United States — Utah Act or statute

United States — Utah legislation

Utah Code § 10-2a-504, 2024

The lieutenant governor must hire a qualified feasibility consultant, and the consultant must prepare, consult on, and publish a feasibility study for a proposed municipality.

cost calculationfeasibility studyfiscal analysisgovernment procurementmunicipal developmentmunicipal feasibility studymunicipal incorporationmunicipal servicesmunicipal taxationpreliminary municipality areaprocurementproperty tax burdenpublic financepublic hearingsrevenue projectionsspecial service districttax basewater availabilitywater supply

Professional statute overview

Enactment structure, operative effect and source provenance

Official source

01

Purpose and legislative effect

“The lieutenant governor must hire a qualified feasibility consultant, and the consultant must prepare, consult on, and publish a feasibility study for a proposed municipality.”

Use this record to locate individual provisions, understand the instrument’s recorded structure, and move from a research summary to the exact source text.

02

How the instrument operates

  1. 01

    Start with the recorded version

    Enacted 2024. The date shown identifies this source expression and should not be treated as proof that no later change exists.

  2. 02

    Locate the controlling provision

    Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.

  3. 03

    Read conditions and exceptions together

    Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.

  4. 04

    Verify currency and official wording

    Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.

03

Research entry points

Selected provisions across the instrument. Open any row to continue with the exact stored text.

Subsection 10-2a-504(2)(c)(iii)(B)

Refers to the county legislative body of the county where the proposed preliminary municipality area is located.

Section 10-2a-504(2)(c)(iii)(B)

Subsection 10-2a-504(3)(a)(ii)(B)

subject to Subsection (3)(b), the initial and five-year projected cost of providing municipal services to the proposed preliminary municipality area, including administrative costs;

Section 10-2a-504(3)(a)(ii)(B)

Subsection 10-2a-504(3)(b)(iii)

The feasibility consultant must account for inflation and anticipated growth when calculating costs under Subsection (3)(a)(ii)(B).

Section 10-2a-504(3)(b)(iii)

Subsection 10-2a-504(7)

The lieutenant governor must post the feasibility study, and any supplemental feasibility study described in Section 10-2a-505, on the lieutenant governor’s website and make a copy available for public review at the lieutenant governor’s office.

Section 10-2a-504(7)

04

Source and current-law status

In force source record

Source record from le.utah.gov · Enacted 2024

In force

This source records the instrument as in force. Confirm subsequent amendments, commencement notices, and judicial treatment before relying on it.

Source-indexed provision map

Sections and provisions

Search by section, heading, part or exact legal wording. Every result remains linked to the stored source record.

Showing 47 of 47 provisions

Provision 47

Part 10-2a-5

part 10-2a-5 Incorporation of a Preliminary Municipality

§ 10-2a-504Feasibility study -- Feasibility study consultant -- Qualifications for proceeding with incorporation.Provision

The lieutenant governor must hire a qualified feasibility consultant, and the consultant must prepare, consult on, and publish a feasibility study for a proposed municipality.

Feasibility study -- Feasibility study consultant -- Qualifications for proceeding with incorporation. Unless the lieutenant governor rescinds the certification under Subsection 10-2a-503(5)(b) , the lieutenant governor shall, within 90 days after the day on which the lieutenant governor certifies a feasibility request under Subsection 10-2a-503(3)(a) , in accordance with Subsection (2), engage a feasibility consultant to conduct a feasibility study. The lieutenant governor shall: select a feasibility consultant in accordance with Title 63G, Chapter 6a, Utah Procurement Code; ensure that the feasibility consultant: has expertise in the processes and economics of local government; and is not affiliated with a sponsor of the feasibility request or the county in which the proposed municipality is located; and require the feasibility consultant to: submit a draft of the feasibility study to each applicable person with whom the feasibility consultant is required to consult under Subsection (3)(c) within 90 days after the day on which the lieutenant governor engages the feasibility consultant to conduct the study; allow each person to whom the consultant provides a draft under Subsection (2)(c)(i) to review and provide comment on the draft; submit a completed feasibility study, including a one-page summary of the results, to the following within 120 days after the day on which the lieutenant governor engages the feasibility consultant to conduct the feasibility study: the lieutenant governor; the county legislative body of the county in which the proposed preliminary municipality area is located; the primary sponsor contact; and each person to whom the consultant provided a draft under Subsection (2)(c)(i); and attend the public hearings described in Section 10-2a-506 to present the feasibility study results and respond to questions from the public. The feasibility study shall include: an analysis of: the likely population and population density within the proposed preliminary municipality area when all phases of the map or plat for the proposed preliminary municipality area are completed; and the population and population density of the area surrounding the proposed preliminary municipality area on the day on which the feasibility request was submitted; an analysis of the following, determined as if, at the time of the analysis, the proposed preliminary municipality area is incorporated as a town with a population of 100 people: the initial and projected five-year demographics and tax base within the boundaries of the proposed preliminary municipality area and the surrounding area, including household size and income, commercial and industrial development, and public facilities; subject to Subsection (3)(b), the initial and five-year projected cost of providing municipal services to the proposed preliminary municipality area, including administrative costs; assuming the same tax categories and tax rates as imposed by the county and all other current service providers at the time during which the feasibility consultant prepares the feasibility study, the initial and five-year projected revenue for the proposed preliminary municipality area; the risks and opportunities that might affect the actual costs described in Subsection (3)(a)(ii)(B) or the revenues described in Subsection (3)(a)(ii)(C) of the proposed preliminary municipality area; new revenue sources that may be available to the proposed preliminary municipality area that are not available before the area incorporates, including an analysis of the amount of revenues the proposed preliminary municipality area might obtain from those revenue sources; the projected tax burden per household of any new taxes that may be levied within the proposed preliminary municipality area within five years after incorporation as a town; and the fiscal impact of the proposed preliminary municipality area's incorporation as a town on unincorporated areas, other municipalities, special districts, special service districts, and other governmental entities in the county; and an analysis regarding whether sufficient water will be available to support the proposed preliminary municipality area when the development of the area is complete. In calculating the projected costs under Subsection (3)(a)(ii)(B), the feasibility consultant shall assume the proposed preliminary municipality area will provide a level and quality of municipal services that fairly and reasonably approximate the level and quality of municipal services that are provided to the area surrounding the proposed preliminary municipality area at the time the feasibility consultant conducts the feasibility study. In calculating the current cost of a municipal service under Subsection (3)(a)(ii)(B), the feasibility consultant shall consider: the amount it would cost the proposed preliminary municipality area to provide the municipal service for the first five years after the area incorporates as a town; and the proposed or current municipal service provider's initial and five-year projected cost of providing the municipal service after the proposed preliminary municipality area incorporates as a town. In calculating costs under Subsection (3)(a)(ii)(B), the feasibility consultant shall account for inflation and anticipated growth. In conducting the feasibility study, the feasibility consultant shall consult with the following before submitting a draft of the feasibility study under Subsection (2)(c)(iii): if the proposed preliminary municipality will include lands owned by the United States federal government, the entity within the United States federal government that has jurisdiction over the land; if the proposed preliminary municipality will include lands owned by the state, the entity within state government that has jurisdiction over the land; each entity that provides, or is proposed to provide, a municipal service to a portion of the proposed preliminary municipality area; and each other special service district that provides, or is proposed to provide, services to a portion of the proposed preliminary municipality area. If the five-year projected revenues calculated under Subsection (3)(a)(ii)(C) exceed the five-year projected costs calculated under Subsection (3)(a)(ii)(B) by more than 5%, the feasibility consultant shall project and report the expected annual revenue surplus to the primary sponsor contact and the lieutenant governor. Except as provided in Subsection (5)(b), if the results of the feasibility study, or a supplemental feasibility study described in Section 10-2a-505 , show that the average annual amount of revenue calculated under Subsection (3)(a)(ii)(C) does not exceed the average annual cost calculated under Subsection (3)(a)(ii)(B) by more than 5%, the process to incorporate the area that is the subject of the feasibility study or supplemental feasibility study may not proceed. Except as provided in Subsection 10-2a-505(3) , the process to incorporate an area described in Subsection (5)(a) may proceed if a subsequent supplemental feasibility study conducted under Section 10-2a-505 for the proposed incorporation demonstrates compliance with Subsection (5)(a). If the results of the feasibility study or revised feasibility study do not comply with Subsection (5), and if requested by the sponsors of the request, the feasibility consultant shall, as part of the feasibility study or revised feasibility study, make recommendations regarding how the proposed preliminary municipality area may be altered to comply with Subsection (5), unless the sponsors are precluded from modifying the feasibility request under Subsection 10-2a-505(3) . The lieutenant governor shall post a copy of the feasibility study, and any supplemental feasibility study described in Section 10-2a-505 , on the lieutenant governor's website and make a copy available for public review at the lieutenant governor's office.
Section 10-2a-504Verify source
§ 10-2a-504(1)Subsection 10-2a-504(1)Provision

Unless the lieutenant governor rescinds the certification, the lieutenant governor must engage a feasibility consultant to conduct a feasibility study within 90 days after certifying a feasibility request.

Unless the lieutenant governor rescinds the certification under Subsection 10-2a-503(5)(b) , the lieutenant governor shall, within 90 days after the day on which the lieutenant governor certifies a feasibility request under Subsection 10-2a-503(3)(a) , in accordance with Subsection (2), engage a feasibility consultant to conduct a feasibility study.
Section 10-2a-504(1)Verify source
§ 10-2a-504(2)Subsection 10-2a-504(2)Provision

The lieutenant governor shall: select a feasibility consultant in accordance with Title 63G, Chapter 6a, Utah Procurement Code; ensure that the feasibility consultant: has expertise in the processes and economics of local government; and

The lieutenant governor shall: select a feasibility consultant in accordance with Title 63G, Chapter 6a, Utah Procurement Code; ensure that the feasibility consultant: has expertise in the processes and economics of local government; and is not affiliated with a sponsor of the feasibility request or the county in which the proposed municipality is located; and require the feasibility consultant to: submit a draft of the feasibility study to each applicable person with whom the feasibility consultant is required to consult under Subsection (3)(c) within 90 days after the day on which the lieutenant governor engages the feasibility consultant to conduct the study; allow each person to whom the consultant provides a draft under Subsection (2)(c)(i) to review and provide comment on the draft; submit a completed feasibility study, including a one-page summary of the results, to the following within 120 days after the day on which the lieutenant governor engages the feasibility consultant to conduct the feasibility study: the lieutenant governor; the county legislative body of the county in which the proposed preliminary municipality area is located; the primary sponsor contact; and each person to whom the consultant provided a draft under Subsection (2)(c)(i); and attend the public hearings described in Section 10-2a-506 to present the feasibility study results and respond to questions from the public.
Section 10-2a-504(2)Verify source
§ 10-2a-504(2)(a)Subsection 10-2a-504(2)(a)Provision

select a feasibility consultant in accordance with Title 63G, Chapter 6a, Utah Procurement Code;

select a feasibility consultant in accordance with Title 63G, Chapter 6a, Utah Procurement Code;
Section 10-2a-504(2)(a)Verify source
§ 10-2a-504(2)(b)Subsection 10-2a-504(2)(b)Provision

The feasibility consultant must have expertise in local government processes and economics and must not be affiliated with the feasibility-request sponsor or the county where the proposed municipality is located.

ensure that the feasibility consultant: has expertise in the processes and economics of local government; and is not affiliated with a sponsor of the feasibility request or the county in which the proposed municipality is located; and
Section 10-2a-504(2)(b)Verify source
§ 10-2a-504(2)(b)(i)Subsection 10-2a-504(2)(b)(i)Provision

has expertise in the processes and economics of local government; and

has expertise in the processes and economics of local government; and
Section 10-2a-504(2)(b)(i)Verify source
§ 10-2a-504(2)(b)(ii)Subsection 10-2a-504(2)(b)(ii)Provision

is not affiliated with a sponsor of the feasibility request or the county in which the proposed municipality is located; and

is not affiliated with a sponsor of the feasibility request or the county in which the proposed municipality is located; and
Section 10-2a-504(2)(b)(ii)Verify source
§ 10-2a-504(2)(c)Subsection 10-2a-504(2)(c)Provision

The feasibility consultant must send a draft to required consultees within 90 days, submit the completed study with a one-page summary to specified recipients within 120 days, and attend the public hearings to present results and answer questions.

require the feasibility consultant to: submit a draft of the feasibility study to each applicable person with whom the feasibility consultant is required to consult under Subsection (3)(c) within 90 days after the day on which the lieutenant governor engages the feasibility consultant to conduct the study; allow each person to whom the consultant provides a draft under Subsection (2)(c)(i) to review and provide comment on the draft; submit a completed feasibility study, including a one-page summary of the results, to the following within 120 days after the day on which the lieutenant governor engages the feasibility consultant to conduct the feasibility study: the lieutenant governor; the county legislative body of the county in which the proposed preliminary municipality area is located; the primary sponsor contact; and each person to whom the consultant provided a draft under Subsection (2)(c)(i); and attend the public hearings described in Section 10-2a-506 to present the feasibility study results and respond to questions from the public.
Section 10-2a-504(2)(c)Verify source
§ 10-2a-504(2)(c)(i)Subsection 10-2a-504(2)(c)(i)Provision

The feasibility consultant must submit a draft of the feasibility study to each applicable person the consultant must consult with under Subsection (3)(c), within 90 days after the lieutenant governor engages the consultant.

submit a draft of the feasibility study to each applicable person with whom the feasibility consultant is required to consult under Subsection (3)(c) within 90 days after the day on which the lieutenant governor engages the feasibility consultant to conduct the study;
Section 10-2a-504(2)(c)(i)Verify source
§ 10-2a-504(2)(c)(ii)Subsection 10-2a-504(2)(c)(ii)Provision

Each person who receives a draft from the consultant under Subsection (2)(c)(i) is allowed to review it and provide comments.

allow each person to whom the consultant provides a draft under Subsection (2)(c)(i) to review and provide comment on the draft;
Section 10-2a-504(2)(c)(ii)Verify source
§ 10-2a-504(2)(c)(iii)Subsection 10-2a-504(2)(c)(iii)Provision

The consultant must submit the completed feasibility study, including a one-page summary, within 120 days after the lieutenant governor engages the consultant.

submit a completed feasibility study, including a one-page summary of the results, to the following within 120 days after the day on which the lieutenant governor engages the feasibility consultant to conduct the feasibility study: the lieutenant governor; the county legislative body of the county in which the proposed preliminary municipality area is located; the primary sponsor contact; and each person to whom the consultant provided a draft under Subsection (2)(c)(i); and
Section 10-2a-504(2)(c)(iii)Verify source
§ 10-2a-504(2)(c)(iii)(A)Subsection 10-2a-504(2)(c)(iii)(A)Provision

Refers to the lieutenant governor.

the lieutenant governor;
Section 10-2a-504(2)(c)(iii)(A)Verify source
§ 10-2a-504(2)(c)(iii)(B)Subsection 10-2a-504(2)(c)(iii)(B)Provision

Refers to the county legislative body of the county where the proposed preliminary municipality area is located.

the county legislative body of the county in which the proposed preliminary municipality area is located;
Section 10-2a-504(2)(c)(iii)(B)Verify source
§ 10-2a-504(2)(c)(iii)(C)Subsection 10-2a-504(2)(c)(iii)(C)Provision

Mentions the primary sponsor contact.

the primary sponsor contact; and
Section 10-2a-504(2)(c)(iii)(C)Verify source
§ 10-2a-504(2)(c)(iii)(D)Subsection 10-2a-504(2)(c)(iii)(D)Provision

This text refers to each person who received a draft from the consultant under Subsection (2)(c)(i).

each person to whom the consultant provided a draft under Subsection (2)(c)(i); and
Section 10-2a-504(2)(c)(iii)(D)Verify source
§ 10-2a-504(2)(c)(iv)Subsection 10-2a-504(2)(c)(iv)Provision

A person must attend the public hearings described in Section 10-2a-506, present the feasibility study results, and answer public questions.

attend the public hearings described in Section 10-2a-506 to present the feasibility study results and respond to questions from the public.
Section 10-2a-504(2)(c)(iv)Verify source
§ 10-2a-504(3)Subsection 10-2a-504(3)Provision

The feasibility study shall include: an analysis of: the likely population and population density within the proposed preliminary municipality area when all phases of the map or plat for the proposed preliminary municipality area are

The feasibility study shall include: an analysis of: the likely population and population density within the proposed preliminary municipality area when all phases of the map or plat for the proposed preliminary municipality area are completed; and the population and population density of the area surrounding the proposed preliminary municipality area on the day on which the feasibility request was submitted; an analysis of the following, determined as if, at the time of the analysis, the proposed preliminary municipality area is incorporated as a town with a population of 100 people: the initial and projected five-year demographics and tax base within the boundaries of the proposed preliminary municipality area and the surrounding area, including household size and income, commercial and industrial development, and public facilities; subject to Subsection (3)(b), the initial and five-year projected cost of providing municipal services to the proposed preliminary municipality area, including administrative costs; assuming the same tax categories and tax rates as imposed by the county and all other current service providers at the time during which the feasibility consultant prepares the feasibility study, the initial and five-year projected revenue for the proposed preliminary municipality area; the risks and opportunities that might affect the actual costs described in Subsection (3)(a)(ii)(B) or the revenues described in Subsection (3)(a)(ii)(C) of the proposed preliminary municipality area; new revenue sources that may be available to the proposed preliminary municipality area that are not available before the area incorporates, including an analysis of the amount of revenues the proposed preliminary municipality area might obtain from those revenue sources; the projected tax burden per household of any new taxes that may be levied within the proposed preliminary municipality area within five years after incorporation as a town; and the fiscal impact of the proposed preliminary municipality area's incorporation as a town on unincorporated areas, other municipalities, special districts, special service districts, and other governmental entities in the county; and an analysis regarding whether sufficient water will be available to support the proposed preliminary municipality area when the development of the area is complete. In calculating the projected costs under Subsection (3)(a)(ii)(B), the feasibility consultant shall assume the proposed preliminary municipality area will provide a level and quality of municipal services that fairly and reasonably approximate the level and quality of municipal services that are provided to the area surrounding the proposed preliminary municipality area at the time the feasibility consultant conducts the feasibility study. In calculating the current cost of a municipal service under Subsection (3)(a)(ii)(B), the feasibility consultant shall consider: the amount it would cost the proposed preliminary municipality area to provide the municipal service for the first five years after the area incorporates as a town; and the proposed or current municipal service provider's initial and five-year projected cost of providing the municipal service after the proposed preliminary municipality area incorporates as a town. In calculating costs under Subsection (3)(a)(ii)(B), the feasibility consultant shall account for inflation and anticipated growth. In conducting the feasibility study, the feasibility consultant shall consult with the following before submitting a draft of the feasibility study under Subsection (2)(c)(iii): if the proposed preliminary municipality will include lands owned by the United States federal government, the entity within the United States federal government that has jurisdiction over the land; if the proposed preliminary municipality will include lands owned by the state, the entity within state government that has jurisdiction over the land; each entity that provides, or is proposed to provide, a municipal service to a portion of the proposed preliminary municipality area; and each other special service district that provides, or is proposed to provide, services to a portion of the proposed preliminary municipality area.
Section 10-2a-504(3)Verify source
§ 10-2a-504(3)(a)Subsection 10-2a-504(3)(a)Provision

The feasibility study shall include: an analysis of: the likely population and population density within the proposed preliminary municipality area when all phases of the map or plat for the proposed preliminary municipality area are

The feasibility study shall include: an analysis of: the likely population and population density within the proposed preliminary municipality area when all phases of the map or plat for the proposed preliminary municipality area are completed; and the population and population density of the area surrounding the proposed preliminary municipality area on the day on which the feasibility request was submitted; an analysis of the following, determined as if, at the time of the analysis, the proposed preliminary municipality area is incorporated as a town with a population of 100 people: the initial and projected five-year demographics and tax base within the boundaries of the proposed preliminary municipality area and the surrounding area, including household size and income, commercial and industrial development, and public facilities; subject to Subsection (3)(b), the initial and five-year projected cost of providing municipal services to the proposed preliminary municipality area, including administrative costs; assuming the same tax categories and tax rates as imposed by the county and all other current service providers at the time during which the feasibility consultant prepares the feasibility study, the initial and five-year projected revenue for the proposed preliminary municipality area; the risks and opportunities that might affect the actual costs described in Subsection (3)(a)(ii)(B) or the revenues described in Subsection (3)(a)(ii)(C) of the proposed preliminary municipality area; new revenue sources that may be available to the proposed preliminary municipality area that are not available before the area incorporates, including an analysis of the amount of revenues the proposed preliminary municipality area might obtain from those revenue sources; the projected tax burden per household of any new taxes that may be levied within the proposed preliminary municipality area within five years after incorporation as a town; and the fiscal impact of the proposed preliminary municipality area's incorporation as a town on unincorporated areas, other municipalities, special districts, special service districts, and other governmental entities in the county; and an analysis regarding whether sufficient water will be available to support the proposed preliminary municipality area when the development of the area is complete.
Section 10-2a-504(3)(a)Verify source
§ 10-2a-504(3)(a)(i)Subsection 10-2a-504(3)(a)(i)Provision

an analysis of: the likely population and population density within the proposed preliminary municipality area when all phases of the map or plat for the proposed preliminary municipality area are completed; and the population and

an analysis of: the likely population and population density within the proposed preliminary municipality area when all phases of the map or plat for the proposed preliminary municipality area are completed; and the population and population density of the area surrounding the proposed preliminary municipality area on the day on which the feasibility request was submitted;
Section 10-2a-504(3)(a)(i)Verify source
§ 10-2a-504(3)(a)(i)(A)Subsection 10-2a-504(3)(a)(i)(A)Provision

the likely population and population density within the proposed preliminary municipality area when all phases of the map or plat for the proposed preliminary municipality area are completed; and

the likely population and population density within the proposed preliminary municipality area when all phases of the map or plat for the proposed preliminary municipality area are completed; and
Section 10-2a-504(3)(a)(i)(A)Verify source
§ 10-2a-504(3)(a)(i)(B)Subsection 10-2a-504(3)(a)(i)(B)Provision

The area’s population and population density are considered as of the day the feasibility request was submitted.

the population and population density of the area surrounding the proposed preliminary municipality area on the day on which the feasibility request was submitted;
Section 10-2a-504(3)(a)(i)(B)Verify source
§ 10-2a-504(3)(a)(ii)Subsection 10-2a-504(3)(a)(ii)Provision

an analysis of the following, determined as if, at the time of the analysis, the proposed preliminary municipality area is incorporated as a town with a population of 100 people: the initial and projected five-year demographics and tax

an analysis of the following, determined as if, at the time of the analysis, the proposed preliminary municipality area is incorporated as a town with a population of 100 people: the initial and projected five-year demographics and tax base within the boundaries of the proposed preliminary municipality area and the surrounding area, including household size and income, commercial and industrial development, and public facilities; subject to Subsection (3)(b), the initial and five-year projected cost of providing municipal services to the proposed preliminary municipality area, including administrative costs; assuming the same tax categories and tax rates as imposed by the county and all other current service providers at the time during which the feasibility consultant prepares the feasibility study, the initial and five-year projected revenue for the proposed preliminary municipality area; the risks and opportunities that might affect the actual costs described in Subsection (3)(a)(ii)(B) or the revenues described in Subsection (3)(a)(ii)(C) of the proposed preliminary municipality area; new revenue sources that may be available to the proposed preliminary municipality area that are not available before the area incorporates, including an analysis of the amount of revenues the proposed preliminary municipality area might obtain from those revenue sources; the projected tax burden per household of any new taxes that may be levied within the proposed preliminary municipality area within five years after incorporation as a town; and the fiscal impact of the proposed preliminary municipality area's incorporation as a town on unincorporated areas, other municipalities, special districts, special service districts, and other governmental entities in the county; and
Section 10-2a-504(3)(a)(ii)Verify source
§ 10-2a-504(3)(a)(ii)(A)Subsection 10-2a-504(3)(a)(ii)(A)Provision

the initial and projected five-year demographics and tax base within the boundaries of the proposed preliminary municipality area and the surrounding area, including household size and income, commercial and industrial development, and

the initial and projected five-year demographics and tax base within the boundaries of the proposed preliminary municipality area and the surrounding area, including household size and income, commercial and industrial development, and public facilities;
Section 10-2a-504(3)(a)(ii)(A)Verify source
§ 10-2a-504(3)(a)(ii)(B)Subsection 10-2a-504(3)(a)(ii)(B)Provision

subject to Subsection (3)(b), the initial and five-year projected cost of providing municipal services to the proposed preliminary municipality area, including administrative costs;

subject to Subsection (3)(b), the initial and five-year projected cost of providing municipal services to the proposed preliminary municipality area, including administrative costs;
Section 10-2a-504(3)(a)(ii)(B)Verify source
§ 10-2a-504(3)(a)(ii)(C)Subsection 10-2a-504(3)(a)(ii)(C)Provision

assuming the same tax categories and tax rates as imposed by the county and all other current service providers at the time during which the feasibility consultant prepares the feasibility study, the initial and five-year projected revenue

assuming the same tax categories and tax rates as imposed by the county and all other current service providers at the time during which the feasibility consultant prepares the feasibility study, the initial and five-year projected revenue for the proposed preliminary municipality area;
Section 10-2a-504(3)(a)(ii)(C)Verify source
§ 10-2a-504(3)(a)(ii)(D)Subsection 10-2a-504(3)(a)(ii)(D)Provision

the risks and opportunities that might affect the actual costs described in Subsection (3)(a)(ii)(B) or the revenues described in Subsection (3)(a)(ii)(C) of the proposed preliminary municipality area;

the risks and opportunities that might affect the actual costs described in Subsection (3)(a)(ii)(B) or the revenues described in Subsection (3)(a)(ii)(C) of the proposed preliminary municipality area;
Section 10-2a-504(3)(a)(ii)(D)Verify source
§ 10-2a-504(3)(a)(ii)(E)Subsection 10-2a-504(3)(a)(ii)(E)Provision

new revenue sources that may be available to the proposed preliminary municipality area that are not available before the area incorporates, including an analysis of the amount of revenues the proposed preliminary municipality area might

new revenue sources that may be available to the proposed preliminary municipality area that are not available before the area incorporates, including an analysis of the amount of revenues the proposed preliminary municipality area might obtain from those revenue sources;
Section 10-2a-504(3)(a)(ii)(E)Verify source
§ 10-2a-504(3)(a)(ii)(F)Subsection 10-2a-504(3)(a)(ii)(F)Provision

Refers to the projected tax burden per household from any new taxes that may be levied in the proposed preliminary municipality area within five years after incorporation as a town.

the projected tax burden per household of any new taxes that may be levied within the proposed preliminary municipality area within five years after incorporation as a town; and
Section 10-2a-504(3)(a)(ii)(F)Verify source
§ 10-2a-504(3)(a)(ii)(G)Subsection 10-2a-504(3)(a)(ii)(G)Provision

the fiscal impact of the proposed preliminary municipality area's incorporation as a town on unincorporated areas, other municipalities, special districts, special service districts, and other governmental entities in the county; and

the fiscal impact of the proposed preliminary municipality area's incorporation as a town on unincorporated areas, other municipalities, special districts, special service districts, and other governmental entities in the county; and
Section 10-2a-504(3)(a)(ii)(G)Verify source
§ 10-2a-504(3)(a)(iii)Subsection 10-2a-504(3)(a)(iii)Provision

an analysis regarding whether sufficient water will be available to support the proposed preliminary municipality area when the development of the area is complete.

an analysis regarding whether sufficient water will be available to support the proposed preliminary municipality area when the development of the area is complete.
Section 10-2a-504(3)(a)(iii)Verify source
§ 10-2a-504(3)(b)Subsection 10-2a-504(3)(b)Provision

The feasibility consultant must make specific assumptions and cost calculations when estimating municipal service costs, including service levels, five-year costs, inflation, and anticipated growth.

In calculating the projected costs under Subsection (3)(a)(ii)(B), the feasibility consultant shall assume the proposed preliminary municipality area will provide a level and quality of municipal services that fairly and reasonably approximate the level and quality of municipal services that are provided to the area surrounding the proposed preliminary municipality area at the time the feasibility consultant conducts the feasibility study. In calculating the current cost of a municipal service under Subsection (3)(a)(ii)(B), the feasibility consultant shall consider: the amount it would cost the proposed preliminary municipality area to provide the municipal service for the first five years after the area incorporates as a town; and the proposed or current municipal service provider's initial and five-year projected cost of providing the municipal service after the proposed preliminary municipality area incorporates as a town. In calculating costs under Subsection (3)(a)(ii)(B), the feasibility consultant shall account for inflation and anticipated growth.
Section 10-2a-504(3)(b)Verify source
§ 10-2a-504(3)(b)(i)Subsection 10-2a-504(3)(b)(i)Provision

The feasibility consultant must assume the proposed preliminary municipality area will provide municipal services that fairly and reasonably approximate those provided to the surrounding area when calculating projected costs.

In calculating the projected costs under Subsection (3)(a)(ii)(B), the feasibility consultant shall assume the proposed preliminary municipality area will provide a level and quality of municipal services that fairly and reasonably approximate the level and quality of municipal services that are provided to the area surrounding the proposed preliminary municipality area at the time the feasibility consultant conducts the feasibility study.
Section 10-2a-504(3)(b)(i)Verify source
§ 10-2a-504(3)(b)(ii)Subsection 10-2a-504(3)(b)(ii)Provision

The feasibility consultant must consider specified municipal service cost estimates when calculating current cost under Subsection (3)(a)(ii)(B).

In calculating the current cost of a municipal service under Subsection (3)(a)(ii)(B), the feasibility consultant shall consider: the amount it would cost the proposed preliminary municipality area to provide the municipal service for the first five years after the area incorporates as a town; and the proposed or current municipal service provider's initial and five-year projected cost of providing the municipal service after the proposed preliminary municipality area incorporates as a town.
Section 10-2a-504(3)(b)(ii)Verify source
§ 10-2a-504(3)(b)(ii)(A)Subsection 10-2a-504(3)(b)(ii)(A)Provision

the amount it would cost the proposed preliminary municipality area to provide the municipal service for the first five years after the area incorporates as a town; and

the amount it would cost the proposed preliminary municipality area to provide the municipal service for the first five years after the area incorporates as a town; and
Section 10-2a-504(3)(b)(ii)(A)Verify source
§ 10-2a-504(3)(b)(ii)(B)Subsection 10-2a-504(3)(b)(ii)(B)Provision

the proposed or current municipal service provider's initial and five-year projected cost of providing the municipal service after the proposed preliminary municipality area incorporates as a town.

the proposed or current municipal service provider's initial and five-year projected cost of providing the municipal service after the proposed preliminary municipality area incorporates as a town.
Section 10-2a-504(3)(b)(ii)(B)Verify source
§ 10-2a-504(3)(b)(iii)Subsection 10-2a-504(3)(b)(iii)Provision

The feasibility consultant must account for inflation and anticipated growth when calculating costs under Subsection (3)(a)(ii)(B).

In calculating costs under Subsection (3)(a)(ii)(B), the feasibility consultant shall account for inflation and anticipated growth.
Section 10-2a-504(3)(b)(iii)Verify source
§ 10-2a-504(3)(c)Subsection 10-2a-504(3)(c)Provision

The feasibility consultant must consult the listed entities before submitting a draft feasibility study.

In conducting the feasibility study, the feasibility consultant shall consult with the following before submitting a draft of the feasibility study under Subsection (2)(c)(iii): if the proposed preliminary municipality will include lands owned by the United States federal government, the entity within the United States federal government that has jurisdiction over the land; if the proposed preliminary municipality will include lands owned by the state, the entity within state government that has jurisdiction over the land; each entity that provides, or is proposed to provide, a municipal service to a portion of the proposed preliminary municipality area; and each other special service district that provides, or is proposed to provide, services to a portion of the proposed preliminary municipality area.
Section 10-2a-504(3)(c)Verify source
§ 10-2a-504(3)(c)(i)Subsection 10-2a-504(3)(c)(i)Provision

If the proposed preliminary municipality includes federal land, the relevant federal entity with jurisdiction over that land is identified.

if the proposed preliminary municipality will include lands owned by the United States federal government, the entity within the United States federal government that has jurisdiction over the land;
Section 10-2a-504(3)(c)(i)Verify source
§ 10-2a-504(3)(c)(ii)Subsection 10-2a-504(3)(c)(ii)Provision

If the proposed preliminary municipality will include state-owned land, the state government entity with jurisdiction over that land is the relevant actor.

if the proposed preliminary municipality will include lands owned by the state, the entity within state government that has jurisdiction over the land;
Section 10-2a-504(3)(c)(ii)Verify source
§ 10-2a-504(3)(c)(iii)Subsection 10-2a-504(3)(c)(iii)Provision

Refers to each entity that provides, or is proposed to provide, a municipal service to part of the proposed preliminary municipality area.

each entity that provides, or is proposed to provide, a municipal service to a portion of the proposed preliminary municipality area; and
Section 10-2a-504(3)(c)(iii)Verify source
§ 10-2a-504(3)(c)(iv)Subsection 10-2a-504(3)(c)(iv)Provision

Applies to each other special service district that provides, or is proposed to provide, services to part of the proposed preliminary municipality area.

each other special service district that provides, or is proposed to provide, services to a portion of the proposed preliminary municipality area.
Section 10-2a-504(3)(c)(iv)Verify source
§ 10-2a-504(4)Subsection 10-2a-504(4)Provision

If projected revenues exceed projected costs by more than 5%, the feasibility consultant must project and report the expected annual revenue surplus to the primary sponsor contact and the lieutenant governor.

If the five-year projected revenues calculated under Subsection (3)(a)(ii)(C) exceed the five-year projected costs calculated under Subsection (3)(a)(ii)(B) by more than 5%, the feasibility consultant shall project and report the expected annual revenue surplus to the primary sponsor contact and the lieutenant governor.
Section 10-2a-504(4)Verify source
§ 10-2a-504(5)Subsection 10-2a-504(5)Provision

The incorporation process may not proceed if the feasibility study shows revenue does not exceed cost by more than 5%, unless an exception applies.

Except as provided in Subsection (5)(b), if the results of the feasibility study, or a supplemental feasibility study described in Section 10-2a-505 , show that the average annual amount of revenue calculated under Subsection (3)(a)(ii)(C) does not exceed the average annual cost calculated under Subsection (3)(a)(ii)(B) by more than 5%, the process to incorporate the area that is the subject of the feasibility study or supplemental feasibility study may not proceed. Except as provided in Subsection 10-2a-505(3) , the process to incorporate an area described in Subsection (5)(a) may proceed if a subsequent supplemental feasibility study conducted under Section 10-2a-505 for the proposed incorporation demonstrates compliance with Subsection (5)(a).
Section 10-2a-504(5)Verify source
§ 10-2a-504(5)(a)Subsection 10-2a-504(5)(a)Provision

Except as provided in Subsection (5)(b), the incorporation process may not proceed if the feasibility study or supplemental feasibility study shows revenue is not more than 5% above cost.

Except as provided in Subsection (5)(b), if the results of the feasibility study, or a supplemental feasibility study described in Section 10-2a-505 , show that the average annual amount of revenue calculated under Subsection (3)(a)(ii)(C) does not exceed the average annual cost calculated under Subsection (3)(a)(ii)(B) by more than 5%, the process to incorporate the area that is the subject of the feasibility study or supplemental feasibility study may not proceed.
Section 10-2a-504(5)(a)Verify source
§ 10-2a-504(5)(b)Subsection 10-2a-504(5)(b)Provision

The incorporation process for an area described in Subsection (5)(a) may proceed if a later supplemental feasibility study under Section 10-2a-505 shows compliance with Subsection (5)(a), unless Subsection 10-2a-505(3) applies.

Except as provided in Subsection 10-2a-505(3) , the process to incorporate an area described in Subsection (5)(a) may proceed if a subsequent supplemental feasibility study conducted under Section 10-2a-505 for the proposed incorporation demonstrates compliance with Subsection (5)(a).
Section 10-2a-504(5)(b)Verify source
§ 10-2a-504(6)Subsection 10-2a-504(6)Provision

If the feasibility study or revised feasibility study does not comply with Subsection (5), and the sponsors request it, the feasibility consultant must recommend how the proposed preliminary municipality area may be altered to comply.

If the results of the feasibility study or revised feasibility study do not comply with Subsection (5), and if requested by the sponsors of the request, the feasibility consultant shall, as part of the feasibility study or revised feasibility study, make recommendations regarding how the proposed preliminary municipality area may be altered to comply with Subsection (5), unless the sponsors are precluded from modifying the feasibility request under Subsection 10-2a-505(3) .
Section 10-2a-504(6)Verify source
§ 10-2a-504(7)Subsection 10-2a-504(7)Provision

The lieutenant governor must post the feasibility study, and any supplemental feasibility study described in Section 10-2a-505, on the lieutenant governor’s website and make a copy available for public review at the lieutenant governor’s office.

The lieutenant governor shall post a copy of the feasibility study, and any supplemental feasibility study described in Section 10-2a-505 , on the lieutenant governor's website and make a copy available for public review at the lieutenant governor's office.
Section 10-2a-504(7)Verify source

Legislative relationships

0 referenced instruments

Names are derived from the stored provision headings and citation-enrichment layer. Treat this as a research index and verify each relationship against the source text.

No structured legislative relationships were detected

The statute remains fully searchable by provision. Consult the source text for amendments and cross-references that have not yet been indexed.

Recorded versions and source checkpoint

1 version available in this collection

Current-law checkpoint
  • Undated version · currentEnglish · In force

Source-linked research

Ask AI about this statute

The overview, provisions, and source records above are public. Continue in a separate conversation with this statute’s jurisdiction and source version attached.

About this LexChat collection

Statute information is organised from identified legislative sources for professional research. Corrections can be reported to hello@esheria.ai.