under Subsection (7)(a)(i), the feasibility consultant shall, within 20 business days after the expiration of the deadline under Subsection (7)(b)(i) for submitting a response to an objection: modify the feasibility study report; or explain in writing why the feasibility consultant is not modifying the feasibility study report; and deliver the modified feasibility study report or written explanation to: the request sponsors; the municipal services district that provides service to the community council area; the county in which the community council area is located; and each municipality that borders any part of the community council area. Within seven days after the expiration of the deadline under Subsection (7)(a)(i) for submitting an objection or, if an objection is submitted, within seven days after receiving a modified feasibility study report or written explanation under Subsection (7)(c), but at least 30 days before a public hearing under Subsection (9), the applicable community council shall: make a copy of the report available to the public at the primary office of the applicable community council; and post a copy of the report on the website of the applicable community council, if the applicable community council has a website.
Section 10-2a-205.5(7)Verify source
§ 10-2a-205.5(7)(a)Subsection 10-2a-205.5(7)(a)Provision

The request sponsors or the county may file a written objection with the feasibility consultant within 20 business days after receiving the relevant feasibility study report.

If the request sponsors or the county in which the community council area is located disagrees with any aspect of a feasibility study report or, if applicable, a feasibility study report modified under Subsection (7)(c), the request sponsors or county may, within 20 business days after receiving a copy of the report under Subsection (6) or a copy of a modified feasibility study report under Subsection (7)(c)(ii), submit to the feasibility consultant a written objection detailing the disagreement. Request sponsors who submit a written objection under Subsection (7)(a)(i) shall simultaneously deliver a copy of the objection to the county. A county that submits a written objection under Subsection (7)(a)(i) shall simultaneously deliver a copy of the objection to the request sponsors.
Section 10-2a-205.5(7)(a)Verify source
§ 10-2a-205.5(7)(a)(i)Subsection 10-2a-205.5(7)(a)(i)Provision

If the request sponsors or the county disagrees with a feasibility study report, they may file a written objection with the feasibility consultant within 20 business days after receiving the report.

If the request sponsors or the county in which the community council area is located disagrees with any aspect of a feasibility study report or, if applicable, a feasibility study report modified under Subsection (7)(c), the request sponsors or county may, within 20 business days after receiving a copy of the report under Subsection (6) or a copy of a modified feasibility study report under Subsection (7)(c)(ii), submit to the feasibility consultant a written objection detailing the disagreement.
Section 10-2a-205.5(7)(a)(i)Verify source
§ 10-2a-205.5(7)(a)(ii)Subsection 10-2a-205.5(7)(a)(ii)Provision

Request sponsors who submit a written objection under Subsection (7)(a)(i) shall simultaneously deliver a copy of the objection to the county.

Request sponsors who submit a written objection under Subsection (7)(a)(i) shall simultaneously deliver a copy of the objection to the county.
Section 10-2a-205.5(7)(a)(ii)Verify source
§ 10-2a-205.5(7)(a)(iii)Subsection 10-2a-205.5(7)(a)(iii)Provision

A county that files a written objection under Subsection (7)(a)(i) must simultaneously send a copy of the objection to the request sponsors.

A county that submits a written objection under Subsection (7)(a)(i) shall simultaneously deliver a copy of the objection to the request sponsors.
Section 10-2a-205.5(7)(a)(iii)Verify source
§ 10-2a-205.5(7)(b)Subsection 10-2a-205.5(7)(b)Provision

The request sponsors or a county may submit a written response to an objection within 10 business days, and if either one does so, it must simultaneously deliver a copy to the other specified party.

The request sponsors or a county may, within 10 business days after receiving an objection under Subsection (7)(a)(i), submit to the feasibility consultant a written response to the objection. The request sponsors who submit a response under Subsection (7)(b)(i) shall simultaneously deliver a copy of the response to the county. A county that submits a response under Subsection (7)(b)(i) shall simultaneously deliver a copy of the response to the request sponsors.
Section 10-2a-205.5(7)(b)Verify source
§ 10-2a-205.5(7)(b)(i)Subsection 10-2a-205.5(7)(b)(i)Provision

The request sponsors or a county may submit a written response to an objection to the feasibility consultant within 10 business days after receiving the objection.

The request sponsors or a county may, within 10 business days after receiving an objection under Subsection (7)(a)(i), submit to the feasibility consultant a written response to the objection.
Section 10-2a-205.5(7)(b)(i)Verify source
§ 10-2a-205.5(7)(b)(ii)Subsection 10-2a-205.5(7)(b)(ii)Provision

Request sponsors who submit a response under Subsection (7)(b)(i) must simultaneously deliver a copy of that response to the county.

The request sponsors who submit a response under Subsection (7)(b)(i) shall simultaneously deliver a copy of the response to the county.
Section 10-2a-205.5(7)(b)(ii)Verify source
§ 10-2a-205.5(7)(b)(iii)Subsection 10-2a-205.5(7)(b)(iii)Provision

A county that submits a response under Subsection (7)(b)(i) must at the same time deliver a copy of that response to the request sponsors.

A county that submits a response under Subsection (7)(b)(i) shall simultaneously deliver a copy of the response to the request sponsors.
Section 10-2a-205.5(7)(b)(iii)Verify source
§ 10-2a-205.5(7)(c)Subsection 10-2a-205.5(7)(c)Provision

If an objection is filed, the feasibility consultant must, within 20 business days after the response deadline, either modify the feasibility study report or explain in writing why not, and deliver that result to specified recipients.

If an objection is filed under Subsection (7)(a)(i), the feasibility consultant shall, within 20 business days after the expiration of the deadline under Subsection (7)(b)(i) for submitting a response to an objection: modify the feasibility study report; or explain in writing why the feasibility consultant is not modifying the feasibility study report; and deliver the modified feasibility study report or written explanation to: the request sponsors; the municipal services district that provides service to the community council area; the county in which the community council area is located; and each municipality that borders any part of the community council area.
Section 10-2a-205.5(7)(c)Verify source
§ 10-2a-205.5(7)(c)(i)Subsection 10-2a-205.5(7)(c)(i)Provision

The feasibility consultant must either modify the feasibility study report or explain in writing why it is not being modified.

modify the feasibility study report; or explain in writing why the feasibility consultant is not modifying the feasibility study report; and
Section 10-2a-205.5(7)(c)(i)Verify source
§ 10-2a-205.5(7)(c)(i)(A)Subsection 10-2a-205.5(7)(c)(i)(A)Provision

modify the feasibility study report; or

modify the feasibility study report; or
Section 10-2a-205.5(7)(c)(i)(A)Verify source
§ 10-2a-205.5(7)(c)(i)(B)Subsection 10-2a-205.5(7)(c)(i)(B)Provision

The feasibility consultant must explain in writing why it is not modifying the feasibility study report.

explain in writing why the feasibility consultant is not modifying the feasibility study report; and
Section 10-2a-205.5(7)(c)(i)(B)Verify source
§ 10-2a-205.5(7)(c)(ii)Subsection 10-2a-205.5(7)(c)(ii)Provision

An unspecified actor must deliver the modified feasibility study report or written explanation to the listed recipients.

deliver the modified feasibility study report or written explanation to: the request sponsors; the municipal services district that provides service to the community council area; the county in which the community council area is located; and each municipality that borders any part of the community council area.
Section 10-2a-205.5(7)(c)(ii)Verify source
§ 10-2a-205.5(7)(c)(ii)(A)Subsection 10-2a-205.5(7)(c)(ii)(A)Provision

the request sponsors;

the request sponsors;
Section 10-2a-205.5(7)(c)(ii)(A)Verify source
§ 10-2a-205.5(7)(c)(ii)(B)Subsection 10-2a-205.5(7)(c)(ii)(B)Provision

Refers to the municipal services district that provides service to the community council area.

the municipal services district that provides service to the community council area;
Section 10-2a-205.5(7)(c)(ii)(B)Verify source
§ 10-2a-205.5(7)(c)(ii)(C)Subsection 10-2a-205.5(7)(c)(ii)(C)Provision

the county in which the community council area is located; and

the county in which the community council area is located; and
Section 10-2a-205.5(7)(c)(ii)(C)Verify source
§ 10-2a-205.5(7)(c)(ii)(D)Subsection 10-2a-205.5(7)(c)(ii)(D)Provision

each municipality that borders any part of the community council area.

each municipality that borders any part of the community council area.
Section 10-2a-205.5(7)(c)(ii)(D)Verify source
§ 10-2a-205.5(7)(d)Subsection 10-2a-205.5(7)(d)Provision

The applicable community council must make a copy of the report available to the public at its primary office, and post it on the council website if it has one.

Within seven days after the expiration of the deadline under Subsection (7)(a)(i) for submitting an objection or, if an objection is submitted, within seven days after receiving a modified feasibility study report or written explanation under Subsection (7)(c), but at least 30 days before a public hearing under Subsection (9), the applicable community council shall: make a copy of the report available to the public at the primary office of the applicable community council; and post a copy of the report on the website of the applicable community council, if the applicable community council has a website.
Section 10-2a-205.5(7)(d)Verify source
§ 10-2a-205.5(7)(d)(i)Subsection 10-2a-205.5(7)(d)(i)Provision

The applicable community council must make a copy of the report available to the public at its primary office.

make a copy of the report available to the public at the primary office of the applicable community council; and
Section 10-2a-205.5(7)(d)(i)Verify source
§ 10-2a-205.5(7)(d)(ii)Subsection 10-2a-205.5(7)(d)(ii)Provision

The applicable community council must post a copy of the report on its website if it has one.

post a copy of the report on the website of the applicable community council, if the applicable community council has a website.
Section 10-2a-205.5(7)(d)(ii)Verify source
§ 10-2a-205.5(8)Subsection 10-2a-205.5(8)Provision

A feasibility study report, including a modified report under Subsection (7), may not be challenged unless the challenge is based on collusion or fraud.

A feasibility study report or, if a feasibility study report is modified under Subsection (7), a modified feasibility study report may not be challenged unless the basis of the challenge is that the report results from collusion or fraud. Subsection (8)(a) does not apply to an objection to a feasibility study report or a modified feasibility study report under Subsection (7).
Section 10-2a-205.5(8)Verify source
§ 10-2a-205.5(8)(a)Subsection 10-2a-205.5(8)(a)Provision

A feasibility study report, or a modified report under Subsection (7), may not be challenged except for collusion or fraud.

A feasibility study report or, if a feasibility study report is modified under Subsection (7), a modified feasibility study report may not be challenged unless the basis of the challenge is that the report results from collusion or fraud.
Section 10-2a-205.5(8)(a)Verify source
§ 10-2a-205.5(8)(b)Subsection 10-2a-205.5(8)(b)Provision

Subsection (8)(a) does not apply to objections to a feasibility study report or a modified feasibility study report under Subsection (7).

Subsection (8)(a) does not apply to an objection to a feasibility study report or a modified feasibility study report under Subsection (7).
Section 10-2a-205.5(8)(b)Verify source
§ 10-2a-205.5(9)Subsection 10-2a-205.5(9)Provision

After objection deadlines or receipt of a modified feasibility study report/written explanation, the applicable community council must schedule at least one public hearing within 60 days, let the public review the feasibility study, and publish notice for three consecutive weeks before the hearing.

Following the expiration of the deadline under Subsection (7)(a)(i) for submitting an objection, or, if an objection is submitted under Subsection (7)(a)(i), following the applicable community council's receipt of the modified feasibility study report or written explanation under Subsection (7)(c), the applicable community council shall, at the applicable community council's next regular meeting, schedule at least one public hearing to be held: within the following 60 days; and for the purpose of allowing: the feasibility consultant to present the results of the feasibility study; and the public to become informed about the feasibility study results, to ask the feasibility consultant questions about the feasibility study, and to express the public's views about the proposed incorporation of the community council area. At a public hearing under Subsection (9)(a), the applicable community council shall: provide a copy of the feasibility study for public review; and allow the public to: ask the feasibility consultant questions about the feasibility study; and express the public's views about the advantages and disadvantages of the proposed incorporation as compared to a potential annexation under Section 10-2-814 . The applicable community council shall publish notice of a hearing under Subsection (9)(a), as a class A notice under Section 63G-30-102 , for three consecutive weeks immediately before the public hearing. A notice under Subsection (9)(c)(i) shall state: the date, time, and location of the public hearing; and that a copy of the feasibility study report may be obtained, free of charge, at the office of the applicable community council or, if applicable, on the applicable community council's website.
Section 10-2a-205.5(9)Verify source
§ 10-2a-205.5(9)(a)Subsection 10-2a-205.5(9)(a)Provision

The applicable community council must schedule at least one public hearing at its next regular meeting, to be held within 60 days, after the objection period ends or after receiving the specified modified report or explanation if an objection was filed.

Following the expiration of the deadline under Subsection (7)(a)(i) for submitting an objection, or, if an objection is submitted under Subsection (7)(a)(i), following the applicable community council's receipt of the modified feasibility study report or written explanation under Subsection (7)(c), the applicable community council shall, at the applicable community council's next regular meeting, schedule at least one public hearing to be held: within the following 60 days; and for the purpose of allowing: the feasibility consultant to present the results of the feasibility study; and the public to become informed about the feasibility study results, to ask the feasibility consultant questions about the feasibility study, and to express the public's views about the proposed incorporation of the community council area.
Section 10-2a-205.5(9)(a)Verify source
§ 10-2a-205.5(9)(a)(i)Subsection 10-2a-205.5(9)(a)(i)Provision

within the following 60 days; and

within the following 60 days; and
Section 10-2a-205.5(9)(a)(i)Verify source
§ 10-2a-205.5(9)(a)(ii)Subsection 10-2a-205.5(9)(a)(ii)Provision

for the purpose of allowing: the feasibility consultant to present the results of the feasibility study; and the public to become informed about the feasibility study results, to ask the feasibility consultant questions about the

for the purpose of allowing: the feasibility consultant to present the results of the feasibility study; and the public to become informed about the feasibility study results, to ask the feasibility consultant questions about the feasibility study, and to express the public's views about the proposed incorporation of the community council area.
Section 10-2a-205.5(9)(a)(ii)Verify source
§ 10-2a-205.5(9)(a)(ii)(A)Subsection 10-2a-205.5(9)(a)(ii)(A)Provision

The feasibility consultant must present the results of the feasibility study.

the feasibility consultant to present the results of the feasibility study; and
Section 10-2a-205.5(9)(a)(ii)(A)Verify source
§ 10-2a-205.5(9)(a)(ii)(B)Subsection 10-2a-205.5(9)(a)(ii)(B)Provision

the public to become informed about the feasibility study results, to ask the feasibility consultant questions about the feasibility study, and to express the public's views about the proposed incorporation of the community council area.

the public to become informed about the feasibility study results, to ask the feasibility consultant questions about the feasibility study, and to express the public's views about the proposed incorporation of the community council area.
Section 10-2a-205.5(9)(a)(ii)(B)Verify source
§ 10-2a-205.5(9)(b)Subsection 10-2a-205.5(9)(b)Provision

At the public hearing, the applicable community council must provide the feasibility study for public review and let the public question the feasibility consultant and comment on the proposed incorporation versus possible annexation.

At a public hearing under Subsection (9)(a), the applicable community council shall: provide a copy of the feasibility study for public review; and allow the public to: ask the feasibility consultant questions about the feasibility study; and express the public's views about the advantages and disadvantages of the proposed incorporation as compared to a potential annexation under Section 10-2-814 .
Section 10-2a-205.5(9)(b)Verify source
§ 10-2a-205.5(9)(b)(i)Subsection 10-2a-205.5(9)(b)(i)Provision

provide a copy of the feasibility study for public review; and

provide a copy of the feasibility study for public review; and
Section 10-2a-205.5(9)(b)(i)Verify source
§ 10-2a-205.5(9)(b)(ii)Subsection 10-2a-205.5(9)(b)(ii)Provision

allow the public to: ask the feasibility consultant questions about the feasibility study; and express the public's views about the advantages and disadvantages of the proposed incorporation as compared to a potential annexation under

allow the public to: ask the feasibility consultant questions about the feasibility study; and express the public's views about the advantages and disadvantages of the proposed incorporation as compared to a potential annexation under Section 10-2-814 .
Section 10-2a-205.5(9)(b)(ii)Verify source
§ 10-2a-205.5(9)(b)(ii)(A)Subsection 10-2a-205.5(9)(b)(ii)(A)Provision

ask the feasibility consultant questions about the feasibility study; and

ask the feasibility consultant questions about the feasibility study; and
Section 10-2a-205.5(9)(b)(ii)(A)Verify source
§ 10-2a-205.5(9)(b)(ii)(B)Subsection 10-2a-205.5(9)(b)(ii)(B)Provision

express the public's views about the advantages and disadvantages of the proposed incorporation as compared to a potential annexation under Section 10-2-814 .

express the public's views about the advantages and disadvantages of the proposed incorporation as compared to a potential annexation under Section 10-2-814 .
Section 10-2a-205.5(9)(b)(ii)(B)Verify source
§ 10-2a-205.5(9)(c)Subsection 10-2a-205.5(9)(c)Provision

The applicable community council must publish a hearing notice as a class A notice for three consecutive weeks before the public hearing.

The applicable community council shall publish notice of a hearing under Subsection (9)(a), as a class A notice under Section 63G-30-102 , for three consecutive weeks immediately before the public hearing. A notice under Subsection (9)(c)(i) shall state: the date, time, and location of the public hearing; and that a copy of the feasibility study report may be obtained, free of charge, at the office of the applicable community council or, if applicable, on the applicable community council's website.
Section 10-2a-205.5(9)(c)Verify source
§ 10-2a-205.5(9)(c)(i)Subsection 10-2a-205.5(9)(c)(i)Provision

The applicable community council must publish notice of the hearing as a class A notice for three consecutive weeks before the public hearing.

The applicable community council shall publish notice of a hearing under Subsection (9)(a), as a class A notice under Section 63G-30-102 , for three consecutive weeks immediately before the public hearing.
Section 10-2a-205.5(9)(c)(i)Verify source
§ 10-2a-205.5(9)(c)(ii)Subsection 10-2a-205.5(9)(c)(ii)Provision

The notice must state the public hearing date, time, and location, and explain how a free copy of the feasibility study report may be obtained.

A notice under Subsection (9)(c)(i) shall state: the date, time, and location of the public hearing; and that a copy of the feasibility study report may be obtained, free of charge, at the office of the applicable community council or, if applicable, on the applicable community council's website.
Section 10-2a-205.5(9)(c)(ii)Verify source
§ 10-2a-205.5(9)(c)(ii)(A)Subsection 10-2a-205.5(9)(c)(ii)(A)Provision

Requires stating the date, time, and location of the public hearing.

the date, time, and location of the public hearing; and
Section 10-2a-205.5(9)(c)(ii)(A)Verify source
§ 10-2a-205.5(9)(c)(ii)(B)Subsection 10-2a-205.5(9)(c)(ii)(B)Provision

A copy of the feasibility study report may be obtained free of charge from the applicable community council office or, if applicable, its website.

that a copy of the feasibility study report may be obtained, free of charge, at the office of the applicable community council or, if applicable, on the applicable community council's website.
Section 10-2a-205.5(9)(c)(ii)(B)Verify source
§ 10-2a-205.5(10)Subsection 10-2a-205.5(10)Provision

A community council area may not incorporate if the feasibility study concludes that incorporation of the community council area is not functionally and financially feasible.

A community council area may not incorporate if the feasibility study concludes that incorporation of the community council area is not functionally and financially feasible.
Section 10-2a-205.5(10)Verify source
§ 10-2a-205.5(11)Subsection 10-2a-205.5(11)Provision

The lieutenant governor must pay feasibility consultant fees and costs from the Municipal Incorporation Expendable Special Revenue Fund. If the community council area incorporates as a municipality, the new municipality must pay incorporation costs to the lieutenant governor and county under Section 10-2a-220.

Notwithstanding any other provision of this part: the lieutenant governor shall pay the fees and costs of a feasibility consultant using funds from the Municipal Incorporation Expendable Special Revenue Fund under Section 10-2a-220 ; and if the community council area incorporates as a municipality, the newly incorporated municipality shall pay incorporation costs to the lieutenant governor and county as provided in Section 10-2a-220 .
Section 10-2a-205.5(11)Verify source
§ 10-2a-205.5(11)(a)Subsection 10-2a-205.5(11)(a)Provision

The lieutenant governor must pay a feasibility consultant’s fees and costs from the Municipal Incorporation Expendable Special Revenue Fund.

the lieutenant governor shall pay the fees and costs of a feasibility consultant using funds from the Municipal Incorporation Expendable Special Revenue Fund under Section 10-2a-220 ; and
Section 10-2a-205.5(11)(a)Verify source
§ 10-2a-205.5(11)(b)Subsection 10-2a-205.5(11)(b)Provision

If the community council area incorporates as a municipality, the newly incorporated municipality must pay incorporation costs to the lieutenant governor and county.

if the community council area incorporates as a municipality, the newly incorporated municipality shall pay incorporation costs to the lieutenant governor and county as provided in Section 10-2a-220 .
Section 10-2a-205.5(11)(b)Verify source
§ 10-2a-205.5(12)Subsection 10-2a-205.5(12)Provision

Unless the request sponsors and county agree otherwise, feasibility-study conditions needed for incorporation are binding on the community council municipality and county if incorporation occurs.

Unless the request sponsors and county agree otherwise, conditions that a feasibility study report indicates are necessary to be met for the incorporation of the community council area to be functionally and financially feasible for the proposed community council municipality are binding on the community council municipality and county if the incorporation occurs.
Section 10-2a-205.5(12)Verify source

Legislative relationships

0 referenced instruments

Names are derived from the stored provision headings and citation-enrichment layer. Treat this as a research index and verify each relationship against the source text.

No structured legislative relationships were detected

The statute remains fully searchable by provision. Consult the source text for amendments and cross-references that have not yet been indexed.

Recorded versions and source checkpoint

1 version available in this collection

Current-law checkpoint
  • Undated version · currentEnglish · In force

Source-linked research

Ask AI about this statute

The overview, provisions, and source records above are public. Continue in a separate conversation with this statute’s jurisdiction and source version attached.

About this LexChat collection

Statute information is organised from identified legislative sources for professional research. Corrections can be reported to hello@esheria.ai.