Electricity (Wayleave and Clearances) Regulations, 2026

These Regulations may be cited as the Electricity (Wayleave Title and Clearances) Regulations, 2026.

AI-assisted research synopsis — verify against the official legal text below.

Jurisdiction
Zambia
Instrument
Statutory instrument
Citation
SI 2 of 2026
Version
2 Jan 2026
Language
en
Official source
View official record ↗
aviation barriers boat ramps bridge clearance building clearance building clearances building standards burial depth cable clearance cable installation calculation and measurement clearance clearance distance clearance distances clearance requirements clearances conductors construction construction clearance construction safety construction work construction works crossing point dimensions development planning +133 more

Statute overview

About this statute

These Regulations may be cited as the Electricity (Wayleave Title and Clearances) Regulations, 2026. This section defines key terms used in the Regulations, including clearance, competent person, developer, overhead line, wayleave, and related electricity-safety terms. These Regulations apply to certain structures, overhead lines, developers, and installations, but not to wiring of premises or scientific-study installations; excluded scientific-study installations still need supervision and safety compliance. A licensee or developer must construct, operate, and maintain an overhead line and underground electricity cable according to the Schedule. People, planning authorities, and licensees placing electricity infrastructure must meet the Schedule’s minimum overhead-line wayleave requirements.