PCM Mining Supply (Pty) Ltd and Another v Manuli Fluiconnecto (Pty) Ltd and Another (2023-018601) [2023] ZAGPJHC 1015 (12 September 2023)
The court found that PCM Mining Supply (Pty) Ltd failed to establish the existence of the alleged oral agreement constituting it as Manuli Fluiconnecto (Pty) Ltd's sole joint venture partner for the Greater Tubatse region. The evidence supported Manuli's version that the partnership arrangement was limited to a single project, as documented in the 'one project only' principle. After PCM was awarded the Glencore contract, it was no longer eligible to be Manuli's partner for the Amplats tender. The absence of documentary proof of the alleged ongoing joint venture and the existence of factual disputes rendered the matter unsuitable for resolution by motion proceedings. Consequently, PCM did...
- Citation
- [2023] ZAGPJHC 1015
- Parties
- Applicant: PCM Mining Supply (Pty) Ltd; Applicant: Petros Mafakalada Tonga; Respondent: Manuli Fluiconnecto (Pty) Ltd; Respondent: Anglo American Platinum Ltd
- Court
- South Gauteng High Court, Johannesburg
- Jurisdiction
- South Africa
- Judgment Date
- 12 September 2023
- Case Number
- 2023-018601
- Procedural Posture
- Urgent Application / Final Opposed Motion
- Outcome
- Application dismissed with costs; interim order discharged.
- Judges
- N Manoim
- Legal Topics
- Interim Interdict, Oral Agreement, Joint Venture Dispute, Motion Proceedings, Contractual Rights
Case Brief
Summary, issues, holding and outcome
More case intelligence is available
Unlock the full research layer for this judgment.
Parties
PCM Mining Supply (Pty) Ltd
Applicant
Petros Mafakalada Tonga
Applicant
Manuli Fluiconnecto (Pty) Ltd
Respondent
Anglo American Platinum Ltd
Respondent
Procedural Posture
Urgent Application / Final Opposed Motion
Legal Issues
- 1 Whether PCM Mining Supply (Pty) Ltd has a clear right to a final interdict preventing Manuli Fluiconnecto (Pty) Ltd from appointing another joint venture partner for the Amplats project.
- 2 Whether an oral agreement existed between PCM and Manuli constituting PCM as Manuli's sole joint venture partner for the Greater Tubatse region.
- 3 Whether the 'one project only' principle applied to exclude PCM from further partnership with Manuli after the Glencore contract was awarded.
Ratio Decidendi
The court found that PCM Mining Supply (Pty) Ltd failed to establish the existence of the alleged oral agreement constituting it as Manuli Fluiconnecto (Pty) Ltd's sole joint venture partner for the Greater Tubatse region. The evidence supported Manuli's version that the partnership arrangement was limited to a single project, as documented in the 'one project only' principle. After PCM was awarded the Glencore contract, it was no longer eligible to be Manuli's partner for the Amplats tender. The absence of documentary proof of the alleged ongoing joint venture and the existence of factual disputes rendered the matter unsuitable for resolution by motion proceedings. Consequently, PCM did...
Court Disposition
Application dismissed with costs; interim order discharged.
Orders
- The application is dismissed.
- The interim order dated 14 March 2023 is discharged.
Full Case Text
Judgment text and source record
Sign in to read
Sign in to read the full judgment text
Sign in to read the full judgment text. Downloads and additional research tools may depend on your plan.
Sign in to read the full judgment