8 May 2025
DIXIE ENGINEERING COMPANY LTD v. LONG ENGINEERING LTD
- Citation
- [2025] HKCFI 1809
- Court
- Court of First Instance
- Case number
- HCMP109/2025
Plaintiff obtained by issuing the originating summons the practical result it sought (the statutory demand was withdrawn) and therefore is entitled to its costs; no basis to deny costs where defendant did not show pre-proceedings inquiry and the court should not engage in speculative counterfactual inquiries into alternative conduct of the parties.