India Judgment

P. PARTHASARATHY v STATE OF KARNATAKA & ORS.

On this page

Professional case brief

Research organized from the available case record

01

Holding and result

The Supreme Court held that all statutory preconditions and formalities under Section 28 of the Karnataka Industrial Areas Development Act, 1966 were duly complied with, including identification of land and opportunity to file objections. Any discrepancies in the notification's description did not mislead the petitioner, nor prevent effective objection or hearing. Thus, the final notification was legally valid and required no interference.

Court disposition

SLP dismissed

Orders

  • No interference with the impugned judgment and order of the Division Bench of Karnataka High Court
  • Any interim order passed by the High Court stands vacated by this order
  • Parties to bear their own costs

02

Material facts

Parties

P. Parthasarathy

Petitioner Counsel: P.P. Rao, K.G. Sadashivaiah, Kashi Vishweshwar, A. Sumathi, Satish Kumar, Anjali Chauhan, S. Nanda Kumar

State of Karnataka & Ors.

Respondents Counsel: Dushyant A. Dave, K.T. Anantharaman, R.V.S. Naik, Guru Raj Deshpande, Vasudevan Raghavan, Anitha Shenoy, Sandeep Patil

Amounts and remedies

  • Area of Land Acquired: 2.33

03

Procedural history

  1. Posture

    SLP (civil) / Supreme Court Appeal From Karnataka High Court Division Bench

04

Questions and positions

Legal issues

Party arguments

Applicant
Notification under Section 28(4) was invalid; boundaries and description of land were inaccurate and incorrect; land not clearly identifiable; notification liable to be quashed. Relied on Narendrajit Singh v. State of U.P.; Madhya Pradesh Housing Board v. Mohd. Shafi; Om Prakash Sharma v. M.P. Audyogik Kendra Vikas Nigam.
Respondent
Land sought to be acquired was identifiable all along; petitioner was given opportunity to file objections; objections were considered; land was re-surveyed and correctly identified; statutory formalities complied with; notification validly issued.

05

Court’s reasoning

  1. 01

    AIR 1960 SC 1203 (Babu Barkya Thakur v. State of Bombay)

    Purpose of preliminary notification is to carry on investigation and identification of land; final notification must describe land sufficiently so as to be identifiable.

  2. 02

    Judgment text and AIR 1960 SC 1203

    Minor discrepancies in land description do not vitiate acquisition if land is ultimately identifiable and affected party had an effective hearing.

06

Ratio, limits and disposition

Ratio decidendi

The Supreme Court held that all statutory preconditions and formalities under Section 28 of the Karnataka Industrial Areas Development Act, 1966 were duly complied with, including identification of land and opportunity to file objections. Any discrepancies in the notification's description did not mislead the petitioner, nor prevent effective objection or hearing. Thus, the final notification was legally valid and required no interference.

Court disposition

SLP dismissed

  • No interference with the impugned judgment and order of the Division Bench of Karnataka High Court
  • Any interim order passed by the High Court stands vacated by this order
  • Parties to bear their own costs

Source and reliance status

Official court record

This page organises the available record for research. Confirm quotations, current status, and subsequent treatment against the official source before relying on the case.

Judgment reading view

Judgment text

The complete available source text.

Court record

Judgment

Judgment

[2011] 10 S.C.R. 599

P. PARTHASARATHY V. STATE OF KARNATAKA & ORS. (SLP (Civil) No. 19510 of 2011)

AUGl:JST 24, 2011

[DR. MUKUNDAKAM SHARMA AND ANIL R. DAVE, JJ.]

A

B

Karnataka Industrial Areas Development Act, 1966 - s. 28(4) - Final Notification issued under- Legality and validity C of - Issuance of Notification u/s. 28 (1) to acquire land of the petitioner - No objection filed by the petitioner, -whereupon Notification u/s. 28 (4) issued - Challenged by filing writ petition uls. 28(4) - Single Judge of the High Court quashed the Notification u/s. 28(4) and directed the Land Acquisition o. Officer to -provide opportunity to the petitioner and also to identify the land and thereafter, to proceed with the matter - . Subsequent thereto, land was identified and objections of the petitioner were considered and actual portion of/and required for formation of road was notified - Issuance of final notification E u/s. 28 (4) - Writ Petition by the petitioner challenging the validity of the said Notification - Dismissed by the Single Judge of the High Court holding that the order of Single Judge in the earlier writ petition had become final and binding - Division Bench upheld the order - On appeal, held: Land F which was sought to be acquired by the respondent was identifiable - Petitioner was given opportunity to file his objections which were considered - Land was resuNeyed and thereafter, the land sought to be acquired was identified, which included the land of the petitioner - Thus, the entire pre- G conditions and formalities laid down uls. 28 were duly complied with and were adhered to and followed - Although there was some discrepancy in the description of the property proposed to be acquired, and the description given although might not have been exactly accurate, but the same did not 599

H

600

SUPREME COURT REPORTS

. (2011) 10 S.C.R.

A

in any manner mislead the petitioner regarding the identity of the land which is corroborated by the fact of the detailed enquiry conducted in his presence - Petitioner was able to file a detailed and effective reply to the show cause notice issued to him - Thus, final Notification uls. 28 (4) having been validly

B issued, no interference is called for.

Babu Barkya Thakur vs. State of Bombay and Ors./ AIR

1960 SC 1203 - Followed.

Narendrajit Singh and Anr. vs. The State of U.P. and Anr. C (1970) 1 SCC 125: 1970 (3) SCR 278; Madhya Pradesh Housing Board vs. Mohd. Shafi and Ors. (1992) 2 SCC 168: 1992 (1) SCR 657; Om Prakash Sharma and Ors. vs. M.P. Audyogik Kendra Vikas Nigam and Ors. (2005) 10 SCC 306 - Distinguished.

D

E

F

G

H

State of Karnataka and Anr. Vs. All India Manufacturers Association and Anr. (2006) 4 SCC 683: 2006 (1) Suppl. SCR 86 - Cited .

Case Law Reference:

.. .. ..

2006 (1) Suppl. SCR 86 Cited .

Para 13

1970 (3) SCR 278

Distinguished .

Para 20

1992 (1) SCR 657 (2005) 1 o sec 306

Distinguished.

Para 21

Distinguished.

Para 22

AIR 1960 SC 1203

Followed

Para 17

CIVIL APPELLATE JURISDICTION : SLP (Civil) No.

19510 of 2011.

From the Judgment & Order dated 15.6.2011 of the High Court of Karnataka, Bangalore in Writ Petition No. 3527 of 2009.

P.P. Rao, K.G. Sadashivaiah, Kashi Vishweshwar, A.

P. PARTHASARATHY v. STATE OF KARNATAKA & 601

ORS.

Sumathi, Satish Kumar, Anjali Chauhan, S. Nanda Kumar for A the Petitioner.

Dushyant A. Dave, K.T. Anantharaman, R.V.S. Naik, Guru Raj Deshpande, Vasudevan Raghavan, Anitha Shenoy, Sandeep Patil for the Respondents.

B

The following order of the Court was delivered

ORDER

1. This special leave petition is directed against the c

judgment and order dated 15.6.2011 passed by the Division Bench of the Karnataka High Court affirming the judgment and order passed by the learned Single Judge of the same High Court.

2. By the aforesaid order, the High Court where the legality D

and validity of the final notification dated 6.2.09 issued under sub-section (4) of Section 28 ofthe Karnataka Industrial Areas Development Act, 1966 {hereinafter referred to as the 'Act') was challenged upheld the validity and legality of the aforesaid notification issued by the respondent/State exercising the E powers vested in it under sub-section (4) of Section 28 of the Act.

3. The petitioner herein is the owner of survey no. 154/10 measuring about 2 acres at Kengeri village, Kengeri Hobli, F Bangalore South taluk. The land of the petitioner was the subject matter of the notification issued by the State of Karnataka. The notification was issued under Section 28(1) of the Act. The petitioner, however, did not file any objection whereupon a final notification under Section 28(4) of the Act G was issued, which, however, was challenged before the learned Single Judge of the Karnataka High Court by filing a writ petition, which was registered and numbered as W.P. No. 24867 of 2005.

4. The learned Single Judge by judgment and order dated H

602

SUPREME COURT REPORTS

[2011) 10 S.C.R.

A 13.01.2009 allowed the said writ petition filed by the petitioner herein and quashed the final notification issued and also the consequential corrigendum. The learned Singie Judge also gave a liberty to the respondents to identify the land which they propose to acquire. It was also held therein by the learned B Single Judge that the petitioner as also the respondent no. 4 would take the proceeding before the High Court as the notice in the matter of identification of the land in question and file their objections within a period of four weeks. Subsequent thereto, a notice was issued to the petitioner by the Board on 6.2.2009. c In the said notice, the Board informed the petitioner that the land described in the notice is required for the development of the Karnataka Industrial Development Board and that the Government of Karnataka had issued a notification under sub section (1) of Section 28 of the Act by notification dated 0 19.12.1998. The petitioner was further informed that he may show cause as to why the land should not be acquired and that such a notice is being given to the petitioner pursuant to the order passed by the High Court in the aforesaid writ petition. ·A description of the land was also given in the said notice. The E petitioner as against the same submitted a reply contending, inter alia, that the land of the petitioner could not and would not come within

the aforesaid acquisition and, therefore, his name shown in the preliminary notification dated 19.12.1998 be deleted. He further stated in the said reply filed that the plan prepared for road including the peripherial road junction, F approved by the competent authority clearly indicate that the land in question is not at all required or proposed to be acquired and that being the state of affairs, acquisition of any portion of the said land bearing survey no. 154 cannot be sustained either in facts or in law and the same is liable to be

· G dropped from acquisition.

5. After the receipt of the aforesaid objection filed by the petitioner, an enquiry was conducted by the Special Land Acquisition Officer. A report was also prepared, which is placed H · on record. It appears the petitioner was represented by his

P. PARTHASARATHY v. STATE OF KARNATAKA & 603

ORS.

counsel in the said enquiry proceedings. The concerned officer A considered the records and then ordered that notices be issued to all concerned persons including the petitioner notifying them that a survey would be conducted to measure the land and that the petitioner should be present in the aforesaid survey to be made to show their respective lands.

B

6. It is also disclosed from the ·record that as per the date fixed i.e. on 18.4.2009, the concerned officers visited the spot and on that day, the concerned persons including the petitioner and others were present. In the said survey, the previous C phoded numbers were cancelled and thereafter the mahazar was drawn in the presence of the parties and they were also given sketch copies with available records in terms of their requests. The officer, thereafter, heard the arguments and after referring to the order of the Karnataka High Court dated 13.01.2009 it was held that the land measuring 2.33 acres is D required for·the project. Thereafter the said Land Acquisition Officer passed an order that the land bearing survey no. 154/ 10 of Kengeri village, Kengeri Hobli, Bangalore South taluk is required for the proposed reasons of acquisition and that the same is suitable and required as per the joint measurement . E and schedule and, therefore, the said land measuring 2.33 acres was ordered to be acquired. Consequent thereupon a notification under Section 28(4) was issued whereby the land of the petitioner was acquired by putting the name of the petitioner in the schedule annexed to the said notification.

F

7. The validity of the aforesaid notification was challenged by filing a writ petition in the Karnataka High Court. The learned Single Judge who heard the writ petition, after hearing the counsel appearing for the parties, dismissed the writ petition G by h·is order dated 11.9.2009 holding that the order of the learned Single Judge in the earlier writ petition no. 24867/2005 directing the Land Acquisition Officer to provide opportunity to the petitioner and also to identify the land and thereafter to proceed with the matter having.become final and binding and since subsequent to th~id order, the land having been H

604

SUPREME COURT REPORTS

[2011) 10 S.C.R.

A 1

identified and his objections having been considered and the actual portion of the land required for formation of the road having been notified, there could be no further grievance of the petitioner. Consequently, the writ petition filed by the petitioner was dismissed.

B

8. Being aggrieved by the said order, a writ appeal was filed before the High Court, which is the impugned judgment and order. By the said judgment, the Division Bench of the High Court dismissed the appeal holding that any defect in the C preliminary notification would not prove fatal to the acquisition proceedings. It was also held that though survey number was not challenged, a fresh inquiry was held to identify the land whereupon the land was identified and thereafter order was passed followed by final declaration that the land of the petitioner is required for the project. Consequently, the appeal D was also dismissed and the present petition was filed on which we have heard the learned counsel appearing for the parties.

9. Mr. P.P. Rao, learned senior counsel appearing for the petitioner has submitted that the land was not identifiable as E although the extent of land was mentioned in the notification but the boundaries that were given were incorrect and erroneous and, therefore, the notification issued by the respondent State under sub-section (4) of Section 28 of the Act is liable to be . quashed.

F

10. In support of the aforesaid contention, the learned counsel has relied upon the decisions of this Court titled Narendrajit Singh & Anr. Vs. The State of U.P. and Anr. reported in (1970) 1 SCC 125, Madhya Pradesh Housing Board Vs. Mohd. Shafi and Others reported in (1992) 2 SCC G 168 and Om Prakash Sharma and Others Vs. M.P. Audyogik Kendra Vikas Nigam and Others reported in (2005) 10 SCC 306.

11. Mr. Dushyant Dave, learned senior counsel appearing for the respondent no. 5 and Ms. Shenoy, learned counsel

H

P. PARTHASARATHY v. STATE OF KARNATAKA & 605

ORS.

:appearing for the State have refuted the aforesaid submissions A of the counsel appearing for the petitioner and submitted that the land which was sought to be acquired by the respondent was identifiable all along. It is also submitted that the petitioner was given opportunity to file his objections, which were considered, and even the land was re-surveyed in order to B identify the exact location and area of the land in terms of the order passed by the learned Single Judge and thereafter upon proper identification and verification of the land, the notification under sub-section (4) of Section 28 of the Act having been validly issued, there could be no interference in the present C case.

12. In the light of the aforesaid submissions of the counsel appearing for the respondents, we propose to dispose of this special leave petition by giving our reasons thereof.

D

13. The project that we are concerned with was also the subject matter of appeal filed in this Court in the case of State of Kamataka and Anr. Vs. All India Manufacturers Association and Anr. reported in (2006) 4 SCC 683. In paragraph 77 of the said judgment, it was held by this Court that the concerned project is an integrated infrastructure development project and is not merely a highway project. It was also held that the project which is styled, conceived and implemented is the Bangalore Mysore Infrastructure Corridor Project which conceived of the development of roads between Bangalore and Mysore. There are several interchanges in and around the periphery of the city of the Bangalore together with numerous developmental infrastructure activities along with the highway at several points. It is, therefore, needless to reiterate that the project is a very important project and the land which is sought to be acquired G is proposed to be a part of the peripheral road being a part of the aforesaid developmental infrastructure.

F

E

14. The issue that arises for our consideration is whether there was any inaccuracy with regard to the description of the boundaries of the land which is sought to be acquired by the H

606

SUPREME COURT REPORTS

(2011) 10 S.C.R.

A

respondents. In fact, in the earlier round of litigation wherein validity of sub-section (1) of Section 28 was not challenged, what was done was to quash the notification issued under sub section (4) of Section 28, which was in fact under challenge. Even thereafter and pursuant to the orders of the High Court s which had become final and binding, a re-survey was done after going through the objection filed by the petitioner. In the said re-survey where the petitioner was also personally present, the land proposed to be taken and acquired was identified, sketch map was prepared and thereafter only the final

c notification under sub-section (4) of Section 28 was issued.

15. That the petitioner could file his objection and he was fully heard and was also given an opportunity regarding identification of the land indicates that the petitioner had ample opportunity to place his case, which was considered but D decided against him. In our considered opinion full opportunity having been given to the petitioner to place his case and to oppose the acquisition process, there could be no further grievance of the petitioner in that regard.

E

16. We are also of the opinion that no prejudice is 'caused to the petitioner in any manner for the land was re-surveyed and thereafter the land sought to be acquired was identified, which included the land of the petitioner and, therefore, the entire pre conditions and formalities as laid down under Section 28 of the F Act were duly complied with and were adhered to and followed and, therefore, there cannot be any further cause of grievance for the petitioner.

17. In this connection, we may appropriately refer to a decision of the Constitution Bench of this Court in Babu Barkya G Thakur Vs. State of Bombay and Others, reported in AIR 1960 SC 1203. In paragraph 12 of the said judgment, the Supreme Court has held that the purpose of the notification under Section 4 is to carry on a preliminary investigation with a view to finding out after necessary survey and taking of levels and if necessary H digging or boring into the sub-soil whether the land was

P. PARTHASARATHY v. STATE OF KARNATAKA & 607

ORS.

adapted for the purpose for which it was sought to be acquired. A It was further held in that decision that it is only under Section 6 that a firm declaration has to be made by the Government that the land with proper description and area so as to identifiable is needed for a public purpose or for a company. The aforesaid observation was made after holding that what B was a mere proposal under Section 4 becomes a subject matter of a definite proceeding for acquisition on issuance of notification under Section 6 of the Act.

18. We feel that the law laid down in the said decision applies in full force to this case also. In the present case also C there were some errors and mistakes in the notification issued under sub-section ( 1) of Section 28 of the Act but the same did not, in any manner, prevent the petitioner from submitting an effective objection and also from getting an opportunity of effective hearing for him. A re-survey was done in his presence D and, therefore, the purpose for which the provision of sub section (1 ), (2) and (3) have been enacted, have been fully carried out in the present case.

19. We are, therefore, of the considered opinion that E

although there was some discrepancy in the description of the property proposed to be acquired and the description given although might not have been exactly accurate, but the same did not in any manner misled the petitioner regarding the identity of the land which is corroborated by the fact of the detailed F enquiry which was conducted in his presence. The petitioner was also able to file a detailed and effective reply to the show cause notice issued to him.

20. The decisions which are relied upon by the learned counsel appearing for the petitioner are clearly distinguishable G on facts. So far the decision in case of Narendrajit Singh & Anr. Vs. The State of U.P. and Anr. reported in (1970) 1 SCC 125 (supra) is concerned, in the said case we find that this Court interfered with the declaration because there was no particulars given in the notification. In the said case, there was H

608

SUPREME COURT REPORTS

[2011] 10 S.C.R.

A no mention of any locality at all and in that context, this Court

interfered with the proposed acquisition.

8

21. So far the next case, namely, Madhya Pradesh Housing Board Vs. Mohd. Shafi and Others reported in (1992) 2 SCC 168 (supra} is concerned, in that case also details and particulars of the land were not given and a wrong public purpose was mentioned and in that view of the matter, this Court interfered with the acquisition proceeding.

/

22. As regards the case of Om Prakash Sharma and c Others Vs. M.P. Audyogik Kendra Vikas Nigam and Others reported in (2005) 10 sec 306 (supra) which was relied upon by the counsel for the petitioner is concerned, in that case neither any survey number was given nor any khasra number was given. Even the name of the persons were not mentioned D and in that context the declaration was quashed with a liberty by way of giving a fresh opportunity for initiation of a fresh acquisition proceeding.

23. The aforesaid cases are clearly distinguishable on facts and, therefore, they have no application in the facts and

E circumstances of the present case.

24. Considering the entire facts and circumstances of the case, we are of the considered opinion that the learned Single Judge as also the learned Division Bench of the Karnataka High Court did not commit any mistake or error in dismissing the writ petition ..

F

25. We find no infirmity in the impugned judgment and order passed by the Division· Bench. The petition has no merit and is dismissed, but leaving the parties to bear their own

G costs.

26. Since we have dismissed this petition, any interim order passed by the High Court shall also stand vacated by this order.

H N.J.

SLP dismissed.

Source wording is retained. Consult the source document for its original formatting and pagination.

Authorities

Authorities used by the court

Cases, legislation, regulations, and constitutional provisions identified in the available record.

Babu Barkya Thakur v. State of Bombay and Ors., AIR 1960 SC 1203

Case cited

Narendrajit Singh and Anr. v. State of U.P. and Anr., (1970) 1 SCC 125; 1970 (3) SCR 278

Case cited

Madhya Pradesh Housing Board v. Mohd. Shafi and Ors., (1992) 2 SCC 168; 1992 (1) SCR 657

Case cited

Om Prakash Sharma and Ors. v. M.P. Audyogik Kendra Vikas Nigam and Ors., (2005) 10 SCC 306

Case cited

State of Karnataka and Anr. v. All India Manufacturers Association and Anr., (2006) 4 SCC 683; 2006 (1) Suppl. SCR 86

Case cited

Karnataka Industrial Areas Development Act, 1966

Legislation

Legislation referenced in the available case record.

Case-aware research

Ask AI about this case

The judgment and available research above are public. New questions open in a separate private conversation grounded in this case.