Factories (Plant Inspection and Examination Fees) Regulations, 1992 | SI 43 of 1992 — Zambia law | Esheria

Factories (Plant Inspection and Examination Fees) Regulations, 1992

These regulations may be cited as the Factories (Plant Inspection and Examination Fees) Regulations, 1992.

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Zambia
Instrument
Statutory instrument
Citation
SI 43 of 1992
Version
14 Feb 1992
Language
en
Official source
View official record ↗
boiler inspection compliance equipment examination equipment inspection scheduling factory regulation fees industrial equipment inspection fee inspection fees notification requirements plant inspection regulatory applicability

Statute overview

About this statute

These regulations may be cited as the Factories (Plant Inspection and Examination Fees) Regulations, 1992. These Regulations apply to factories, building operations, and works of engineering construction. If a boiler, steam receiver, or air receiver is inspected or examined by an inspector or someone authorised by the Commissioner, the appropriate fee for that inspection or examination must be paid. Before inspecting or examining certain boilers or receivers, notice must be sent by registered letter giving the date and time, at least 10 days in advance. If an inspection is delayed because the owner, user, or occupier does not cooperate, a surcharge is added to the inspection fee, and the inspector must issue an Inspection Report with a NIL maximum permissible pressure entry if the inspection cannot be carried out.