Professional statute overview
Enactment structure, operative effect and source provenance
01
Purpose and legislative effect
“The Office of Energy Development must study continued operation of a project entity’s existing coal-powered generation facility, and a project entity must cooperate and provide information. The office must then report by the specified 2023 interim committee meeting.”
Use this record to locate individual provisions, understand the instrument’s recorded structure, and move from a research summary to the exact source text.
02
How the instrument operates
- 01
Start with the recorded version
Enacted 2023. The date shown identifies this source expression and should not be treated as proof that no later change exists.
- 02
Locate the controlling provision
Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.
- 03
Read conditions and exceptions together
Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.
- 04
Verify currency and official wording
Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.
03
Research entry points
Selected provisions across the instrument. Open any row to continue with the exact stored text.
The Office of Energy Development must study continued operation of a project entity’s existing coal-powered generation facility, and a project entity must cooperate and provide information. The office must then report by the specified 2…
Section 11-13-319
coordinate with state and local economic development agencies to evaluate economic opportunities for continued use of a project entity's existing coal-powered electrical generation facility;
Section 11-13-319(1)(d)
in a public private partnership; and
Section 11-13-319(1)(g)(ii)
The report described in Subsection (3) shall include: the results of the study described in Subsection (1) ; recommendations for continued operation of a project entity's existing coal-powered electrical generation facility; environmental
Section 11-13-319(4)
recommendations for legislation to be introduced in the 2024 General Session to enable the continued operation of a project entity's existing coal-powered electrical generation facility.
Section 11-13-319(4)(e)
04
Source and current-law status
In force source record
Source record from le.utah.gov · Enacted 2023
This source records the instrument as in force. Confirm subsequent amendments, commencement notices, and judicial treatment before relying on it.