Holding and result

The Court held that the alternative option to preserve the tree by narrowing the road and re-aligning the central line should be adopted, as it balances safety, cost, and environmental concerns, with regular monitoring and no order for destruction at this time.

Court disposition

alternative option adopted

Orders

  • Necessary work to narrow the road by 400mm and re-align the central line to preserve the tree.
  • Plant at least one semi-mature English oak tree nearby as a replacement.
  • Regular monitoring of the tree's safety by the Parish.
  • Install warning signs for drivers at the bend.

02

Material facts

Parties

Transport and Technical Services (TTS)

Respondent

The Minister

Applicant

Mr Pallett, the Connétable

Intervener

Amounts and remedies

  • Estimated Cost of Widening the Road: GBP 83,750
  • Estimated Cost of Road Re Alignment: GBP 10,000

03

Procedural history

  1. Posture

    Public Safety Order / Judgment

04

Questions and positions

Legal issues

Party arguments

Applicant
The Minister submitted that preserving the oak tree is the only viable option for the next 10 years by narrowing the road and re-aligning the central line, with the cost of £10,000 being acceptable.
Respondent
Mr Pallett, the Connétable, argued that narrowing the road increases risk to motorists and that felling the tree is the most sensible and cost-effective solution in the long term.

05

Court’s reasoning

  1. 01

    Court's reasoning

    Public safety must be balanced with environmental preservation and economic feasibility.

06

Ratio, limits and disposition

Ratio decidendi

The Court held that the alternative option to preserve the tree by narrowing the road and re-aligning the central line should be adopted, as it balances safety, cost, and environmental concerns, with regular monitoring and no order for destruction at this time.

Obiter and limits

  • It is not right to order destruction of the tree in 10 years' time as future circumstances are unknown.
  • Signs should be put in place to warn drivers of the bend and the need to slow down.

Court disposition

alternative option adopted

  • Necessary work to narrow the road by 400mm and re-align the central line to preserve the tree.
  • Plant at least one semi-mature English oak tree nearby as a replacement.
  • Regular monitoring of the tree's safety by the Parish.
  • Install warning signs for drivers at the bend.

Source and reliance status

Official court record

This page organises the available record for research. Confirm quotations, current status, and subsequent treatment against the official source before relying on the case.

Judgment reading view

Judgment text

The complete available source text.

Source document

Court record

Judgment

[2013] JRC 024

judgment the commissioner: 1. At the Visite Royale 15 th August, 2012, the Court's attention was drawn to an oak tree that was encroaching over Le Mont au Roux constituting a potentially serious danger to the public. The Court ordered, on that occasion, that Transport and Technical Services (TTS) would provide, within 3 months to the Inferior Number of the Court, proposals as to how to save the oak tree and to make the road in question safe.

2. TTS were duly instructed to review the land in question and they concluded that the tree was expected to live at least another 100 years. In order to accommodate this growth, whilst maintaining the safety of the road, the road would have to be widened away from the tree, thus allowing the central line to be moved. They estimated that as the oak tree continues to grow the encroachment would increase by approximately 5mm each year, therefore increasing the encroachment by 500mm over 100 years. The existing encroachment is already approximately 150mm, therefore any widening of the road to accommodate growth over 100 years would have to be a minimum of 1 metre. If the road was to be widened by a minimum of 1 metre it would be necessary to engineer support for the widened road, as the grass verge opposite the oak tree is only 1 metre wide with a steep drop thereafter finishing approximately 2.5 metres below road level.

3. Based on this, TTS engineers have estimated that such a project would cost in the region of £83,750, a figure which they say would be difficult to justify in the present economic climate. They have however identified an alternative option. This would involve the road being reduced in width by 400mm and the central line being re-aligned, which would allow the tree to survive for a further 10 years without encroaching onto the road. The cost of such a re-alignment would be £10,000, which the Minister has agreed to. The Minister has therefore respectively submitted that preserving the oak tree is the only viable option for the next 10 years, at which point it will need to be removed.

4. Mr Pallett , the Connétable, has visited the area and points out to us that immediately above is a sweeping bend where cars tend to naturally drift towards the south side of the road. Narrowing the south side lane would, in his opinion, not only make the bend more severe but also increase the risk to motorists on an already tight section of the road. In his view there are already clear issues of safety as to the area directly below the tree, which has been treated with an anti-slip surface to prevent skidding. He reminded the Court that this area of the road was susceptible to a high amount of debris from leaves from this and other trees in the area during Autumn and Winter when the road is particularly hazardous. He would therefore be more inclined to agree to a proposal whereby the road would be moved 400mm from the kerb at the tree side and then also extended by the same amount on the south side of the road in order to retain the width of the road on the south side. However this solution was too expensive and in his view it would be better to fell the tree. There is no doubt in his mind that the tree would continue to encroach further as each year passes, possibly necessitating further changes to the road in the intervening 10 years, at which time it has been deemed the tree would need to be felled. Like most Islanders he does not wish to see a healthy tree destroyed without good reason but in these economic times he feels we must be aware of the cost to the taxpayer, and in his view the most sensible thing to do for both safety and cost would be to remove the tree, which he says in the long term is inevitable.

5. We are very grateful to the Connétable for visiting this site again, on at least three occasions, and for his helpful comments. He informed us that he has been to meet with the TTS engineers and put all of these concerns to them, but notwithstanding this and after a helpful and constructive discussion, they stand by their recommendations and as the Connétable did acknowledge to us, they are the road traffic experts.

6. We agree that spending £83,000, if not more on widening the road, cannot be justified in todays' economic climate. At the same time, without compromising road safety, we would wish to see if the tree could be reprieved, if that can be done and we therefore are going to go for the alternative option put forward by the Minister to preserve the tree for so long as it does not pose any danger to traffic, by ordering that the necessary work is carried out to allow the tree to be preserved by narrowing the road by 400mm and re-aligning the central line and by instructing the planting of at least one semi-mature English oak tree close by so that if the tree is removed in the future, a replacement will be in place and hopefully well established.

7. We do not think it right to make an order now for the destruction of the tree in 10 years' time; we do not know what the circumstances will be then or in the intervening period but we are comforted by the fact that it's safety will be monitored on a regular basis by the Parish. We do think it is a good idea, as the Connétable has said, that signs be put in place when this work is done in order to warn drivers of the bend and the need to slow down. No Authorities Page Last Updated: 16 Aug 2015 BAILII: Copyright Policy | Disclaimers | Privacy Policy | Feedback | Donate to BAILII

Source wording is retained. Consult the source document for its original formatting and pagination.

Authorities

Authorities used by the court

Cases, legislation, regulations, and constitutional provisions identified in the available record.

No structured authorities are available for this judgment.

Refer to the full judgment and official source for citations that have not yet been extracted.

Case-aware research

Ask AI about this case

The judgment and available research above are public. New questions open in a separate private conversation grounded in this case.

About this LexChat collection

This page organizes the available case record for research. Verify quotations, current status, and subsequent treatment against the source document. Corrections can be reported to hello@esheria.ai.

Legal information, not legal advice. Research summaries do not replace the judgment.