[2020] KEELC 2440 (KLR)

[2020] KEELC 2440 (KLR)

The court found that the application dated 20/7/2018 had already been dismissed on 8/10/2018 for non-attendance by the applicants. As such, there was no application pending before the court for determination. Any directions or orders issued by the court after the dismissal date regarding the hearing of the...

Source-derived case information.

Citation
[2020] KEELC 2440 (KLR)
Parties
Plaintiff: Njau Muchoki; Plaintiff: Japhet Ngige; Plaintiff: Karimi Muriithi; Plaintiff: Japhet Riungu Njau; Plaintiff: Linus Nkonge Mukindia; Plaintiff: Eliphaz Njagi Kiunga; Plaintiff: Marangu Justo; Defendant: KTDA Greater Meru Power Company Limited; Defendant: KTDA Power Company Limited; Defendant: Weru Tea Factory Limited; Defendant: Jiangxi Water & Hydropower Construction Company Limited; Defendant: Andritz Hydro GmbH; Defendant: National Environmental Management Authority
Court
Environment and Land Court
Court Station
Environment and Land Court at Meru
Jurisdiction
Kenya
Case Number
Environment & Land Case 113 of 2016
Procedural Posture
Environment and Land Case / Ruling on Application Dismissal and Directions
Outcome
Application dismissed for non-attendance; subsequent directions declared superfluous.
Legal Topics
Dismissal for Non Attendance, Reinstatement of Application, Court Directions, Environment and Land Court Procedure
Source Language
en
Civil Procedure Land and Property Dismissal for Non Attendance Reinstatement of Application Court Directions Environment and Land Court Procedure

Source-derived case record

Summary, issues, holding and outcome

More case intelligence is available

Unlock the full research layer for this judgment.

Downloadable case file Legal principles 2 Authorities cited 2 Party arguments 2
Sign in to unlock

Parties

Njau Muchoki

Plaintiff

Japhet Ngige

Plaintiff

Karimi Muriithi

Plaintiff

Japhet Riungu Njau

Plaintiff

Linus Nkonge Mukindia

Plaintiff

Eliphaz Njagi Kiunga

Plaintiff

Marangu Justo

Plaintiff

KTDA Greater Meru Power Company Limited

Defendant

KTDA Power Company Limited

Defendant

Weru Tea Factory Limited

Defendant

Jiangxi Water & Hydropower Construction Company Limited

Defendant

Andritz Hydro GmbH

Defendant

National Environmental Management Authority

Defendant

Procedural Posture

Environment and Land Case / Ruling on Application Dismissal and Directions

  1. 1 Whether the court can proceed to determine an application that was previously dismissed for non-attendance.
  2. 2 Whether directions issued after dismissal of the application are valid.

Ratio Decidendi

The court found that the application dated 20/7/2018 had already been dismissed on 8/10/2018 for non-attendance by the applicants. As such, there was no application pending before the court for determination. Any directions or orders issued by the court after the dismissal date regarding the hearing of the non-existent application were declared superfluous. The court emphasized that unless and until the dismissed application is reinstated through proper procedure, it cannot proceed to determine the issues raised in that application. The ruling was delivered electronically in compliance with COVID-19 practice directions, and parties were deemed to have waived the requirement for open court...

Court Disposition

Application dismissed for non-attendance; subsequent directions declared superfluous.

Orders

  • Any directions given by the court after 8/10/2018 regarding the hearing of the dismissed application are declared superfluous.
  • No further proceedings will be taken on the dismissed application unless it is reinstated.