United States — Utah Act or statute

United States — Utah legislation

Utah Code § 10-2a-507, 2024

Certain property owners may file an incorporation petition within one year after the required hearings are completed, if the petition includes specified information and supporting documents.

bond/deposit/letter of creditcounty jurisdictionfeasibility requestincorporationinfrastructure completionmunicipal dissolutionmunicipal incorporationpetition filingproperty ownerspublic hearing costssurveying

Professional statute overview

Enactment structure, operative effect and source provenance

Official source

01

Purpose and legislative effect

“Certain property owners may file an incorporation petition within one year after the required hearings are completed, if the petition includes specified information and supporting documents.”

Use this record to locate individual provisions, understand the instrument’s recorded structure, and move from a research summary to the exact source text.

02

How the instrument operates

  1. 01

    Start with the recorded version

    Enacted 2024. The date shown identifies this source expression and should not be treated as proof that no later change exists.

  2. 02

    Locate the controlling provision

    Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.

  3. 03

    Read conditions and exceptions together

    Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.

  4. 04

    Verify currency and official wording

    Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.

03

Research entry points

Selected provisions across the instrument. Open any row to continue with the exact stored text.

Petition for incorporation -- Requirements and form.

Certain property owners may file an incorporation petition within one year after the required hearings are completed, if the petition includes specified information and supporting documents.

Section 10-2a-507

Subsection 10-2a-507(1)(h)

A bond, cash deposit, or letter of credit must be posted by the initial landowners to secure completion of the system infrastructure within six years after they file the incorporation petition.

Section 10-2a-507(1)(h)

Subsection 10-2a-507(2)

If the preliminary municipality’s system infrastructure is not completed within six years after the initial landowners file a petition for incorporation, the unrefunded portion of the bond, cash deposit, or letter of credit forfeits to the preliminary…

Section 10-2a-507(2)

Subsection 10-2a-507(3)(d)

Initial landowners are liable to the county for damages caused by dissolution of the preliminary municipality.

Section 10-2a-507(3)(d)

04

Source and current-law status

In force source record

Source record from le.utah.gov · Enacted 2024

In force

This source records the instrument as in force. Confirm subsequent amendments, commencement notices, and judicial treatment before relying on it.

Source-indexed provision map

Sections and provisions

Search by section, heading, part or exact legal wording. Every result remains linked to the stored source record.

Showing 22 of 22 provisions

Provision 22

Part 10-2a-5

part 10-2a-5 Incorporation of a Preliminary Municipality

§ 10-2a-507Petition for incorporation -- Requirements and form.Provision

Certain property owners may file an incorporation petition within one year after the required hearings are completed, if the petition includes specified information and supporting documents.

Petition for incorporation -- Requirements and form. At any time within one year after the day on which the lieutenant governor completes the public hearings required under Section 10-2a-506 , the owners of the property who filed the feasibility request under Section 10-2a-502 for the proposed preliminary municipality area may proceed with the incorporation process by filing a petition for incorporation of the proposed preliminary municipality that: includes the typed or printed name, signature, address, and phone number of the initial landowners; describes the proposed preliminary municipality area, as described in the feasibility request or the modified feasibility request; demonstrates compliance with Subsection 10-2a-504(4) ; states the proposed name for the proposed preliminary municipality; designates the primary sponsor contact for the proposed preliminary municipality; designates the board chair and three of the four board members who will serve as a five member council form of government for the preliminary municipality, described in Section 10-3b-402 , for the preliminary municipality; is accompanied by an accurate map or plat, prepared by a licensed surveyor, showing: the boundaries of the proposed preliminary municipality; a single development plan for the proposed municipality, depicting each phase of the development; is accompanied by a bond, cash deposit, or letter of credit that: is posted by the initial landowners; is in favor of the proposed preliminary municipality, to guarantee that the initial landowners will complete the system infrastructure no later than six years after the day on which the initial landowners file the petition for incorporation described in this section; and will be refunded to the initial landowners in percentages that reflect the progress toward completing the system infrastructure; and is accompanied by payment in full, from the initial landowners, of the costs incurred by the lieutenant governor for the feasibility study, the public notices, the hearings, and the other expenses incurred by the lieutenant governor to comply with the requirements of this part in relation to the proposed preliminary municipality. If, within six years after the day on which the initial landowners file a petition for incorporation under Subsection (1), the system infrastructure for the preliminary municipality is not completed, the portion of the bond, cash deposit, or letter of credit described in Subsection (1)(h) that has not been refunded to the initial landowners shall forfeit to the preliminary municipality. If, within four years after the day on which the first residential certificate of occupancy is issued for the development described in Subsection 10-2a-503(5)(e) , or six years after the day on which the initial landowners file a petition for incorporation under Subsection (1), the preliminary municipality has not transitioned to a town: the lieutenant governor shall issue a certificate dissolving the preliminary municipality; all roads and infrastructure within the preliminary municipality revert to the county in which the preliminary municipality is located; the area within the proposed municipality falls under the jurisdiction of the county and is no longer incorporated; and the initial landowners are liable to the county for damages caused to the county due to the dissolution of the preliminary municipality.
Section 10-2a-507Verify source
§ 10-2a-507(1)Subsection 10-2a-507(1)Provision

Certain property owners may file a petition to start incorporation within one year after the lieutenant governor finishes the required public hearings, and the filing must include specified names, signatures, contact details, a description, a map, a development plan, financial security, and payment of the lieutenant governor’s costs.

At any time within one year after the day on which the lieutenant governor completes the public hearings required under Section 10-2a-506 , the owners of the property who filed the feasibility request under Section 10-2a-502 for the proposed preliminary municipality area may proceed with the incorporation process by filing a petition for incorporation of the proposed preliminary municipality that: includes the typed or printed name, signature, address, and phone number of the initial landowners; describes the proposed preliminary municipality area, as described in the feasibility request or the modified feasibility request; demonstrates compliance with Subsection 10-2a-504(4) ; states the proposed name for the proposed preliminary municipality; designates the primary sponsor contact for the proposed preliminary municipality; designates the board chair and three of the four board members who will serve as a five member council form of government for the preliminary municipality, described in Section 10-3b-402 , for the preliminary municipality; is accompanied by an accurate map or plat, prepared by a licensed surveyor, showing: the boundaries of the proposed preliminary municipality; a single development plan for the proposed municipality, depicting each phase of the development; is accompanied by a bond, cash deposit, or letter of credit that: is posted by the initial landowners; is in favor of the proposed preliminary municipality, to guarantee that the initial landowners will complete the system infrastructure no later than six years after the day on which the initial landowners file the petition for incorporation described in this section; and will be refunded to the initial landowners in percentages that reflect the progress toward completing the system infrastructure; and is accompanied by payment in full, from the initial landowners, of the costs incurred by the lieutenant governor for the feasibility study, the public notices, the hearings, and the other expenses incurred by the lieutenant governor to comply with the requirements of this part in relation to the proposed preliminary municipality.
Section 10-2a-507(1)Verify source
§ 10-2a-507(1)(a)Subsection 10-2a-507(1)(a)Provision

includes the typed or printed name, signature, address, and phone number of the initial landowners;

includes the typed or printed name, signature, address, and phone number of the initial landowners;
Section 10-2a-507(1)(a)Verify source
§ 10-2a-507(1)(b)Subsection 10-2a-507(1)(b)Provision

describes the proposed preliminary municipality area, as described in the feasibility request or the modified feasibility request;

describes the proposed preliminary municipality area, as described in the feasibility request or the modified feasibility request;
Section 10-2a-507(1)(b)Verify source
§ 10-2a-507(1)(c)Subsection 10-2a-507(1)(c)Provision

demonstrates compliance with Subsection 10-2a-504(4) ;

demonstrates compliance with Subsection 10-2a-504(4) ;
Section 10-2a-507(1)(c)Verify source
§ 10-2a-507(1)(d)Subsection 10-2a-507(1)(d)Provision

states the proposed name for the proposed preliminary municipality;

states the proposed name for the proposed preliminary municipality;
Section 10-2a-507(1)(d)Verify source
§ 10-2a-507(1)(e)Subsection 10-2a-507(1)(e)Provision

This provision designates the primary sponsor contact for the proposed preliminary municipality.

designates the primary sponsor contact for the proposed preliminary municipality;
Section 10-2a-507(1)(e)Verify source
§ 10-2a-507(1)(f)Subsection 10-2a-507(1)(f)Provision

It designates the board chair and three board members to serve on a five-member council form of government for the preliminary municipality.

designates the board chair and three of the four board members who will serve as a five member council form of government for the preliminary municipality, described in Section 10-3b-402 , for the preliminary municipality;
Section 10-2a-507(1)(f)Verify source
§ 10-2a-507(1)(g)Subsection 10-2a-507(1)(g)Provision

is accompanied by an accurate map or plat, prepared by a licensed surveyor, showing: the boundaries of the proposed preliminary municipality; a single development plan for the proposed municipality, depicting each phase of the development;

is accompanied by an accurate map or plat, prepared by a licensed surveyor, showing: the boundaries of the proposed preliminary municipality; a single development plan for the proposed municipality, depicting each phase of the development;
Section 10-2a-507(1)(g)Verify source
§ 10-2a-507(1)(g)(i)Subsection 10-2a-507(1)(g)(i)Provision

the boundaries of the proposed preliminary municipality;

the boundaries of the proposed preliminary municipality;
Section 10-2a-507(1)(g)(i)Verify source
§ 10-2a-507(1)(g)(ii)Subsection 10-2a-507(1)(g)(ii)Provision

a single development plan for the proposed municipality, depicting each phase of the development;

a single development plan for the proposed municipality, depicting each phase of the development;
Section 10-2a-507(1)(g)(ii)Verify source
§ 10-2a-507(1)(h)Subsection 10-2a-507(1)(h)Provision

A bond, cash deposit, or letter of credit must be posted by the initial landowners to secure completion of the system infrastructure within six years after they file the incorporation petition.

is accompanied by a bond, cash deposit, or letter of credit that: is posted by the initial landowners; is in favor of the proposed preliminary municipality, to guarantee that the initial landowners will complete the system infrastructure no later than six years after the day on which the initial landowners file the petition for incorporation described in this section; and will be refunded to the initial landowners in percentages that reflect the progress toward completing the system infrastructure; and
Section 10-2a-507(1)(h)Verify source
§ 10-2a-507(1)(h)(i)Subsection 10-2a-507(1)(h)(i)Provision

is posted by the initial landowners;

is posted by the initial landowners;
Section 10-2a-507(1)(h)(i)Verify source
§ 10-2a-507(1)(h)(ii)Subsection 10-2a-507(1)(h)(ii)Provision

The initial landowners must complete the system infrastructure no later than six years after filing the petition for incorporation.

is in favor of the proposed preliminary municipality, to guarantee that the initial landowners will complete the system infrastructure no later than six years after the day on which the initial landowners file the petition for incorporation described in this section; and
Section 10-2a-507(1)(h)(ii)Verify source
§ 10-2a-507(1)(h)(iii)Subsection 10-2a-507(1)(h)(iii)Provision

will be refunded to the initial landowners in percentages that reflect the progress toward completing the system infrastructure; and

will be refunded to the initial landowners in percentages that reflect the progress toward completing the system infrastructure; and
Section 10-2a-507(1)(h)(iii)Verify source
§ 10-2a-507(1)(i)Subsection 10-2a-507(1)(i)Provision

is accompanied by payment in full, from the initial landowners, of the costs incurred by the lieutenant governor for the feasibility study, the public notices, the hearings, and the other expenses incurred by the lieutenant governor to

is accompanied by payment in full, from the initial landowners, of the costs incurred by the lieutenant governor for the feasibility study, the public notices, the hearings, and the other expenses incurred by the lieutenant governor to comply with the requirements of this part in relation to the proposed preliminary municipality.
Section 10-2a-507(1)(i)Verify source
§ 10-2a-507(2)Subsection 10-2a-507(2)Provision

If the preliminary municipality’s system infrastructure is not completed within six years after the initial landowners file a petition for incorporation, the unrefunded portion of the bond, cash deposit, or letter of credit forfeits to the preliminary municipality.

If, within six years after the day on which the initial landowners file a petition for incorporation under Subsection (1), the system infrastructure for the preliminary municipality is not completed, the portion of the bond, cash deposit, or letter of credit described in Subsection (1)(h) that has not been refunded to the initial landowners shall forfeit to the preliminary municipality.
Section 10-2a-507(2)Verify source
§ 10-2a-507(3)Subsection 10-2a-507(3)Provision

If, within four years after the day on which the first residential certificate of occupancy is issued for the development described in Subsection 10-2a-503(5)(e) , or six years after the day on which the initial landowners file a petition

If, within four years after the day on which the first residential certificate of occupancy is issued for the development described in Subsection 10-2a-503(5)(e) , or six years after the day on which the initial landowners file a petition for incorporation under Subsection (1), the preliminary municipality has not transitioned to a town: the lieutenant governor shall issue a certificate dissolving the preliminary municipality; all roads and infrastructure within the preliminary municipality revert to the county in which the preliminary municipality is located; the area within the proposed municipality falls under the jurisdiction of the county and is no longer incorporated; and the initial landowners are liable to the county for damages caused to the county due to the dissolution of the preliminary municipality.
Section 10-2a-507(3)Verify source
§ 10-2a-507(3)(a)Subsection 10-2a-507(3)(a)Provision

The lieutenant governor must issue a certificate dissolving the preliminary municipality.

the lieutenant governor shall issue a certificate dissolving the preliminary municipality;
Section 10-2a-507(3)(a)Verify source
§ 10-2a-507(3)(b)Subsection 10-2a-507(3)(b)Provision

all roads and infrastructure within the preliminary municipality revert to the county in which the preliminary municipality is located;

all roads and infrastructure within the preliminary municipality revert to the county in which the preliminary municipality is located;
Section 10-2a-507(3)(b)Verify source
§ 10-2a-507(3)(c)Subsection 10-2a-507(3)(c)Provision

the area within the proposed municipality falls under the jurisdiction of the county and is no longer incorporated; and

the area within the proposed municipality falls under the jurisdiction of the county and is no longer incorporated; and
Section 10-2a-507(3)(c)Verify source
§ 10-2a-507(3)(d)Subsection 10-2a-507(3)(d)Provision

Initial landowners are liable to the county for damages caused by dissolution of the preliminary municipality.

the initial landowners are liable to the county for damages caused to the county due to the dissolution of the preliminary municipality.
Section 10-2a-507(3)(d)Verify source

Legislative relationships

0 referenced instruments

Names are derived from the stored provision headings and citation-enrichment layer. Treat this as a research index and verify each relationship against the source text.

No structured legislative relationships were detected

The statute remains fully searchable by provision. Consult the source text for amendments and cross-references that have not yet been indexed.

Recorded versions and source checkpoint

1 version available in this collection

Current-law checkpoint
  • Undated version · currentEnglish · In force

Source-linked research

Ask AI about this statute

The overview, provisions, and source records above are public. Continue in a separate conversation with this statute’s jurisdiction and source version attached.

About this LexChat collection

Statute information is organised from identified legislative sources for professional research. Corrections can be reported to hello@esheria.ai.