Professional statute overview
Enactment structure, operative effect and source provenance
01
Purpose and legislative effect
“These Regulations are cited as the Factories (Plant Inspection and Examination Fees) Regulations, 2018, and they apply to factories, building operations, and works of engineering construction.”
These Regulations are cited as the Factories (Plant Inspection and Examination Fees) Regulations, 2018, and they apply to factories, building operations, and works of engineering construction. Steam boilers, steam receivers, and air receivers must be inspected periodically under Part VIII of the Act. A fee must be paid for each inspection or examination of a steam boiler, steam receiver, or air receiver when the inspection is done by an inspector or a person authorised by the Commissioner. When a steam boiler, steam receiver, or air receiver is due for inspection or examination, the Commissioner must notify the owner, user, or occupier by registered letter of the date and time, at least 10 days in advance. If a plant inspection or examination is delayed because the owner, user, or occupier was not prepared, a surcharge applies. The inspector must also issue an Inspection Report with a “Nil” entry for Maximum Permissible Pressure when the inspection cannot be carried out.
02
How the instrument operates
- 01
Start with the recorded version
Source version 9 Feb 2018. The date shown identifies this source expression and should not be treated as proof that no later change exists.
- 02
Locate the controlling provision
Use the provision map, part headings and full-text filter to move from the broad subject to the exact legal language.
- 03
Read conditions and exceptions together
Keep subsections, definitions, provisos and cross-references in context before drawing a legal conclusion.
- 04
Verify currency and official wording
Confirm later legislation, commencement notices and corrections with the official publisher before advice, filing or reliance.
03
Research entry points
Selected provisions across the instrument. Open any row to continue with the exact stored text.
These Regulations are cited as the Factories (Plant Inspection and Examination Fees) Regulations, 2018, and they apply to factories, building operations, and works of engineering construction.
Section 1
This section lists fee units for electrically heated boilers based on boiler diameter and volume.
Section 2
This section defines “competent person” and “lifting machinery” for the Regulations.
Section 2
The provision lists fee units for several kinds of lifting equipment, with amounts varying by equipment type and capacity/height.
Section 666
This section lists fees as percentages of the appropriate basic fee for certain examinations or inspections, but the formatting is unclear.
Section 6
04
Source and current-law status
Source record view
Source record from zambialii.org · Source version 9 Feb 2018
The source record does not state a definitive current-law status. Check the official publisher and later amendments before relying on this text.