29 Nov 2001
YUE PO ENGINEERING CO. LTD. v. OCEAN INDUSTRIAL CO.
- Citation
- YUE PO ENGINEERING CO. LTD. v. OCEAN INDUSTRIAL CO.
- Court
- Court of First Instance
- Case number
- HCA3660/1995
The court found on the balance of probabilities that the plaintiff provided the required electrical and mechanical plans (showing connection points and capacities), that delay and failure to test were caused by the defendant's failure to prepare the site and provide utilities, and that equipment problems (weak stove flame, refrigeration issues) were due to inadequate utilities or maintenance rather than inherent defects; accordingly plaintiff was entitled to the unpaid contract balance and the defendant's counterclaim was dismissed.