[2013] KEHC 697 (KLR)

[2013] KEHC 697 (KLR)

The court found that the plaintiff had established a prima facie case with a probability of success, as the defendant's rebilling covered an excessive period without clear evidence of when or by whom the meter tampering occurred. The Energy Act requires consultation and limits rebilling periods, and disputes should...

Source-derived case information.

Citation
[2013] KEHC 697 (KLR)
Parties
Plaintiff: Dorosh Limited T/A Makuti Villas Kilifi; Defendant: Kenya Power & Lighting Co. Ltd
Court
High Court
Court Station
High Court at Mombasa
Jurisdiction
Kenya
Case Number
Commercial Suit 10 of 2012
Procedural Posture
Commercial Case / Interlocutory Application (injunction)
Outcome
Interlocutory injunction granted; defendant restrained from disconnecting power supply pending determination of the suit.
Legal Topics
Injunctive Relief, Electricity Supply Disputes, Meter Tampering, Rebilling Disputes
Source Language
en
Commercial and Corporate Civil Procedure Injunctive Relief Electricity Supply Disputes Meter Tampering Rebilling Disputes

Source-derived case record

Summary, issues, holding and outcome

More case intelligence is available

Unlock the full research layer for this judgment.

Downloadable case file Legal principles 4 Authorities cited 6 Party arguments 2 Amounts and remedies 2
Sign in to unlock

Parties

Dorosh Limited T/A Makuti Villas Kilifi

Plaintiff

Kenya Power & Lighting Co. Ltd

Defendant

Procedural Posture

Commercial Case / Interlocutory Application (injunction)

  1. 1 Whether the defendant should be restrained from disconnecting the plaintiff's power supply on account of the rebilled sum pending determination of the suit.
  2. 2 Whether the defendant's rebilling and threat of disconnection was lawful under the Energy Act and contractual terms.
  3. 3 Whether the plaintiff is liable for alleged meter tampering and the resultant rebilling.

Ratio Decidendi

The court found that the plaintiff had established a prima facie case with a probability of success, as the defendant's rebilling covered an excessive period without clear evidence of when or by whom the meter tampering occurred. The Energy Act requires consultation and limits rebilling periods, and disputes should be referred to the commission rather than resolved by disconnection. The drastic nature of power disconnection, especially given the defendant's near monopoly, warranted the grant of an injunction. The defendant was therefore restrained from disconnecting the plaintiff's power supply on account of the rebilled sum pending the hearing and determination of the suit.

Court Disposition

Interlocutory injunction granted; defendant restrained from disconnecting power supply pending determination of the suit.

Orders

  • The defendant is restrained from disconnecting power supply to the plaintiff on account of the rebilled sum pending the hearing and determination of this suit.
  • Costs in the cause.