Utah Code § 10-8-87, 2025

Municipalities in a metropolitan planning organization boundary must update their transportation and traffic circulation element by July 1, 2027, identify priority connections and related costs/funding/impediments, and…

access infrastructurecirculation elementfunding sourcesgeneral plan updategeneral plan updatesreportingtransportation connectivitytransportation connectivity improvements

Professional statute overview

Enactment structure, operative effect and source provenance

Official source

01

Purpose and legislative effect

“Municipalities in a metropolitan planning organization boundary must update their transportation and traffic circulation element by July 1, 2027, identify priority connections and related costs/funding/impediments, and the metropolitan planning organization must report to the Transportation Interim Committee by Novembe”

Use this record to locate individual provisions, understand the instrument’s recorded structure, and move from a research summary to the exact source text.

02

How the instrument operates

  1. 01

    Start with the recorded version

    Enacted 2025. The date shown identifies this source expression and should not be treated as proof that no later change exists.

  2. 02

    Locate the controlling provision

    Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.

  3. 03

    Read conditions and exceptions together

    Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.

  4. 04

    Verify currency and official wording

    Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.

03

Research entry points

Selected provisions across the instrument. Open any row to continue with the exact stored text.

Transportation connectivity plan -- Reporting.

Municipalities in a metropolitan planning organization boundary must update their transportation and traffic circulation element by July 1, 2027, identify priority connections and related costs/funding/impediments, and the metropolitan planning organization…

Section 10-8-87

Subsection 10-8-87(3)(a)

A metropolitan planning organization must report to the Transportation Interim Committee, in consultation with each affected municipality, on several transportation-related items.

Section 10-8-87(3)(a)

Subsection 10-8-87(4)

Transportation connectivity enhancements described in Subsection (1) must be considered in the prioritization processes in Sections 72-1-304 and 72-2-302.

Section 10-8-87(4)

04

Source and current-law status

In force source record

Source record from le.utah.gov · Enacted 2025

In force

This source records the instrument as in force. Confirm subsequent amendments, commencement notices, and judicial treatment before relying on it.

Source-indexed provision map

Sections and provisions

Search by section, heading, part or exact legal wording. Every result remains linked to the stored source record.

Showing 14 of 14 provisions

Provision 14
§ 10-8-87Transportation connectivity plan -- Reporting.Provision

Municipalities in a metropolitan planning organization boundary must update their transportation and traffic circulation element by July 1, 2027, identify priority connections and related costs/funding/impediments, and the metropolitan planning organization must report to the Transportation Interim Committee by November 1 in 2025, 2026, and 2027.

Transportation connectivity plan -- Reporting. On or before July 1, 2027, a municipality within a metropolitan planning organization boundary shall, in consultation with relevant stakeholders, update the transportation and traffic circulation element of the municipality's general plan as described in Subsection 10-20-404(2)(a)(ii) to identify priority connections to remedy physical impediments, including water conveyances, that would improve circulation and enhance vehicle, transit, bicycle, or pedestrian access to significant economic, educational, recreational, and other priority destinations. For a priority connection identified in accordance with Subsection (1) , a municipality shall identify: cost estimates; potential funding sources, including state, local, federal, and private funding; and impediments to constructing the connections. A metropolitan planning organization, in consultation with each affected municipality, shall report to the Transportation Interim Committee regarding: the status of the required municipal modifications to general plans required by Subsection (2) ; the status of a regional roadway grid network study; physical and other impediments to constructing priority transportation connections; and potential funding sources, including state, local, federal, and private funding, to make transportation connectivity improvements. The metropolitan planning organization shall provide the report described in Subsection (3)(a) on or before November 1 of 2025, 2026, and 2027. Enhancement of transportation connectivity as described in Subsection (1) shall be given consideration in the prioritization processes described in Sections 72-1-304 and 72-2-302 .
Section 10-8-87Verify source
§ 10-8-87(1)Subsection 10-8-87(1)Provision

On or before July 1, 2027, a municipality within a metropolitan planning organization boundary shall, in consultation with relevant stakeholders, update the transportation and traffic circulation element of the municipality's general plan

On or before July 1, 2027, a municipality within a metropolitan planning organization boundary shall, in consultation with relevant stakeholders, update the transportation and traffic circulation element of the municipality's general plan as described in Subsection 10-20-404(2)(a)(ii) to identify priority connections to remedy physical impediments, including water conveyances, that would improve circulation and enhance vehicle, transit, bicycle, or pedestrian access to significant economic, educational, recreational, and other priority destinations.
Section 10-8-87(1)Verify source
§ 10-8-87(2)Subsection 10-8-87(2)Provision

For a priority connection under Subsection (1), a municipality must identify cost estimates, possible funding sources, and impediments to construction.

For a priority connection identified in accordance with Subsection (1) , a municipality shall identify: cost estimates; potential funding sources, including state, local, federal, and private funding; and impediments to constructing the connections.
Section 10-8-87(2)Verify source
§ 10-8-87(2)(a)Subsection 10-8-87(2)(a)Provision

cost estimates;

cost estimates;
Section 10-8-87(2)(a)Verify source
§ 10-8-87(2)(b)Subsection 10-8-87(2)(b)Provision

potential funding sources, including state, local, federal, and private funding; and

potential funding sources, including state, local, federal, and private funding; and
Section 10-8-87(2)(b)Verify source
§ 10-8-87(2)(c)Subsection 10-8-87(2)(c)Provision

impediments to constructing the connections.

impediments to constructing the connections.
Section 10-8-87(2)(c)Verify source
§ 10-8-87(3)Subsection 10-8-87(3)Provision

A metropolitan planning organization must report to the Transportation Interim Committee, in consultation with affected municipalities, on specified transportation planning and funding topics.

A metropolitan planning organization, in consultation with each affected municipality, shall report to the Transportation Interim Committee regarding: the status of the required municipal modifications to general plans required by Subsection (2) ; the status of a regional roadway grid network study; physical and other impediments to constructing priority transportation connections; and potential funding sources, including state, local, federal, and private funding, to make transportation connectivity improvements. The metropolitan planning organization shall provide the report described in Subsection (3)(a) on or before November 1 of 2025, 2026, and 2027.
Section 10-8-87(3)Verify source
§ 10-8-87(3)(a)Subsection 10-8-87(3)(a)Provision

A metropolitan planning organization must report to the Transportation Interim Committee, in consultation with each affected municipality, on several transportation-related items.

A metropolitan planning organization, in consultation with each affected municipality, shall report to the Transportation Interim Committee regarding: the status of the required municipal modifications to general plans required by Subsection (2) ; the status of a regional roadway grid network study; physical and other impediments to constructing priority transportation connections; and potential funding sources, including state, local, federal, and private funding, to make transportation connectivity improvements.
Section 10-8-87(3)(a)Verify source
§ 10-8-87(3)(a)(i)Subsection 10-8-87(3)(a)(i)Provision

the status of the required municipal modifications to general plans required by Subsection (2) ;

the status of the required municipal modifications to general plans required by Subsection (2) ;
Section 10-8-87(3)(a)(i)Verify source
§ 10-8-87(3)(a)(ii)Subsection 10-8-87(3)(a)(ii)Provision

the status of a regional roadway grid network study;

the status of a regional roadway grid network study;
Section 10-8-87(3)(a)(ii)Verify source
§ 10-8-87(3)(a)(iii)Subsection 10-8-87(3)(a)(iii)Provision

physical and other impediments to constructing priority transportation connections; and

physical and other impediments to constructing priority transportation connections; and
Section 10-8-87(3)(a)(iii)Verify source
§ 10-8-87(3)(a)(iv)Subsection 10-8-87(3)(a)(iv)Provision

potential funding sources, including state, local, federal, and private funding, to make transportation connectivity improvements.

potential funding sources, including state, local, federal, and private funding, to make transportation connectivity improvements.
Section 10-8-87(3)(a)(iv)Verify source
§ 10-8-87(3)(b)Subsection 10-8-87(3)(b)Provision

The metropolitan planning organization must provide the report described in Subsection (3)(a) by November 1 in 2025, 2026, and 2027.

The metropolitan planning organization shall provide the report described in Subsection (3)(a) on or before November 1 of 2025, 2026, and 2027.
Section 10-8-87(3)(b)Verify source
§ 10-8-87(4)Subsection 10-8-87(4)Provision

Transportation connectivity enhancements described in Subsection (1) must be considered in the prioritization processes in Sections 72-1-304 and 72-2-302.

Enhancement of transportation connectivity as described in Subsection (1) shall be given consideration in the prioritization processes described in Sections 72-1-304 and 72-2-302 .
Section 10-8-87(4)Verify source

Legislative relationships

0 referenced instruments

Names are derived from the stored provision headings and citation-enrichment layer. Treat this as a research index and verify each relationship against the source text.

No structured legislative relationships were detected

The statute remains fully searchable by provision. Consult the source text for amendments and cross-references that have not yet been indexed.

Recorded versions and source checkpoint

1 version available in this collection

Current-law checkpoint
  • Undated version · currentEnglish · In force

Source-linked research

Ask AI about this statute

The overview, provisions, and source records above are public. Continue in a separate conversation with this statute’s jurisdiction and source version attached.

About this LexChat collection

Statute information is organised from identified legislative sources for professional research. Corrections can be reported to hello@esheria.ai.