Principal investigators need a permit to survey or excavate on covered state lands, and others may not do so unless working under a permitted principal investigator.

archaeological excavationarchaeological surveysartifact/specimen removalasset forfeiturecollections custodycompliancecustody and deposit of collectionseducation credential equivalencyexcavationexcavationsland-use compliancepermit revocationpermit/consentpermitspermittingregulatory enforcementreportingrepository designationresearch administrationresearch permittingrulemakingsurveytrainingtraining equivalencytrust ownership

Professional statute overview

Enactment structure, operative effect and source provenance

Official source

01

Purpose and legislative effect

“Principal investigators need a permit to survey or excavate on covered state lands, and others may not do so unless working under a permitted principal investigator.”

Use this record to locate individual provisions, understand the instrument’s recorded structure, and move from a research summary to the exact source text.

02

How the instrument operates

  1. 01

    Start with the recorded version

    Legal dates not recorded. The date shown identifies this source expression and should not be treated as proof that no later change exists.

  2. 02

    Locate the controlling provision

    Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.

  3. 03

    Read conditions and exceptions together

    Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.

  4. 04

    Verify currency and official wording

    Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.

03

Research entry points

Selected provisions across the instrument. Open any row to continue with the exact stored text.

Subsection 9-8a-305(3)(a)(i)

a research design to the Public Lands Policy Coordinating Office and the Antiquities Section that: states the questions to be addressed; states the reasons for conducting the work; defines the methods to be used; describes the analysis to

Section 9-8a-305(3)(a)(i)

Subsection 9-8a-305(4)(b)

An unspecified authority must grant an excavation permit to a principal investigator after approving the project research design, in consultation with the Antiquities Section.

Section 9-8a-305(4)(b)

Subsection 9-8a-305(11)

The office may enter memoranda of agreement to issue project numbers or retain other data for certain federal or Native American lands within the state.

Section 9-8a-305(11)

04

Source and current-law status

In force source record

Source record from le.utah.gov · Legal dates not recorded

In force

This source records the instrument as in force. Confirm subsequent amendments, commencement notices, and judicial treatment before relying on it.

Source-indexed provision map

Sections and provisions

Search by section, heading, part or exact legal wording. Every result remains linked to the stored source record.

Showing 64 of 64 provisions

Provision 61Offence 3

Part 9-8a-3

part 9-8a-3 Antiquities

§ 9-8a-305Permit required to survey or excavate on state lands -- Public Lands Policy Coordinating Office to issue permits and make rules -- Ownership of collections and resources -- Revocation or suspension of permits -- Criminal penalties.Offence

Principal investigators need a permit to survey or excavate on covered state lands, and others may not do so unless working under a permitted principal investigator.

Permit required to survey or excavate on state lands -- Public Lands Policy Coordinating Office to issue permits and make rules -- Ownership of collections and resources -- Revocation or suspension of permits -- Criminal penalties. Except as provided by Subsections (1)(d) and (3)(c) , each principal investigator who wishes to survey or excavate on any lands owned or controlled by the state, its political subdivisions, or by the School and Institutional Trust Lands Administration shall obtain a survey or excavation permit from the Public Lands Policy Coordinating Office. A principal investigator who holds a valid permit under this section may allow other individuals to assist the principal investigator in a survey or excavation if the principal investigator ensures that all the individuals comply with the law, the rules, the permit, and the appropriate professional standards. A person, other than a principal investigator, may not survey or excavate on any lands owned or controlled by the state, its political subdivisions, or by the School and Institutional Trust Lands Administration unless the person works under the direction of a principal investigator who holds a valid permit. A permit obtained before July 1, 2006, shall continue until the permit terminates on its own terms. To obtain a survey permit, a principal investigator shall: submit a permit application on a form furnished by the Public Lands Policy Coordinating Office; except as provided in Subsection (2)(b) , possess a graduate degree in anthropology, archaeology, or history; have one year of full-time professional experience or equivalent specialized training in archaeological research, administration, or management; and have one year of supervised field and analytical experience in Utah prehistoric or historic archaeology. In lieu of the graduate degree required by Subsection (2)(a)(ii) , a principal investigator may submit evidence of training and experience equivalent to a graduate degree. Unless the permit is revoked or suspended, a survey permit is valid for the time period specified in the permit by the Public Lands Policy Coordinating Office, which may not exceed three years. Except as provided by Subsection (3)(c) , to obtain an excavation permit, a principal investigator shall, in addition to complying with Subsection (2)(a) , submit: a research design to the Public Lands Policy Coordinating Office and the Antiquities Section that: states the questions to be addressed; states the reasons for conducting the work; defines the methods to be used; describes the analysis to be performed; outlines the expected results and the plan for reporting; evaluates expected contributions of the proposed work to archaeological or anthropological science; and estimates the cost and the time of the work that the principal investigator believes is necessary to provide the maximum amount of historic, scientific, archaeological, anthropological, and educational information; and proof of permission from the landowner to enter the property for the purposes of the permit. An excavation permit is valid for the amount of time specified in the permit, unless the permit is revoked according to Subsection (9) . The Public Lands Policy Coordinating Office may delegate to an agency the authority to issue excavation permits if the agency: requests the delegation; and employs or has a long-term contract with a principal investigator with a valid survey permit. The Public Lands Policy Coordinating Office shall conduct an independent review of the delegation authorized by Subsection (3)(c) every three years and may revoke the delegation at any time without cause. The Public Lands Policy Coordinating Office shall: grant a survey permit to a principal investigator who meets the requirements of this section; and grant an excavation permit to a principal investigator after approving, in consultation with the Antiquities Section, the research design for the project. By following the procedures and requirements of Title 63G, Chapter 3, Utah Administrative Rulemaking Act , the Public Lands Policy Coordinating Office shall, after consulting with the Antiquities Section, make rules to: establish survey methodology; standardize report and data preparation and submission; require other permit application information that the Public Lands Policy Coordinating Office finds necessary, including proof of consultation with the appropriate Native American tribe; establish what training and experience is equivalent to a graduate degree; establish requirements for a person authorized by Subsection (1)(b) to assist the principal investigator; establish requirements for a principal investigator's employer, if applicable; and establish criteria that, if met, would allow the Public Lands Policy Coordinating Office to reinstate a suspended permit. Each principal investigator shall submit a summary report of the work for each project to the Antiquities Section in a form prescribed by a rule established under Subsection (5)(b) , which shall include copies of all: site forms; data; maps; drawings; photographs; and descriptions of specimens. Except as provided in Subsection (7)(c) , a person may not remove from Utah any specimen, site, or portion of any site from lands owned or controlled by the state or its political subdivisions, other than school and institutional trust lands, without permission from the Antiquities Section, and prior consultation with the landowner and any other agencies managing other interests in the land. Except as provided in Subsection (7)(c) , a person may not remove from Utah any specimen, site, or portion of any site from school and institutional trust lands without permission from the School and Institutional Trust Lands Administration, granted after consultation with the Antiquities Section. If a specimen, site, or portion of a site is placed in a repository or curation facility, a person may remove it by following the procedures established by the repository or curation facility. Collections recovered from school and institutional trust lands are owned by the respective trust. Collections recovered from lands owned or controlled by the state or its subdivisions, other than school and institutional trust lands, are owned by the state. Within a reasonable time after the completion of fieldwork, each permit holder shall deposit all collections at the museum, a curation facility, or a repository. The repository or curation facility for collections from lands owned or controlled by the state or its subdivisions shall be designated according to the rules made under the authority of Section 53H-4-211 . Upon complaint by an agency, the Public Lands Policy Coordinating Office shall investigate a principal investigator and the work conducted under a permit. By following the procedures and requirements of Title 63G, Chapter 4, Administrative Procedures Act , the Public Lands Policy Coordinating Office may revoke or suspend a permit if the principal investigator fails to conduct a survey or excavation according to law, the rules enacted by the Public Lands Policy Coordinating Office, or permit provisions. Any person violating this section is guilty of a class B misdemeanor. A person convicted of violating this section, or found to have violated the rules authorized by this section, shall, in addition to any other penalties imposed, forfeit all archaeological resources discovered by or through the person's efforts to the state or the respective trust. The office may enter into memoranda of agreement to issue project numbers or to retain other data for federal lands or Native American lands within the state.
Section 9-8a-305Verify source
§ 9-8a-305(1)Subsection 9-8a-305(1)Provision

A principal investigator generally must obtain a survey or excavation permit before surveying or excavating on covered state-related lands. A permit holder may let others assist only if the principal investigator ensures compliance with law, rules, the permit, and professional standards. Non-investigators may not survey or excavate on those lands unless working under the direction of a permitted principal investigator. Permits obtained before July 1, 2006 continue until they end on their own terms.

Except as provided by Subsections (1)(d) and (3)(c) , each principal investigator who wishes to survey or excavate on any lands owned or controlled by the state, its political subdivisions, or by the School and Institutional Trust Lands Administration shall obtain a survey or excavation permit from the Public Lands Policy Coordinating Office. A principal investigator who holds a valid permit under this section may allow other individuals to assist the principal investigator in a survey or excavation if the principal investigator ensures that all the individuals comply with the law, the rules, the permit, and the appropriate professional standards. A person, other than a principal investigator, may not survey or excavate on any lands owned or controlled by the state, its political subdivisions, or by the School and Institutional Trust Lands Administration unless the person works under the direction of a principal investigator who holds a valid permit. A permit obtained before July 1, 2006, shall continue until the permit terminates on its own terms.
Section 9-8a-305(1)Verify source
§ 9-8a-305(1)(a)Subsection 9-8a-305(1)(a)Provision

A principal investigator who wants to survey or excavate on certain state-related lands must obtain a permit from the Public Lands Policy Coordinating Office, except as provided in the cited subsections.

Except as provided by Subsections (1)(d) and (3)(c) , each principal investigator who wishes to survey or excavate on any lands owned or controlled by the state, its political subdivisions, or by the School and Institutional Trust Lands Administration shall obtain a survey or excavation permit from the Public Lands Policy Coordinating Office.
Section 9-8a-305(1)(a)Verify source
§ 9-8a-305(1)(b)Subsection 9-8a-305(1)(b)Provision

A principal investigator with a valid permit may let other individuals help with a survey or excavation, but must ensure they comply with the law, the rules, the permit, and professional standards.

A principal investigator who holds a valid permit under this section may allow other individuals to assist the principal investigator in a survey or excavation if the principal investigator ensures that all the individuals comply with the law, the rules, the permit, and the appropriate professional standards.
Section 9-8a-305(1)(b)Verify source
§ 9-8a-305(1)(c)Subsection 9-8a-305(1)(c)Provision

Most people may not survey or excavate on certain state-related lands unless they work under the direction of a principal investigator with a valid permit.

A person, other than a principal investigator, may not survey or excavate on any lands owned or controlled by the state, its political subdivisions, or by the School and Institutional Trust Lands Administration unless the person works under the direction of a principal investigator who holds a valid permit.
Section 9-8a-305(1)(c)Verify source
§ 9-8a-305(1)(d)Subsection 9-8a-305(1)(d)Provision

A permit obtained before July 1, 2006 continues until it ends on its own terms.

A permit obtained before July 1, 2006, shall continue until the permit terminates on its own terms.
Section 9-8a-305(1)(d)Verify source
§ 9-8a-305(2)Subsection 9-8a-305(2)Provision

A principal investigator must submit a permit application and meet specified education and experience requirements to obtain a survey permit.

To obtain a survey permit, a principal investigator shall: submit a permit application on a form furnished by the Public Lands Policy Coordinating Office; except as provided in Subsection (2)(b) , possess a graduate degree in anthropology, archaeology, or history; have one year of full-time professional experience or equivalent specialized training in archaeological research, administration, or management; and have one year of supervised field and analytical experience in Utah prehistoric or historic archaeology. In lieu of the graduate degree required by Subsection (2)(a)(ii) , a principal investigator may submit evidence of training and experience equivalent to a graduate degree. Unless the permit is revoked or suspended, a survey permit is valid for the time period specified in the permit by the Public Lands Policy Coordinating Office, which may not exceed three years.
Section 9-8a-305(2)Verify source
§ 9-8a-305(2)(a)Subsection 9-8a-305(2)(a)Provision

A principal investigator seeking a survey permit must submit an application on the form provided by the Public Lands Policy Coordinating Office and meet specified education and experience requirements, subject to an exception in Subsection (2)(b).

To obtain a survey permit, a principal investigator shall: submit a permit application on a form furnished by the Public Lands Policy Coordinating Office; except as provided in Subsection (2)(b) , possess a graduate degree in anthropology, archaeology, or history; have one year of full-time professional experience or equivalent specialized training in archaeological research, administration, or management; and have one year of supervised field and analytical experience in Utah prehistoric or historic archaeology.
Section 9-8a-305(2)(a)Verify source
§ 9-8a-305(2)(a)(i)Subsection 9-8a-305(2)(a)(i)Provision

A permit application must be submitted on a form furnished by the Public Lands Policy Coordinating Office.

submit a permit application on a form furnished by the Public Lands Policy Coordinating Office;
Section 9-8a-305(2)(a)(i)Verify source
§ 9-8a-305(2)(a)(ii)Subsection 9-8a-305(2)(a)(ii)Provision

Except as provided in Subsection (2)(b), the provision refers to possessing a graduate degree in anthropology, archaeology, or history.

except as provided in Subsection (2)(b) , possess a graduate degree in anthropology, archaeology, or history;
Section 9-8a-305(2)(a)(ii)Verify source
§ 9-8a-305(2)(a)(iii)Subsection 9-8a-305(2)(a)(iii)Provision

have one year of full-time professional experience or equivalent specialized training in archaeological research, administration, or management; and

have one year of full-time professional experience or equivalent specialized training in archaeological research, administration, or management; and
Section 9-8a-305(2)(a)(iii)Verify source
§ 9-8a-305(2)(a)(iv)Subsection 9-8a-305(2)(a)(iv)Provision

Requires one year of supervised field and analytical experience in Utah prehistoric or historic archaeology.

have one year of supervised field and analytical experience in Utah prehistoric or historic archaeology.
Section 9-8a-305(2)(a)(iv)Verify source
§ 9-8a-305(2)(b)Subsection 9-8a-305(2)(b)Provision

A principal investigator may submit evidence of training and experience equivalent to a graduate degree instead of the degree required by Subsection (2)(a)(ii).

In lieu of the graduate degree required by Subsection (2)(a)(ii) , a principal investigator may submit evidence of training and experience equivalent to a graduate degree.
Section 9-8a-305(2)(b)Verify source
§ 9-8a-305(2)(c)Subsection 9-8a-305(2)(c)Provision

A survey permit is valid only for the time period set in the permit by the Public Lands Policy Coordinating Office, and that period cannot exceed three years, unless the permit is revoked or suspended.

Unless the permit is revoked or suspended, a survey permit is valid for the time period specified in the permit by the Public Lands Policy Coordinating Office, which may not exceed three years.
Section 9-8a-305(2)(c)Verify source
§ 9-8a-305(3)Subsection 9-8a-305(3)Provision

A principal investigator must submit a research design and proof of landowner permission to obtain an excavation permit, and the Public Lands Policy Coordinating Office may delegate permit-issuing authority to an agency under stated conditions.

Except as provided by Subsection (3)(c) , to obtain an excavation permit, a principal investigator shall, in addition to complying with Subsection (2)(a) , submit: a research design to the Public Lands Policy Coordinating Office and the Antiquities Section that: states the questions to be addressed; states the reasons for conducting the work; defines the methods to be used; describes the analysis to be performed; outlines the expected results and the plan for reporting; evaluates expected contributions of the proposed work to archaeological or anthropological science; and estimates the cost and the time of the work that the principal investigator believes is necessary to provide the maximum amount of historic, scientific, archaeological, anthropological, and educational information; and proof of permission from the landowner to enter the property for the purposes of the permit. An excavation permit is valid for the amount of time specified in the permit, unless the permit is revoked according to Subsection (9) . The Public Lands Policy Coordinating Office may delegate to an agency the authority to issue excavation permits if the agency: requests the delegation; and employs or has a long-term contract with a principal investigator with a valid survey permit. The Public Lands Policy Coordinating Office shall conduct an independent review of the delegation authorized by Subsection (3)(c) every three years and may revoke the delegation at any time without cause.
Section 9-8a-305(3)Verify source
§ 9-8a-305(3)(a)Subsection 9-8a-305(3)(a)Provision

Except as provided by Subsection (3)(c) , to obtain an excavation permit, a principal investigator shall, in addition to complying with Subsection (2)(a) , submit: a research design to the Public Lands Policy Coordinating Office and the

Except as provided by Subsection (3)(c) , to obtain an excavation permit, a principal investigator shall, in addition to complying with Subsection (2)(a) , submit: a research design to the Public Lands Policy Coordinating Office and the Antiquities Section that: states the questions to be addressed; states the reasons for conducting the work; defines the methods to be used; describes the analysis to be performed; outlines the expected results and the plan for reporting; evaluates expected contributions of the proposed work to archaeological or anthropological science; and estimates the cost and the time of the work that the principal investigator believes is necessary to provide the maximum amount of historic, scientific, archaeological, anthropological, and educational information; and proof of permission from the landowner to enter the property for the purposes of the permit.
Section 9-8a-305(3)(a)Verify source
§ 9-8a-305(3)(a)(i)Subsection 9-8a-305(3)(a)(i)Provision

a research design to the Public Lands Policy Coordinating Office and the Antiquities Section that: states the questions to be addressed; states the reasons for conducting the work; defines the methods to be used; describes the analysis to

a research design to the Public Lands Policy Coordinating Office and the Antiquities Section that: states the questions to be addressed; states the reasons for conducting the work; defines the methods to be used; describes the analysis to be performed; outlines the expected results and the plan for reporting; evaluates expected contributions of the proposed work to archaeological or anthropological science; and estimates the cost and the time of the work that the principal investigator believes is necessary to provide the maximum amount of historic, scientific, archaeological, anthropological, and educational information; and
Section 9-8a-305(3)(a)(i)Verify source
§ 9-8a-305(3)(a)(i)(A)Subsection 9-8a-305(3)(a)(i)(A)Provision

states the questions to be addressed;

states the questions to be addressed;
Section 9-8a-305(3)(a)(i)(A)Verify source
§ 9-8a-305(3)(a)(i)(B)Subsection 9-8a-305(3)(a)(i)(B)Provision

states the reasons for conducting the work;

states the reasons for conducting the work;
Section 9-8a-305(3)(a)(i)(B)Verify source
§ 9-8a-305(3)(a)(i)(C)Subsection 9-8a-305(3)(a)(i)(C)Provision

defines the methods to be used;

defines the methods to be used;
Section 9-8a-305(3)(a)(i)(C)Verify source
§ 9-8a-305(3)(a)(i)(D)Subsection 9-8a-305(3)(a)(i)(D)Provision

describes the analysis to be performed;

describes the analysis to be performed;
Section 9-8a-305(3)(a)(i)(D)Verify source
§ 9-8a-305(3)(a)(i)(E)Subsection 9-8a-305(3)(a)(i)(E)Provision

outlines the expected results and the plan for reporting;

outlines the expected results and the plan for reporting;
Section 9-8a-305(3)(a)(i)(E)Verify source
§ 9-8a-305(3)(a)(i)(F)Subsection 9-8a-305(3)(a)(i)(F)Provision

evaluates expected contributions of the proposed work to archaeological or anthropological science; and

evaluates expected contributions of the proposed work to archaeological or anthropological science; and
Section 9-8a-305(3)(a)(i)(F)Verify source
§ 9-8a-305(3)(a)(i)(G)Subsection 9-8a-305(3)(a)(i)(G)Provision

estimates the cost and the time of the work that the principal investigator believes is necessary to provide the maximum amount of historic, scientific, archaeological, anthropological, and educational information; and

estimates the cost and the time of the work that the principal investigator believes is necessary to provide the maximum amount of historic, scientific, archaeological, anthropological, and educational information; and
Section 9-8a-305(3)(a)(i)(G)Verify source
§ 9-8a-305(3)(a)(ii)Subsection 9-8a-305(3)(a)(ii)Provision

proof of permission from the landowner to enter the property for the purposes of the permit.

proof of permission from the landowner to enter the property for the purposes of the permit.
Section 9-8a-305(3)(a)(ii)Verify source
§ 9-8a-305(3)(b)Subsection 9-8a-305(3)(b)Provision

An excavation permit stays valid for the time stated in the permit, unless it is revoked under Subsection (9).

An excavation permit is valid for the amount of time specified in the permit, unless the permit is revoked according to Subsection (9) .
Section 9-8a-305(3)(b)Verify source
§ 9-8a-305(3)(c)Subsection 9-8a-305(3)(c)Provision

The Public Lands Policy Coordinating Office may delegate excavation-permit issuing authority to an agency if the agency asks for the delegation and has a principal investigator with a valid survey permit.

The Public Lands Policy Coordinating Office may delegate to an agency the authority to issue excavation permits if the agency: requests the delegation; and employs or has a long-term contract with a principal investigator with a valid survey permit.
Section 9-8a-305(3)(c)Verify source
§ 9-8a-305(3)(c)(i)Subsection 9-8a-305(3)(c)(i)Provision

requests the delegation; and

requests the delegation; and
Section 9-8a-305(3)(c)(i)Verify source
§ 9-8a-305(3)(c)(ii)Subsection 9-8a-305(3)(c)(ii)Provision

This subsection refers to an entity that employs or has a long-term contract with a principal investigator holding a valid survey permit.

employs or has a long-term contract with a principal investigator with a valid survey permit.
Section 9-8a-305(3)(c)(ii)Verify source
§ 9-8a-305(3)(d)Subsection 9-8a-305(3)(d)Provision

The Public Lands Policy Coordinating Office must independently review the delegation every three years and may revoke it at any time without cause.

The Public Lands Policy Coordinating Office shall conduct an independent review of the delegation authorized by Subsection (3)(c) every three years and may revoke the delegation at any time without cause.
Section 9-8a-305(3)(d)Verify source
§ 9-8a-305(4)Subsection 9-8a-305(4)Provision

The Public Lands Policy Coordinating Office must grant a survey permit to a principal investigator who meets this section’s requirements, and must grant an excavation permit after approving the project’s research design in consultation with the Antiquities Section.

The Public Lands Policy Coordinating Office shall: grant a survey permit to a principal investigator who meets the requirements of this section; and grant an excavation permit to a principal investigator after approving, in consultation with the Antiquities Section, the research design for the project.
Section 9-8a-305(4)Verify source
§ 9-8a-305(4)(a)Subsection 9-8a-305(4)(a)Provision

grant a survey permit to a principal investigator who meets the requirements of this section; and

grant a survey permit to a principal investigator who meets the requirements of this section; and
Section 9-8a-305(4)(a)Verify source
§ 9-8a-305(4)(b)Subsection 9-8a-305(4)(b)Provision

An unspecified authority must grant an excavation permit to a principal investigator after approving the project research design, in consultation with the Antiquities Section.

grant an excavation permit to a principal investigator after approving, in consultation with the Antiquities Section, the research design for the project.
Section 9-8a-305(4)(b)Verify source
§ 9-8a-305(5)Subsection 9-8a-305(5)Provision

The Public Lands Policy Coordinating Office must make rules on survey methods, reporting and data submission, permit application information, training and experience equivalencies, assistant and employer requirements, and permit reinstatement criteria, after consulting the Antiquities Section.

By following the procedures and requirements of Title 63G, Chapter 3, Utah Administrative Rulemaking Act , the Public Lands Policy Coordinating Office shall, after consulting with the Antiquities Section, make rules to: establish survey methodology; standardize report and data preparation and submission; require other permit application information that the Public Lands Policy Coordinating Office finds necessary, including proof of consultation with the appropriate Native American tribe; establish what training and experience is equivalent to a graduate degree; establish requirements for a person authorized by Subsection (1)(b) to assist the principal investigator; establish requirements for a principal investigator's employer, if applicable; and establish criteria that, if met, would allow the Public Lands Policy Coordinating Office to reinstate a suspended permit.
Section 9-8a-305(5)Verify source
§ 9-8a-305(5)(a)Subsection 9-8a-305(5)(a)Provision

establish survey methodology;

establish survey methodology;
Section 9-8a-305(5)(a)Verify source
§ 9-8a-305(5)(b)Subsection 9-8a-305(5)(b)Provision

standardize report and data preparation and submission;

standardize report and data preparation and submission;
Section 9-8a-305(5)(b)Verify source
§ 9-8a-305(5)(c)Subsection 9-8a-305(5)(c)Provision

The Public Lands Policy Coordinating Office may require additional permit application information, including proof of consultation with the appropriate Native American tribe.

require other permit application information that the Public Lands Policy Coordinating Office finds necessary, including proof of consultation with the appropriate Native American tribe;
Section 9-8a-305(5)(c)Verify source
§ 9-8a-305(5)(d)Subsection 9-8a-305(5)(d)Provision

An authority may establish what training and experience counts as equivalent to a graduate degree.

establish what training and experience is equivalent to a graduate degree;
Section 9-8a-305(5)(d)Verify source
§ 9-8a-305(5)(e)Subsection 9-8a-305(5)(e)Provision

establish requirements for a person authorized by Subsection (1)(b) to assist the principal investigator;

establish requirements for a person authorized by Subsection (1)(b) to assist the principal investigator;
Section 9-8a-305(5)(e)Verify source
§ 9-8a-305(5)(f)Subsection 9-8a-305(5)(f)Provision

establish requirements for a principal investigator's employer, if applicable; and

establish requirements for a principal investigator's employer, if applicable; and
Section 9-8a-305(5)(f)Verify source
§ 9-8a-305(5)(g)Subsection 9-8a-305(5)(g)Provision

establish criteria that, if met, would allow the Public Lands Policy Coordinating Office to reinstate a suspended permit.

establish criteria that, if met, would allow the Public Lands Policy Coordinating Office to reinstate a suspended permit.
Section 9-8a-305(5)(g)Verify source
§ 9-8a-305(6)Subsection 9-8a-305(6)Provision

Each principal investigator must submit a summary report for each project to the Antiquities Section, in the form set by rule under Subsection (5)(b).

Each principal investigator shall submit a summary report of the work for each project to the Antiquities Section in a form prescribed by a rule established under Subsection (5)(b) , which shall include copies of all: site forms; data; maps; drawings; photographs; and descriptions of specimens.
Section 9-8a-305(6)Verify source
§ 9-8a-305(6)(a)Subsection 9-8a-305(6)(a)Provision

site forms;

site forms;
Section 9-8a-305(6)(a)Verify source
§ 9-8a-305(6)(b)Subsection 9-8a-305(6)(b)Provision

data;

data;
Section 9-8a-305(6)(b)Verify source
§ 9-8a-305(6)(c)Subsection 9-8a-305(6)(c)Provision

maps;

maps;
Section 9-8a-305(6)(c)Verify source
§ 9-8a-305(6)(d)Subsection 9-8a-305(6)(d)Provision

drawings;

drawings;
Section 9-8a-305(6)(d)Verify source
§ 9-8a-305(6)(e)Subsection 9-8a-305(6)(e)Provision

photographs; and

photographs; and
Section 9-8a-305(6)(e)Verify source
§ 9-8a-305(6)(f)Subsection 9-8a-305(6)(f)Provision

descriptions of specimens.

descriptions of specimens.
Section 9-8a-305(6)(f)Verify source
§ 9-8a-305(7)Subsection 9-8a-305(7)Provision

A person generally may not remove specimens, sites, or parts of sites from certain Utah lands without the required permission; a limited exception applies for removals from a repository or curation facility if its procedures are followed.

Except as provided in Subsection (7)(c) , a person may not remove from Utah any specimen, site, or portion of any site from lands owned or controlled by the state or its political subdivisions, other than school and institutional trust lands, without permission from the Antiquities Section, and prior consultation with the landowner and any other agencies managing other interests in the land. Except as provided in Subsection (7)(c) , a person may not remove from Utah any specimen, site, or portion of any site from school and institutional trust lands without permission from the School and Institutional Trust Lands Administration, granted after consultation with the Antiquities Section. If a specimen, site, or portion of a site is placed in a repository or curation facility, a person may remove it by following the procedures established by the repository or curation facility.
Section 9-8a-305(7)Verify source
§ 9-8a-305(7)(a)Subsection 9-8a-305(7)(a)Provision

A person may not remove specimens, sites, or portions of sites from certain state-controlled lands in Utah without Antiquities Section permission and prior consultation, except as provided in Subsection (7)(c).

Except as provided in Subsection (7)(c) , a person may not remove from Utah any specimen, site, or portion of any site from lands owned or controlled by the state or its political subdivisions, other than school and institutional trust lands, without permission from the Antiquities Section, and prior consultation with the landowner and any other agencies managing other interests in the land.
Section 9-8a-305(7)(a)Verify source
§ 9-8a-305(7)(b)Subsection 9-8a-305(7)(b)Provision

A person may not remove certain specimens, sites, or site portions from school and institutional trust lands in Utah unless permission is granted by the School and Institutional Trust Lands Administration after consultation with the Antiquities Section, except as provided in Subsection (7)(c).

Except as provided in Subsection (7)(c) , a person may not remove from Utah any specimen, site, or portion of any site from school and institutional trust lands without permission from the School and Institutional Trust Lands Administration, granted after consultation with the Antiquities Section.
Section 9-8a-305(7)(b)Verify source
§ 9-8a-305(7)(c)Subsection 9-8a-305(7)(c)Provision

A person may remove a specimen, site, or portion of a site from a repository or curation facility if the person follows that facility’s procedures.

If a specimen, site, or portion of a site is placed in a repository or curation facility, a person may remove it by following the procedures established by the repository or curation facility.
Section 9-8a-305(7)(c)Verify source
§ 9-8a-305(8)Subsection 9-8a-305(8)Provision

Permit holders must deposit all collections at a museum, curation facility, or repository within a reasonable time after fieldwork ends.

Collections recovered from school and institutional trust lands are owned by the respective trust. Collections recovered from lands owned or controlled by the state or its subdivisions, other than school and institutional trust lands, are owned by the state. Within a reasonable time after the completion of fieldwork, each permit holder shall deposit all collections at the museum, a curation facility, or a repository. The repository or curation facility for collections from lands owned or controlled by the state or its subdivisions shall be designated according to the rules made under the authority of Section 53H-4-211 .
Section 9-8a-305(8)Verify source
§ 9-8a-305(8)(a)Subsection 9-8a-305(8)(a)Provision

Recovered collections from school and institutional trust lands belong to the respective trust.

Collections recovered from school and institutional trust lands are owned by the respective trust.
Section 9-8a-305(8)(a)Verify source
§ 9-8a-305(8)(b)Subsection 9-8a-305(8)(b)Provision

Collections recovered from lands owned or controlled by the state or its subdivisions, other than school and institutional trust lands, are owned by the state.

Collections recovered from lands owned or controlled by the state or its subdivisions, other than school and institutional trust lands, are owned by the state.
Section 9-8a-305(8)(b)Verify source
§ 9-8a-305(8)(c)Subsection 9-8a-305(8)(c)Provision

Each permit holder must deposit all collections at a museum, curation facility, or repository within a reasonable time after fieldwork is completed.

Within a reasonable time after the completion of fieldwork, each permit holder shall deposit all collections at the museum, a curation facility, or a repository.
Section 9-8a-305(8)(c)Verify source
§ 9-8a-305(8)(d)Subsection 9-8a-305(8)(d)Provision

A repository or curation facility for collections from state- or subdivision-owned or controlled lands must be designated under rules made under Section 53H-4-211.

The repository or curation facility for collections from lands owned or controlled by the state or its subdivisions shall be designated according to the rules made under the authority of Section 53H-4-211 .
Section 9-8a-305(8)(d)Verify source
§ 9-8a-305(9)Subsection 9-8a-305(9)Provision

Upon complaint by an agency, the Public Lands Policy Coordinating Office shall investigate a principal investigator and the work conducted under a permit. By following the procedures and requirements of Title 63G, Chapter 4, Administrative

Upon complaint by an agency, the Public Lands Policy Coordinating Office shall investigate a principal investigator and the work conducted under a permit. By following the procedures and requirements of Title 63G, Chapter 4, Administrative Procedures Act , the Public Lands Policy Coordinating Office may revoke or suspend a permit if the principal investigator fails to conduct a survey or excavation according to law, the rules enacted by the Public Lands Policy Coordinating Office, or permit provisions.
Section 9-8a-305(9)Verify source
§ 9-8a-305(9)(a)Subsection 9-8a-305(9)(a)Provision

If an agency complains, the Public Lands Policy Coordinating Office must investigate a principal investigator and the work done under a permit.

Upon complaint by an agency, the Public Lands Policy Coordinating Office shall investigate a principal investigator and the work conducted under a permit.
Section 9-8a-305(9)(a)Verify source
§ 9-8a-305(9)(b)Subsection 9-8a-305(9)(b)Provision

The Public Lands Policy Coordinating Office may revoke or suspend a permit if the principal investigator fails to conduct a survey or excavation according to law, agency rules, or permit provisions.

By following the procedures and requirements of Title 63G, Chapter 4, Administrative Procedures Act , the Public Lands Policy Coordinating Office may revoke or suspend a permit if the principal investigator fails to conduct a survey or excavation according to law, the rules enacted by the Public Lands Policy Coordinating Office, or permit provisions.
Section 9-8a-305(9)(b)Verify source
§ 9-8a-305(10)Subsection 9-8a-305(10)Offence

Any person violating this section is guilty of a class B misdemeanor. A person convicted of violating this section, or found to have violated the rules authorized by this section, shall, in addition to any other penalties imposed, forfeit

Any person violating this section is guilty of a class B misdemeanor. A person convicted of violating this section, or found to have violated the rules authorized by this section, shall, in addition to any other penalties imposed, forfeit all archaeological resources discovered by or through the person's efforts to the state or the respective trust.
Section 9-8a-305(10)Verify source
§ 9-8a-305(10)(a)Subsection 9-8a-305(10)(a)Provision

A person who violates this section commits a class B misdemeanor.

Any person violating this section is guilty of a class B misdemeanor.
Section 9-8a-305(10)(a)Verify source
§ 9-8a-305(10)(b)Subsection 9-8a-305(10)(b)Offence

A person convicted of violating this section, or found to have violated the rules authorized by this section, must forfeit all archaeological resources discovered by or through the person's efforts to the state or the respective trust, in addition to any other penalties.

A person convicted of violating this section, or found to have violated the rules authorized by this section, shall, in addition to any other penalties imposed, forfeit all archaeological resources discovered by or through the person's efforts to the state or the respective trust.
Section 9-8a-305(10)(b)Verify source
§ 9-8a-305(11)Subsection 9-8a-305(11)Provision

The office may enter memoranda of agreement to issue project numbers or retain other data for certain federal or Native American lands within the state.

The office may enter into memoranda of agreement to issue project numbers or to retain other data for federal lands or Native American lands within the state.
Section 9-8a-305(11)Verify source

Legislative relationships

0 referenced instruments

Names are derived from the stored provision headings and citation-enrichment layer. Treat this as a research index and verify each relationship against the source text.

No structured legislative relationships were detected

The statute remains fully searchable by provision. Consult the source text for amendments and cross-references that have not yet been indexed.

Recorded versions and source checkpoint

1 version available in this collection

Current-law checkpoint
  • Undated version · currentEnglish · In force

Source-linked research

Ask AI about this statute

The overview, provisions, and source records above are public. Continue in a separate conversation with this statute’s jurisdiction and source version attached.

About this LexChat collection

Statute information is organised from identified legislative sources for professional research. Corrections can be reported to hello@esheria.ai.