[2018] KEELC 3404 (KLR)

[2018] KEELC 3404 (KLR)

The court found that the plaintiff had established, on a balance of probabilities, the existence of a valid wayleave easement over the suit property, which constitutes an overriding interest binding on the defendant as lessee. The evidence showed that the defendant carried out excavations within the wayleave trace,...

Source-derived case information.

Citation
[2018] KEELC 3404 (KLR)
Parties
Plaintiff: Kenya Power & Lighting Co. Ltd; Defendant: Kipevu Inland Container EPZ Ltd
Court
Environment and Land Court
Court Station
Environment and Land Court at Mombasa
Jurisdiction
Kenya
Case Number
Environment & Land Case 178 of 2010
Procedural Posture
Environment and Land Court Suit / Judgment After Formal Proof Following Interlocutory Judgment
Outcome
Judgment for the plaintiff as prayed in the plaint.
Judges
CK Yano
Legal Topics
Wayleave Easements, Overriding Interests, Mandatory Injunctions, Public Right of Way
Source Language
en
Land and Property Civil Procedure Wayleave Easements Overriding Interests Mandatory Injunctions Public Right of Way

Source-derived case record

Summary, issues, holding and outcome

More case intelligence is available

Unlock the full research layer for this judgment.

Downloadable case file Legal principles 4 Authorities cited 14 Party arguments 2
Sign in to unlock

Parties

Kenya Power & Lighting Co. Ltd

Plaintiff

Kipevu Inland Container EPZ Ltd

Defendant

Procedural Posture

Environment and Land Court Suit / Judgment After Formal Proof Following Interlocutory Judgment

  1. 1 Whether the plaintiff has an overriding interest in the form of a wayleave easement over the suit property.
  2. 2 Whether the defendant breached the plaintiff's wayleave rights by excavating or developing within the wayleave trace.
  3. 3 Whether the plaintiff is entitled to a permanent injunction and mandatory restoration order against the defendant.

Ratio Decidendi

The court found that the plaintiff had established, on a balance of probabilities, the existence of a valid wayleave easement over the suit property, which constitutes an overriding interest binding on the defendant as lessee. The evidence showed that the defendant carried out excavations within the wayleave trace, leaving pylons exposed and at risk, and failed to comply with the plaintiff's demands to desist. The defendant did not rebut the plaintiff's case or adduce contrary evidence. The court held that the public interest in maintaining the integrity and safety of the power lines outweighed the defendant's proprietary interests, and that the plaintiff was entitled to permanent...

Court Disposition

Judgment for the plaintiff as prayed in the plaint.

Orders

  • The defendant, by itself, its servants, agents or otherwise, is permanently restrained from further excavating, developing, constructing or in any manner interfering with the land forming the wayleave trace measuring twenty (20) metres from the pylons of KV 132 and KV 33 running across Plot No. MN/VI/3842/2.
  • The defendant is compelled by mandatory order to restore the land forming the wayleave trace measuring twenty (20) metres from the pylons of KV 132 and KV 33 running across Plot No. MN/VI/3842/2 to the compact state it was prior to the illegal excavations.